# Engine Alliance Service Bulletin EAGP7-A72-426: No revision named

- Rights: © Engine Alliance. Filed by the FAA in regulations.gov docket FAA-2019-0912; AD 2019-25-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Engine Alliance Service Bulletin EAGP7-A72-426](https://openairdocs.org/service-documents/engine-alliance/eagp7-a72-426.md)
- Title as filed: EA SB EAGP7-A72-426
- Pages: 96
- PDF: https://openairdocs.org/files/sha256/2a/b9/2ab92ce754f4e8b49e3dfa9d7df5d846a5a305aad7987c4bac1b4ee7f3e8b80a
- Page: https://openairdocs.org/service-documents/engine-alliance/eagp7-a72-426/file/2ab92ce754f4

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

██
██
ALERT
SER
VICE
BULLETIN
ENGINE
—
BLADE
ASSEMBL
Y
,
1ST
ST
AGE
LOW
PRESSURE
COMPRESSOR
(LPC)
ROT
OR
—
ONE-TIME
UL
TRASONIC
INSPECTION
FOR
CRACKS
MODEL
APPLICA
TION
GP7270,
GP7277
BULLETIN
ISSUE
SEQUENCE
EAGP7
Series
A72-426
A
T
A
NUMBER
72-00-31
ENGINE
ALLIANCE,
LLC.
PROPRIET
AR
Y
INFORMA
TION
The
information
contained
in
this
document
is
Engine
Alliance,
LLC
(“EA”)
Proprietary
Information
and
is
disclosed
in
confidence.
It
is
the
property
of
EA
and
shall
not
be
used,
disclosed
to
others
or
reproduced
for
any
purpose,
including,
without
limitation,
to
design,
manufacture
or
repair
parts
or
to
obtain
F
AA
or
other
government
approval
to
do
so,
without
the
express
written
consent
of
EA.
Neither
receipt
nor
possession
of
this
document
alone,
from
any
source,
constitutes
such
permission.
Unauthorized
possession,
use,
copying
or
disclosure
may
result
in
criminal
and/or
civil
liability
.
If
consent
is
given
for
reproduction
in
whole
or
in
part,
this
notice
and
the
notice
set
forth
on
each
page
of
this
document
shall
appear
in
any
such
reproduction
in
whole
or
in
part.
This
technical
data
is
considered
subject
to
the
Export
Administration
Regulations
(EAR)
pursuant
to
15
CFR
Parts
730-774
respectively
.
T
ransfer
of
this
data
by
any
means
to
a
Non-US
Person,
whether
in
the
United
States
or
abroad,
without
the
proper
U.S.
Government
authorization
(i.e.
export
license,
license
exception,
NLR),
is
strictly
prohibited.
Export
Classification:
EAR
ECCN
9E991
Compliance
Category
2
EA
Distribution
Code
2686,
2687
September
30/19
EAGP7-A72-426
Page
1
of
13

