# Daher Mandatory Service Bulletin 10-152: No revision named

- Rights: © Socata. Filed by the FAA in regulations.gov docket FAA-2015-3642; AD 2015-24-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Daher Mandatory Service Bulletin 10-152](https://openairdocs.org/service-documents/daher/sb-10-152.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin - SB 10-152 Amendment 1
- Pages: 19
- PDF: https://openairdocs.org/files/sha256/fc/34/fc34ff6998e1f92da31e11dbfb91c742c107a7b091779d59e9be13204e5f0cee
- Page: https://openairdocs.org/service-documents/daher/sb-10-152/file/fc34ff6998e1

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

A DAHER-SOCATA
SOCATA SAS
Direction des Services  TELEPHONE: 33 (0)5 62.41.73.00
65921 TARBES CEDEX 9  TELEFAX: 33 (0)5 62.41.76.54
FRANCE
TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  AMENDMENT 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
HORIZONTAL STABILIZERS ON WHICH ORIGINAL SB HAS ALREADY BEEN APPLIED ARE NOT
CONCERNED BY FIRST APPLICATION OF THIS SERVICE BULLETIN
REFERENCE : MODIFICATION No. MOD10-0230-55 - REPAIR SHEET No. 20-116
SUBJECT: HORIZONTAL STABILIZER INTERNAL STRUCTURE
EFFECTIVITY: All TB aircraft
PURPOSE
A. PROBLEM
Field reports of corrosion on horizontal stabilizer spar that could result in buckling and
permanent horizontal stabilizer distortion and consequently a lower controllability of the
airplane.
B. REASON
Humidity accumulation on aircraft subject to severe environmental conditions.
C. SOLUTION
Implementation of a regular inspection of the area.
implementation of a repair solution, if necessary.
PURPOSE OF THE REVISION 1:
- To modify SB classification
- To modify paragraphs A. PROBLEM and C. SOLUTION
- To modify paragraph APPLICATION
- To add 3 repair solutions
SUMMARY
A. CREATION OF INSPECTION HOLES
B. INSPECTION
C. MEASUREMENT OF CORRODED AREA
D. TYPE 1 REPAIR
E. TYPE 2 REPAIR
F. TYPE 3 REPAIR
G. RECONDITIONING
MAY 13  Page 1 / 19
Amdt. 1 - APR 15

### Page 2 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10 - 152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
APPLICATION:
1st application :
During the next scheduled inspection and at the latest, 1 year and 1 month after the Service
Bulletin issuance reference date.
Further applications (except Paragraph "A"):
This inspection must be repeated every 6 years.
WARRANTY
- None
PROCURABLE MATERIAL:
- Kit No. OPT10K152-01 to be ordered from your TB spare parts distributor if Type 1 repair
is applied
Item  Part number  Description  Qty/aircraft
25  5521667504  Rivet  25
81  5536342402  Rivet  80
82  5529565405  Rivet  60
83  5536342404  Rivet  8
84  5536342406  Rivet  30
85/87  5521668502  Rivet  45
86  5528340232  Rivet  0.010 kg
Kit No. OPT10K152-02 to be ordered from your TB spare parts distributor if Type 2 repair
is applied
Item  Part number  Description  Qty/aircraft
28/30  5528371416  Rivet  0.050 kg
29  5521668502  Rivet  10
31  5529565405  Rivet  15
31  5521668402  Rivet  10
32/36/83  5536342404  Rivet  25
61  TB109606710100  Short doubler  1
81  5536342402  Rivet  80
82  5529565405  Rivet  60
84  5536342406  Rivet  33
85/87  5521668502  Rivet  45
86  5528340232  Rivet  0.010 kg
5521667505  Rivet  10
5548340253  Rivet  0.10 kg
MAY 13  Page 2 / 19
Amdt. 1 - APR 15

### Page 3 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
Item  Part number  Description  Qty/aircraft
5431218060  Ecrou à river  3
5553368406  Rivet
5521667504  Rivet  12
- Kit No. OPT 10K152-03 to be ordered from your TB spare parts distributor if Type 3 repair
is applied
Item  Part number  Description  Qty/aircraft
28/30  5528371416  Rivet  0.050 kg
29  5521668502  Rivet  10
31  5529565405  Rivet  15
31  5521668402  Rivet  10
32/36/83  5536342404  Rivet  30
71  TB109606710000  Long doubler  1
74  TB109606710300  Angle bracket  1
75  TB109606710200  Angle bracket  1
72  TB109606710400  Rib root  1
72  TB109606710500  Rib root  1
73  TB109606710800  Washer  6
81  5536342402  Rivet  80
82  5529565405  Rivet  60
84  5536342406  Rivet  33
85/87  5521668502  Rivet  45
86  5528340232  Rivet  0.010 kg
5528371314  Rivet  0.015 kg
5548340253  Rivet  0.050 kg
5521667505  Rivet  30
5521667504  Rivet  6
5521674403  Rivet  5
5521348507  Rivet  3
5528658506  Rivet  3
5431218060  Anchor nut  11
5553368406  Rivet
NOTE :
The contents of the kits is given for your information and will not be updated.
MAY 13  Page 3 / 19
Amdt. 1 - APR 15

