# Dowty Propellers Service Bulletin 61-A1124: Revision 2

- Rights: © Dowty Propellers. Filed by the FAA in regulations.gov docket FAA-2010-1270; AD 2005-25-10 R1 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Dowty Propellers Service Bulletin 61-A1124](https://openairdocs.org/service-documents/dowty-propellers/61-a1124.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin 61-A1124
Transmittal Letter for Revision No.2
- Pages: 35
- PDF: https://openairdocs.org/files/sha256/3b/e2/3be2e012242d8751cbc853b2195c1f6cffa865978d19745890181e04fd028f8c
- Page: https://openairdocs.org/service-documents/dowty-propellers/61-a1124/file/3be2e012242d

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Part of GE’s Aviat i on Business  
  SERVICE BULLETIN .  
 
 
 
SERVICE BULLETIN
SERVICE BULLETIN 61-A1124
TRANSMITTAL LETTER FOR REVISION NO.2
Dated Aug 25/10
1. REASON
A. Service Bulletin compliance changed to ALERT.
B. To advise operators that the requirement for the continued inspection of hub assemblies  
Part No. 660709201 can be terminated by the introduction of a revised hub assembly in accordance with 
Dowty Propellers Service Bulletin 61-1144.
C. Service bulletin reformatted.
2.   ACTION
A. Remove and destroy existing pages 1 to 3 of the service bulletin and replace with revised pages 1 to 3 
dated Aug 25/10.
B. Remove and destroy existing pages 1 to 6 of Appendix A and replace with revised pages 1 to 6  dated  
Aug 25/10.
C. Remove and destroy existing pages 1 of Appendix B and replace with revised pages 1 dated  Aug 25/10.
D. Remove and destroy existing pages 1 to 13 of Appendix C and replace with revised pages 1 to 13  dated 
Aug 25/10.
E. Remove and destroy existing pages 1 to 7 of Appendix D and replace with revised pages 1 to 7  dated  
Aug 25/10.
Dowty Propellers
Anson Business Park, Cheltenham Road East, Gloucester, GL2 9QN ENGLAND
Telephone: 01452 716000  Facsimile: 01452 716001

### Page 2

(No text on this page.)

### Page 3

Page 1 of 3
ALERT
CAGE CODE: U7387
For Europe, Africa, India and
Middle East contact:
Dowty Propellers
Anson Business Park
Cheltenham Road East,
Gloucester, GL2 9QN, United Kingdom
T: + 44 (0)1452 716000
F: + 44 (0)1452 716001
For Asia, Australasia and the Pacific
contact:
Dowty Propellers
Anson Business Park
Cheltenham Road East,
Gloucester, GL2 9QN, United Kingdom
T: + 44 (0)1452 716000
F: + 44 (0)1452 716001
For the Americas
contact:
Dowty Propellers
114 Powers Court
Sterling, VA 20166
United States of America
T: + 1 (703) 421 4434
F: + 1 (703) 450 0087
Copyright (2010), GE Aviation Systems Ltd., U.K
The information contained in this document is GE Aviation Systems Ltd proprietary information and is disclosed in confidence. I t is the
property of GE Aviation Systems Ltd and shall not be used, disclosed to others or reproduced without the express written consen t of GE
Aviation Systems Ltd, including, but without limitation, it is not to be used in the creation, manufacture, development, or derivation of any
repairs, modifications, spare parts, designs, or configuration chan ges or to obtain FAA, CAA, EASA, or any other government or 
regulatory approval to do so. If consent is given for reproduction in whole or in part, this notice and the notice set forth on  each page of
this document shall appear in any such reproduction in whole or in part.
All technical documentation and information contained herein, with respect to assembly and disassembly, cleaning, inspection me thods
and limits, repair methods and limits, operational limits, life limits and the like, have been developed and approved for use w ith this
equipment and parts that have been manufactured and/or approved by GE and that have been maintained in accordance with GE 
technical documentation and recommendations.  GE has no contractual or legal obligation for, nor knowlege of, non-GE-approved p arts
and repairs.  Accordingly, this document is not intended to apply to non-GE-approved parts and repairs.
Manual Ref:  61-10-24
SERVICE BULLETIN
PROPELLER - HUB WALL CRACKING
1. Planning Information
WARNING: FAILURE TO IMPLEMENT ANY INSTRUCTION GIVEN HERE, AS AMENDED FROM TIME TO
TIME BY DOWTY PROPELLERS, MAY ENDANGER HEALTH AND SAFETY .
A.
B. Effectivity
Aircraft affected : Jetstream Series 3100 and 3200
Unit affected : Propeller
Part/Type No. : All R333/4-82-F/12 propellers
C. Reason
(1) On a similar propeller type, there have been reports of cracks originating from around the threaded
insert holes of the rear half hub which in one instance has resulted in a complete propeller
separation from the engine flange.
(2) To inspect for cracks in the rear wall of propeller hub assemblies Part No. 660709201.
D. Description
(1) Hub assemblies Part No. 660709201 are to be inspected in accordance with Appendix A or
Appendix D of this bulletin.
Non. Mod.
May 07/02  61-A1124
Aug 25/10 (Revision 2)

