# Embraer Service Bulletin 190E2-32-0015: Revision 1

- Rights: © Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2023-1636, the docket of AD 2023-15-02. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Embraer Service Bulletin 190E2-32-0015](https://openairdocs.org/service-documents/embraer/190e2-32-0015.md)
- Title as filed: SB190E2-32-0015 Rev 01 Jan 27 2023
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/3b/29/3b29b2cded877bc6d5ee49569442d9d4ebcc1541fa527d96d3e1af6e38de70bb
- Page: https://openairdocs.org/service-documents/embraer/190e2-32-0015/file/3b29b2cded87

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

1. DESCRIPTION 
 This sheet informs about Revision 01 to the Service Bulletin 190E2-32-0015.
 This is a complete reissue of this Service Bulletin.
 This revision incorporates the information presented in the Information Notice related to the previous issue of
this Service Bulletin, as listed below:
 SB190E2-32-0015R01-IN01
2. ADDITIONAL ACTION 
 Aircraft that have complied with the previous issue of this bulletin do not need any additional action.
3. RECORD OF REVISION 
 Basic issue: Aug 05, 2022
 Revision 01: Jan 27, 2023
4. HIGHLIGHTS 
 The topics, affected pages and a brief description of the content-related changes introduced by this revision
are presented below.
 Revision bars are shown in the left margin of each page to show where significant changes were made. Text
displacement and text format changes are not indicated.
TOPIC / PAGE DESCRIPTION OF REVISION
1. PLANNING INFORMATION
1.C. REASON / 01 Added reason of Revision 01.
3. ACCOMPLISHMENT INSTRUCTIONS
3. ACCOMPLISHMENT INSTRUCTIONS / 06 thru
08 Updated procedure information.
TRANSMITTAL LETTER
SB190E2-32-0015
Page 1 of 1
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 2

User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 3

LANDING GEAR - MLG SIDE-STAY UPPER SPINDLE - ATTACHMENT PARTS INSPECTION
In connection with the use of this document, Embraer does not provide any express or implied warranties and expressly disclaims any
warranty of merchantability or fitness for a particular purpose.
This document contains trade secrets, confidential, proprietary information of Embraer and technical data subject to U.S. Export
Administration Regulation ("EAR") and other countries export control laws and regulations. Diversion contrary to the EAR and other laws
and regulations is strictly forbidden. The above restrictions may apply to data on all pages of this document.
1. PLANNING INFORMATION 
A. SB EFFECTIVITY 
 Aircraft affected:
MODEL SN
E-JETS E2 19020009 thru 19020015, 19020017 thru 19020040, and19020042 thru 19020066.
 In-production effectivity:
This bulletin does not affect any in-production aircraft.
B. CONCURRENT REQUIREMENTS 
 None.
C. REASON 
 (1) HISTORY
 Embraer has received reports about the MLG side stay upper spindle attachments parts (bolt,
locking nut, washer and cotter pin) missing.
 These attachment parts are locking elements responsible for holding the Side Stay Nut in place.
If these are missing the Side Stay Nut could be lost due to the region vibration causing a non-
annunciated loss of the downlocking capability and collapse of the MLG during aircraft takeoff or
landing roll.
 (2) OBJECTIVE
 To do an one-time inspection of the MLG side stay upper spindle installation to check for the
correct installation of the nut locking elements and to measure clearances present in this
installation.
 (3) EXPECTED BENEFITS
 To make sure that MLG side stay upper spindle attachments parts are properly installed in order
to prevent the collapse of the MLG.
 (4) REVISION HISTORY
REVISION 01: This revision has been issued to update the accomplishment instructions.
This revision includes the Information Notice:
SB190E2-32-0015R01-IN01
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 1 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 4

