# Embraer Service Bulletin 145LEG-53-A032: Revision 01

- Rights: © Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2014-0234; AD 2014-16-28 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Embraer Service Bulletin 145LEG-53-A032](https://openairdocs.org/service-documents/embraer/145leg-53a032.md)
- Title as filed: U.S. DOT/FAA - SB 145LEG-53-A032 R01
- Pages: 27
- PDF: https://openairdocs.org/files/sha256/18/2e/182e2a35f1f67babb87555f33785960ea76a884eab6301d8400b0fe3357a5e95
- Page: https://openairdocs.org/service-documents/embraer/145leg-53a032/file/182e2a35f1f6

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

TRANSMITTAL LETTER
. 
TRANSMITTAL LETTER SB No.: 145LEG-53-A032 
 PAGE: 1 of 1 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
1. DESCRIPTION 
This sheet transmits Revision 01 to Service Bulletin 145LEG-53-A032. 
This is a complete reissue of the Bulletin. 
This revision incorporates the information presente d in the Information Notice related 
to the previous issues of this Service Bulletin, as listed below: 
 
None. 
2. ADDITIONAL ACTION 
Aircraft that have complied with the previous issue of this bulletin do not need any 
additional action. 
3. RECORD OF REVISION 
Original issue: 20/Sep/2013. 
Revision 01: 24/Sep/2013. 
4. HIGHLIGHTS 
The topics, affected pages, and a brief description  of the content-related changes 
introduced by this revision are presented below.  
Revision bars are put in the left margin of each pa ge to show the location of the 
significant changes. Text displacement and text format changes are not indicated. 
TOPIC/ PAGE DESCRIPTION OF REVISION 
1. PLANNING INFORMATION  
C. REASON/ 7 Included reason for Revision 01 
3. ACCOMPLISHMENT INSTRUCTIONS  
FIGURE 2/ 25 and 26. Updated illustration.

### Page 2

(No text on this page.)

### Page 3

A L E R T
SERVICE BULLETIN
 
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 1 of 24 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
 
 
FUSELAGE – INSPECTION AND REPLACEMENT OF ATTACHMENT S PARTS FROM 
THE COCKPIT WINDSHIELD CENTER POST LOWER EYELET FITTING 
 
In connection with the use of this document, Embraer does not provide any express or implied warrantie s 
and expressly disclaims any warranty of merchantability or fitness for a particular purpose. 
 
 
 
1. PLANNING INFORMATION  
A. SB EFFECTIVITY 
Aircraft affected: 
MODEL SN 
EMB-135BJ 145412, 145462, 145484, 145495, 145505, 1 45516, 
145528, 145540, 145549, 145555, 145586, 145625, 
145637, 145642, 145644, 145678, 145686, 145699, 
145706, 145711, 145717, 145730, 145770, 145775, 
145780, 145789, 145796, 14500802, 14500809, 
14500818, 14500825, 14500832, 14500841, 
14500851, 14500854, 14500863, 14500867, 
14500873, 14500880, 14500884, 14500891, 
14500901, 14500903, 14500910, 14500913, 
14500916, 14500919, 14500925, 14500933, 
14500937, 14500939, 14500941, 14500942, 
14500944, 14500946, 14500948, 14500950, 
14500952, 14500954, 14500955, 
14500957, 14500960, 14500961, 14500963, 
14500965 thru 14500967, 14500969 thru 14500976, 
14500978 thru 14500983, 14500985, 14500986, 
14500988 thru 14500991, 14500993 thru 14500995, 
14500997 thru 14500999, 14501001 thru 
14501004, 14501006 thru 14501008, 14501010 thru 
14501012,14501014 thru 14501018, 14501020,

### Page 4

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 2 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
MODEL SN 
EMB-135BJ 14501021, 14501023, 14501025, 14501026, 
14501029, 14501031, 14501032, 14501034, 
14501035, 14501037 thru 14501039, 14501041, 
14501042, 14501044 thru 14501046, 14501048, 
14501049, 14501051, 14501052, 14501054, 
14501055, 14501057, 14501058, 14501060 thru 
14501062, 14501064, 14501066, 14501067, 
14501069, 14501071, 14501072, 14501074, 
14501075, 14501078 thru 14501080, 14501082, 
14501083, 14501086, 14501087, 14501089 thru 
14501092, 14501094 thru 14501096, 14501098 
thru 14501100, 14501102, 14501105 thru 
14501107, 14501109 thru 14501111, 14501113, 
14501114, 14501117 thru 14501123, 14501126 
thru 14501128, 14501131 thru 14501134, 
14501136 thru 14501152, 14501154 thru 
14501158, 14501160 thru 14501169, 14501171 
thru 14501174, 14501176, 14501181, 14501184, 
and 14501187. 
 
Affected component: 
 
None. 
 