### Page 4 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
Is the subject of an AD
CONSUMABLE MATERIAL or OTHER PRODUCTS (Local purchase) :
- Alodine 1200 (MIL-C-5541) or wash - primer
- Epoxy Primer
- Finish paint
- 2 grommets DKK 8/14/18-3 or equivalent
- Clean cloths
- Methyl - Ethyl - Ketone (M.E.K)
- Adhesive HYSOL EA9394
- Anti corrosion Wadis 24 (MIL-C-16173D) or equivalent
- Sealant PR 1782 C2
TOOLS
- Standard aeronautical maintenance station tools
- Counterbore dia. suitable with endoscope dimensions
- Pneumatic vacuum cleaner
- Endoscope
MANPOWER
- 1 aeronautical mechanic :
. repair type 1: 15 hours
• repari type 2: 30 hours
• repair type 3: 38 hours
1 helper (partially)
TECHNICAL INCIDENCES:
- If no corrosion is detected or Type 1 repair is applied: None
- If Type 2 repair is applied :
• Weight : 0.055 lbs (+ 0.025 kg)
• Arm : 217.56 in (5526 mm)
• Electrical consumption: not applicable
- If Type 3 repair is applied :
• Weight : 0.373 bs (+ 0.169 kg)
• Arm : 217.56 in (5526 mm)
• Electrical consumption: not applicable
DESCRIPTION OF ACCOMPLISHMENT INSTRUCTIONS:
NOTE :
The kit installation must be accomplished by persons authorized by their Airworthiness
Authorities and according to the procedure described hereafter.
MAY 13  Page 4 / 19
Amdt. 1 - APR 15

### Page 5 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
NOTE :
Any removed anchor nut must be replaced by a new one and reinstalled at the same location
as before, with rivet P/N 5548340253, 5536342406 and 5553368406.
A. CREATION OF INSPECTION HOLES - see Figure 1
1) On the bottom surface, drill the 2 inspection holes (1) to dia. 1/8" (3.2 mm)
2) Bore to a diameter suitable with the endoscope dimensions, the 2 inspection
holes (1) and the 2 drainage holes (2) using a counterbore with its associated guide
pin 0.62 in. max (16 mm max). Deburr.
3) Vacuum chips and clean area with a clean cloth moistened with M.E.K.
4) Protect bare metal with Alodine 1200 or wash-primer, primer and finish paint.
B. INSPECTION - see Figure 1
1) Insert the endoscope through the 4 holes to check corrosion on the spar.
2) If the inspection does not reveal corroded area, spray Wadis 24 on the spar to protect
it, plug the two inspection holes with grommets and refer to Paragraph UPDATING
OF THE AIRCRAFT DOCUMENTATION.
3) If the inspection reveals a corroded area, refer to Paragraph C.
C. MEASUREMENT OF CORRODED AREA - see Figures 2, 3, 4 and 5
1) Remove tail cone - refer to Chapter 53-20-04 of the Maintenance Manual.
2) Remove horizontal stabilizer - refer to Chapter 55-20-01 of the Maintenance
Manual.
3) Remove upper surface rivets as indicated on Figure 2 or Figure 3 - refer to Chapter
51-40-00 of the Maintenance Manual.
NOTE :
In order not to damage the horizontal stabilizer during removal of rivets, maintain it on
a table using straps.
CAUTION
TAKE CARE NOT TO DAMAGE THE UPPER SURFACE SKIN
4) Using an appropriate means, keep the upper surface skin open.
CAUTION
IF SPAR WEB (21) AND SPAR FLANGE (22) ARE AFFECTED BY CORROSION,
HORIZONTAL STABILIZER MUST BE REPLACED BEFORE NEXT FLIGHT - REFER
TO CHAPTER 55-20-01 OF THE MAINTENANCE MANUAL.
IF SPAR WEB (21) IS AFFECTED BY CORROSION AND SPAR FLANGE (22) IS NOT,
CONTACT DAHER (*).
IF CORRODED AREA "Y" IS NOT COMPRISED BETWEEN - 14.37 IN (- 365 MM)
AND 14.37 IN (365 MM), HORIZONTAL STABILIZER MUST BE REPLACED BEFORE
NEXT FLIGHT - REFER TO CHAPTER 55-20-01 OF THE MAINTENANCE MANUAL.
MAY 13  Page 5 / 19
Amdt. 1 - APR 15