D. DESCRIPTION 
 This bulletin is to measure the clearance between the spindle shoulder and the bushing flange, and the
clearance between the bushing flange and washer. Also, it gives instructions to do a check of the
attachment parts (bolt, locking nut, washer and cotter pin) to make sure that they are properly installed
on the MLG side-stay upper spindle. If they are not, it gives the instructions to install them.
 To do this, it is necessary to get access to the area at MLG compartment, in zones 731 and 741.
 This Bulletin is divided into 2 PARTS, as follows:
 (1) APPLICABLE TO PART I:
 PART I of this Service Bulletin gives the procedures to do the check of the attachment parts (bolt,
locking nut, washer and cotter pin) for correct installation on the LH MLG side-stay upper spindle.
Also, it gives the procedures to measure the clearance between the spindle shoulder and the
bushing flange, and the clearance between the bushing flange and the washer.
 (2) APPLICABLE TO PART II:
 PART II of this Service Bulletin gives the procedures to do the check of the attachment parts
(bolt, locking nut, washer and cotter pin) for correct installation on the RH MLG side-stay upper
spindle. Also, it gives the procedures to measure the clearance between the spindle shoulder and
the bushing flange, and the clearance between the bushing flange and the washer.
NOTE: The modification presented in this bulletin does not affect Fatigue Critical Structure (FCS).
E. COMPLIANCE 
1) SB CATEGORY
 
 Category 02: RECOMMENDED
 
2) SB ACCOMPLISHMENT
 
 Embraer recommends the accomplishment of this SB in the next 500FH/350FC or 3 months,
whichever comes first, from the SB issue date.
 
F. APPROVAL 
 The inspection mentioned in this Service Bulletin does not affect the type design previously approved
by Agência Nacional de Aviação Civil (ANAC).
NOTE: If any aircraft listed in the SB effectivity has an incorporated modification or repair that is not
from EMBRAER and which affects the content of this Service Bulletin, the operator will take
full responsibility for obtaining approval by a regulatory agency for any adaptation necessary
before the incorporation of this Service Bulletin.
G. ESTIMATED MANPOWER 
 This is an estimate of the manpower necessary to accomplish this Service Bulletin on a single aircraft.
 It is intended for direct labor only, performed by experienced personnel and does not include the time
to plan, prepare or inspect the work. Sealant, paint or adhesive curing times are not included either.
 It is assumed that all the tools, parts and other means are readily available when necessary.
 An adjustment to these values may be necessary to meet particular circumstances.
SERVICE BULLETIN
SB190E2-32-0015
Page 2 of 11
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 5

(1) APPLICABLE TO PART I:
– Access opening: 0.1 man-hours.
– Inspection: 0.1 man-hours.
– Modification: 2.0 man-hours.
– Access closure: 0.1 man-hours.
– Test: None.
NOTE: The estimate man-hours to do this modification may vary according to the issues found
during the inspections described in this Service Bulletin.
 (2) APPLICABLE TO PART II:
– Access opening: 0.1 man-hours.
– Inspection: 0.1 man-hours.
– Modification: 2.0 man-hours.
– Access closure: 0.1 man-hours.
– Test: None.
NOTE: The estimate man-hours to do this modification may vary according to the issues found
during the inspections described in this Service Bulletin.
H. WEIGHT AND BALANCE 
 None.
I. ELECTRICAL LOAD DATA 
 Not changed.
J. SOFTWARE ACCOMPLISHMENT SUMMARY 
 None.
K. REFERENCES 
AMM 190E2/( ) Aircraft Maintenance Manual PART II - 20-00-00 and 20-10-02 - STANDARDPRACTICES-AIRFRAME.
AMM 190E2/( ) Aircraft Maintenance Manual PART II - 32-11-11 and 32-12-01 - LANDINGGEAR.
SRM 190E2/( ) Structural Repair Manual Part II - 51-21-05 - STANDARD PRACTICES ANDSTRUCTURES.
L. OTHER PUBLICATIONS AFFECTED 
 None.
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 3 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 6