 
In-production effectivity: 
 
EMB-135BJ model aircraft SN 14501103, 14501115, 145 01170, 14501175, 
14501179, 14501180, 14501182, 14501183, 14501188 th ru 14501210, 14501212 
thru 14501227, and 14501229 thru 14501249 and on have an equivalent modification 
factory-incorporated.

### Page 5

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 3 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
The SB effectivity is divided into GROUPS of aircraft, as follows: 
 
(1) GROUP 1 
MODEL SN 
EMB-135BJ 145412, 145462, 145484, 145495, 145505, 145516, 145 528, 
145540, 145549, 145555, 145586, 145591, 145625, 145 637, 
145642, 145644, 145678, 145686, 145699, 145706, 145 711, 
145717, 145730, 145770, 145775, 145780, 145789, 145 796, 
14500802, 14500809, 14500818, 14500825, 14500832, 1 4500841, 
14500851, and 14500854 which have accomplished with  
SB145LEG-53-0021. 
 
 
(2) GROUP 2 
 
MODEL SN 
EMB-135BJ 14500863, 14500867, 14500873, 14500880, 14500884, 1 4500891, 
14500901, 14500903, 14500910, 14500913, 14500916, 1 4500919, 
14500925, 14500933, 14500937, 14500939, 14500941, 1 4500942, 
14500944, 14500946, 14500948, 14500950, 14500952, 1 4500954, 
14500955, 14500957, 14500960, 14500961, 14500963, 1 4500965 
thru 14500967, 14500969 thru 14500976, 14500978 thr u 
14500983, 14500985, 14500986, 14500988 thru 1450099 1, 
14500993 thru 14500995, 14500997 thru 14500999, 14501001 thru 
14501004, 14501006 thru 14501008, 14501010 thru 145 01012, 
14501014 thru 14501018, 14501020, 14501021, 1450102 3, 
14501025, 14501026, 14501029, 14501031, 14501032, 1 4501034, 
14501035, 14501037 thru 14501039, 14501041, 1450104 2, 
14501044 thru 14501046, 14501048, 14501049, 1450105 1, 
14501052, 14501054, 14501055, 14501057, 14501058, 1 4501060 
thru 14501062, 14501064, 14501066, 14501067, 14501069,

### Page 6

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 4 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
MODEL SN 
EMB-135BJ 14501071, 14501072, 14501074, 14501075, 14501078 th ru 
14501080, 14501082, 14501083, 14501086, 14501087, 1 4501089 
thru 14501092, 14501094 thru 14501096, 14501098 thr u 
14501100, 14501102, 14501105 thru 14501107, 1450110 9 thru 
14501111, 14501113, 14501114, 14501117 thru 1450112 3, 
14501126 thru 14501128, 14501131 thru 14501134, 14501136 thru 
14501152, 14501154 thru 14501158, 14501160 thru 145 01169, 
14501171 thru 14501174, 14501176, 14501181, 1450118 4, and 
14501187. 
 
 
 
B. CONCURRENT REQUIREMENTS 
None.

### Page 7

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 5 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
C. REASON 
1. HISTORY 
During planned inspections of ERJ145 aircraft lower  beam it was detected a  
failure of bolts that connect the forward fuselage center post eyelet (between 
windshields). Investigation indicates that this fai lure may have relation to the 
bolts fatigue strength, and therefore a dedicated a ction to ensure the structures’ 
integrity is required. 
 
2. OBJECTIVE 
To ensure the integrity of the four bolts that conn ect the forward fuselage center 
post eylet.  
 
 
3. EXPECTED BENEFITS 
The new bolts present higher mechanical properties and also better fatigue life, 
preventing eyelet fitting dettaching. 
 
 
4. REVISION HISTORY 
(a) Revision 01: Updated illustration.

### Page 8

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 6 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
D. DESCRIPTION 
This Bulletin is divided into 2 PARTS, as follows: 
 
PART I INSPECTION OF THE CENTER POST FITTING ATTACHMENT PARTS. 
Applicable to: GROUPS 1 and 2 aircraft. 
 
 
PART I of this bulletin presents an inspection for the integrity of the attaching parts of 
the cockpit windshield center post lower eyelet fitting.  
 
To gain access to the work area, it is necessary to  remove the glareshield coverage, 
and the windshield center fairing. 
 
 
PART II REPLACEMENT OF THE CENTER POST FITTING ATTACHMENT PARTS. 
Applicable to: GROUPS 1 and 2 aircraft. 
 
 
PART II of this bulletin consists in replacing the attachment parts of the cockpit 
windshield center post lower eyelet fitting. 
 
To gain access to the work area, it is necessary to  remove the cockpit windshields, 
pilot and copilot seats, glareshield coverage, and the windshield center fairing.