### Page 6 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
(*)
DAHER - Direction des Services
Aeroport Tarbes-Lourdes - Pyrénées
65921 TARBES Cedex 9
FRANCE
Phone: +33 (0)5 62 41 76 59
Fax: +33 (0)5 62 41 76 54
e-mail : support@daher.com
or for the Americas :
DAHER
601 NE 10th St.
Pompano Beach, FL 33060
USA
Phone: +1 (954) 366 3331
5) Remove rivets (25).
6) Measure Y min and Y max positions of the corroded area.
7) Remove corrosion - refer to Chapter 20-00-04 of the Maintenance Manual.
8) Measure the minimum remaining thickness (51).
9) Apply the procedure according to the table hereunder :
ON THE SPAR FLANGE (22)  CORRODED AREA  AIRCRAFT TYPE
GEOMETRICAL CHARACTERISTICS
T: minimum remaining  Y: Y max and Y min  TB09  TB20
thickness (51)  positions of the corroded  TB200  TB10  TB21
TYPE OF REPAIR
T ≥ 0.11 in (2.8 mm) AND
- 3.54 in (- 90 mm) ≤ Y ≤ 3.54 in (90 mm)  Type 2 repair
Apply Parag. E.
Type 1 repair
0.098 in (2.5 mm) ≤ T < 0.11 in (2.8 mm) OR  Apply Parag. D.  Type 3 repair
- 14.37 in (- 365 mm) ≤ Y ≤ 14.37 in (365 mm)  Apply Parag. F.
0.087 in (2,2 mm) ≤ T < 0.098 in (2,5 mm) AND  Type 3 repair
- 14.37 in (- 365 mm) ≤ Y ≤ 14.37 in (365 mm)  Apply Parag. F.
T <0.087 in (2,2 mm)  Replace horizontal stabilizer
D. TYPE 1 REPAIR - see Figures 4 and 5
1) In compliance with Figure 5, eliminate sharp edges on corroded area.
2) Inspect the corroded area to check absence of cracks - refer to Chapter 20-00-14
of the Maintenance Manual.
MAY 13  Page 6 / 19
Amdt. 1 - APR 15

### Page 7 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
3) Vacuum working area.
4) Protect bare metal with Alodine 1200 and epoxy primer.
5) Prepare a compound with adhesive Hysol 9394.
6) Fill and level corroded area with adhesive Hysol 9394. If necessary, insert shim (52).
7) Remove excess adhesive.
8) Allow adhesive to cure for 24 hours at an ambient temperature between 59° and 68° F
(15 and 20° C).
9) Install rivets (25) - refer to Chapter 51-40-00 of the Maintenance Manual.
10) Reconditioning - refer to Paragraph G.
E. TYPE 2 REPAIR - see Figures 4, 5 and 6
1) Remove rivets (28), (29) and (30) - refer to Chapter 51-40-00 of the Maintenance
Manual.
2)  Locate and remove levers (27).
3) Pin 100% of upper surface skin.
4) Return horizontal stabilizer.
5) On lower surface skin, remove rivets (31) and (32).
6) Return horizontal stabilizer.
7) Locate and remove ribs (26) and (24).
8) In compliance with Figure 5, eliminate sharp edges on corroded area.
9) Inspect the corroded area to check absence of cracks - refer to Chapter 20-00-14
of the Maintenance Manual.
10) From the spar flange (22), using a drill suitable with the diameter of removed rivet,
backdrill existing hole on short doubler (61).
11) Vacuum working area.
12) Protect bare metal with Alodine 1200 and epoxy primer.
13) Prepare a compound with adhesive Hysol 9394.
14) Fill and level corroded area with adhesive Hysol 9394. If necessary, insert shim (52).
15) Remove excess adhesive.
16) Allow adhesive to cure for 24 hours at an ambient temperature between 59° and 68° F
(15 and 20° C).
CAUTION
BEFORE INSTALLING SHORT DOUBLER (61) ON SPAR FLANGE (22), CONTROL
THE REPAIRED AREA FLATNESS
17) Install short doubler (61) on spar flange (22) with sealant PR 1782 C2 and rivets
P/N 5521667505 - refer to Chapter 51-40-00 of the Maintenance Manual.
18) On both sides of short doubler (61), install rivets P/N 5521667504 on spar flange (22).
MAY 13  Page 7 / 19
Amdt. 1 - APR 15