2. MATERIAL INFORMATION 
A. MATERIAL - PRICE AND AVAILABILITY 
 (1) MATERIAL AVAILABLE FROM EMBRAER
 None.
 (2) MATERIAL AVAILABLE FROM OTHER VENDORS
 None.
B. INDUSTRY SUPPORT INFORMATION 
 None.
C. MATERIAL NECESSARY FOR EACH AIRCRAFT 
 When applicable, the use of alternative or similar parts is allowed, once it is approved by Embraer as
indicated in the related Embraer Technical Publications or through a formal Embraer communication
channel.
 The necessary expendable or consumable parts presented in the AMM Tasks mentioned in this bulletin
can be acquired from the operator's inventories or ordered as spares.
 When necessary, additional information is presented as Notes in the respective Table.
 (1) TOP KITS AND KITS
 None.
 (2) MATERIAL TO BE PROCURED
 (a) Parts
 The material below or equivalent required for the accomplishment of this bulletin should be
procured from the operator’s inventories or from a local supplier.
NEW PN DESCRIPTION OLD PN QTY DISP/Notes
AN4-25 BOLT-HEXAGONHEAD,STEEL AN4-25 2 6
NAS1149C0432R WASHER,FLAT-CRES NAS1149C0432R 2 6
MS17825-4 NUT,HEXAGON MS17825-4 2 6
MS24665-134 PIN,COTTER-SPLIT,STEEL MS24665-134 2 6
 (b) Consumable Materials
 The material below or equivalent required for the accomplishment of this bulletin should be
procured from the operator’s inventories or from a local supplier.
SERVICE BULLETIN
SB190E2-32-0015
Page 4 of 11
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 7

Applicable to PARTS I and II
NEW PN DESCRIPTION OLD PN QTY DISP/Notes
COR-BAN 27L
CORROSION-
INHIBITING
COMPOUND
COR-BAN 27L AR 6
DISPOSITION: 6 = Apply as required
QUANTITY: AR = As Required
D. MATERIAL NECESSARY FOR EACH SPARE 
 None.
E. REIDENTIFIED PARTS 
 None.
F. TOOLING - PRICE AND AVAILABILITY 
 Whenever required, the necessary tooling presented in the AMM Tasks mentioned in this bulletin,
should be procured from the operator’s inventories or ordered as spares.
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 5 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 8

3. ACCOMPLISHMENT INSTRUCTIONS 
NOTE:
1) The definition of a General Visual Inspection (GVI) for this Service Bulletin is: “A visual
examination of an interior or exterior area, installation or assembly to detect obvious damage,
failure or irregularity. This level of inspection is made from within touching distance, unless
otherwise specified. A mirror may be necessary to enhance visual access to all exposed
surfaces in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may require
removal or opening of access panels or doors. Stands, ladders or platforms may be required
to gain proximity to the area being checked.”
2) For the purpose of this Service Bulletin, a Detailed Inspection (DET) is: “An intensive
examination of a specific item, installation or assembly to detect damage, failure or irregularity.
Available lighting is normally supplemented with a direct source of good lighting at an intensity
deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate access procedures may be required.”
3) Obey all of the WARNINGS and CAUTIONS included in the mentioned manuals and
procedures.
4) The Manuals and other documents are mentioned as acronyms or with a simplified form.
Refer to section 1.K. REFERENCES for a more complete definition.
 The steps below outline the general accomplishment instructions.
 The detailed sequence is included in the respective figure, when necessary.
 A. Make sure that the aircraft is safe for maintenance. Refer to AMM TASK 20-00-00-910-801-A/200 -
Aircraft Safety Procedures Before Maintenance - Standard Procedures.
 B. PART I – LH MLG SIDE-STAY UPPER SPINDLE
 (1) Open the MLG INBD doors. Refer to AMM TASK 32-12-01-860-801-A/200  - Main-Landing-Gear
Inboard Door (open) - Configuration.
 (2) On the LH MLG side-stay, do the GVI and make sure that the attachment parts (bolt P/N AN4-25,
washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N MS24665-134) are
correctly installed on the LH MLG side-stay upper spindle. Refer to Figure 1.
 (3) If all attachment parts are installed (bolt, locking nut, washer and cotter pin), do the Step 3.B.(5).
 (4) If any attachment part is missing, do as follows:
 (a) Identify the missing attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R,
locknut P/N MS17825-4 and cotter pin P/N MS24665-134) and install it as follows ( Figure
1):
 1 Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L to
the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or
locknut P/N MS17825-4) (SRM PART II 51-21-05 - FASTENER SEALING).
 2 Install the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or
locknut P/N MS17825-4) on the spindle.
 3 Make sure that the threads of locknut P/N MS17825-4 and bolt P/N AN4-25 fully
engage. The base of the locknut P/N MS17825-4 must not touch the surface.
SERVICE BULLETIN
SB190E2-32-0015
Page 6 of 11
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 9