### Page 9

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 7 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
E. COMPLIANCE 
 (a) Applicable to GROUP 1 aircraft: 
For aircraft with more than 3000 flight cycles sinc e the SB 145LEG-53-0021 
incorporation:  
 
- “PART I” of this bulletin is to be accomplished w ithin the next 50 flight 
cycles from the date this bulletin was issued. 
-  Thereafter, “PART I” of this bulletin is to be r epeated every 50 flight cycles 
limited to maximum of 6 inspections, until “PART II ” of this bulletin has 
been accomplished. 
 
For aircraft with less than 3000 flight cycles sinc e the SB 145LEG-53-0021 
incorporation: 
 
PART II of this bulletin must be accomplished befor e the aircraft logs 3000 
flight cycles or the next 96 months check (or multi ples), whichever occurs 
first. 
 
 
(b) Applicable to GROUP 2 aircraft: 
For aircraft with more than 3000 total flight cycles: 
 
- “PART I” of this bulletin is to be accomplished w ithin the next 50 flight 
cycles from the date this bulletin was issued. 
-  Thereafter, “PART I” of this bulletin is to be r epeated every 50 flight cycles 
limited to maximum of 6 inspections, until “PART II ” of this bulletin has 
been accomplished. 
 
For aircraft with less than 3000 total flight cycles: 
 
PART II of this bulletin must be accomplished befor e the aircraft logs 3000 
flight cycles or the next 96 months check (or multi ples), whichever occurs 
first. 
 
 
F. APPROVAL 
The technical aspects of this Alert Service Bulleti n are approved by: Embraer – 
Engineering Board.

### Page 10

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 8 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
G. COMMUNICATIONS TO EMBRAER 
EMBRAER requests that any results found during thes e inspections be informed to 
your local EMBRAER representatives or offices. 
 
 
 
H. ESTIMATED MANPOWER 
This estimate is for direct labor only, performed b y experienced personnel, and does 
not include the time to plan, prepare, or inspect the work. 
It is assumed that all the tools, parts, and other means are promptly available when 
necessary. 
This estimate does not include the sealant, paint, or adhesive curing time. 
 
 
1. APPLICABLE TO PART I 
- Access opening: 1.0 man-hour. 
- Inspection: 0.5 man-hours. 
- Modification: None. 
- Access closure: 1.0 man-hour. 
- Test: none. 
 
 
2. APPLICABLE TO PART II 
- Access opening: 10.0 man-hours. 
- Inspection: 0.5 man-hours. 
- Modification: 1.5 man-hours. 
- Access closure: 22.0 man-hours. 
- Test: none.

### Page 11

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 9 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
I. WEIGHT AND BALANCE 
- Change in basic weight: None 
- Change in basic moment: None 
 
 
 
J. ELECTRICAL LOAD DATA 
None. 
 
 
 
K. REFERENCES 
AMM-( ) – Aircraft Maintenance Manual – Chapter 32- 00-01 – Landing Gear. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 25- 12-07 – Equipment and 
Furnishings. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 25- 12-01 – Equipment and 
Furnishings. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 25- 11-01 – Equipment and 
Furnishings. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 25- 12-15 – Equipment and 
Furnishings. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 53- 12-02 – Fuselage. 
AMM-( ) – Aircraft Maintenance Manual – Chapter 56- 10-01 – Windows. 
 
 
 
L. OTHER PUBLICATIONS AFFECTED 
IPC-( ) – Illustrated Parts Catalog - Chapter 53-12 -00 - Fuselage.

### Page 12

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 10 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
2. MATERIAL INFORMATION  
A. MATERIAL – PRICE AND AVAILABILITY 
(1) MATERIAL AVAILABLE FROM EMBRAER 
None. 
 
 
(2) MATERIAL AVAILABLE FROM OTHER VENDORS  
None. 
 
 
 
B. INDUSTRY SUPPORT INFORMATION 
None. 
 
 
 
C. MATERIAL NECESSARY FOR EACH AIRCRAFT 
None.

### Page 13

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 11 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
(2) MATERIAL TO BE PROCURED 
(a) Parts 
The parts below should be procured from the manufac turer or locally 
purchase, as indicated in the associated Note, or o rdered as spares from 
Embraer. 
 
(1) Applicable to GROUPS 1 and 2 aircraft: 
 
NEW PN  DESCRIPTION  OLD PN  QTY  DISP/ Notes  
MS14181-05018L  Bolt  NAS6405A17  04 3 
MS21299-5 Washer MS21299-5K  08  3 
MS21299-C5  Washer MS21299C5K  08  3 
MS14182L05  Nut NAS1805-5 04 3 
MS24665-302  Cotter pin MS24665-302  01  7 
 
 
 (b) Consumables 
The material below or equivalent, required for the accomplishment of this 
bulletin, should be procured from the operator’s in ventories or from a local 
supplier. 
 
