# Embraer Service Bulletin 190LIN-57-0016: No revision named

- Rights: © Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2012-1227; AD 2013-11-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Embraer Service Bulletin 190LIN-57-0016](https://openairdocs.org/service-documents/embraer/190lin-57-0016.md)
- Title as filed: SB190LIN-57-0016
- Pages: 46
- PDF: https://openairdocs.org/files/sha256/7e/24/7e240ffbfd3a8ad6bc627089d25f8e1e5e03afec74b401a029e03ab0c2ad43cc
- Page: https://openairdocs.org/service-documents/embraer/190lin-57-0016/file/7e240ffbfd3a

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

WINGS - MAIN LANDING GEAR SIDE STAY BUSHING - REPLACEMENT
1. PLANNING INFORMATION
A. SB EFFECTIVITY
Aircraft affected:
MODEL SN
EMBRAER 190 ECJ 19000109, 19000140, 19000159, 19000177, 19000203,
19000225, 19000236, 19000243, 19000261, and
19000296.
In-production effectivity:
EMBRAER 190 ECJ model aircraft SN 19000278, 19000307, 19000317 and on have an
equivalent modification factory-incorporated.
B. CONCURRENT REQUIREMENTS
The accomplishment of Service Bulletin 190LIN-32-0017 original Issue, or a subsequent
approved revision is required in conjunction with the accomplishment of PART II and/or
PART III of this Service Bulletin.
C. REASON
(1) HISTORY
Instances have been reported concerning the migration of the outer bushing of the
side stay support fitting on the left-hand and right-hand Main Landing Gear (MLG).
The migration of the outer bushing may cause inefficient lubrication of the support
fitting. In extreme cases of bushing migration, cracks on the Main Landing Gear
(MLG) Side Stay Support Assembly may occur.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 1 of 44
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 2

(2) OBJECTIVE
To provide instructions to replace the current outer bushing of the Main Landing Gear
(MLG) side stay support fitting with new flanged one plus support spacers. Also, to
provide instructions to replace the current inner bushing.
(3) EXPECTED BENEFITS
This modification is aimed at ensuring proper lubrication of the Main Landing Gear
(MLG) side stay support fitting.
(4) REVISION HISTORY
None.
D. DESCRIPTION
This Bulletin is divided into 03 PARTS, as follows:
PART I INSPECTION FOR MIGRATION OF THE OUTER BUSHING OF THE LHAND RH MAIN LANDING GEAR SIDE STAY SUPPORT FITTING
Applicable to: Refer to 1.A. SB EFFECTIVITY aircraft.
PART I of this bulletin consists in measuring the axial migration of the outer bushing from
its housing on the side stay support fitting of the left-hand and right-hand Main Landing
Gear (MLG).
To do this, it is necessary to gain access to the side stay support fitting of the left-hand
and right-hand Main Landing Gear (MLG).
PART II REPLACEMENT OF THE OUTER / INNER BUSHING OF THE LH MAINLANDING GEAR SIDE STAY SUPPORT FITTING
Applicable to: Refer to 1.A. SB EFFECTIVITY aircraft.
The modification presented in PART II of this bulletin consists in replacing the current
outer bushing of the LH Main Landing Gear (MLG) side stay support fitting with a new
flanged one made from beryllium-copper and support spacers installation. Therefore, the
current inner bushing of the LH Main Landing Gear (MLG) side stay support fitting must
be replaced also.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 2
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 3

To do this, it is necessary to remove the support assembly of the left-hand Main Landing
Gear (MLG) side stay support fitting.
PART III REPLACEMENT OF THE OUTER / INNER BUSHING OF THE RH MAINLANDING GEAR SIDE STAY SUPPORT FITTING
Applicable to: Refer to 1.A. SB EFFECTIVITY aircraft.
The modification presented in PART III of this bulletin consists in replacing the current
outer bushing of the RH Main Landing Gear (MLG) side stay support fitting with a new
flanged one made from beryllium-copper and support spacers installation. Therefore, the
current inner bushing of the RH Main Landing Gear (MLG) side stay support fitting must
be replaced also.
To do this, it is necessary to remove the support assembly of the right-hand Main Landing
Gear (MLG) side stay support fitting.
NOTE: The modification presented in this bulletin does not affect the Fatigue
Critical Structure (FCS).
E. COMPLIANCE
(1) APPLICABLE TO PART I
Embraer recommends that PART I of this bulletin be accomplished within the next
100 Flight Cycle(s) or during the next scheduled maintenance check, whichever
occurs first.
– If the distance of the outer bushing migration is less than 5 mm, Part II and/or
PART III of this bulletin must be accomplished by the time that the aircraft logs
100 Flight Cycle(s) or during the next scheduled maintenance check, whichever
occurs first, from the accomplishment of inspection presented in this PART I.
– If the distance of the outer bushing migration is equal to or greater than 5 mm,
immediate accomplishment of Part II and/or PART III of this bulletin is required.
(2) APPLICABLE TO PART II
Embraer recommends that PART II of this bulletin be accomplished as follows:
– If the distance of the outer bushing migration is less than 5 mm, according to the
inspection presented in PART I of this bulletin, this PART II must be accomplished
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 3
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 4

by the time that the aircraft logs 100 Flight Cycle(s) or during the next scheduled
maintenance check, whichever occurs first, from the accomplishment of PART I
of this bulletin.
– If the distance of the outer bushing migration is equal to or greater than 5 mm,
according to the inspection presented in PART I of this bulletin, this PART II must
be accomplished immediately.
(3) APPLICABLE TO PART III
Embraer recommends that PART III of this bulletin be accomplished as follows:
– If the distance of the outer bushing migration is less than 5 mm, according to the
inspection presented in PART I of this bulletin, this PART III must be
accomplished by the time that the aircraft logs 100 Flight Cycle(s) or during the
next scheduled maintenance check, whichever occurs first, from the
accomplishment of PART I of this bulletin.
– If the distance of the outer bushing migration is equal to or greater than 5 mm,
according to the inspection presented in PART I of this bulletin, this PART III must
be accomplished immediately.
F. APPROVAL
The technical aspects of this Service Bulletin are approved by: Agência Nacional de
Aviação Civil (ANAC).
G. ESTIMATED MANPOWER
This estimate is for direct labor only, performed by experienced personnel, and does not
include the time to plan, prepare, or inspect the work.
It is assumed that all the tools, parts, and other means are readily available when
necessary.
This estimate does not include the sealant, paint, or adhesive curing time.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 4
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 5

(1) APPLICABLE TO PART I
– Access opening: None.
– Inspection: 0.5 man-hours.
– Modification: None.
– Access closure: None.
– Test: None.
(2) APPLICABLE TO PART II
– Access opening: 4.5 man-hours.
– Inspection: None.
– Modification: 2.0 man-hours.
– Access closure: 5.0 man-hours.
– Test: 1.0 man-hour.
NOTE: These estimates do not include the time necessary to accomplish SB
190LIN-32-0017.
(3) APPLICABLE TO PART III
– Access opening: 4.5 man-hours.
– Inspection: None.
– Modification: 2.0 man-hours.
– Access closure: 5.0 man-hours.
– Test: 1.0 man-hour.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 5
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 6