### Page 4

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 2
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
E. Compliance:  ALERT
(1) Hub assemblies Part No. 660709201 included in propellers installed on aircraft must:
- have a repetitive inspection at an interval of not more than 1000 flying hours.
(2) Hub assemblies Part No. 660709201 included in propellers in storage must:
- have a repetitive inspection at an interval of not more than 1000 flying hours after the
installation of the propeller to an aircraft.
(3) Hub assemblies Part No. 660709201 in storage must:
- have a repetitive inspection at an interval of not more than 1000 flying hours after the
installation of the hub assembly onto an aircraft.
(4) The requirement for the continued inspection of hub assemblies Part No. 660709201 can be
terminated by the introduction of a revised hub assembly in accordance with Dowty Propellers
Service Bulletin 61-1144.
F. Approval
(1) This service bulletin was approved and classified as MANDATORY by the United Kingdom Civil
Aviation Authority.  The technical content of this bulletin which affects airworthiness was approved
by a representative of the United Kingdom Civil Aviation Authority dated Apr 24/02.
G. Manpower
(1) Normal time for propeller removal and installation plus approximately 0.5 manhour to carry out the
NDT inspections. 
NOTE : The above manhours are given for shop planning purposes only.  Dowty Propellers will not
be responsible for the cost of these manhours.  The estimate assumes that the equipment
has been placed in a maintenance status and does not include preparation or
administrative functions.
H. Material
(1) None.
I. Tooling
(1) Equipment and materials as listed in Appendix A or Appendix D of this bulletin.  Equipment in
Appendix A, para 2.B. and 2.C. and Appendix D, para 2.B. is available from Dowty Propellers on
request.
J. Weight and Balance
(1) None.
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 5

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 3
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
K. References
(1) Aircraft Maintenance Manual.
(2) Dowty Propellers Aircraft Maintenance Manual Pub. No. 1008.
(3) Dowty Propellers Component Maintenance Manual 61-10-24.
(4) Appendices A, B, C and D of this bulletin.
L. Other Publications Affected
(1) None.
2. Material Information
A. None.
3. Accomplishment Instructions
A. Embodiment Instructions
(1) Inspect the propeller hub rear half rear wall to the instructions at Appendix A or Appendix D of this
bulletin.  Record all data from the inspections carried out on Appendix B and forward all reports to
Dowty Propellers as per para 3. B. (1).  Defective hubs, if any, are to be returned to Dowty
Propellers for further investigation.
B. Reporting Instructions
(1) Reports of  all inspections are to be forwarded by FAX to the Technical Support Manager, Dowty
Propellers, Fax. No. 44 1452 716001.  The following information is required. 
(a) Hub serial number.
(b) Hub total flying time since new.
(c) Hub flying time since overhaul.
(d) Hub crack details if found, or report ‘Satisfactory’ if uncracked.
(e) Confirmation of use of NDT methods specified in this service bulletin.
(f) A photocopy of the hub log cards.
C. Recording Instructions
(1) Record the compliance with the instructions of this service bulletin in the propeller log book.
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 6

(No text on this page.)

### Page 7

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 1 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
APPENDIX A
THE ULTRASONIC INSPECTION OF THE JETSTREAM PROPELLER HUB (REAR HALF)
1. Introduction
A. This technique is designed for the detection of fatigue cracking originating from and around the threaded
insert holes.  (Figure 1).
B. This technique will necessitate removal of the propeller.  It is not necessary to remove the backplate.
C. The scan area as shown in Figure 1 must be clean and free from surface damage.
2. Equipment Required
A. Ultrasonic flaw detector operating in the 1 to 15 Mhz range.  (A Sonatest Masterscan 335 was used in the
preparation of this technique, operating at 15 Mhz).
B. A 3 mm (0.125 in) diameter 5Mhz longitudinal probe type No. Panametrics V1091 or equivalent.
C. Reference block Part No. DAPT 09-0001-00 detail 9 (Apply to Dowty Propellers for a manufacturing
drawing.  Appendix C includes NDT 5DAP which is required for the manufacture of the reference block).
D. Suitable couplant.
3. Calibration Procedure.
A. Using a suitable couplant, place the probe on the reference block.
B. Using standard calibration procedure establish the probe zero position.
C. By probe movement identify the signal from the flat bottom hole and set at 6.0 on the timebase.  (See
Figure 3).
D. Maximise this signal and set amplitude to 80% full screen height.  (See Figure 3).
4. Inspection Procedure
A. Apply couplant to hub mounting face in scan area and position probe as shown in Figure 1.
B. A back wall echo will appear at approx. 6.0 on the timebase.  (See Figure 4).  This signal will vary in
amplitude from 5 - 100% full screen height due to the inside face geometry.
C. Scan 360 _ of scan area.
D. Discontinuity indications may appear at any position along the timebase, between 1.0 and the back wall
echo signals.  They may appear as a single indication or a multiple peak indication as shown in Figure 5.
5. Inspection Standard
A. Any indication which, after careful cross-checking of calibration procedure, is 20% of full screen height or
more is to be considered as a defect and rejected.
NOTE : Indications from the thread flanks may appear up to 15% full screen height. (See Figure 4).
B. Mark up a ’Status Report’ reproduced from Appendix B of this service bulletin.  Supply all the information
required in lines 1 to 9.  Record all data from the inspection and FAX to the Product Support Manager,
Dowty Propellers, Fax. No. 44 1452 716001.
C. Rejected hubs are to be returned to Dowty Propellers for further investigation.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix A

