# 328 Support Services Service Bulletin 328-55-557: Revision 2

- Rights: © 328 Support Services. Filed by the FAA in regulations.gov docket FAA-2018-0503; AD 2018-19-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [328 Support Services Service Bulletin 328-55-557](https://openairdocs.org/service-documents/dornier/sb-328-55-557.md)
- Title as filed: SB-328-55-557R02
- Pages: 22
- PDF: https://openairdocs.org/files/sha256/7c/b3/7cb3cd5bbf5a8308e43f629e532e67e95a61fc1d04f33af21acb78c47a55e9cb
- Page: https://openairdocs.org/service-documents/dornier/sb-328-55-557/file/7cb3cd5bbf5a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

SB  Dornier 328  Service Bulletin  D-82231 Wessling  328 Support Services GmbH  Customer Support • Global Support Centre  P. O. Box 1252  Telefax: +49 8153 88111 6565  Phone: +49 8153 88111 6666  Эга*
Germany  E-Mail: gsc.op@328.eu
Revision Transmittal Sheet
This sheet transmits Revision 2 of Service Bulletin SB-328-55-557 titled:
Stabilizer - Inspection of Horizontal Stabilizer Bearing Support Rear
This is a complete revision. This has been reprinted in its entirety. All previous editions must
be destroyed. This revision does not require further action.
Reason for Revision:
General:  Spelling Errors - not marked with revision bars
Page 16:  Alternative item 4 added to Material Parts List, bolt, NAS6710D31.
NOTE: The changes are marked with revision bars at the outside margin.
This Revision Transmittal Sheet is part of SB-328-55-557 Revision 2
Model: Dorier 328-100  No.:  SB-328-55-557
Date of Issue: May 24, 2018
Page  _1  of

### Page 2

(No text on this page.)

### Page 3 (OCR)

SB  Dornier 328  328 Support Services GmbH  Customer Support • Global Support Centre  P. O. Box 1252  Phone: +49 8153 88111 6666  J2gr
Service Bulletin  D-82231 Wessling  Telefax: +49 8153 88111 6565
Germany  E-Mail: gsc.op@328.eu
SB-328-55-557
Title: Stabilizer - Inspection of Horizontal Stabilizer Bearing
Support Rear
1 PLANNING INFORMATION
Effectivity
Dornier 328-100
Type Certificate Data Sheet EASA.A.096
Serial No.: All
Reason
During execution of SB-328-55-527 several stabilizer bearing supports were found corroded
at the contact surface to the horizontal stabilizer rear spar.
Description
The horizontal stabilizer bearing supports rear need to be inspected for corrosion and
replaced on condition for horizontal stabilizers with S/Ns 1032 and up. Bearing supports rear
of horizontal stabilizers with S/Ns 1005 up to and including 1031 must be replaced.
Approval
The technical content of this Service Bulletin is approved under the authority of EASA
approved Design Organization 328 Support Services GmbH (EASA.21J.438).
The technical content of this SB is covered by CN-100331 and CN-100411.
328 Support Services GmbH
EASA approved Design organisation
EASA.21J.438
© 328 Support Services GmbH 2006-2018. All Rights reserved
This document is property of 328 Support Services GmbH and is supplied on the condition that it is treated as confidential. No use or reproduction may be made thereof other than that
expressly authorized. The information provided by this SB has been prepared for a specific Serial Number(s) aircraft, component, component part number or specific problem on the basis
of the information supplied to 328 Support Services GmbH. The information provided by 328 Support Services GmbH is not to be used for any other specific serial Number(s) aircraft,
component, component part number or any other purpose than for that which it was supplied without the written approval of 328 Support Services GmbH.
Any information contained in this SB are Technical Documents and Data as defined in the Technical Data Agreement which 328 Support Services GmbH has separately concluded with
the Customer. The Technical Data Agreement, especially the confidentiality obligations contained therein applies to any information provided by 328 Support Services GmbH in the course
of the fulfilment of the SB.
The Design Organisation 328 Support Services GmbH is the TC-Holder of Dornier 328-100 and 328-300 and authorised to provide necessary approved data under the privilege of EASA
approval number EASA 21J.438.
It is the operator's responsibility to comply with the relevant aviation regulations of the country in which the aircraft is registered.
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  1  of  17