NOTE: These estimates do not include the time necessary to accomplish SB
190LIN-32-0017.
H. WEIGHT AND BALANCE
(1) APPLICABLE TO PART I
None.
(2) APPLICABLE TO PART II
– Change in basic weight: + 3.0789 lb (+ 1.3966 kg).
– Change in basic moment: + 2164.8 lb.in (+ 24.9 kg.m).
(3) APPLICABLE TO PART III
– Change in basic weight: + 3.0789 lb (+ 1.3966 kg).
– Change in basic moment: + 2164.8 lb.in (+ 24.9 kg.m).
I. SOFTWARE ACCOMPLISHMENT SUMMARY
None.
J. REFERENCES
AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 07-10-01 - LIFTING &
SHORING.
AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 20-00-00 - STANDARD
PRACTICES-AIRFRAME.
AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 29-10-00 - HYDRAULIC
POWER.
AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 32-00-00, 32-00-03,
32-11-05, and 32-11-09 - LANDING GEAR.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 6
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 7

SRM 190LIN/( ) Structural Repair Manual Part II - 51-21-01, 51-21-02, and
51-21-07 - STANDARD PRACTICES AND STRUCTURES.
K. OTHER PUBLICATIONS AFFECTED
AIPC 190LIN/( ) Aircraft Illustrated Parts Catalog - 32-11-05 - LANDING GEAR.
AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 32-11-05 - LANDING
GEAR.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 7
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 8

2. MATERIAL INFORMATION
A. MATERIAL - PRICE AND AVAILABILITY
(1) MATERIAL AVAILABLE FROM EMBRAER
The kit(s) below, required for the accomplishment of this bulletin, will be available
from Embraer according to the commercial conditions defined in the item 2.B.
INDUSTRY SUPPORT INFORMATION of this service bulletin.
The estimated delivery date will be provided by Embraer upon request.
When ordering, specify SB 190LIN-57-0016 and Top Kit PN presented in Table
below, as applicable.
REF TOP KIT PN Unit Price(US$) TOP KIT EFFECTIVITY
01 BSLIN5700160001 PART II / Refer to 1.A. SB EFFECTIVITY
aircraft.
02 BSLIN5700160002 PART III / Refer to 1.A. SB EFFECTIVITY
aircraft.
(2) MATERIAL AVAILABLE FROM OTHER VENDORS
None.
B. INDUSTRY SUPPORT INFORMATION
(1) WARRANTY COVERAGE
(a) Parts
The SB kit will be provided at no charge.
(b) Labor
Will be reimbursed by Embraer to the limit defined in the item1.G. ESTIMATED
MANPOWER if performed at an Embraer-Authorized Service Center.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 8
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 9

(c) Expiration
The terms expressed in the warranty coverage will be valid for 36 months after
the SB issue date.
C. MATERIAL NECESSARY FOR EACH AIRCRAFT
When applicable, the use of alternative or similar parts in place of the one specified in the
kits is allowable, provided that these alternative or similar parts are approved by Embraer
as indicated in the related Embraer Technical Publications or through a formal Embraer
communication channel.
The necessary expendable or consumable parts presented in the AMM Tasks referred to
in this bulletin should be procured from the operator’s inventories or ordered as spares.
The complementary information, when necessary, is presented as Notes in the respective
Table.
For ordering information and Top Kit effectivity refer to section 2.A. MATERIAL - PRICE
AND AVAILABILITY of this Bulletin.
(1) TOP KITS AND KITS
Kit Summary: Top Kit Composition (Kit PN / Quantity)
Top Kit PN 191-07090-603 191-07090-604 191-21800-603 191-21800-604
BSLIN5700160001 01 - 01 -
BSLIN5700160002 - 01 - 01
(a)
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 9
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 10

Kit PN 191-07090-603 - SIDE STAY BUSHING, SB KIT
NEW PN DESCRIPTION OLD PN QTYSUP QTYRQD DISP/Notes
191-07080-005 Inner Bushing 191-07080-003 01 01 3
191-19356-003 Outer Bushing 190-32805-003 or190-32805-023 01 01 3
(b)
Kit PN 191-07090-604 - SIDE STAY BUSHING, SB KIT
NEW PN DESCRIPTION OLD PN QTYSUP QTYRQD DISP/Notes
191-07080-005 Inner Bushing 191-07080-003 01 01 3
191-19356-003 Outer Bushing 190-32805-003 or
190-32805-023 01 01 3
(c)
Kit PN 191-21800-603 - SIDE STAY BUSHING, SB KIT
NEW PN DESCRIPTION OLD PN QTYSUP QTYRQD DISP/Notes
191-19357-001 Space Tube - 01 01 2
191-19358-401 Space Tube - 01 01 2
NAS6303-7 Bolt - 04 04 2
NAS1149C0363R Washer - 04 04 2
(d)
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 10
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 11

Kit PN 191-21800-604 - SIDE STAY BUSHING, SB KIT
NEW PN DESCRIPTION OLD PN QTYSUP QTYRQD DISP/Notes
191-19357-001 Space Tube - 01 01 2
191-19358-401 Space Tube - 01 01 2
NAS6303-7 Bolt - 04 04 2
NAS1149C0363R Washer - 04 04 2
(2) MATERIAL TO BE PROCURED
(a) Parts
The parts below, if required for the accomplishment of this bulletin, should be
ordered as spares from Embraer.
Applicable to all Top Kit
NEW PN DESCRIPTION OLD PN QTY DISP/Notes
191-19356-007 Outer Bushing 190-32805-003 or
190-32805-023 AR 3
191-21788-001 AFT Inner Bushing 191-07080-003 AR 3/ [1]
191-21789-001 FWD Inner Bushing
190-32803-003 or
190-32803-021
AR 3/ [1]
1. When necessary, these parts must be ordered together.
(b) Consumable Materials
The material below or equivalent, required for the accomplishment of this
bulletin, should be procured from the operator’s inventories or from a local
supplier.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 11
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 12