ITEM PN  DESCRIPTION  QTY  DISP/ Notes  
PR1776M B2 654 SEM 
KIT Interface sealant (AMS3281 CLASS B) AR  6 
COR-BAN 27L Corrosion Inhibitive Compound. (MEP 09-075) AR  6

### Page 14

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 12 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
QUANTITY : 
AR = As Required. 
 
DISPOSITION:  
3 = Replace part bearing OLD PN with part bearing NEW PN 
6 = Apply as required 
7 = Replace with part bearing same PN 
 
 
 
D. MATERIAL NECESSARY FOR EACH SPARE 
None. 
 
 
 
E. REIDENTIFIED PARTS 
None. 
 
 
 
F. TOOLING – PRICE AND AVAILABILITY 
 
None.

### Page 15

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 13 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
3. ACCOMPLISHMENT INSTRUCTIONS  
NOTES : 1)  For the purpose of this Service Bulletin, a General  Visual Inspection 
(GVI) is: “A visual examination of an interior or e xterior area, 
installation or assembly to detect obvious damage, failure or 
irregularity. This level of inspection is made from  within touching 
distance, unless otherwise specified. A mirror may be necessary to 
enhance visual access to all exposed surfaces in th e inspection 
area. This level of inspection is made under normal ly available 
lighting conditions such as daylight, hangar lighti ng, flashlight or 
drop-light and may require removal or opening of ac cess panels or 
doors. Stands, ladders or platforms may be required  to gain 
proximity to the area being checked.” 
2) Obey all of the WARNINGS and CAUTIONS included i n the 
referenced manuals and procedures. 
3) The Manuals and other documents are referred to by means of 
acronyms or using a simplified form. Refer to secti on “1. I. 
REFERENCES” for a more complete definition. 
4) This Service Bulletin effectivity is divided int o 02 aircraft GROUPS 
according to the relevant configuration and the SB itself is divided 
into 02 PARTS. The SB PARTS are featured to allow t heir 
independent accomplishment. 
REFERENCE APPLICATION TABLE 
Aircraft GROUPS SB PART APPLICABLE FIGURES 
1 and 2 I 1  
1 and 2  II 2 
 
 
The steps below outline the general accomplishment instructions. 
The detailed sequence is included in the respective figure, when necessary. 
 
 
A. Make sure that the aircraft is safe for maintenance.

### Page 16

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 14 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
B. PART I - INSPECTION OF THE BOLTS OF THE COCKPIT WINDSHIELD 
CENTER POST LOWER EYELET FITTING. 
(1) Install the landing gear safety pin. Refer to t he applicable “Aircraft Maintenance 
Manual” – Chapter 32-00-01 (TASK 32-00-01-910-801-A) – Landing Gear. 
(2) Remove and retain the glareshield coverage (223 AZ) from the instrument 
panel. Refer to the applicable AMM 25-12-07 (TASK 2 5-12-07-000-801-A) - 
Glareshild Coverage. 
(3) Remove and retain the windshield center fairing . Refer to the applicable AMM 
25-12-01 (TASK 25-12-01-000-801-A) - Ceiling Lining. 
(4) Do the inpection on the bolts PN NAS6405A17, wa shers PN MS21299C5K, 
MS21299-5K and nuts NAS1805-5 that attaches the coc kpit windshield center 
post eyelet fitting to the structure as follows: 
(a) If there is any sign of discrepancy on the bolt s, washers and nuts replace the 
bolts washers and nuts of the cockpit windshield ce nter post eyelet fitting 
immediately, according to PART II of this bulletin. 
(b) If there is no discrepancy on bolts, washers an d nuts, with the proper 
wrench, check if the bolts are tightened. 
(1) If the bolts are tightened, perform actions of inspection or replacement 
according limits defined in section E. COMPLIANCE. 
(2) If the bolt(s) are not tightened replace the bo lts washers and nuts of the 
cockpit windshield center post eyelet fitting immed iately, according to 
PART II of this bulletin. 
(5) Reinstall the retained glareshield coverage ( 2 23AZ) on its respective place on 
the instrument panel. Refer to the applicable AMM 2 5-12-07 (TASK 25-12-07-
400-801-A) - Glareshild Coverage. 
(6) Reinstall the retained windshield center fairin g. Refer to the applicable AMM 
25-12-01 (TASK 25-12-01-400-801-A) - Ceiling Lining. 
(7) Put the aircraft back to its initial condition.  
(8) Write the accomplishment of PART I of this bull etin in the applicable 
documents.