### Page 4 (OCR)

Compliance
Mandatory.
For S/N 1005 to and including S/N 1031 the inspection and modification described within this
service bulletin must be performed within the next 1000 FC or 8 Months from approval date
of this Service Bulletin, whichever comes first.
From S/N 1032 and onwards the inspection described within this service bulletin must be
performed within the next 5000 FH or 30 Months, whichever comes first.
Manpower
Access & removal:  40.0  Mh
Inspection:  4.0  Mh
Modification:  16.0  Mh
Additional Effort
for Replacement:  24.0  Mh (depending on findings)
Close-up:  56.0  Mh
Functional checks:  12.0  Mh
Total:  128 - 152 Mh (depending on findings)
A curing time of 26 h to 7 days, depending on the selected process, is not included. Refer to
SRM 51-77-20 and paragraph C of this SB for details.
It is recommended to perform this SB together with SB-328-55-527 if not yet accomplished.
The manpower needed for this SB is reduced to approximately 20 to 44 Mh depending on the
result of the inspection.
Material
Refer to Material Parts List.
Special Tools
GSE No. 12.6.03  Platform, adjustable
GSE No. 07.1.13  Hoisting equipment
GSE No. 07.1.14  Hoisting fitting
GSE No. GM.5.0  Torque wrench or equivalent
P/N 001U536A2110000  Positioning Fixture Bearing Rib 8
P/N 001U551A1440000  Drilling Jig Rear Horizontal Stabilizer D0328-100
P/N 001U551A1447000  Installation Kit (bolt, with washer and nut), 2 EA
NOTE: A separate drill template, P/N 001U551A1440000, is necessary for each bearing
support rear installation in case of a replacement of the support. The two kits of additional
bolts, nuts and washers, P/N 001U551A1447000, and the Positioning Fixture Bearing Rib 8,
P/N 001U536A2110000, can be used again for further installations.
Page  2  of  17  SB-328-55-557 Rev. 2

### Page 5 (OCR)

Eddy current tester:  Elotest M3 or M2 or equivalent
SE.4.50  Probe KAS 66-3 or equivalent
SE.4.45  Calibration standard or equivalent
Visual inspection equipment: Light source, e.g. flashlight, magnifying glass
Weight and Balance
N/A
Electrical Load Data
N/A
References
AMM JIC 00-30-01
AMM JIC 00-30-10
AMM JIC 55-10-00-020-801-YYY
AMM JIC 55-10-00-420-801-YYY
AMM JIC 55-11-70-220-803-A01
Make the Aircraft Safe for Maintenance - Material and
Aircraft Handling
General Maintenance Practices - Material and Aircraft
Handling
Horizontal Stabilizer - Removal
Horizontal Stabilizer - Installation
Horizontal Stabilizer, Rear Support to vertical Stabilizer
including Bolts - Detailed Inspection.
NTM 51-25-60  Eddy Current Inspection - General
NTM 51-25-90  Detailed Visual Inspection - General
SRM 51-21-00  Cleaning processes
SRM 51-40-11  Fastener Hole and Drill Data - Metallic Structure
SRM 51-40-12  Fastener Hole and Drill Data - Non-metallic Structure
SRM 51-40-22  Countersinking non-metallic Structure
SRM 51-40-30  Fastener Spacing and Margin Data
SRM 51-41-10  Rivet Identification and Specification
SRM 51-41-20  Rivet Installation & Removal Metallic Structure
SRM 51-41-30  Rivet Installation & Removal Non-metallic Structure
SRM 51-41-50  Oversize Rivets
SRM 51-74-00  Corrosion Prevention
SRM 51-74-11  Corrosion Removal from Aluminium Alloys
SRM 51-74-20  Corrosion Preventive Treatment
SRM 51-77-20  Composite Repairs - Material, Handling and Preparation
SRM 51-91-00  Protective Treatment
SRM 51-92-00  Paint Coating
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  3  of  17

### Page 6 (OCR)

SRM 55-11-20  Horizontal Stabilizer
SRM 55-11-70  Horizontal Stabilizer Fittings
SB-328-55-527  Stabilizer - Inspection of Horizontal Stabilizer Support
Fittings
Other Publication affected
N/A
Reporting
Compliance with this Service Bulletin must be reported to the 328 Support Services GmbH
Customer Support with the Compliance Report (CR) for configuration control.
NOTE: A/C S/N, P/N and S/N of the horizontal stabilizer, nature of horizontal stabilizer
(original or spare), location and results of the inspection - independent on the outcome - must
be reported. Refer to the compliance report sheet in the annex of this Service Bulletin.
NOTE: In case of replacement the bearing support rear must be returned to the 328 Support
Services GmbH Customer Support.
Page  4  of  17  SB-328-55-557 Rev. 2