Applicable to all Top Kit
NEW PN DESCRIPTION OLD PN QTY DISP/Notes
RHODIASOLVE E-23 Solvent - AR 6/ [1]
PR1776M B-2 Sealant - AR 6/ [2]
COR-BAN 27L Corrosion-inhibitingcompound -A R 6 / [3]
AEROSHELL 33 Synthetic grease - AR 6/ [4]
ARDROX AV-15 Corrosion-inhibiting
compound -A R 6 / [5]
70307-12 Lubricant Medium
Paste (BOELUB) -A R 6/ [6]
1. Solvent for Manual Cleaning (MEP 13-073) RHODIASOLVE E-23
2. Class B2 Low-Density Polysulfide Sealant (AMS3281) PR1776M B-2
3. Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L
4. Synthetic Grease (MIL-PRF-23827) AEROSHELL 33
5. Corrosion Inhibiting Compound (MEP_10-063) ARDROX AV-15
6. Class V-D(2) Lubricant Paste (-) 70307-12 (Spec BAC 5008)
DISPOSITION: 2 = Incorporate part bearing NEW PN
3 = Replace part bearing OLD PN with part bearing NEW
PN
6 = Apply as required
QUANTITY: AR = As Required
D. MATERIAL NECESSARY FOR EACH SPARE
None.
E. REIDENTIFIED PARTS
None.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 12
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 13

F. TOOLING - PRICE AND AVAILABILITY
(1) The tooling presented below, required for the accomplishment of this bulletin, will be
available from Embraer as one kit per site at no charge.
DESCRIPTION PN SUPPLIER
Side Stay Bushing Tool SAC-2010-HELICOIDAL(E1456716) EMBRAER
Support Tool 040932(E6310175) EMBRAER
Extractor Tool 040928(E6309528) EMBRAER
(2) The tooling presented below, if required for the accomplishment of this bulletin,
should be procured directly from the manufacturer or should be ordered at loan basis
from Embraer.
DESCRIPTION PN SUPPLIER
Roller burnishing tool - 68 mm
in diameter 024.01511-0000 Commercially available [1]
Roller burnishing tool - 50 mm
in diameter 024.01510-0000 Commercially available [2]
1. When ordering from Embraer, specify Ecode 2123411.
2. When ordering from Embraer, specify Ecode 2123388
(3) The tooling presented below, if required for the accomplishment of this bulletin, will
be available from Embraer at loan basis.
DESCRIPTION PN SUPPLIER
Reamer 70301493(E1457256) Embraer
Reamer T1133/07(E2467310) Embraer
(4) Whenever required, the necessary tooling presented in the AMM Tasks referred to in
this bulletin, should be procured from the operator’s inventories or ordered as
spares.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 13
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 14

3. ACCOMPLISHMENT INSTRUCTIONS
NOTE: 1) For the purpose of this Service Bulletin, a Detailed Inspection (DI) is: “An
intensive examination of a specific item, installation or assembly to detect
damage, failure or irregularity. Available lighting is normally supplemented with
a direct source of good lighting at an intensity deemed appropriate. Inspection
aids such as mirrors, magnifying lenses, etc. may be necessary. Surface
cleaning and elaborate access procedures may be required.”
2) Obey all of the WARNINGS and CAUTIONS included in the referenced manuals
and procedures.
3) The Manuals and other documents are referred to by acronyms or using a
simplified form. Refer to section 1.J. REFERENCES for a more complete
definition.
4) This Service Bulletin is divided into 03 PARTS. The SB PARTS are featured to
allow their independent accomplishment.
REFERENCE APPLICATION TABLE
SB PART APPLICABLE FIGURES
I1
II 2, 3, 4, 5, and 6
III 2, 3, 4, 5, and 6
The steps below outline the general accomplishment instructions.
The detailed sequence is included in the respective figure, when necessary.
A. Make sure that the aircraft is safe for maintenance. Refer to AMM TASK 20-00-00-910-
801-A/200 - Aircraft Maintenance Safety Procedures - Standard Procedures.
B. PART I - LH AND RH MAIN LANDING GEAR SIDE STAY BUSHING MIGRATION -
MEASUREMENT
(1) Do the procedure to make the aircraft safe for maintenance of the landing gear.
Refer to AMM TASK 32-00-00-860-801-A/200 - Landing Gear - Prepare for
Maintenance.
(2) Measure the bushing axial migration from the bushing housing on the left-hand and
right-hand Main Landing Gear (MLG) side stay. Refer to Figure 1.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 14
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 15

– If the distance of the bushing migration is less than 5 mm, it is necessary to
accomplish Part II and/or PART III of this bulletin no later than 100 Flight Cycle(s)
or during the next scheduled maintenance check, whichever occurs first, after the
accomplishment of the inspection presented in this PART I.
– If the distance of the bushing migration is equal to or greater than 5 mm,
immediate accomplishment of Part II and/or PART III of this bulletin is necessary.
(3) Restore the aircraft to normal.
(4) Enter the accomplishment of PART I of this bulletin in the applicable documents.
C. PART II - LH MAIN LANDING GEAR SIDE STAY BUSHINGS - REPLACEMENT
(1) Do the procedure to make the aircraft safe for maintenance of the landing gear.
Refer to AMM TASK 32-00-00-860-801-A/200 - Landing Gear - Prepare for
Maintenance.
(2) Release the pressure from the No. 2 hydraulic system. Refer to AMM TASK
29-10-00-860-804-A/200 - Hydraulic System - Depressurization.
(3) Lift the aircraft on jacks. Refer to AMM TASK 07-10-01-500-801-A/200 - Complete
Aircraft Jacking - Maintenance Practices.
(4) Remove the two Left-Hand (LH) MLG downlock springs. Refer to AMM TASK
32-11-09-000-801-A/400 - Main-Landing-Gear Downlock Spring - Removal.
(5) Remove the Left-Hand (LH) downlock sensor harness from the lever and side stay
upper assembly. Refer to AMM TASK 32-11-05-000-801-A/400 - Main-Landing-Gear
Side Stay - Removal.
(6) Disconnect the union nuts of the Left-Hand (LH) hydraulic hoses from the unions.
Refer to AMM TASK 32-11-05-000-801-A/400 - Main-Landing-Gear Side Stay -
Removal.
(7) Replace the bushing of the Left-Hand (LH) main landing gear side stay, following the
steps below:
(a) Disconnect the Left-Hand (LH) MLG side stay from the trunnion. Refer to Figure
2.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 15
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 16

(b) Replace the inner bushing of the Left-Hand (LH) main landing gear side stay.
Refer to Figure 3.
(c) Replace the outer bushing of the Left-Hand (LH) main landing gear side stay.
Refer to Figure 4.
(d) Reconnect the Left-Hand (LH) side-stay to the trunnion. Refer to Figure 5.
(8) Reconnect the Left-Hand (LH) hydraulic hoses on the unions. Refer to AMM TASK
32-11-05-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
(9) Reinstall the Left-Hand (LH) downlock sensor harnesses to the locking stay. Refer to
AMM TASK 32-11-05-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
(10) Reinstall the Left-Hand (LH) MLG downlock springs. Refer to AMM TASK 32-11-09-
400-801-A/400 - Main-Landing-Gear Downlock Spring - Installation.
(11) Lubricate the Left-Hand (LH) upper side stay attachment point on the aircraft
structure. Refer to AMM TASK 32-00-03-600-801-A/300 - Main-Landing-Gear
Mechanical System - Lubrication.
(12) Restore the aircraft to normal.
(13) Enter the accomplishment of PART II of this bulletin in the applicable documents.
D. PART III - RH MAIN LANDING GEAR SIDE STAY BUSHINGS - REPLACEMENT
(1) Do the procedure to make the aircraft safe for maintenance of the landing gear.
Refer to AMM TASK 32-00-00-860-801-A/200 - Landing Gear - Prepare for
Maintenance.
(2) Release the pressure from the No. 2 hydraulic system. Refer to AMM TASK
29-10-00-860-804-A/200 - Hydraulic System - Depressurization.
(3) Lift the aircraft on jacks. Refer to AMM TASK 07-10-01-500-801-A/200 - Complete
Aircraft Jacking - Maintenance Practices.
(4) Remove the two Right-Hand (RH) MLG downlock springs. Refer to AMM TASK
32-11-09-000-801-A/400 - Main-Landing-Gear Downlock Spring - Removal.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 16
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 17