### Page 8

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 2 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Scan Areas A
Figure 1
61-10-27
May 07/02 61-A1124
Aug 25/10 ( Revision 2)
Appendix A

### Page 9

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 3 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Possible Crack Orientation
Figure 2
61-10-27-1
May 07/02 61-A1124
Aug 25/10 (revision 2)
Appendix A

### Page 10

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 4 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Signal From Reference Block
Figure 3
May 07/02 61-A1124
Aug 25/10 (Revision 2)
Appendix A

### Page 11

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 5 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Back Wall Echo And Thread Signal
Figure 4
Appendix A
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 12

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 6 of 6
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Typical Crack Signal
Figure 5
Appendix A
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 13

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 1 of 1
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
APPENDIX B
STATUS REPORT
THE ULTRASONIC INSPECTION OF THE JETSTREAM PROPELLER HUB (REAR HALF)
1. Operator .............................................................
2. Aircraft Serial No. ..............................................
3. Propeller Installation (delete whichever is not applicable)
4. Propeller Serial No. .........................................
5. Hub Serial No. ..................................................
6. Hub total flying hours since new ..................... Flying Hours
7. Hub total flying hours since overhaul ..................... Flying Hours
8. Crack indications and details if any (illustrate above) ..................................................................... ......................
..............................................................................................................................................................................
Report ‘Satisfactory if no cracks are found.
9. Inspectors stamp or signature ............................................................................................... ...............................
61-10-27-2
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix B
Left    Right

### Page 14

(No text on this page.)

### Page 15

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 1 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
APPENDIX C
NDT 5DAP
ULTRASONIC FLAW DETECTION
1. Scope.
A. NDT 5DAP supersedes NDT 5 for all future Dowty Aerospace Propellers contracts.  Where existing
drawings/documents call up NDT 5, NDT 5DAP must be used in lieu.
B. This specification explains the control and calibration requirements for all ultrasonic inspection equipment
(sets, probes and reference blocks) at DAP.  Sub-contracting agencies must also meet the requirements
described here-in when inspecting components for DAP .  Wherever possible National or International
standards have been referenced, this is planned to reduce the need for frequent re-issues, and make this
specification easier to adhere to.
C. Individual inspection procedures are issued at DAP as separate documents.  E.g. for Immersion
longitudinal or Contact etc.  In addition to these procedures an individual technique must be raised to each
component or part number.  These procedures and techniques must be approved by an appropriate level
III NDT engineer, and, technique numbers must be referenced on the relative drawing or layout.  Sub-
contracting agencies must maintain Procedures and techniques relevant to their own equipment.
D. The requirements to carry out ultrasonic flaw detection on raw materials are given in BS L100 and 
BS S100 such ultrasonic inspection is normally the responsibility of the supplier.  When carried out at DAP,
the methods and standards referred to in the British Standards shall be applied.  Sample inspection may
be applied in this case.
E. Where parts are manufactured by DAP on a sub-contract basis, the ultrasonic inspection requirements of
the main contractor will apply unless agreement has been reached to apply this specification.
F. Repair and overhaul ultrasonic inspection of parts for the purpose of detection of in-service defects, is
covered by techniques associated with service bulletins or Ministry of Defence instructions, usually
servicing instructions (SI’s) or special technical instructions (STI’s).
These techniques are usually derived from product support techniques prepared by DAP NDT technicians.
NOTE : Where deemed necessary DAP may use the product support technique system for cases not
covered by paragraph F.
When the repair or overhaul of a part uses methods or processes used on production to which
ultrasonic inspection would apply, the same inspection technique shall be applied to the repair of
the used part.
2. Personnel Requirements.
A. Personnel operating this inspection procedure at DAP must be qualified in accordance with the
requirements of NDT 10DAP.  Sub-contracting agencies must maintain their own personnel certification
scheme, this in turn, must be approved by DAP.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 16