### Page 17

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 15 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
(9) Fill out the attached “Service Bulletin Impleme ntation and Evaluation” form and 
return it to: 
EMBRAER S.A. 
Customer Support Contact Center 
Embraer Executive Jets 
contact.center@embraer.com  
 
24/7 Toll Free Numbers 
1 888 362-2648 USA & Canada 
0800 704 1099 Brazil 
 
24/7 International Numbers 
1 703 621-7350 North America, including Mexico, & Caribbean 
+33 1 7048-0510 Europe, Middle East & Africa 
+65 6307-7647 Asia Pacific 
+55 12 3927-7000 Latin America 
 
NOTE : To formally inform that the SB has been incorporat ed in the aircraft or that the 
SB will not be incorporated, so that Embraer can update the affected technical 
publications, use the “Service Bulletin Full-Fleet Incorporation Report” form, 
which is available on the Flyembraer portal ( http://www.flyembraer.com ).

### Page 18

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 16 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
C. PART II - BOLTS, WASHERS AND NUTS OF THE COCKPIT  WINDSHIELD 
CENTER POST LOWER EYELET FITTING REPLACEMENT. 
(1) Install the landing gear safety pin. Refer to t he applicable “Aircraft 
Maintenance Manual” – Chapter 32-00-01 (TASK 32-00- 01-910-801-A) – 
Landing Gear. 
(2) Remove and retain the glareshield coverage ( 22 3AZ) from the instrument 
panel. Refer to the applicable AMM 25-12-07 (TASK 2 5-12-07-000-801-A) - 
Glareshild Coverage. 
(3) Remove and retain the windshield center fairing . Refer to the applicable AMM 
25-12-01 (TASK 25-12-01-000-801-A) - Ceiling Lining. 
(4) Remove and retain the cockpit windshields (LH a nd RH sides). Refer to the 
applicable AMM – Chapter 56-10-01 (TASK 56-10-01-00 0-801-A or TASK 56-
10-01-000-802-A, as applicable) – Windows. 
(5) Remove and retain the pilot and copilot seats. Refer to the applicable “Aircraft 
Maintenance Manual” – Chapter 25-11-01 (TASK 25-11- 01-000-801-A) – Pilot 
Seats. 
(6) Move the LH and RH pedal assembly (backward or forward) to get access to 
the botton part of the work area. Refer to the appl icable AOM - Section 2-02 
(TASK 2-02-05) - Pedal Adjustment. 
(7) Remove and retain the cockpit pedal covers. Ref er to the applicable  
“Aircraft Maintenance Manual” – Chapter 25-12-15 (T ASK 25-12-15-000-801-
A) – Cockpit Pedal Covers . 
(8) Replace the attachment parts of the cockpit win dshield center post eyelet 
fitting according to Figure 2. 
(9) Reinstall the cockpit pedal covers. Refer to th e applicable  
“Aircraft Maintenance Manual” – Chapter 25-12-15 (T ASK 25-12-15-400-801-
A) – Cockpit Pedal Covers. 
(10) Reinstall the retained glareshield coverage ( 223AZ) on its respective place on 
the instrument panel. Refer to the applicable AMM 2 5-12-07  
(TASK 25-12-07-400-801-A) - Glareshild Coverage. 
(11) Reinstall the retained windshield center fairi ng. Refer to the applicable AMM 
25-12-01 (TASK 25-12-01-400-801-A) - Ceiling Lining.

### Page 19

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 17 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
(12) Reinstall the retained cockpit windshields (LH  and RH sides). Refer to the 
applicable AMM – Chapter 56-10-01 (TASK 56-10-01-40 0-801-A or TASK 
56-10-01-400-802-A, as applicable) – Windows. 
(13) Reinstall the retained pilot and copilot seats . Refer to the applicable “Aircraft 
Maintenance Manual” – Chapter 25-11-01 (TASK 25-11- 01-400-801-A) – 
Pilot Seats. 
(14) Put the aircraft back to its initial condition . 
(15) Write the accomplishment of PART II of this bu lletin in the applicable 
documents. 
(16) Fill out the attached “Service Bulletin Implem entation and Evaluation” form 
and return it to: 
EMBRAER S.A. 
Customer Support Contact Center 
Embraer Executive Jets 
contact.center@embraer.com  
 
24/7 Toll Free Numbers 
1 888 362-2648 USA & Canada 
0800 704 1099 Brazil 
 
24/7 International Numbers 
1 703 621-7350 North America, including Mexico, & Caribbean 
+33 1 7048-0510 Europe, Middle East & Africa 
+65 6307-7647 Asia Pacific 
+55 12 3927-7000 Latin America 
 
NOTE : To formally inform that the SB has been incorporat ed in the aircraft or that the 
SB will not be incorporated, so that Embraer can update the affected technical 
publications, use the “Service Bulletin Full-Fleet Incorporation Report” form, 
which is available on the Flyembraer portal ( http://www.flyembraer.com ).