(5) Remove the Right-Hand (RH) downlock sensor harness from the lever and side stay
upper assembly. Refer to AMM TASK 32-11-05-000-801-A/400 - Main-Landing-Gear
Side Stay - Removal.
(6) Disconnect the union nuts of the Right-Hand (RH) hydraulic hoses from the unions.
Refer to AMM TASK 32-11-05-000-801-A/400 - Main-Landing-Gear Side Stay -
Removal.
(7) Replace the bushing of the Right-Hand (RH) main landing gear side stay following
the steps below:
(a) Disconnect the Right-Hand (RH) MLG side stay from the trunnion. Refer to
Figure 2.
(b) Replace the inner bushing of the Right-Hand (RH) main landing gear side stay.
Refer to Figure 3.
(c) Replace the outer bushing of the Right-Hand (RH) main landing gear side stay.
Refer to Figure 4.
(d) Reconnect the Right-Hand (RH) side-stay to the trunnion. Refer to Figure 5.
(8) Reconnect the right-hand hydraulic hoses on the unions. Refer to AMM TASK
32-11-05-400-801-A/400 - Main-Landing-Gear Side Stay - Installation.
(9) Reinstall the Right-Hand (RH) downlock sensor harnesses to the locking stay. Refer
to AMM TASK 32-11-05-400-801-A/400 - Main-Landing-Gear Side Stay - Installa-
tion.
(10) Reinstall the Right-Hand (RH) MLG downlock springs. Refer to AMM TASK
32-11-09-400-801-A/400 - Main-Landing-Gear Downlock Spring - Installation.
(11) Lubricate the Right-Hand (RH) upper side stay attachment point on the aircraft
structure. Refer to AMM TASK 32-00-03-600-801-A/300 - Main-Landing-Gear
Mechanical System - Lubrication.
(12) Restore the aircraft to normal.
(13) Enter the accomplishment of PART III of this bulletin in the applicable documents.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 17
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 18

NOTE: 1) Please inform us by e-mail reliability.executive@embraer.com.br of the aircraft
manufacturer serial number and the SB incorporation date, specifying the SB
Part(s) incorporated or whether the whole SB has been incorporated. This will
enable Embraer to consider your aircraft configuration when providing future
modifications.
2) To formally inform that the SB has been incorporated fleet-wide or that the SB
will not be incorporated, so that Embraer can update the affected technical
publications, use the “Service Bulletin Full-Fleet Incorporation Report” form,
which is available on the Flyembraer portal (http://www.flyembraer.com).
3) Use the attached “Service Bulletin Evaluation” form to send us your comments
regarding this SB. Your feedback will be much appreciated as an aid for us to
improve the quality of the SBs.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 18
DATE: 10/Jun/2011
REVISION No.:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 19

EM170SB570972A.DGN
A
B
B
DIMENSION
(MEASURE)
ZONE
740
A
ZONE
730
A
1 USE A VERNIER CALIPER TO MEASURE THE DISTANCE BETWEEN THE
BUSHING HOUSING LIMIT EDGE AND THE BUSHING EDGE.
1
OUTER
BUSHING
(REF.)
OUTER BUSHING
HOUSING
(REF.)
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 19
APPLICABLE TO PART I
FIGURE 1 - MAIN LANDING GEAR SIDE STAY BUSHING MIGRATION - INSPECTION
(SHEET 01 OF 01)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 20

1. Remove and retain retaining ring PN M27426-1147D, locking nut PN 2821-0059, and
spring ring PN 2000A0764K01 from the support assembly. Refer to detail C.
2. Remove and retain nut PN 2821-0058. Then remove locking ring PN 2821-0056 and pin
PN MS51838-220 from the support assembly. Retain the locking ring and discard the
pin. Refer to detail C.
3. Hold the MLG side stay and move it away from the trunnion. Refer to detail C.
4. Use a polyethylene spatula, lint-free wiper cloth and Solvent for Manual Cleaning (MEP
13-073) RHODIASOLVE E-23 to remove the fillet sealant from the bushing. Refer to
SRM PART II 51-21-07/1 - SEALING REMOVAL.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 20
DATE: 10/Jun/2011
REVISION No.:
FIGURE 2 - DISCONNECTION OF THE MLG SIDE STAY FROM THE TRUNNION
(SHEET 01 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 21

A
TYPICAL
B
B
C
EM170SB570973A.DGN
ZONE
740
A
ZONE
730
A
MLG SIDE STAY
(REF.)
TRUNNION
(REF.)
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 21
APPLICABLE TO PART II AND PART III
FIGURE 2 - DISCONNECTION OF THE MLG SIDE STAY FROM THE TRUNNION
(SHEET 02 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 22

2 NUT
PN 2821−0058
(REMOVE AND RETAIN)
2
TRUNNION
(REF.)
LOCKING RING
PN 2821−0056
(REMOVE AND RETAIN)
SPRING RING
PN 2000A0764K01
(REMOVE AND RETAIN)
LOCKING NUT
PN 2821−0059
(REMOVE AND RETAIN)
RETAINING RING
PN M27426−1147D
(REMOVE AND RETAIN)
PIN
PN MS51838−220
(REMOVE AND DISCARD)
1
1
EM170SB570975A.DGN
3
SUPPORT ASSEMBLY (REF.)
(DISCONNECT)
1
1
1
3 4
14
3
MLG SIDE STAY
(REF.)
(DISCONNECT)
REMOVE THE FILLET SEALANT FROM THE BUSHINGS. REFER TO SRM 51−21−07.
2
C
OUTER
BUSHING
(REF.)
AFT INNER
BUSHING
(REF.)
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 22
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 2 - DISCONNECTION OF THE MLG SIDE STAY FROM THE TRUNNION
(SHEET 03 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 23