### Page 7 (OCR)

2 ACCOMPLISHMENT INSTRUCTIONS
WARNING: OBEY THE GENERAL MAINTENANCE PRACTICES AND SAFETY
PRECAUTIONS REFER TO ALL RELATED SRM, AMM, AMM-JIC
CHAPTERS, IN PARTICULAR:
AMM JIC Chapter 00 00-30-10  General Maintenance Practices
CAUTION: Put a note into the cockpit not to move the controls
A Preparation
1) Make the aircraft safe for maintenance. Refer to AMM JIC 00-30-01.
2) Remove the horizontal stabilizer. Refer to AMM JIC 55-10-00-020-801-YYY. Obey
the related safety precautions.
3) Clean the inspection areas (see SRM 51-21-00).
4) Remove the temporary protection system (Corrosion Inhibiting Compound).
Fig. 1: Inspection and Modification area: Horizontal stabilizer rear spar and bearing
support rear at the centre section of the horizontal stabilizer
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  5  of  17

### Page 8 (OCR)

B Inspection
1) Do the necessary inspections of SB-328-55-527, if not done. Refer to SB-328-55-
527. Report result to 328 Support Services GmbH Customer Support regardless of
its outcome.
2) Make sure that the 6 spherical bearings of the bearing supports do not have too
much play (axial play < 100 um).
3) Remove the bearing support rear.
a) Remove equipment, fasteners and secondary structure to get a condition as
shown in tig. 2.
NOTE: In case of a subsequent replacement of the removed bearing support rear. It
will be necessary to copy the fastener hole positions onto the undrilled spare bearing
support rear.
NOTE: Obey SRM 51-40 and subsequent chapters for rivet identification and
removal of fasteners. Do not damage holes.
NOTE: If necessary use non-metallic tools to remove the bearing support rear from
the horizontal stabilizer rear spar, to not damage the rear spar and/or the support.
b) Clean bearing support rear and remove corrosion inhibiting compound and
sealant. Refer to SRM 51-21-00.
Fig 2: Horizontal stabilizer rear spar centre after removal of the bearing support rear
and the detachment and/or removal of secondary structure.
4) Do a detailed visual inspection of the bearing support rear for corrosion and cracks.
Specially examine the area adjacent to the lower edge of the HS rear spar and
bonding contact surfaces, see fig. 3.
Page  6  of  17  SB-328-55-557 Rev. 2

### Page 9 (OCR)

5) Do an eddy current inspection of the bearing support rear from both sides in general.
Specially examine the areas of the web marked with green frames, refer to fig. 3.
Obey NTM 51-25-60. Examine for corrosion and cracks.
Fig 3: Example for corrosion found on a bearing support rear (red frames). During
inspection specially examine the green framed areas.
6)  Examine the edges of the bearing support rear for chafe marks. Refer to fig. 4 for
location and identification of chafe marks. The bearing support rear can have chafing
marks because of a contact between an angle installed on fairing assemblies
001B551A2850 000 / -001 and the bearing supports rear, see fig. 4 and 5.
Fig. 4: Typical chafe mark on the edge of the bearing support rear
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  7  of  17

### Page 10 (OCR)

C
D
Fairing
Fig. 5: Location and cause of chafing of the bearing support rear: In some cases the
angle has been installed to the fairing assembly 001B551A2850000 and -001 (view
D) with corner anchor nuts and screws as an alternative to HLGPL rivets and collars.
The attachment rivet and the edge of the angle can cause chafing of the bearing
support, as shown in the lower picture marked by a red frame.
Page  8  17  SB-328-55-557 Rev. 2

### Page 11 (OCR)

C Modification of the Horizontal Stabilizer Rear Spar
1) To create a flat/smooth contact surface for the bearing support rear to be installed,
remove the resin and/or paint lump at the lower edge of the horizontal stabilizer rear
spar by grinding. See the green mark in the sketch of fig. 6.
NOTE: Small concave areas can stay as they are, but elevated surfaces must be
ground off. Do not damage the original composite structure of the rear spar and the
copper bonding stripe.
Resin and/or paint lump
Bearing support rear
HS Rear Spar
Void to be filled with
sealant
Fig. 6: The lower edge of the horizontal stabilizer rear spar shows elevated areas:
The mating surface to the bearing support rear must be flat/smooth. Small concave
areas can stay, but must be filled with sealant during the installation of the bearing
support. Make sure that the void, marked in red, is completely filled with sealant to
keep water out.
2) Prepare bearing support rear foot print area (+ approximately 10 mm, if not otherwise
limited) on the rear spar for the application of a composite wet lay-up. For the surface
preparation procedure see SRM 51-77-20, chapter 4.
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  9  of  17