4 Turn the locknut P/N MS17825-4 and measure the locking torque with a torque
wrench.
 5 Make sure that the locking torque is 0.39 - 3.39 N.m (3.5 - 30.0 lb.in).
NOTE: If you find a locknut P/N MS17825-4 that is not in the correct range, you must
replace it and do steps 3, 4, and 5 again.
 6 Add the locking torque value measured in step 5 to the standard torque of 1 - 3 N.m
(8.8 - 26.5 lb.in) to get the final torque.
 7 Apply the final torque to locknut P/N MS17825-4 with a torque wrench, as follows:
 a Tighten the locknut P/N MS17825-4 to the bolt P/N AN4-25 to remove the
clearance.
 b Torque the locknut P/N MS17825-4 with the minimum final torque value and
continue to torque as necessary to align its slot with the cotter pin P/N
MS24665-134 hole in the bolt P/N AN4-25.
NOTE: Be careful not to apply more than the maximum torque value.
 8 Safety the locknut P/N MS17825-4 to the bolt P/N AN4-25 with a new cotter pin P/N
MS24665-134 (AMM TASK 20-10-02-910-801-A/200 - Typical Safetying Methods -
Maintenance Practices).
 (b) Do the Step 3.B.(5).
 (5) With a feeler gauge, do a DET inspection to measure the clearance between the spindle shoulder
and the bushing flange (A) and the clearance between the bushing flange and the washer (B).
The clearance measurement (A+B) must use the criteria that follows to dispatch the aircraft
(Figure 2):
 (a) If the clearance dimension (A+B) is less than or equal to 0.5 mm (0.0196 in), no action is
necessary.
 (b) If the clearance dimension (A+B) is between 0.6 mm (0.0236 in) and 2.0 mm (0.0787 in),
remove and install the LH MLG side-stay upper spindle in the next 10 Flight Cycles (FC).
Refer to AMM TASK 32-11-11-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
 (c) If the clearance dimension (A+B) is more than 2.0 mm (0.0787 in), remove and install the
LH MLG side-stay upper spindle. Refer to AMM TASK 32-11-11-400-801-A/400 - Main-
Landing-Gear Side Stay - Installation.
 (6) Close the MLG INBD doors. Refer to AMM TASK 32-12-01-860-802-A/200 - Main-Landing-Gear
Inboard Door (close) - Configuration.
 C. PART II – RH MLG SIDE-STAY UPPER SPINDLE
 (1) Open the MLG INBD doors. Refer to AMM TASK 32-12-01-860-801-A/200  - Main-Landing-Gear
Inboard Door (open) - Configuration.
 (2) On the RH MLG side-stay, do the GVI and make sure that the attachment parts (bolt P/N
AN4-25, washer P/N NAS1149C0432R, locknut P/N MS17825-4 and cotter pin P/N
MS24665-134) are correctly installed on the RH MLG side-stay upper spindle. Refer to Figure 1.
 (3) If all attachment parts are installed (bolt, locking nut, washer and cotter pin), do the Step 3.C.(5).
 (4) If any attachment part is missing, do as follows:
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 7 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 10