1. Remove and discard AFT inner bushing PN 191-07080-003 following the steps below:
NOTE: Before bushing removal, protect the surface where the tool will be touch in
order to prevent damage to the structure.
(a) Install support extractor tool PN 040932 and extractor tool PN 040928 as shown in
picture 1.
(b) Heat the trunnion area around the AFT inner bushing with a heat gun set at a
temperature of approximately 80 °C. Use a digital thermometer to verify the
trunnion temperature.
(c) Torque the nut to extract the AFT inner bushing from the trunnion as shown in
picture 2.
WARNING : BE CAREFUL WHEN YOU USE THE RHODIASOLVE E-23. PUT ON
SAFETY GOGGLES AND PROTECTIVE CLOTHING. DO NOT
BREATHE THE GAS OR DUST. DO THE WORK IN AN AREA WHICH
HAS A GOOD FLOW OF AIR. THE RHODIASOLVE E-23 ARE POISON-
OUS AND HIGHLY FLAMMABLE SUBSTANCES.
2. Clean the AFT inner bushing housing with a clean cloth wet in Solvent for Manual
Cleaning (MEP 13-073) RHODIASOLVE E-23 or similar. Refer to picture 3.
3. Perform a detailed inspection on the AFT inner bushing housing surface for signs of
scratches, marks or gouges. Refer to picture 3.
(a) If any discrepancy is found, proceed according to steps 4. Figure 4 and on.
(b) If no discrepancy is found, proceed according to steps 7. Figure 4 and on.
4. Blend out the damaged area of the AFT inner bushing housing, using an aluminum-
oxyde grain sandpaper No.300/600 and/or a scotch brite pad. Refer to picture 3.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 23
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 01 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 24

WARNING : BE CAREFUL WHEN YOU USE THE RHODIASOLVE E-23. PUT ON
SAFETY GOGGLES AND PROTECTIVE CLOTHING. DO NOT
BREATHE THE GAS OR DUST. DO THE WORK IN AN AREA WHICH
HAS A GOOD FLOW OF AIR. THE RHODIASOLVE E-23 ARE POISON-
OUS AND HIGHLY FLAMMABLE SUBSTANCES.
5. Clean the AFT inner bushing housing again with a clean cloth wet in Solvent for Manual
Cleaning (MEP 13-073) RHODIASOLVE E-23 or similar. Refer to picture 4.
6. Perform a detailed inspection again on the AFT inner bushing housing surface for signs
of scratches, marks or gouges. Refer to picture 4.
(a) If any discrepancy is found, proceed according to step 8. Figure 4 and on.
(b) If no discrepancy is found, proceed according to step 7. Figure 4 and on.
7. Measure the internal diameter of the AFT inner bushing housing at three different points
and three different depths, using a bore micrometer. Refer to picture 5.
(a) If the bushing housing diameter value is equal to or less than 58.030 mm, AFT inner
bushing PN 191-07080-005 must be installed, according to steps 11. Figure 3 and
on.
(b) If the bushing housing diameter value is greater than 58.030 mm, AFT inner
bushing PN 191-21788-001 and FWD inner bushing PN 191-21789-001 must be
installed, according to steps 8. Figure 4 and on.
8. Remove FWD inner bushing PN 190-32803-003 or PN 190-32803-021, as applicable,
following the steps below:
NOTE: Before bushing removal, protect the area where the tool will be touch in
order to prevent damage to the structure.
(a) Install tool PN SAC-2010-HELICOIDAL as shown in picture 6.
(b) Heat the trunnion area around the AFT inner bushing with a heat gun set at a
temperature of approximately 80 °C. Use a digital thermometer to verify the
trunnion temperature.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 24
DATE: 10/Jun/2011
REVISION No.:
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 02 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 25

(c) Torque the nut to extract the bushing from the trunnion as shown in picture 7.
9. Enlarge the internal diameter of the inner bushing housing, using reamer PN 1T133/07
with Class V-D(2) Lubricant Paste (-) 70307-12 , and FWD inner bushing PN
191-21789-001 should be installed together with AFT inner bushing PN 191-21788-001.
Refer to picture 8
NOTE: AFT inner bushing PN 191-21788-001 and FWD inner bushing PN 191-21789-
001 should be ordered as spares from Embraer.
10.Install AFT inner bushing PN 191-21788-001 and FWD inner bushing PN 191-21789-
001 following the steps below:
WARNING : LIQUID NITROGEN IS DANGEROUS, OBEY MANUFACTURERS
INSTRUCTIONS.
(a) Let the AFT and FWD inner bushing in liquid nitrogen for 20 min, as shown in
picture 9. As a guide, the bushing soak will usually stop ″gassing off ″ when the
maximum shrinkage has been obtained.
(b) Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN
27L around the inner bushing housing as shown in picture 10. Refer to SRM PART
II 51-21-01/1 - FAYING SURFACE SEALING.
(c) Remove the AFT inner bushing from the liquid nitrogen and install it into its housing
immediately as shown in picture 10.
1 Make sure the flange of the AFT inner bushing is in contact with the trunnion.
(d) Remove the FWD inner bushing from the liquid nitrogen and install it into its
housing immediately as shown in picture 11.
1 Make sure the flange of the FWD inner bushing is in contact with the trunnion.
(e) Follow the instructions given in steps 12. Figure 3 and on.
11. Install AFT inner bushing PN 191-07080-005 following the steps below:
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 25
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 03 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 26

WARNING : LIQUID NITROGEN IS DANGEROUS, OBEY MANUFACTURERS
INSTRUCTIONS.
(a) Let the bushing in liquid nitrogen for 20 min, as shown in picture 12. As a guide, the
bushing soak will usually stop″gassing off″ when the maximum shrinkage has been
obtained.
(b) Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN
27L around the bushing housing, as shown in picture 13. Refer to SRM PART II
51-21-01/1 - FAYING SURFACE SEALING.
(c) Remove the AFT inner bushing from the liquid nitrogen and install it into its housing
immediately, as shown in picture 13.
1 Make sure the flange of the AFT inner bushing is in contact with the trunnion.
12.Measure the internal diameter of the inner bushings, as shown in picture 14. The
bushing must have an internal diameter between 50.045 mm and 50.065 mm.
(a) If the measure value is less than the allowed limit, burnish inside the installed
bushing using an appropriate roller burnishing tool.
13.Apply Class B2 Low-Density Polysulfide Sealant (AMS3281) PR1776M B-2 to the
bushing (both lateral interfaces between the flanged bushing and the fitting), as shown
in pictures 15 and 16. Refer to SRM PART II 51-21-02/1 - FILLET SEALING.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 26
DATE: 10/Jun/2011
REVISION No.:
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 04 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 27

1
2
1
SUPPORT TOOL
PN 040932
(REF.)
EXTRACTOR TOOL
PN 040928
(REF.)
AFT INNER BUSHING
PN 191−07080−003
(REMOVE AND DISCARD)
1 1
1
1
SUPPORT TOOL
PN 040932
(REF.)
1
TRUNNION
(REF.)
EXTRACTOR TOOL
PN 040928
(REF.)
1
REMOVE AFT INNER BUSHING USING SUPPORT TOOL PN 040932 AND EXTRACTOR TOOL PN 040928.
EM170SB570974A.DGN
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 27
APPLICABLE TO PART II AND PART III
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 05 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 28