### Page 2

Summary
The
purpose
of
this
Alert
Service
Bulletin
is
to
perform
an
ultrasonic
inspection
of
the
1st
stage
Low
Pressure
Compressor
(LPC)
rotor
(Fan)
blade
assemblies
(to
be
referred
to
as
a
fan
blade)
for
cracks.
A
GP7200
engine
fan
blade
fractured
due
to
a
fatigue
crack.
Analysis
indicates
ultrasonic
inspection
for
cracks
of
a
localized
area
on
the
fan
blade
convex
airfoil
is
a
necessary
interim
action
to
mitigate
the
risk
of
a
fan
blade
fracture
event.
In
addition,
data
from
this
inspection
will
be
used
to
help
define
the
final
action.
Planning
Information
Ef
fectivity
Data
Engine
Models
Applicable
GP7270,
GP7277
Engine
Serial
Nos.
—
All
engines
with
fan
blades
that
have
3,250
flight
cycles
since
new
or
more
on
October
1,
2019
Fan
Blade
Serial
Nos.
—
All
fan
blades
that
have
3,250
flight
cycles
or
more
since
new
on
October
1,
2019
Concurrent
Requirements
There
are
no
concurrent
requirements.
Reason
1.
Problem:
A
GP7200
engine
hollow
fan
blade
experienced
a
crack
that
originated
on
the
internal
surface
of
the
convex
airfoil
and
propagated
to
the
point
of
airfoil
fracture.
2.
Cause:
The
fatigue
crack
originated
in
an
area
of
microtexture.
Microtexture
can
result
in
a
low
cycle
fatigue
debit
which
may
allow
a
crack
to
initiate
and
possibly
propagate
to
airfoil
fracture.
3.
Solution:
Do
a
one-time
ultrasonic
inspection
for
cracks
of
a
limited
population
of
fan
blades
to
mitigate
the
risk
of
a
fan
blade
fracture
event.
The
inspection
is
of
a
localized
area
on
the
fan
blade
convex
airfoil.
Description
Do
an
ultrasonic
inspection
for
cracks
of
the
1st
stage
LPC
Rotor
(Fan)
blade
assemblies.
Compliance
Category
2
For
1st
stage
LPC
Rotor
(Fan)
blade
assemblies
with
3,250
flight
Cycles
Since
New
(CSN)
or
more
as
of
October
1,
2019,
do
the
ultrasonic
inspection
within
250
flight
cycles
(as
of
October
1,
2019).
Af
fected
fan
blades
previously
inspected
to
Reference
5,
NDIP-1205,
Original
Issue,
dated
August
30,
2019
have
complied
with
the
requirements
of
this
Service
Bulletin.
NOTE
:
Fan
blades
that
get
to
3,250
flight
CSN
after
October
1,
2019
are
not
subject
to
this
Service
Bulletin.
Approval
Data
The
times
between
inspections
specified
in
Compliance
and
the
inspection
procedures
specified
in
the
Accomplishment
Instructions
agree
with
the
applicable
Federal
A
viation
Regulations
and
are
F
AA-Approved
for
the
engine
model(s)
given.
September
30/19
EAGP7-A72-426
Page
2
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 3

The
inspection
procedures
described
in
this
Service
Bulletin
are
reviewed
and
technically
accepted
by
Airbus
to
apply
to
the
Airbus
fleet
af
fected.
This
Service
Bulletin
does
not
contain
any
change
information
that
revises
the
equipment
definition
covered
by
Airbus
approved
modifications
Manpower
The
estimate
of
man-hours
of
labor
directly
necessary
to
do
the
intent
of
this
Service
Bulletin
are
as
follows:
For
Fan
Blades
Installed
In
An
Engine
(set
of
24
blades):
1.
Necessary
to
do
the
Inspection
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8.0
2.
T
otal
Necessary
Man-hours
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8.0
For
Fan
Blades
Not
Installed
In
An
Engine
(set
of
24
blades):
1.
Necessary
to
do
the
Inspection
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8.0
2.
T
otal
Necessary
Man-hours
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8.0
W
eight
Data
Not
Applicable.
Electrical
Load
Data
Not
Applicable.
Software
Accomplishment
Summary
Not
Applicable.
References
1.
Engine
Alliance
Standard
Practices
Manual,
Part
No.
5700139.
2.
Engine
Alliance
GP7270,
and
GP7277,
Illustrated
Parts
Catalog,
Part
No.
5700308.
3.
GP7000
Series,
Engine
Manual,
Part
No.
5700147.
4.
Airbus
Aircraft
Maintenance
Manual
(AMM).
5.
Non-Destructive
Inspection
Procedure,
NDIP-1205,
Revision
1
—
GP7000
1st
Stage
LPC
Rotor
(Fan)
Blade
Assembly
Airfoil
Ultrasonic
Inspection
for
Cracks
(Fan
Blades
installed
or
uninstalled),
Date
of
Issue:
September
23,
2019.
6.
Engine
Alliance
Special
Instruction
No.
863F-19,
Fan
Blade
Removal
and
Installation
—
Interim
Procedure
In
Advance
of
Aircraft
Maintenance
Manual
(AMM)
Update
7.
Engine
Alliance
Special
Instruction
No.
864F-19,
Fan
Blade
Removal
and
Installation
—
Interim
Procedure
In
Advance
of
Engine
Manual
(EM)
Update
Publications
Changed
Engine
Alliance
GP7270
and
GP7277,
Illustrated
Parts
Catalog,
Part
No.
5700308.
72-00-31,
Figure
2
Interchangeability
Not
Applicable.
September
30/19
EAGP7-A72-426
Page
3
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 4