### Page 12 (OCR)

CAUTION: Do not cover the copper stripes for bonding with the glass ply. Make
sure the cut-out of the protective glass fabric ply is correct. The
surfaces of the copper stripe and the adjacent surfaces must stay
metallic blank before installation.
3) Prepare a ply of glass fabric, mat. no. 05-091 or an equivalent, and wet it with epoxy
resin/hardener, mat. no. 08-022 (Alternate: 08-030). For material information see
SRM 51-77-20, chapter 5.
4) Clean and degrease rear spar surface for composite lay-up, see SRM 51-77-20,
chapter 4.
5) Apply glass fabric ply. Obey SRM 51-77-20, chapter 7 and 8. Let cure.
Copper stripes for
bonding. Cut-out glass
fabric ply, Bonding area
must not be covered.
...  Prepare for Lay-Up
- Edge of Glass Ply
• Rear Attachment Fitting
Fig. 7: Application of glass ply.
6) Make sure the surface is even. If necessary rework the surface, but do not grind
through the glass ply.
Page  10  SB-328-55-557 Rev. 2

### Page 13 (OCR)

7) Remove glass fabric from fastener holes and resin residuals from glass ply
application in the fastener holes. Do not damage holes. If necessary wet the
composite edges with epoxy resin, mat. no. 08-022.
8) Restore surface protection with filler, mat. no. 08-023, primer, mat. no. 16-010 and top
coat, mat. no. 16-007.
NOTE: Bonding surfaces of the copper bonding stripe must stay metallic blank. Obey
SRM 51-00 as applicable and SRM 51-93-21.
D Horizontal Stabilizer fitting - Installation
NOTE: Bearing supports rear removed from horizontal stabilizers with S/N 1001 up to
and including S/N 1031, P/N 001B551A1441000, made from a corrosion sensitive
material, must be replaced with item 1, P/N 001B551A1441002.
NOTE: Obey SRM, chapter 51-40 and subsequent chapters for rivet identification
and installation of fasteners. Do not damage holes.
1) If the inspected bearing support rear shows no signs of corrosion or other damages
and has P/N 001B551A1441002 continue with chapter D, 3), otherwise continue with
chapter D, 2) or, in case you are not sure or you have found chafe marks, contact
328 Support Services GmbH Customer Support, see fig. 6.
2) Use drilling jig, P/N 001U551A1440000 and installation kit, P/N 001U551A1447000,
and copy holes from the removed support to the new bearing support rear, item 1.
See fig. 8.
NOTE: Use a vertical drill press machine to drill all necessary holes including pre-drill
holes.
NOTE: No play between the drill jig and support during the copy process of holes is
allowed. Apply clamps, if necessary.
a) Install pre-drill bushings on the removed support.
NOTE: Make sure that the pre-drill bushings have a tight fit when installed. Even
though a slight tilting of the bushes in the holes is permitted no lateral play is allowed.
If there is lateral play, the next oversize fasteners must be installed during later
installation.
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  11  of  17

### Page 14 (OCR)

Fig. 8: Corroded bearing support rear fixed to drill jig. The drill bushes are installed.
b) Attach the undrilled drill jig to the removed bearing support rear and copy pre-
drilled holes from the support to the drill template. The pre-drill hole diameters
are given by the final fastener hole size and by the drill bushes.
c) Separate drill jig and bearing support rear.
d) Expand pre-drilled holes on the drill jig to their final diameter, see fig. 10.
e) Attach drill template to the new bearing support rear, item 1.
NOTE: Make sure that the drill jig and the new bearing support rear have no play. If a
small play exists, clamp the mating parts together.
f) Copy holes onto the new bearing support. Obey SRM 51-40-11.
g) Apply chemical conversion coating, mat. no. 05-001 to all holes.
3) If no chafe marks have been found on the bearing support, see fig. 4 and 5, continue
with Step D. 4). If there are chafe marks please continue as follows:
a) Smoothly blend out chafe marks on the bearing support rear. The minimum blend
radius along the edge is R=30 mm and R=5 mm around the edge. The maximum
depth of the chafe mark must not be more than 1.0 mm. Please contact 328
Support Services GmbH Customer Support if the damage size is more than 1.0
mm.
b) Apply/ Repair surface protection. Refer to SRM.
c) Change attachment angle of fairing assembly, see fig. 4 and 5, to prevent further
chafing.
Page  12  of  17  SB-328-55-557 Rev. 2