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 2 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
3. References
A. BS L100 Inspection & testing of wrought aluminium and aluminium alloys.
B. BS S100 Inspection & testing of wrought steel.
C. ASTM E 114 Practice for ultrasonic pulse-echo straight beam testing by the contract method.
D. ASTM E 127 Practice for fabricating and checking aluminium alloy ultrasonic standard reference
blocks.
E. ASTM E 214 Practice for immersed ultrasonic examination by the reflection method using pulsed
longitudinal waves.
F. ASTM E 317 Practice for evaluating performance characteristics of pulse-echo testing systems
without the use of electronic measurement instruments.
G. NDT 10DAP Approval of personnel for NDT Inspection.
4. Procedure and Techniques
A. The procedures in use at DAP are separate documents to this specification.  In addition to the procedures,
an individual technique for each component or part number is required.  (See paragraph 1.C.). As a
minimum each technique shall include the following:-
(1) Company Name
(2) Technique Number
(3) Related Inspection Procedure
(4) Acceptance Class (Refer to international/national standards or drawing requirements)
(5) Inspection Scan Cover
(6) Part No. & Material
(7) Manufacturing Stage
(8) Transducer Type Diameter & Frequency
(9) Couplant
(10) Transfer Method (If Used)
(11) Reference Standards
Appendix C
May 07/02  61-A1124
Aug 25/10 (Revision 2)

### Page 17

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 3 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
5. Equipment Calibration Requirements.
A. Electronic Flaw Detector Unit.
(1) Calibration Requirements:-
(a) Electronic Flaw Detector units which are to be used for immersion techniques are to be
calibrated annually in accordance with the procedure stated in paragraphs 5.A.(2) (a) to (e).
This is to be carried out by a level II or III approved NDT Technician and tagged with a
calibration label.  All calibration graphs are to be kept on file in the calibration control area.
(b) Electronic Flaw Detector units which are to be used in the contact mode alone are to be
calibrated in accordance with the procedure stated in paragraphs 5.A (2) (a), (b) and (e).
This calibration is to be carried out be a level II or II approved NDT Technician on a6 monthly
basis and tagged with a calibration label.  All calibration graphs are to be kept on file in the
calibration control area.
(2) Calibration Procedure
This procedure is based on the requirements and methods described in ASTM-E-317.  If this
procedure is used for evaluating contact sets consistent and uniform coupling must be ensured.
When used for immersion equipment ensure the probe exit surface and test blocks are free form air
bubbles, always allow time for equipment to stabilise.
(a) Horizontal limit and linearity
Select an appropriate test block that when coupled to the search unit (either by contact or
immersion) will produce eleven back reflections on the flaw detector which is being checked.
Use the instrument gain, delay and calibration settings to set the leading edge of the third and
ninth back reflection at 20% and 80% scale division respectively (when reading reflection
positions always set at the amplitude of that reflection to 50% full screen height).  Once the
third and ninth reflections are positioned at 20% and 80%, read and record the scale position
of each other multiple.
Interpretation of results:-
The horizontal limit is given by the maximum available trace length falling within the screen
graticule.  This must, in all cases be 100%.  Failure to obtain full scale deflection may indicate
an equipment malfunction.  Horizontal linearity results are best plotted in graphical form as
shown in figure 3.  The deviation is given by the displacement (in % of full scale) from the
straight line through the set up points, which represents ideal linearity.  The maximum
displacement allowed is 5% of full scale.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 18

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 4 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
(b) Vertical limit and linearity
This check requires the use of a test block which, when coupled to a suitable search unit will
produce signals having an amplitude ratio of 2 to 1 on the flaw detector being examined.
(Signals do not have to be successive or in any particular order).  Designate these signals HA
and HB (HA being larger) and ensure that there is sufficient range in the gain control to vary
HA from 10% fsh to 100% fsh.  Set signal H A to 60% fsh, this should give a resultant H B
signal of 30% fsh (some deviation allowed see Table 1).
Once this is set adjust the gain control to increase H A up to 100 fsh in increments of 10% or
less.  At each step read and record the amplitude of H A and corresponding amplitude H B.
Return gain setting to original position and check that H A and HB are also at original levels.
Now, reduce gain to bring HA to 10% fsh in increments of 10% or less, read and record HA/HB
values at each increment.
Interpretation of results:-
Vertical limit is given by the maximum vertical deflection within the graticule range that can be
obtained from a large reflector.  This figure must in all cases be 100% of full scale deflection
failure to obtain full scale deflection may indicate an equipment malfunction.
Vertical linearity results are best displayed graphically as shown in figure 3.  Ideal linearity is
indicated by a line from the origin through the set up point (HA60, HB30) to full scale.
Actual linearity must be within ± 5% of ideal linearity.
(c) Resolution
Any method for determination of equipment resolution may be used, if authorised by an
approved level III NDT Engineer.  This section describes one method, it is an overall system
check, therefore it may be used for both search units and flaw detector sets.
This check requires the use of test block number DAPT 09-0045-00.  The block incorporates
both front and back surface flat bottom hole references of 2/64, 3/64 and 5/64ths ″ diameter,
each at distances of 0.060″, 0.125″ and 0.250″ from the respective front or back surface (see
drawing DAPT 09-0045-00).
First, couple the search unit to the near surface check area of the block, and determine by
careful probe movement the smallest hole diameter detectable and the shortest metal trace
distance it can be resolved from the entry surface indication.
A hole is said to be resolved when a signal of 80% fsh can be established from that hole; it is
clearly separated from the adjacent interface indication down to at least 20% fsh, and there
are no residual indications over 20% fsh throughout the test region.
Next move the probe to the back surface check section of the block and repeat process, this
time establish the smallest hole size resolvable, at the shortest metal travel distance from the
back wall echo.
Interpretation of results:-
Record the smallest resolvable hole diameter, at the shortest metal path distance from front
and back surfaces on the relevant test certificate.  This information may then be used to
verify the suitability of equipment for a certain task.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 19