2 IF ANY DISCREPANCY IS FOUND, BLEND OUT THE DAMAGED AREA.
BORE MICROMETER
(REF.)
4
5
56
7
AFT INNER
BUSHING HOUSING
(INSPECT AGAIN)
FWD INNER
BUSHING
(REF.)
FWD INNER
BUSHING
(REF.)
234 2
3
FWD INNER
BUSHING
(REF.)
AFT INNER
BUSHING HOUSING
(MEASURE THE
INTERNAL DIAMETER)
AFT INNER
BUSHING HOUSING
(INSPECT AND BLEND OUT, 
IF NECESSARY)
EM170SB570980A.DGN
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 28
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 06 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 29

EM170SB571014A.DGN
3
TOOL
PN SAC−2010−HELICOIDAL
(INSTALL)
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
1
NUT
(REF.)
TRUNNION
(REF.)
3
6
7
8
8
FWD INNER BUSHING
PN 190−32803−003 OR
PN 190−32803−021
(REMOVE AND DISCARD)
REMOVE BUSHING USING TOOL PN SAC−2010−HELICOIDAL.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 29
APPLICABLE TO PART II AND PART III
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 07 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 30

EM170SB571015A.DGN
RATCHET WRENCH
(REF.)
REMOVE THE BUSHING FROM LIQUID NITROGEN.
4
5
6
7
8
9
USE LUBRICANT PASTE (BOELUB) PN 70307−12.
9
REAMER
PN 1T133/07
(REF.)
8
LET THE BUSHING IN LIQUID NITROGEN.
APPLY COR−BAN 27L.
INSTALL THE BUSHING IMMEDIATELY.
MAKE SURE THAT THE FLANGE IS IN CONTACT WITH THE TRUNNION.
11
FWD INNER BUSHING
PN 191−21789−001
(INSTALL)
10 789
6
AFT INNER BUSHING
PN 191−21788−001
(INSTALL)
10 789
INNER BUSHING
HOUSING
(REF.)
10
9
AFT INNER BUSHING
PN 191−21788−001
FWD INNER BUSHING
PN 191−21789−001
(IMMERSE)
10 5
LIQUID
NITROGEN
9 4
INNER BUSHING HOUSING
(ENLARGE, IF NECESSARY)
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 30
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 08 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 31

EM170SB571016A.DGN
5
LIQUID
NITROGEN
AFT INNER BUSHING
PN 191−07080−005
(IMMERSE)
11
12
6
AFT INNER BUSHING
PN 191−21780−005
(INSTALL)
789
INNER BUSHING
HOUSING
(REF.)
13
11
BURNISHER
(REF.)
11
AFT AND FWD
BUSHINGS
(REF.)
1214 10
MAKE SURE THAT THE FLANGE IS IN CONTACT WITH
THE TRUNNION.
SEALANT
(REF.)
12
A
13
SEALANT
(REF.)
1213
9
10
11
12
15
16
A
MEASURE THE INTERNAL DIAMETER OF THE BUSHING.
IF NECESSARY, USE ROLLER BURNISHER TOOL.
APPLY FILLET SEALANT PN PR1776M B−2.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 31
APPLICABLE TO PART II AND PART III
FIGURE 3 - MAIN LANDING GEAR SIDE STAY INNER BUSHING - REPLACEMENT
(SHEET 09 OF 09)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 32

1. Remove and discard outer bushing PN 190-32805-003 or PN 190-32805-023 following
the steps below:
NOTE: Before bushing removal, protect the area where the tool will touch, in order
to prevent damage to the structure.
(a) Install tool PN SAC-2010-HELICOIDAL as shown in picture 1.
(b) Heat the trunnion area around the AFT inner bushing with a heat gun set at a
temperature of approximately 80 °C. Use a digital thermometer to verify the
trunnion temperature.
(c) Torque the nut to extract the bushing from the trunnion as shown in picture 2.
WARNING : BE CAREFUL WHEN YOU USE THE RHODIASOLVE E-23. PUT ON
SAFETY GOGGLES AND PROTECTIVE CLOTHING. DO NOT
BREATHE THE GAS OR DUST. DO THE WORK IN AN AREA WHICH
HAS A GOOD FLOW OF AIR. THE RHODIASOLVE E-23 ARE POISON-
OUS AND HIGHLY FLAMMABLE SUBSTANCES.
2. Clean the bushing housing with a clean cloth wet in Solvent for Manual Cleaning (MEP
13-073) RHODIASOLVE E-23 or similar. Refer to picture 3.
3. Perform a detailed inspection on the bushing housing surface for signs of scratches,
marks or gouges. Refer to picture 3.
(a) If any discrepancy is found, proceed according to steps 4. Figure 4 and on.
(b) If no discrepancy is found, proceed according to steps 7. Figure 4 and on.
4. Blend out the damaged area of the bushing housing, using an aluminum-oxyde grain
sandpaper No.300/600 and/or a scotch brite pad. Refer to picture 3.
WARNING : BE CAREFUL WHEN YOU USE THE RHODIASOLVE E-23. PUT ON
SAFETY GOGGLES AND PROTECTIVE CLOTHING. DO NOT
BREATHE THE GAS OR DUST. DO THE WORK IN AN AREA WHICH
HAS A GOOD FLOW OF AIR. THE RHODIASOLVE E-23 ARE POISON-
OUS AND HIGHLY FLAMMABLE SUBSTANCES.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 32
DATE: 10/Jun/2011
REVISION No.:
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 01 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 33

5. Clean the bushing housing again with a clean cloth wet in Solvent for Manual Cleaning
(MEP 13-073) RHODIASOLVE E-23 or similar. Refer to picture 4.
6. Perform a detailed inspection again on the bushing housing surface for signs of
scratches, marks or gouges. Refer to picture 4.
(a) If any discrepancy is found, proceed according to steps 8. Figure 4 and on.
(b) If no discrepancy is found, proceed according to steps 7. Figure 4 and on.
7. Measure the internal diameter of the bushing housing at three different points and three
different depths using a bore micrometer. Refer to picture 5.
(a) If the bushing housing diameter value is equal to or less than 82.035 mm, bushing
PN 191-19356-003 must be installed according to step 9. Figure 4.
(b) If the bushing housing diameter value is greater than 82.035 mm, bushing PN
191-19356-007 must be installed, according to steps 8. Figure 4 and on.
8. Enlarge the internal diameter of the bushing housing using reamer PN 70301493 with
Class V-D(2) Lubricant Paste (-) 70307-12 , and bushing PN 191-19356-007 should be
installed. Refer to picture 6
NOTE: Outer bushing PN 191-19356-007, should be ordered as spares from Embraer.
9. Install outer bushing PN 191-19356-003 or PN 191-19356-007, as applicable, following
the steps below:
WARNING : LIQUID NITROGEN IS DANGEROUS, OBEY MANUFACTURERS
INSTRUCTIONS.
(a) Assemble the outer bushing and tool as shown in picture 7 and put it in liquid
nitrogen as shown in picture 8.
NOTE: The base of the tool (″L″) should be positioned on the structure to receive
the bushing and tool set.
(b) Let the outer bushing and tool set in liquid nitrogen for 20 min, as shown in picture
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 33
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 02 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 34