(a) Identify the missing attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R,
locknut P/N MS17825-4 and cotter pin P/N MS24665-134) and install it as follows ( Figure
1):
 1 Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L to
the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or
locknut P/N MS17825-4) (SRM PART II 51-21-05 - FASTENER SEALING).
 2 Install the attachment part(s) (bolt P/N AN4-25, washer P/N NAS1149C0432R, and/or
locknut P/N MS17825-4) on the spindle.
 3 Make sure that the threads of locknut P/N MS17825-4 and bolt P/N AN4-25 fully
engage. The base of the locknut P/N MS17825-4 must not touch the surface.
 4 Turn the locknut P/N MS17825-4 and measure the locking torque with a torque
wrench.
 5 Make sure that the locking torque is 0.39 - 3.39 N.m (3.5 - 30.0 lb.in).
NOTE: If you find a locknut P/N MS17825-4 that is not in the correct range, you must
replace it and do steps 3, 4, and 5 again.
 6 Add the locking torque value measured in step 5 to the standard torque of 1 - 3 N.m
(8.8 - 26.5 lb.in) to get the final torque.
 7 Apply the final torque to locknut P/N MS17825-4 with a torque wrench, as follows:
 a Tighten the locknut P/N MS17825-4 to the bolt P/N AN4-25 to remove the
clearance.
 b Torque the locknut P/N MS17825-4 with the minimum final torque value and
continue to torque as necessary to align its slot with the cotter pin P/N
MS24665-134 hole in the bolt P/N AN4-25.
NOTE: Be careful not to apply more than the maximum torque value.
 8 Safety the locknut P/N MS17825-4 to the bolt P/N AN4-25 with a new cotter pin P/N
MS24665-134 (AMM TASK 20-10-02-910-801-A/200 - Typical Safetying Methods -
Maintenance Practices).
 (b) Do the Step 3.C.(5).
 (5) With a feeler gauge, do a DET inspection to measure the clearance between the spindle shoulder
and the bushing flange (A) and the clearance between the bushing flange and the washer (B).
The clearance measurement (A+B) must use the criteria that follows to dispatch the aircraft
(Figure 2):
 (a) If the clearance dimension (A+B) is less than or equal to 0.5 mm (0.0196 in), no action is
necessary.
 (b) If the clearance dimension (A+B) is between 0.6 mm (0.0236 in) and 2.0 mm (0.0787 in),
remove and install the RH MLG side-stay upper spindle in the next 10 Flight Cycles (FC).
Refer to AMM TASK 32-11-11-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
 (c) If the clearance dimension (A+B) is more than 2.0 mm (0.0787 in), remove and install the
RH MLG side-stay upper spindle. Refer to AMM TASK 32-11-11-400-801-A/400 - Main-
Landing-Gear Side Stay - Installation.
 (6) Close the MLG INBD doors. Refer to AMM TASK 32-12-01-860-802-A/200 - Main-Landing-Gear
Inboard Door (close) - Configuration.
SERVICE BULLETIN
SB190E2-32-0015
Page 8 of 11
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 11

D. Put the aircraft back to a serviceable condition. Refer to AMM TASK 20-00-00-910-802-A/200  - Aircraft
Safety Procedures After Maintenance - Standard Procedures.
 E. Write the accomplishment of PART I and/or PART II of this bulletin in the applicable documents.
NOTE: Please use the online SB evaluation form available on the FlyEmbraer portal ( http://
www.flyembraer.com). Go to "Maintenance > eTechPubs > Utilities > SB Evaluation Form" to
inform us about the SBs that you have incorporated in your fleet, as well as the difficulties
found during the SB incorporation.
This will allow Embraer to consider your aircraft configuration when providing future
modifications.
Your feedback will be much appreciated to improve the quality of Embraer modifications.
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 9 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 12

FIGURE 1 - MLG SIDE-STAY UPPER SPINDLE - GVI
(Sheet 1 of 1)
EM170E2SB320009B.IDR
A
B
DO A VISUAL INSPECTION TO MAKE SURE THAT ALL THE ATTACHMENT PARTS ARE CORRECTLY INSTALLED.1
1
B
BOLT
PN AN4-25
WASHER
PN NAS1149C0432R
LOCKNUT
PN MS17825-4
COTTER PIN
PN MS24665-134
A
SERVICE BULLETIN
SB190E2-32-0015
Page 10 of 11
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 13

FIGURE 2 - MLG SIDE-STAY UPPER SPINDLE - Clearance
(Sheet 1 of 1)
EM170E2SB320010A.IDR
A
B
B
A
B-B
STRUCTURE
(REF.)
SPINDLE SHOULDER
(REF.)
A
B
SERVICE BULLETIN
Date:  Aug 05, 2022
Revision No.:  01 - Jan 27, 2023
SB190E2-32-0015
Page 11 of 11
Copyright © by Embraer S.A. All rights reserved - See title page for details.
User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

### Page 14

User: jglopes - Printed By myTechCare - Mar 24/23 - 18:27:16

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.