### Page 15 (OCR)

NOTE: Use methods, materials and tooling given in the SRM, specially SRM 51-
77-20.
1. Remove corner anchor nuts, see fig. 5.
2. Fill open attachment rivet holes in fairing with filled epoxy resin, mat. no. 08-
022, and let cure.
3. Prepare countersinks and holes in fairing assembly for HLGPL8SCV05.
Refer to 51-40-22 and SRM 51-40-12 for countersinking and drill and hole
data.
4. If necessary, trim angle to prevent chafing. Keep 2drivet edge distance and a
minimum cutting radius of R=8mm.
5. Restore surface protection and repair the paint.
6. Install angle with HLGPL8SCV05B03AS rivets and SLFC-MV05 collars to the
fairing assembly. For alternate rivets refer to SRM 51-41-40.
d) Restore surface protection and do a paint repair as necessary.
4) Install the bearing support rear to the horizontal stabilizer rear spar.
a) Install the positioning fixture to the bearing support forward and centre with the
existing horizontal stabilizer attachment bolts.
b) Place new bearing support rear into the positioning fixture and attach it
temporarily it to the horizontal stabilizer rear spar, see fig. 9.
Fig. 9: Positioning fixture bearing rib 8 with new bearing support rear for fit check and
rework of oversize holes.
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  13  of  17

### Page 16 (OCR)

c) If necessary, use oversize drill holes on the new support and the horizontal
stabilizer rear spar for oversize fasteners in assembly. For drill data refer to SRM
51-40-12.
d) Remove new bearing support rear and apply chemical conversion coating to
holes, see SRM 51-91-11.
e) Install bearing support in the correct position on the fixture and to the rear spar
and install bearing support rear and related brackets. For fastener, sealing and
bonding information refer to fig. 10.
NOTE: Ensure that all mating surfaces - except bonding surfaces - and all voids and
gaps, see fig.6, are sealed with mat.no. 09-041 and mat. no. 09-042 respectively to
prevent any access of water to the area. Apply conductive sealant, mat. no. 09-021,
PR1764, to the bonding surfaces between rear spar and bearing support rear.
NOTE: Two fasteners can have a drill hole for a fastener HL12VF6, but should have
holes for fasteners HL12VF8 as these must be installed, see fig 10, red frame.
NOTE: If holes need to be reworked obey SRM 51-40-11 and -12, fastener hole and
drill data for metallic and non-metallic structure, SRM 51-41-51 and -52, oversize
rivets in metallic and non-metallic structure and SRM 51-40-30, fastener spacing and
margin data.
f) Bead seal around bearing support rear.
-BONDING METHOD 20 /
ACC. 1O ALL JIC 20-28-00-910
515515-515 -515
Item 9 & 17  -5-6  -Ș+6  - Item 9 & 17
330/1 2=0.0
-5:5
91561568 65  -₴ł5
-817 - 812
DICHTMASSE
SEALING COMPOUND
-BONDING  - = POSITION OF HOLE  : LOCHLAGE
Fig. 10: Installation of bearing support rear: Rivets, bonding and sealing definition.
Red numbers indicate diameter and size of HL12VF-X-Y Hi-Loks. Refer to chapter 3,
Material Information. View looking forward. Refer to SRM 51-41-20 2. G. for the
installation of washers if nut and collar become threadbound.
Page  14  of 17  SB-328-55-557 Rev. 2

### Page 17 (OCR)

5) Attach placard, item 2, next to the identification plate, label it with "SB-328-55-557"
and give protection with item 3, see fig 11.
Identification plate
Protection foil, item 3  Supplementary identification  plate „SB-328J-55-324", item 2
Fig. 11: Application of new identification plate
'E Close-up
1) Install the bearings if necessary. Refer to SRM 51-72-20. Obey the safety
precautions.
2) Do a foreign object inspection of the full modification area.
3) Do a bonding test between the bonding strip of elevator hinge 3 or 4 and the bonding
strip of the vertical stabilizer front spar to show the bonding is maintained after the
modification. The resistance must not exceed 10 mg. Refer to AMM-JIC-20-28-00-
910-801-A01.
4) Restore surface protection and apply corrosion inhibiting compound where
necessary. Refer to the SRM.
5) Install the horizontal stabilizer. Refer to AMM JIC 55-10-00-420-801-YYY.
NOTE: Obey the related safety precautions.
6) Remove the "do not to move the controls" note in the cockpit
7) Return the aircraft to a serviceable condition.
Model:  Dornier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  15  of  17