8. As a guide, the outer bushing soak will usually stop ″gassing off ″ when the
maximum shrinkage has been obtained.
(c) Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN
27L around the outer bushing housing as shown in picture 9. Refer to SRM PART
II 51-21-01/1 - FAYING SURFACE SEALING.
(d) Remove the outer bushing and tool set from the liquid nitrogen as shown in pictures
9 and 10 , and install the bushing into the housing immediately, using tool PN
SAC-2010-HELICOIDAL as shown in picture 11.
1 Make sure that the outer bushing and tool set are positioned on the base of the
tool (″L″) in the correct position, with the tool pins facing up, as shown in picture
9.
2 Make sure the flange of the outer bushing is in contact with the trunnion using
tool PN SAC-2010-HELICOIDAL, as shown in pictures 9 and 10.
10.Measure the internal diameter of the outer bushing, as shown in picture 12. The outer
bushing must have an internal diameter between 68.04 mm and 68.06 mm. Refer to
picture 12.
(a) If the measure value is less than the allowed limit, burnish inside the installed outer
bushing, using an appropriate roller burnishing tool.
11. Apply Class B2 Low-Density Polysulfide Sealant (AMS3281) PR1776M B-2 to the
outer bushing (both lateral interfaces between the flanged bushing and the fitting), as
shown in pictures 13 and 14. Refer to SRM PART II 51-21-02/1 - FILLET SEALING.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 34
DATE: 10/Jun/2011
REVISION No.:
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 03 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 35

2
1
11
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
1
EM170SB570976A.DGN
1
1
NUT
(REF.)
TRUNNION
(REF.)
TOOL
PN SAC−2010−HELICOIDAL
(INSTALL)
OUTER BUSHING
PN 190−32805−023 OR
PN 190−32805−003
(REMOVE AND DISCARD)
REMOVE OUTER BUSHING USING TOOL PN SAC−2010−HELICOIDAL.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 35
APPLICABLE TO PART II AND PART III
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 04 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 36

BORE MICROMETER
(REF.)
RATCHET WRENCH
(REF.)
EM170SB570984A.DGN
3
4
5
6
234
56
7
REAMER
PN 70301493
(REF.)
8
2
3
IF ANY DISCREPANCY IS FOUND, BLEND OUT THE DAMAGED AREA.
USE LUBRICANT PASTE (BOELUB) PN 70307−12.
2
OUTER BUSHING HOUSING
(INSPECT AND BLENDOUT,
IF NECESSARY)
3
OUTER BUSHING HOUSING
(MEASURE THE 
INTERNAL DIAMETER)
OUTER BUSHING HOUSING
(INSPECT AGAIN)
OUTER BUSHING HOUSING
(ENLARGE, IF NECESSARY)
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 36
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 05 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 37

TOOL
PN SAC−2010−HELICOIDAL
(REF.)
LIQUID
NITROGEN
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
LET THE BUSHING IN LIQUID NITROGEN.
UP
APPLY COR−BAN 27L
REMOVE THE BUSHING FROM LIQUID NITROGEN.
INSTALL THE BUSHING IMMEDIATELY.
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
THE BASE "L" SHOULD BE POSITIONED ON THE STRUCTURE.
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
78
9 10
9
49
59
9 7
6
9 8
4
5
6
7
8
OUTER BUSHING
(REF.)
OUTER BUSHING
(REF.)
OUTER BUSHING
HOUSING (REF.)
OUTER
BUSHING
(REF.)
OUTER
BUSHING
(REF.)
EM170SB570977A.DGN
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 37
APPLICABLE TO PART II AND PART III
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 06 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 38

MAKE SURE THAT THE FLANGE IS IN CONTACT WITH THE TRUNNION.
MEASURE THE INTERNAL DIAMETER OF THE BUSHING.
IF NECESSARY, USE ROLLER BURNISHER TOOL.
BURNISHER
(REF.)
TRUNNION
(REF.)
TOOL
PN SAC−2010−HELICOIDAL
(REF.)
SEALANT
(REF.)
APPLY FILLET SEALANT PN PR1776M B−2
A
SEALANT
(REF.)
A
11
14
12
13
9 9
12
10
11
12
9
10
11
12
OUTER BUSHING
(REF.)
11
10
OUTER BUSHING
(REF.)
11
EM170SB570978A.DGN
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 38
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 4 - MAIN LANDING GEAR SIDE STAY OUTER BUSHING - REPLACEMENT
(SHEET 07 OF 07)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 39

1. Position the support assembly into the trunnion.
2. Install half spacers PN 191-19357-001 and PN 191-19358-401 according to Figure
Figure 6.
WARNING : ALWAYS OBEY THE MANUFACTURER’S HEALTH AND SAFETY PRE-
CAUTIONS WHEN YOU USE SEALANTS OR SOLVENTS. USE SEAL-
ANTS OR SOLVENTS ONLY IN AREAS WHERE THERE IS A GOOD
AIRFLOW. DO NOT BREATHE THE FUMES OF THESE MATERIALS
AND DO NOT GET THEM ON YOUR SKIN, IN YOUR EYES OR MOUTH.
PUT ON APPROVED PROTECTIVE CLOTHING AND GOGGLES.
SEALANTS AND SOLVENTS ARE DANGEROUS AND IF YOU DO NOT
OBEY THESE PRECAUTIONS, INJURY CAN OCCUR.
3. Apply a thin layer of Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L to
new pin PN MS51838-220, locking ring PN 2821-0056, and nut PN 2821-0058. Refer to
SRM PART II 51-21-01/1 - FAYING SURFACE SEALING.
4. Apply a thin layer of Synthetic Grease (MIL-PRF-23827) AEROSHELL 33 to locking
ring PN 2821-0056.
5. Put new pin PN MS51838-220 on the side stay support assembly. Then install the
locking ring PN 2821-0056.
6. Install nut PN 2821-0058 to the support assembly.
7. Use a torque wrench to apply the initial torque to the nut of 135 - 165 N.m (1195 - 1460
lb.in).
8. Loosen the nut and use a torque wrench to apply the final torque to the nut of 18 - 22
N.m (160 - 195 lb.in).
NOTE: Loosen the nut to adjacent locking hole position (max. 8º).
9. Install spring ring PN 2000A0764K01 on the nut, then put locking nut PN 2821-0059 and
retaining ring PN M27426-1147D to lock the nut.
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 39
FIGURE 5 - RECONNECTION OF THE MLG SIDE STAY TO THE TRUNNION
(SHEET 01 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 40