### Page 20

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 18 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
1. Inspection for the integrity of the attaching pa rts of the cockpit windshield center post 
lower eyelet fitting. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APPLICABLE TO GROUPS 1 AND 2 AIRCRAFT 
 
FIGURE 1: INSPECTION OF THE CENTER POST FITTING ATTACHMENT PARTS. 
(SHEET 01 OF 02)

### Page 21

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 19 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
EM145SB531356A.DGN
A
ZONES
223
224
DET. A
VIEW B
INSPECT THE ATTACHING
PARTS FOR INTEGRITY
B
1
 
APPLICABLE TO GROUPS 1 AND 2 AIRCRAFT 
 
FIGURE 1: INSPECTION OF THE CENTER POST FITTING ATTACHMENT PARTS. 
(SHEET 02 OF 02)

### Page 22

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 20 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
1. Remove and discard the bolts, washers and nuts o f the lower eyelet fitting of the 
cockpit windshield center post following the steps below: 
(a) Remove and discard cotter pin PN MS24665-302 (1  position) and remove and 
retain nut PN PE22072L7 (1 position), washers PN NA S1149C0763R (2 
positions), and bolt PN NAS6407A20D (1 position) th at attach the lower eyelet 
fitting to the cockpit windshield center post. Refe r to the applicable AMM 53-12-02 
(TASK 53-12-02-000-801-A) - Fuselage. 
(b) Remove and retain lower eyelet fitting PN 120-4 4541-003 (1 position) from the 
fuselage structure by removing and discarding nuts PN NAS1805-5 (4 position), 
washers PN MS21299-5K (4 positions) and PN MS21299C 5K (4 positions), and 
bolts PN NAS6405A17 (4 positions). Refer to the app licable AMM 53-12-02 
(TASK 53-12-02-000-801-A) - Fuselage. 
NOTE : More than one washer (PN MS21299-5K and PN MS21299C 5K) can 
be found in each position, limited in the maximum of two for position. 
(c) Remove and retain shim PN 120-04462-001 (2 posi tions). Refer to the applicable 
AMM 53-12-02 (TASK 53-12-02-000-801-A) - Fuselage. 
CAUTION:  THE SHIMS ARE VERY IMPORTANT IN THE ADJUSTMENT OF 
THE WINDSHIELD. BE CAREFUL NOT TO LOSE THEM OR 
CHANGE THEIR POSITIONS. 
WARNING:  BE CAREFUL WHEN YOU USE RHODIASOLVE. PUT ON SAFETY  
GOGGLES AND PROTECTIVE CLOTHING. DO NOT BREATHE THE  
GAS OR DUST. DO THE WORK IN AN AREA THAT HAS A GOOD  
FLOW OF AIR. THE RHODIASOLVE IS POISONOUS AND HIGHL Y 
FLAMMABLE.  
(d) With the aid of a spatula and using RHODIASOLVE  E-23 (MEP 13-073), clean up 
the sealant from the removed eyelet fitting and the fuselage faying area. 
 
 
 
 
 
 
APPLICABLE TO GROUPS 1 AND 2 AIRCRAFT 
 
FIGURE 2: REPLACEMENT ATTACHMENTS PARTS 
(SHEET 01 OF 05)

### Page 23

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 21 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
2. Perform a general visual inspection of lower eye let fitting PN 120-44541-003 (1 
position) to detect obvious damage, failure or irregularity. 
 
(a) if any damage (cracks, dents, scratches), failu re or irregularity is found, contact 
EMBRAER according to address below. 
 
Customer Support Contact Center 
Embraer Executive Jets 
contact.center@embraer.com  
 
24/7 Toll Free Numbers 
1 888 362-2648 USA & Canada 
0800 704 1099 Brazil 
 
24/7 International Numbers 
1 703 621-7350 North America, including Mexico, & Caribbean 
+33 1 7048-0510 Europe, Middle East & Africa 
+65 6307-7647 Asia Pacific 
+55 12 3927-7000 Latin America 
 
(b) if no damage (cracks, dents, scratches), failur e or irregularity is found,, no action 
is required. Perform steps (3) and on. 
3. Replace the bolts, washers and nuts of the cockp it windshield center post lower eyelet 
fitting following the step below: 
WARNING:  BE CAREFUL WHEN YOU USE COR-BAN 27L (MEP 09-075). PUT ON 
SAFETY GOGGLES AND PROTECTIVE CLOTHING. DO NOT 
BREATHE THE GAS OR DUST. DO THE WORK IN AN AREA THA T 
HAS A GOOD FLOW OF AIR. THE RHODIASOLVE IS POISONOU S 
AND HIGHLY FLAMMABLE.  
(a) Install the shim PN 120-04462-001 (2 positions)  between the lower eyelet fitting 
and the fuselage structure in the same position tha t they were installed before the 
disassembly, and apply COR-BAN 27L (MEP 09-075). Re fer to the applicable 
AMM 53-12-02 (TASK 53-12-02-400-801-A) - Fuselage. 
CAUTION:  THE SHIMS ARE VERY IMPORTANT IN THE ADJUSTMENT OF 
THE WINDSHIELD. BE CAREFUL NOT TO LOSE THEM OR 
CHANGE THEIR POSITIONS. 
FIGURE 2: REPLACEMENT ATTACHMENTS PARTS 
(SHEET 02 OF 05)