### Page 8 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
19) Install rib (24) on rib (23) web and on rib (26) web with rivets (29) P/N 5521668502.
20) Install rib (26) on lower surface skin with rivets (31) P/N 5529565405 and
P/N 5521668402.
21)  Install rib (24) on lower surface skin with rivets (32) P/N 5536342404.
22)  Install rib (26) on spar web (21) with rivets (30) P/N 5521660503.
23) Install levers (27) on rib (26) web with rivets (28) P/N 5528371416.
24) Install rivets (36) P/N 5536342404
25) Reconditioning -refer to Paragraph G.
F. TYPE 3 REPAIR - see Figures 4, 5 and 7
1) Remove rivets (28), (29) and (30) - refer to Chapter 51-40-00 of the Maintenance
Manual.
2) Remove and retain lever (27).
3)  Pin 100% of upper surface skin.
4) Turn over horizontal stabilizer.
5) On lower surface skin, remove rivets (31), (32) and (34).
6) Turn over horizontal stabilizer.
7) Identify and remove ribs (26) and rib (24).
8) Remove rivets (35).
9) Identity and remove ribs (23).
10) On table, remove and discard angle brackets (33)
11) In compliance with Figure 5, eliminate sharp edges on corroded area.
12) Inspect the corroded area to check absence of cracks - refer to Chapter 51-40-00
of the Maintenance Manual
13) From the spar flange (22) and using a drill suitable with the diameter of removed rivet,
backdrill existing holes on long doubler (71).
14) Vacuum working area.
15) Protect bare metal with Alodine 1200 and epoxy primer.
16) Prepare a compound with adhesive Hysol 9394.
17) Fill and level corroded area with adhesive Hysol 9394. If necessary, insert a shim (52).
18) Remove excess adhesive.
19) Allow adhesive to cure for 24 hours at an ambient temperature between 59° and 68° F
(15 and 20° C).
CAUTION
BEFORE INSTALLING LONG DOUBLER (71) ON SPAR FLANGE (22), CONTROL THE
REPAIRED AREA FLATNESS
20) Install long doubler (71) on spar flange (22) with sealant PR 1782 C2 and rivets
P/N 5521667505 and P/N 5521667504 - refer to Chapter 51-40-00 of the
Maintenance Manual.
MAY 13  Page 8 / 19
Amdt. 1 - APR 15

### Page 9 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10 - 152  REVISION 1  55  ATA No
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
21) According to Figure 7, cut rib (23).
22) Apply Alodine 1200 and epoxy primer on rib (23) bare end
23) Pin rib (23) on the spar web (21) and on the lower surface skin.
24) From the rib (23) web and using a drill suitable with the diameter of removed rivet,
backdrill existing holes on angle brackets (74), (75) and rib root (72).
25) Assemble rib (23), angle brackets (74), (75) and rib root (72) on a table with rivets
P/N 5528371314.
26) Install the assembly on spar web (21) with rivets P/N 5548340253.
27) From the spar web (21) and using a drill suitable with the diameter of removed rivet,
backdrill existing holes and lower surface skin holes on angle brackets (74), (75) and
rib root (72).
28) Install the assembly on lower surface skin with washers (73), and rivets
P/N 5521674403.
29) Install the assembly on spar flange (22) with washers (73) rivets P/N 5528658506 and
P/N 5521348507.
30) Install rib (24) on rib (23) web and on rib (26) web with rivets (29) P/N 5521668502.
31) Install rib (26) on lower surface with rivets (31) P/N 5529565405 and P/N 5521668402.
32) Install rib (24) on lower surface skin with rivets (32) P/N 5536342404.
33) Install rib (26) on spar web (21) with rivets (30) P/N 5521660503.
34) Install lever (27) on rib (26) web with rivets (28) P/N 5528371416.
35) Install rivets (36) P/N 5536342404.
36) Reconditioning - refer to Paragraph G.
G. RECONDITIONING - see Figures 8 and 9
1) In compliance with Figure 8 or 9, install upper surface skin rivets.
NOTE :
Check horizontal stabilizer balancing - refer to Chapter 51-60-00 of the
Maintenance Manual.
2) Install horizontal stabilizer - refer to Chapter 55-20-01 of the Maintenance Manual.
3) Install tail cone - refer to Chapter 53-20-00 of the Maintenance Manual.
CAUTION
DO NOT PLUG THE DRAINAGE HOLES
4) Plug the 2 inspection holes with grommets.
5) Make sure all the tools and materials are removed and the work area is clean and free
from debris.
UPDATING OF THE AIRCRAFT DOCUMENTATION:
Upon completion of Service Bulletin No. SB 10-152-55, Revision 1 (Reference
MOD10-0230-55) "HORIZONTAL STABILIZER INTERNAL STRUCTURE", make an
appropriate maintenance record entry.
If Paragraphs D, E. or F. have been applied, upon completion of Repair Sheet No. 20-116,
make an appropriate maintenance record entry.
MAY 13  Page 9 / 19
Amdt. 1 - APR 15