A
TYPICAL
B
B
EM170SB570979A.DGN
ZONE
740
A
ZONE
730
A
C
MLG SIDE STAY
(REF.)
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 40
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 5 - RECONNECTION OF THE MLG SIDE STAY TO THE TRUNNION
(SHEET 02 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 41

1
TRUNNION
(REF.)
PIN
PN MS51838−220
(INSTALL)
LOCKING RING
PN 2821−0056
(INSTALL)
NUT
PN 2821−0058
(INSTALL)
SPRING RING
PN 2000A0764K01
(INSTALL)
LOCKING NUT
PN 2821−0059
(INSTALL)
RETAINING RING
PN M27426−1147D
(INSTALL)
SPACER
PN 191−19357−001
(INSTALL, SEE FIG.5)
APPLY GREASE AEROSHEEL 33
5
APPLY COR−BAN 27L4
54
4
47
SPACER
PN 191−19358−401
(INSTALL, SEE FIG.5)
APPLY ARDROX AV−15
6
7
8
INITIAL TORQUE: 135−165 N.m (1195−1460 lb.in)
FINAL TORQUE: 18−22 N.m (160−195 lb.in)
6
85
53
3 6
78
9
9
9
543
C
2
2
1
SUPPORT ASSEMBLY (REF.)
(RECONNECT)
MLG SIDE
STAY (REF.)
(RECONNECT)
15
EM170SB570981A.DGN
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 41
APPLICABLE TO PART II AND PART III
FIGURE 5 - RECONNECTION OF THE MLG SIDE STAY TO THE TRUNNION
(SHEET 03 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 42

1. Position spacer PN 191-19358-401 over the side stay support assembly, as shown in
picture 2.
2. Move up spacer PN 191-19358-40 1(±3 0 degrees) and position spacer PN 191-19357-
001, as shown in picture 3.
3. Position bolt PN NAS6303-7 (2 positions) and washer PN NAS1149C0363R to the upper
part of the spacers, as shown in picture 4.
4. Move spacer PN 191-19358-401 and PN 191-19357-001 in order to position bolt PN
NAS6303-7 (2 positions) and washer PN NAS1149C0363R to the lower part of the
spacers, as shown in picture 5.
5. Move the spacers to the final position, as shown in picture 6.
6. Apply the final torque to the bolt, as shown in picture 6 and following the steps below:
(a) Turn the bolt (4 positions) and measure the drag torque with a torque wrench.
(b) Make sure that the drag torque value is 0.23 to 2.03 N.m (2 to 18 lb.in).
(c) Add the drag torque value measured to the standard torque of 4.52 to 5.65 N.m (40
to 50 lb.in) to get the final torque.
(d) Apply the final torque to the screws with a torque wrench.
NOTE: Due to some tolerances in parts, the rotation of the spacer assembly may
occur.
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 42
DATE: 10/Jun/2011
REVISION No.:
FIGURE 6 - SIDE STAY SUPPORT SPACERS - INSTALLATION
(SHEET 01 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 43

1
2
3
SIDE STAY
SUPPORT ASSY
(REF.)
SPACER
PN 191−19358−401
(POSITION)
SPACER
PN 191−19357−001
(POSITION)
SPACER
PN 191−19358−401
(MOVE)
1
EM170SB570982A.DGN
2
2
SERVICE BULLETIN
DATE: 10/Jun/2011
REVISION No.:
SB No.: 190LIN-57-0016
PAGE: 43
APPLICABLE TO PART II AND PART III
FIGURE 6 - SIDE STAY SUPPORT SPACERS - INSTALLATION
(SHEET 02 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 44

1
4
5
6
BOLT
PN NAS6303−7
WASHER
PN NAS1149C0363R
(02 POSITIONS)
(POSITION)
BOLT
PN NAS6303−7
WASHER
PN NAS1149C0363R
(02 POSITIONS)
(POSITION)
BOLT
PN NAS6303−7
(04 POSITIONS)
(APPLY TORQUE)
TORQUE: 4.52 − 5.65 N.m (40 − 50 lb.in) PLUS DRAG TORQUE: 0.23 − 2.03 N.m (2 − 18 lb.in)
EM170SB570983A.DGN
3
4
5 16
SERVICE BULLETIN
SB No.: 190LIN-57-0016
PAGE: 44
DATE: 10/Jun/2011
REVISION No.:
APPLICABLE TO PART II AND PART III
FIGURE 6 - SIDE STAY SUPPORT SPACERS - INSTALLATION
(SHEET 03 OF 03)
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 45

SERVICE BULLETIN EVALUATION
THE PURPOSE OF THIS FORM IS TO COLLECT DATA THAT WILL BE USED TO IMPROVE THE QUALITY OF OUR
SERVICE BULLETINS AND UPDATE THE TECHNICAL PUBLICATIONS. PLEASE FILL IN FORM AND RETURN IT TO:
EMBRAER - EMPRESA BRASILEIRA DE AERONÁUTICA S.A.
EFTC - SERVICE BULLETIN ENGINEERING
AV. BRIGADEIRO FARIA LIMA, 2170
SÃO JOSÉ DOS CAMPOS - SP - 12227-901
BRASIL
Fax: + 55 12 3927-6600 (ext. 1624)
e-mail: fleet.reliability@embraer.com.br
S.B. Title: S.B.: (Number / Rev.)
Operator:
SB Implementation Report
Aircraft Serial Number or Registration Number: Incorporation Date:
Aircraft Flight Hours: Aircraft Landings:
POST-ACCOMPLISHMENT EVALUATION:(Check applicable squares below)
ESTIMATED MANPOWER: [ ] OK [ ] NOT OK (Explain Below)
MATERIAL & KITS: [ ] OK [ ] NOT OK (Explain Below)
ACCOMPLISHMENT INSTRUCTIONS: [ ] OK [ ] NOT OK (Explain Below)
FIGURES: [ ] OK [ ] NOT OK (Explain Below)
SB GENERAL EVALUATION: [ ] OK [ ] NOT OK (Explain Below)
COMMENTS: (Bulletin quality/ Difficulties found at the time of incorporation/ Suggested improvements/ Other)
Organization: Fax: Phone:
E-mail:
Address: Prepared by:(Name/Title) Date:
Copyright © 2011 by Embraer S.A. All rights reserved.

### Page 46

EMPRESA BRASILEIRA DE AERONÁUTICA S/A -  SÃO JOSÉ DOS CAMPOS - SP
SERVICE NEWSLETTER
SNL 145-31-0011                                                                    DATE: 26/Aug/04
PAGE: 2 of 1 CHANGE No.: __ - __/___/__

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.