### Page 24

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 22 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
(b) Install lower eyelet fitting PN 120-44541-003 ( 1 position) to the fuselage structure, 
applying interface sealant PN PR1776M B2 654 SEM KI T (AMS3281 CLASS B) 
and using bolts PN MS14181-05018L (4 positions) wet  in sealant  
PN COR-BAN 27L (MEP 09-075), washers PN MS21299-C5 (4 positions) and  
PN MS21299-5 (4 positions), and nuts PN MS14182L05 (4 positions). Refer to the 
applicable AMM 53-12-02 (TASK 53-12-02-400-801-A) - Fuselage. 
NOTE : More than one washer (PN MS21299-C5 and PN MS21299- 5) can be 
installed in each position, limited in the maximum of two for position. 
NOTE : The lower eyelet fitting and the windshield center post must be aligned 
in such a way that bolt PN NAS6407A20D can be insta lled by sliding. 
Refer to the applicable AMM 53-12-02 (TASK 53-12-02 -400-801-A) - 
Fuselage. 
NOTE : Add the drag torque value measured before and the s tandard torque 
 together to get the final torque. Refer to AMM 20- 10-01 – Standard 
Practices. 
Apply a torque threaded fastener 190LBF.IN to 230LB F.IN. Refer to  
AMM 20-10-01 – Standard Practices. 
 
(c) Install windshield center post to lower eyelet fitting PN 120-44541-003 reusing bolt 
PN NAS6407A20D, washers PN NAS1149C0763R and PN NAS 1149C0763R, 
nut PN PE22072L7 and a new cotter pin PN MS24665-302. 
NOTE : The windshield center post must be aligned with the  forward fuselage 
centerline. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE 2: REPLACEMENT ATTACHMENTS PARTS 
(SHEET 03 OF 05)

### Page 25

A L E R T
SERVICE BULLETIN  
DATE: 20/Sep/2013 SB No.: 145LEG-53-A032 
REVISION No.: 01 - 24/Sep/2013 PAGE: 23 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
EM145SB531354A.DGN
A
ZONES
223
224
WINDSHIELD
CENTER POST
(REF.)
1
1
DET. A
1
1
B
NUT 
PN NAS1805−5
(04 POSITIONS)
(REMOVE AND DISCARD)
NUT 
PN MS14182L05
(04 POSITIONS)
(INSTALL)
WASHER
PN MS21299−5K
(04 POSITIONS)
(REMOVE AND DISCARD)
WASHER
PN MS21299−5
(04 POSITIONS)
(USE MAXIMUM 2 
WASHERS FOR POSITION)
(INSTALL)
WASHER
PN MS21299C5K
(04 POSITIONS)
(REMOVE AND DISCARD)
WASHER
PN MS21299−C5
(04 POSITIONS)
(USE MAXIMUM 2 
WASHERS FOR POSITION)
(INSTALL)
THICKNESS OF SHIM
(REF.)
FUSELAGE
STRUCTURE
(REF.)
1
EYELET FITTING
PN 120−44541−003
(REMOVE AND RETAIN)
(REINSTALL)
1
WASHER
PN NAS1149C0763R
(REMOVE AND RETAIN)
(REINSTALL)
NUT
PN PE22072L7
(REMOVE AND RETAIN)
(REINSTALL)
COTTER PIN
PN MS24665−302
(REMOVE AND DISCARD)
(INSTALL)
SHIM
PN 120−04462−001
(REMOVE AND RETAIN)
(REINSTALL)
1
BOLT
PN NAS6407A20D
(REMOVE AND RETAIN)
(REINSTALL)
WASHER
PN NAS1149C0763R
(REMOVE AND RETAIN)
(REINSTALL)
BOLT
PN NAS6405A17
(04 POSITIONS)
(REMOVE AND DISCARD)
BOLT
PN MS14181−05018L
(04 POSITIONS)
(INSTALL)
1
2
2
1
3
3
3
3
3
3
32
TORQUE: 33.9 − 45.2 N.m (300 − 400 lb.in) PLUS DRAG TORQUE.
3
APPLY SEALANT PN COR−BAN 27L (MEP 09−075).
3
2
APPLY INTERFACE SEALANT PN PR1776M B2 654 SEM KIT (AMS3281 CLASS B).
 