### Page 18 (OCR)

3 MATERIAL INFORMATION
Material Parts List
Item  Part Number  Qty.  Nomenclature  Remarks
1  001B551A1441002  Bearing Support Rear  S/N 1005 up to and
including S/N1031.
on condition for S&N 1032
and up.
2  DON178 EF A1 M  1  Placard  Text: "SB-328-55-557"
DON178 2  1  Protective foil  Size 60 x 15
NAS6710DH31  4  Bolt  on condition
4  NAS6710D31 (alternative)  4  Bolt  on condition
5  NAS6710H29  2  Bolt  on condition
6  AN310C10  4  Nut
7  MS21044C10  2  Nut
8  MS24665-357  4  Cotter pin
9  HLGPL9SP - V05B03AS  4  LGPL rivet  Refer to fig. 10
10  HL12VF-5-5  20  Hi-Lok  Refer to fig. 10
11  HL12VF -5-6  4  Hi-Lok  Refer to fig. 10
12  HL12VF-6-5  4  Hi-Lok  Refer to fig. 10
13  HL12VF -6-6  2  Hi-Lok  Refer to fig. 10
14  HL12VF-8-5  2  Hi-Lok  Refer to fig. 10
15  HL12VF-8-7  Hi-Lok  Refer to fig. 10
16  HL12VF-8-8  2  Hi-Lok  Refer to fig. 10
17  3SLC-C05  4  Collar
18  HL70-5  24  Collar
19  HL70-6  6  Collar
20  HL70-8  10  Collar
21  HLGPL8SCV05B03AS  2  HLGPL rivet  on condition
22  SLFC-MV05  2  Collar  on condition
NOTE: Most parts do not need to be replaced unless they show signs of damage.
Self-locking nuts and split pins must be replaced.
Page  16  of  17  SB-328-55-557 Rev. 2

### Page 19 (OCR)

The following consumables must be provided by the operator or ordered separately
in commercial quantity (not part of the kit):
Item  Part Number  Qty-  Nomenclature  Remarks
23  CML05-022  AIR  Abrasive Cloth
24  CML05-044  A/R  Barrier material
25  CML05-050  A/R  Masking tape
26  CML05-191  AR  Glass fibre fabric
27  CML08-023  A/R  Filler
28  CML08-022  A/R  EP-Resin / Hardener  Alternate: 08-030
25  CML05-050  A/R  Masking Tape
26  CML09-041  A/R  Sealant
27  CML09-042  A/R  Sealant
28  CML09-021  A/R  Conductive sealant  Use alternate PR1764
29  CML11-002  A/R  Cleaning agent  Alternate: CML11-004
30  CML13-002  A/R  Chemical conversion
coating
31  CML16-010  A/R  PUR-Primer
32  CML16-007  A/R  Top Coat
Required Documents
Document Number  Nomenclature  * Remarks
As necessary and
Miscellaneous  Technical Publication  referred to within the
SB
Model:  Domier 328-100  Rev. No.:  2  No.:  SB-328-55-557
Rev. Date:  May 24, 2018  Date of Issue:  Sep 01, 2017
Page  17  of  17

### Page 20

_-/

### Page 21 (OCR)

328 Support Services GmbH  320*
CR  Dornier 328  Customer Support • Global Support Centre
P. O. Box 1252  Phone: +49 8153 88111 6666
Compliance Report  D-82231 Wessling  Telefax: +49 8153 88111 6565
Germany  E-Mail: gsc.op@328.eu
Please complete this compliance form for each aircraft only when it is applicable, and mail,
e-mail, or fax to:
328 Support Services GmbH
Global Support Centre
P. O. Box 1252
D-82231 Wessling
E-Mail: gsc.op@328.eu
Telefax: +49 8153 88111 6565
From Company:
Doc. No.  Rev.  Title
SB-328-55-557  2  Stabilizer - Inspection of Horizontal Stabilizer Bearing Support
Rear
Operator:
Aircraft Serial Number:
Part Number:  Component Serial Number:
Total Flight Hours:  Total Landings:
(A/C / Component)  (A/C / component)
Date of Compliance:
Findings:  YES  NO
Remarks:
Date  Authorized Signature

### Page 22

(No text on this page.)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.