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 5 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
(d) Sensitivity and Noise
This check requires the use of ASTM-E-127 light alloy reference standards, various blocks
are suggested for various search unit frequencies:-
Test Frequency 0.4-1.5Mhz 1.0-2.5Mhz 2.0-10Mhz
5.0300 to 2.0300 to 1.0300 to
8.0300 6.0300 5.0300
With the instrument sensitivity at maximum, determine the smallest hole size that will give an
indication having an amplitude of at least 60% fsh and baseline noise of no more than 20%
fsh in the test region.  If the dimensions of the test block allow move the search unit just away
from the hole and determine that noise at maximum sensitivity exceeds 20% fsh, reduce the
gain until 20% fsh is obtained and determine the smallest hole that will then produce a 60%
fsh or greater indication.  Record the block number, noise level, signal amplitude and reduced
gain.  If the indication from the smallest hole available exceeds 100% fsh use the gain control
to lower the hole indication to 60% fsh, and record the remaining available gain that does not
cause the noise to exceed 20% fsh.
Interpretation of results:-
Record all the information derived i.e. Block No. noise level, signal amplitude, reduced gain (if
applicable) and gain in hand (if applicable) on the appropriate calibration certificate.  This
information may then be used to verify the suitability of equipment for a certain task.
(e) Linearity of equipment gain
This check relies upon the vertical linearity of the flaw detector previously being established
as acceptable [see paragraph 5.A.(2) (b)].
Using test block ASTM-E-127 5-0300 establish by probe manipulation and flaw detector
adjustments, an 80% fsh indication from the flat bottomed hole.  Note the gain setting and
designate this XdB.  Next, ensuring constant probe coupling and no other flaw detector
alterations adjust the gain settings by the dB amounts shown in Table 2, and record the
resultant % fsh indications from the flat bottomed hole.
Interpretation of results.
All the indications must lie between the maximum and minimum limits as designated in Table
2.
B. Calibration and Control of Transducers.  (Probes).
This section covers calibration of contact probes (both compressional and shear wave) and immersion
probes (focused and unfocused).  All immersion probes must be calibrated annually, the calibration
certificate kept on file and the probe tagged with a calibration due date.  For all probe calibrations use a
flaw detector calibrated to paragraph 5.A.
(1) Contact Transducers
Providing a contact transducer meets the set-up and calibration requirements of a specific
technique it can be used for that technique, therefore there would be no requirement to assess the
transducer for parameters such as dead zone, beam profile, resolution, sensitivity etc.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 20

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 6 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
(2) Calibration of Unfocused immersion transducers
(a) This procedure is to be carried out on all unfocused water immersion probes.
(b) Equipment
1 An immersion tank of suitable size with an adjustable probe manipulator is to be used.
2 A 12,5 mm diameter ball is to be used as the target.
3 An instrument, capable of measurement of 0,025 mm or better is to be used to measure
beam width.
(c) Procedure
NOTE : For the Beam Axis alignment procedure which follows, use the bracketed alternative
position when NF is less than 150 mm.
1 Carry out the following calculations.
a Calculate the theoretical Near Field (NF) distance for the probe:
NF=(D  x  F)   where D = Probe diameter
          8c F = Frequency of probe
c = Speed of sound in immersion 
       fluid water = 1483 m/s at 20°C
b Calculate the 2/3 rds NF distance
c Where NF is 150 mm or greater, calculate the 5/6th NF distance.
2 Mount the ball at least 75 mm below water level.
3 Position the probe against the ball and adjust such that the crystal is concentric with the
ball.
4 Move the probe back to the 2/3 rds NF position.  Using Tilt and Vertical adjustment,
obtain the maximum amplitude signal, ensuring the crystal remains concentric with the
ball.
5 At the 2/3 rds NF distance, obtain maximum amplitude signal using the Swing and
Lateral adjustments.
6 At the 5/6 ths NF distance check that no increase in amplitude can be obtained by
Vertical or Lateral adjustment.
7 Carry out the same check at full NF distance.  Adjustments must be made such that
maximum amplitude signal can be obtained at the three positions without alteration of
adjustments.  This ensures that the ball remains on Beam Axis with probe movement.
8 Move the probe over the theoretical NF distance.  A maximum amplitude signal should
be obtained in the middle region.  Adjust its amplitude to just below full screen height, or
to the upper linear limit.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 21