### Page 10 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
WARNING  SOCATA considers that it is MANDATORY for operators to comply with the instructions of
this SB.
Operators who arbitrarily ignore the compliance statement indicated in this SB do so at their
own risk.
MAY 13  Page 10 / 19
Amdt. 1 - APR 15

### Page 11 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
1 - Inspection hole
2 - Drainage hole
3 - Spar
Vue de dessous
Bottom view
_307
14552001AAADYZ4600
Zone à inspecter
Area to be inspected
Figure 1 - Inspection of horizontal stabilizer internal structure
MAY 13  Page 11 / 19
Amdt. 1 - APR 15

### Page 12 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10 - 152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
11 - Upper surface skin
12 - Area of rivets to be removed
12 -
I4552001AAADYZ14600
Figure 2 - TB9 - TB10 - TB200 Area of rivets to be removed on upper surface skin
MAY 13  Page 12 / 19
Amdt. 1 - APR 15

### Page 13 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
11 - Upper surface skin
12 - Area of rivets to be removed
I4552001AAAJWZ4600
Figure 3 - TB20 - TB21 Area of rivets to be removed on upper surface skin
MAY 13  Page 13 / 19
Amdt. 1 - APR 15

### Page 14 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
Is the subject of an AD
21 - Spar web
22 - Spar flange
23 - Rib
24 - Rib
25 - Rivet
26 - Rib
27 - Lever
28 - Rivet
29 - Rivet
30 - Rivet
31 - Rivet
32 - Rivet
33 - Angle bracket
34 - Rivet
35 - Rivet
36 - Rivet
24
29
32
23
30
36 -
34  26
31
23
I4552001AAANYZ4600  28
27
Figure 4 - Removal of ribs
MAY 13  Page 14 / 19
Amdt. 1 - APR 15

### Page 15 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
22 - Spar flange
51 - Remaining minimum thickness
52 - Shim
Selon Axe longitudinal du longeron
According to spar longitudinal axis
22  51
20e  Zone corrodée  20e
Corroded area
Y Min  YO  Y Max
0,4 mm Max
0.016 in Max
0,4 mm Max
0.016 in Max
51
552001AAAJWZ14600  52
22
Figure 5 - Preparation of corroded area
MAY 13  Page 15 / 19
Amdt. 1 - APR 15

### Page 16 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
22 - Spar flange
23 - Rib
24 - Rib
26 - Rib
27 - Lever
28 - Rivet
33 - Angle bracket
61 - Short doubler
26
23
552001AAANYZ14600  28
27
Figure 6 - Type 2 repair
MAY 13  Page 16 / 19
Amdt. 1 - APR 15

### Page 17 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
22 - Spar flange  28 - Rivet
23 - Rib  71 - Long doubler
24 - Rib  72 - Rib root
26 - Rib  73 - Washer
PA  27 - Lever  74 - Angle bracket  75 - Angle bracket
R 3 mm  4 mm
R 0.12 in  0.16 in
76 mm
3 in
YO
72
23
22
26
23
4552001AAANYZ2460C  28
27
Figure 7 - Type 3 repair
MAY 13  Page 17 / 19
Amdt. 1 - APR 15

### Page 18 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
11 - Upper surface skin
81 -  Rivet
82 -  Rivet
83 -  Rivet
84 -  Rivet
85 -  Rivet
86 -  Rivet
4552001AAAPYZ4600  Figure 8 - TB9 - TB10 - TB200 Installation of rivets on upper surface skin
MAY 13  Page 18 / 19
Amdt. 1 - APR 15

### Page 19 (OCR)

TB AIRCRAFT
SERVICE BULLETIN  SB 10-152  REVISION 1  55  ATA No.
MANDATORY
The technical content of this document is approved
under the authority of DOA No. EASA.21J.013
is the subject of an AD
11 - Upper surface skin
81 -  Rivet
82 -  Rivet
83 -  Rivet
84 -  Rivet
85 -  Rivet
86 -  Rivet
87 -  Rivet
I4552001AAAQYZ4600  Figure 9 - TB20 - TB21 Installation of rivets on upper surface skin
MAY 13  Page 19 / 19
Amdt. 1 - APR 15

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