 
APPLICABLE TO GROUPS 1 AND 2 AIRCRAFT 
 
FIGURE 2: REPLACEMENT ATTACHMENTS PARTS 
(SHEET 04 OF 05)

### Page 26

A L E R T
SERVICE BULLETIN  
SB No.: 145LEG-53-A032 DATE: 20/Sep/2013 
PAGE: 24 REVISION No.: 01 - 24/Sep/2013 
Copyright © 2013 by EMBRAER S.A. All rights reserved. 
 
EM145SB531355A.DGN
1
VIEW B
EYELET FITTING
PN 120−44541−003
(INSTALL)
WINDSHIELD
CENTER POST
(REF.)
FORWARD
FUSELAGE
(REF.)
NUT
PN NAS1805−5
(04 POSITIONS)
(REMOVE AND DISCARD)
NUT 
PN MS14182L05
(04 POSITIONS)
(INSTALL)
WASHER
PN MS21299−5K
(04 POSITIONS)
(REMOVE AND DISCARD)
WASHER
PN MS21299−5
(04 POSITIONS)
(USE MAXIMUM 2 
WASHERS FOR POSITION)
(INSTALL)
WASHER
PN MS21299C5K
(04 POSITIONS)
(REMOVE AND DISCARD)
WASHER
PN MS21299−C5
(04 POSITIONS)
(USE MAXIMUM 2 
WASHERS FOR POSITION)
(INSTALL)
1
1
1
1
1
1
SHIM 
PN 120−04462−001
(REMOVE AND RETAIN)
(REINSTALL)
INSTALL BOLT BY SLIDING IT INTO PLACE.
REINSTALL THE SHIM IN THE SAME POSITION.
THE WINDSHIELD CENTER POST MUST BE ALIGNED WITH FORWARD FUSELAGE.
2
BOLT
PN NAS6405A17
(04 POSITIONS)
(REMOVE AND DISCARD)
BOLT
PN MS14181−05018L
(04 POSITIONS)
(INSTALL)
BOLT
PN NAS6407A20D
WASHER
PN NAS1149C0763R
(02 POSITIONS)
NUT
PN PE22072L7
(REINSTALL)
COTTER PIN
PN MS24665−302
(INSTALL)
4
4
5
5
3
3
3
3
3
3
3
2
6 TORQUE: 21.47 − 25.99 N.m (190 − 230 lb.in) PLUS DRAG TORQUE.
2 6
7
73
APPLY SEALANT PN COR−BAN 27L (MEP 09−075).2
3 APPLY INTERFACE SEALANT PN PR1776M B2 654 SEM KIT(AMS3281 CLASS B).
MAKE SURE THAT AT LEAST 2.0
OF THE BOLT THREAD REMAIN
 
 
APPLICABLE TO GROUPS 1 AND 2 AIRCRAFT 
 
FIGURE 2: REPLACEMENT ATTACHMENTS PARTS 
(SHEET 05 OF 05)

### Page 27

... 
   
 
 
SERVICE BULLETIN IMPLEMENTATION AND EVALUATION FORM  
The purpose of this form is to collect data that will be used to improve the quality of our Service Bulletins and 
Reliability Program.  
Please fill in this form and return it to:  EMBRAER S.A. 
Customer Support Contact Center 
Embraer Executive Jets 
contact.center@embraer.com  
 
24/7 Toll Free Numbers 
1 888 362-2648 USA & Canada 
0800 704 1099 Brazil 
 
24/7 International Numbers 
1 703 621-7350 North America, including Mexico, & Caribbean 
+33 1 7048-0510 Europe, Middle East & Africa 
+65 6307-7647 Asia Pacific 
+55 12 3927-7000 Latin America  
 
SB Number/Revision: SB Title: 
SB145LEG-53-A032R01 REPLACEMENT ATTACHMENTS PARTS OF THE COCKPIT WINDSH IELD CENTER POST LOWER EYELET FITTING  
 
SB Implementation Report 
Aircraft Serial Number or Registration Number: Inco rporation Date: 
  
Aircraft Flight Hours:  Aircraft Landings:  
  
 
SB Evaluation  (Check applicable squares below)  
Estimated Manpower: [   ] OK [   ] Not OK (Explain below) 
Material & Kits: [   ] OK [   ] Not OK (Explain below) 
Accomplishment Instructions: [   ] OK [   ] Not OK (Explain below) 
Figures: [   ] OK [   ] Not OK (Explain below) 
SB General Evaluation: [   ] OK [   ] Not OK (Explain below) 
Comments:  (Bulletin quality, difficulties found at the time of incorporation, suggested improvements,…)  
 
 
Company/ Service Center: Fax: Phone: 
   
Address:  
 
E-mail: Prepared by: (Name/Title) Date: 
   
ENS-003393

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