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 7 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
9 Position the probe 5 mm from the ball and record the amplitude of the signal.  Repeat at
5 mm increments over the 2/3 rd NF range.  Continue at 10 mm increments until the
signal has reduced at approximately 1/5 th screen height.
NOTE : The following procedure of adjustment will eliminate errors due to backlash in
the lateral movement.
10 Beam width is now measured, starting at this final probe position.  Adjust the signal
amplitude to 80% screen height.  Using lateral adjustment, move the probe until the
signal reduces to below 40% of screen height.  Carefully adjust in the opposite direction
until the signal is 40% screen height (6dB down).  Using the measuring instrument,
measure and record the position of the carriage.  Continue the lateral movement of the
carriage such that the signal increases, then decreases to the 40% height.  Care must
be taken not to overshoot this position.  Measure and record the carriage position.
Deduct the smaller from the larger reading to obtain beam width.
11 Repeat this beam width measurement procedure at the 5/6 th and 2/3 rd position.
12 Beam width measurements are to be taken at gradually reduced increments as the
probe is advanced closer to the ball.  Prior to each position measurements at less than
2/3 rds NF, the probe is to be returned to beyond the 2/3 rds position and maximum
height signal obtained on the lateral movement.
13 Using figure 1 ‘Probe Calibration’ sheet, record details and readings, and plot the
Distance/Amplitude Curve and Beam Width.
(d) Assessment of Results
1 A good result has been achieved when beam width is wide when amplitude is low, and
narrow when amplitude is high.  The result must satisfy this before acceptance.
2 Mark on the curve the near and far positions where the signal amplitude falls to 50% of
maximum.  From this, the following Optimum Operational Data is to be entered on the
sheet.
a Water Gap Distance to the ’near’ mark
b Working Range Distance between the two marks in water (Divide by 4 for
steel or aluminium)
c Scan Index Beam width at ’near’ mark.  This should be in excess of 3mm
for standard search probes.
(3) Calibration of focused immersion transducers
(a) This procedure is to be carried out on all focused water immersion probes.
(b) Equipment
1 An immersion tank of suitable size, is to be used.
2 A 12.5 mm diameter steel ball is to be used as the target.
3 An instrument capable of measurement of 0,025 mm or better is to be used to make
beam profile measurements.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 22

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 8 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
(c) Procedure
1 Obtain the manufacturer’s nominal focal distance for the probe.
2 Mount the ball at least 75 mm below water level.
3 Position the probe against the ball and adjust such that the crystal is concentric with the
ball.
4 Move the probe back to the nominal focal distance.  Using Tilt and Vertical adjustment,
obtain the maximum amplitude signal, ensuring the crystal remains concentric to the
ball.
5 Still at the nominal focal distance, obtain the maximum amplitude signal using the Swing
and Lateral adjustments.
6 Increase the distance of the probe to the ball by 20 mm.  Check for increase in amplitude
by Vertical and Lateral adjustment.  Carry out adjustments until maximum signal is
obtained at nominal focal distance and at this position + 20 mm without any further
adjustment being necessary.  This ensures that the ball remains on Beam Axis with
probe movement.  It may be necessary to check this maximum at a third position.
7 Move the probe towards the ball until maximum signal is obtained.  Adjust signal to
upper Linearity limit for the equipment.  Re-check concentricity of probe and ball.
8 Position the probe 5 mm from the ball and record the amplitude of the signal.  Repeat at
5 mm intervals (or less where necessary) over the nominal focal distance. Continue at
10 mm intervals until the signal has reduced to approximately 1/10 th screen height.
9 Beam width measurement is now carried out in the same way as outlines in para 10 of
Part 2(c).  Measurements are taken at 5 mm intervals from the ball to at least 20 mm
past the maximum height position.  Thereafter at 10 mm intervals over the remainder of
the Distance Amplitude plot.
10 Record all details and construct graphs of Distance/ Amplitude and Beam Width on the
left half of figure 2.
11 Beam Profile measurements are now carried out at the actual maximum amplitude
distance from the ball and at approximately 1.3 times this distance, e.g.: If actual max.
amplitude distance is 30 mm., the second position could be taken as 40 mm.
12 At the 1.3 times max. position, set the signal amplitude to the upper linearity limit.  Using
the lateral adjustment on the rig, move the probe in increments of 0,25 mm one
direction, recording amplitude, until below 5% fsh.  Repeat in the opposite direction.
13 This is repeated at the maximum amplitude position in two planes at 90 ° (i.e. rotate
probe in holder for second run).  The probe is to be moved at least 5 mm each side of
centre line and any side lobes are to be plotted.
14 Plot the results on the right hand half of figure 2.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 23

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 9 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
(d) Assessment of Results
1 Actual Focal Distance - This is the distance on the Distance/ Amplitude Curve at which
the amplitude is at maximum.  This may differ considerably from the nominal figure given
by the manufacturer, but should be similar for probes of the same specification.  Record
this distance in the Block on figure 2.
2 Focal Spot Size - This is to be measured at Actual Focal Distance and recorded in the
Block in figure 2.
3 Beam Profile - This is to be assessed for symmetry about the centreline and side lobe
conditions.
4 Symmetry:- The ratio of distance each side of centreline at which amplitude is 50% of
max. - should not exceed 1.5 to 1.
5 Side lobes:- Amplitude must not exceed 20% of maximum.
C. Calibration of Ultrasonic Reference Blocks
(1) General Requirements
(a) It is advisable to calibrate reference blocks by comparing them to other reference blocks of
known accuracy.  In the case of Aluminium Alloy and Steel standard reference blocks, this
can be done by comparing them with blocks of known accuracy.
(b) Master Reference Blocks.
Master reference blocks shall be used only for calibrating other reference blocks of the same
part number.  They shall not be used as a working block.  Calibration is carried out at initial
issue, to the relevant drawing.
(c) Working Reference Blocks
Working reference blocks are to be calibrated on initial issue and 5 yearly thereafter.
Blocks that are to be used with contact techniques only may be calibrated by the contact
method using an instrument qualified to section 5A and a suitable transducer.  When blocks
are to be used with immersion techniques an instrument, qualified to section 5A, is to be used
in conjunction with a 10 MHz, 10mm diameter standard water immersion probe, calibrated to
section 5C.  The serial numbers of the instrument and Probe are to be entered on the
calibration certificate (DAP 614).  When re-calibration is being carried out, the same
Instrument and Probe combination as originally employed should be used.  If an alternative
probe is necessary, select one with calibration curve nearest to the original.
(d) When it is required to compare a flat bottomed hole of a different diameter to the master the
following factors are to be used.
1/64 to 2/64″ = 12dB
2/64 to 3/64″ = 7dB
3/64 to 5/64″ = 9dB
5/64 to 6/64 = 8dB
(e) The amplitude of the signal form a block being calibrated must be within ± 3dB of the master
reference block.  Blocks within tolerance are to have their error marked on them.  When the
signal is less in amplitude than the master, the correction factor is to be marked positive, and
vice-versa.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 24

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 10 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
Table 1
Acceptable Initial Values for HA and HB
Table 2
SET-UP LIMITS
RATIO 2.2 2.0 1.8
HA HB MIN. H B NOM. H B MAX.
65
64
63
62
61
30
29
29
28
27
33
32
32
31
31
36
36
35
34
34
PREFERRED 60 27 30 33
59
58
57
56
55
27
26
26
25
25
30
29
29
28
28
33
32
32
31
31
Nominal HA values are preferred for any give HB value.
Gain Setting Expected % fsh
 Response
Maximum % Minimum %
X+2dB 100 100+ 90
XdB 80 - -
X - 6 d B 4 04 53 5
X-18dB 10 12 8
X-24dB 5 - Signal must be visible
 above base line 
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 25 (OCR)

POWTY
Part of GE's Aviation Business
SERVICE BULLETIN
ALERT
N.D.T. DEPARTMENT.  BISTANCE - AMPLITUDE CURVE AND BEAM HIDTH (58%)  PROBE DETAILS  EQUIPMENT  DETAILS
MAKE  CRYSTAL  FREQUENCY  DIAMETER
DISTINCE  APLIUE  WIDTH
DOWTY REROSPACE PROPELLERS  100
80 015
PROBE CALIBRATION  ТЕД ЛІН НОШ  -•
Figure 1  Appendix C
May 07/02  61-A1124
Aug 25/10 (Revision 2)  Page 11 of 13
GE Aviation Systems Ltd Proprietary Information
Use or disdosure of data contained on this sheet is subject to the restrictions on the cover or first page

### Page 26

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
ALERT
Page 12 of 13
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
Figure 2
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix C

### Page 27 (OCR)

POWTY
Part of GE's A viation Business
SERVICE BULLETIN
ALERT
Dowty Aerospace Propellers
NOT Department
Ultrasonic Flaw Detector Calibration Record
NDT 5DAP
PROBE DETAILS
MANUFACTURER
FREQUENCY
DIAMETER
SERIAL No.
MODE OF USE
FLAW DETECTOR DETAILS
MANUFACTURER
MODEL
SERIAL NO.  70 80 00 100
IT PULL DEALE
DATA PLOT OF HORIZONTAL LINEARITY
TEST PARAMETER
HORIZONTAL LIMIT  - 189-142
VERTICAL LIMIT
RESOLUTION
HOLE DIAMETER
METAL PATH
SENSITIVITY AND NOISE
REFERENCE BLOCK
SIGNAL AMPLITUDE
NOISE LEVEL
GAIN (Reduced/In Hand)
LINEARITY OF EQUIPMENT GAIN
+2dB
•
10.03
-&dB  20 30  40
-18dB  4O PERCENT OF PULL BEALE
-24dB
DATA PLOT OF VERTICAL LINEARITY
DATE:  SIGNATURE/STAMP  CALIBRATION NEXT DUE DATE
DAP616
Figure 3
Appendix C
May 07/02  61-A1124
Aug 25/10 (Revision 2)  Page 13 of 13
GE Aviation Systems Ltd Proprietary Information
Use or disdosure of data contained on this sheet is subject to the restrictions on the cover or first page

### Page 28

(No text on this page.)

### Page 29

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 1 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
APPENDIX D
NDT UT72
THE ULTRASONIC INSPECTION OF THE GENERAL AVIATION
3 & 4 METAL BLADED PROPELLER HUBs
1. Scope.
A. This technique details the contact pulse echo method of ultrasonic inspection for the detection of fatigue
cracking from the 8 threaded insert holes, on the rear half hub.
B. It will be necessary to remove the propeller from the engine drive flange remove the backplate and slip
ring.
C. The ultrasonic equipment is to be calibrated in accordance with NDT 5DAP.
D. Personnel carrying out this technique must be qualified to NDT 10DAP.
2. Equipment Required.
A. Ultrasonic flaw detector operating in the 1 to 15 Mhz range.  (A Sonatest Masterscan 335 was used in the
preparation of this technique).
B. A 3 mm (0.125 in) diameter 5Mhz longitudinal probe type No. Panametrics V1091 or equivalent.
C. Suitable couplant.
3. Calibration Procedure.
A. Using a suitable couplant, place the probe on the hub adjacent to the dowel hole as shown in Figures 1
and 2.
B. Using standard calibration procedure establish the probe zero position.
C. By probe movement identify the signal from the dowel hole and set at 1.6 on the timebase.  (SeeFigure 4).
D. Maximise this signal and set amplitude to 80% full screen height, (see Figure 4), then add 6dB.
4. Inspection Procedure.
A. Apply couplant to hub mounting face in scan area and position probe as shown in Figures 2 and 3.
B. A back wall echo will appear at approx. 6.0 on the timebase.  (See Figure 5).  This signal will vary in
amplitude from 5 - 100% full screen height due to the inside face geometry.
C. Scan 360 ° of scan area.
D. Discontinuity indications may appear at any position along the timebase, between 1.0 and the back wall
echo signals.  They may appear as a single indication or a multiple peak indication as shown in Figure 6.
5. Inspection Standard.
A. Any indication which, after careful cross-checking of calibration procedure, is 20% of full screen height or
more is to be considered as a defect and rejected.
NOTE : Indications from the thread flanks may appear up to 15% full screen height. (See Figure 5).
B. Rejected hubs are to be returned to Dowty Propellers for further investigation.
May 07/02  61-A1124
Aug 25/10 (Revision 2)
Appendix D

### Page 30

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 2 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Probe Position for Calibration
Figure 1
UT 72 F1
PROBE POSITION FOR CALIBRATION
May 07/02 61-A1124
Aug 25/10 ( Revision 2)
Appendix D

### Page 31

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 3 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Figure 2
UT 72 F2
May 07/02 61-A1124
Aug 25/10 (revision 2)
Appendix D

### Page 32

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 4 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Typical Crack Orientation
Figure 3
UT 72 F3
May 07/02 61-A1124
Aug 25/10 (Revision 2)
Appendix D

### Page 33

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 5 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Signal From Hub Dowel Hole
Figure 4
Appendix D
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 34

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 6 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Signals From Back Wall Echo and Threads
Figure 5
Appendix D
May 07/02 61-A1124
Aug 25/10 (Revision 2)

### Page 35

Pa r t  of  GE ’s  Avi ati on  Busi ne ss 
  SERVICE BULLETIN  
 
 
Page 7 of 7
GE Aviation Systems Ltd Proprietary Information 
Use o r disclosure  of data contain ed on this sheet is su bject to  the rest rictions on the cover or first page
ALERT
Typical Crack Signal
Figure 6
Appendix D
May 07/02 61-A1124
Aug 25/10 (Revision 2)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