Information
in
the
Appendix
Alternate
Accomplishment
Instructions
(No)
Progression
Charts
(No)
Added
Data
(Y
es)
Revision
to
T
able
of
Limits
(No)
Inspection
Procedures
(Y
es)
September
30/19
EAGP7-A72-426
Page
4
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 5

Material
Information
Material
—
Cost
and
A
vailability
1.
There
is
no
new
material
cost
to
do
this
Service
Bulletin
if
there
are
no
rejected
fan
blades.
2.
Part
prices
were
not
available
at
the
time
of
Service
Bulletin
publication.
Contact
Engine
Alliance
Spares
Management
&
Logistics
for
firm
quotations.
3.
There
is
no
kit
provided
to
do
this
Service
Bulletin.
4.
Part
availability
information
is
provided
in
material
data
Instructions
—
Disposition.
Industry
Support
Program
Contact
your
Customer
Support
Manager
(CSM).
The
material
data
that
follows
is
for
each
engine.
NOTE
:
It
is
possible
to
use
the
Chapter/Section
and
Figure/Item
reference
number
shown
below
the
old
part
number
to
find
the
part
in
the
Illustrated
Parts
Catalog.
Because
there
are
many
dif
ferent
configurations
used,
it
is
frequently
necessary
to
show
more
than
one
group
of
parts.
When
this
occurs,
parts
that
are
interchangeable
are
shown
line-by-line
only
,
unless
this
is
shown
dif
ferently
.
CAUTION
:
THE
FOLLOWING
MA
TERIAL
DA
T
A
T
ABLE(S)
ARE
ORGANIZED
BY
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG.
ALL
P
AR
TS
IN
THE
T
ABLE(S)
MA
Y
OR
MA
Y
NOT
BE
APPLICABLE
T
O
ALL
THE
ENGINE
MODELS
SHOWN
IN
THE
T
ABLE
HEADING.
YOU
MUST
REFER
T
O
THE
APPROPRIA
TE
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG
FOR
ENGINE
MODEL
APPLICABILITY
USING
THE
OLD
P
AR
T
NUMBER
(PN)
AND
CA
T
ALOG
SEQUENCE
NUMBER.
F
AILURE
T
O
INST
ALL
THE
P
AR
T(S)
IN
THE
CORRECT
ENGINE
MODEL
MA
Y
RESUL
T
IN
A
CONFIGURA
TION
THA
T
IS
NOT
F
AA
APPROVED.
The
material
data
that
follows
is
for
each
engine.
For
GP7270,
GP7277
Engines:
New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
24
BLADE
—
ASSY
OF
,
1ST
ST
AGE
LPC
ROT
OR,
5700531
(72-00-31-2-10)
(4)(C)(X)
OR
24
*
BLADE
—
ASSY
OF
,
1ST
ST
AGE
LPC
ROT
OR,
5702931
(72-00-31-2-10
A)
(4)(C)(X)
OR
24
BLADE
—
ASSY
OF
,
1ST
ST
AGE
LPC
ROT
OR,
5702931CL1
(72-00-31-2-10
B)
(4)(N)(X)
September
30/19
EAGP7-A72-426
Page
5
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 6

New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
OR
24
BLADE
—
ASSY
OF
,
1ST
ST
AGE
LPC
ROT
OR,
5702931CL2
(72-00-31-2-10
B)
(4)(N)(X)
Modification
and
Spares
Information
Estimated
part
prices
are
provided
when
they
are
available
at
time
of
publication.
The
Estimate
of
Unit
Price
is
only
for
planning
purposes
and
does
not
constitute
a
firm
quotation.
An
asterisk
(*)
is
shown
where
part
pricing
information
was
unavailable.
In
either
case,
contact
Engine
Alliance,
LLC.
Spares
Management
&
Logistics
for
firm
quotations.
Parts
Modification
Conditions
(4)
Do
an
inspection
as
specified
in
the
Accomplishment
Instructions.
Spare
Parts
A
vailability
(C)
The
old
part
will
continue
to
be
supplied.
(N)
The
old
part
is
not
available.
(X)
See
Reference
2,
Illustrated
Parts
Catalog
for
applicable
replacement
parts.
V
endor
Services
or
Special
Components/Materials
Not
Applicable.
Material
Data
for
Each
Spare
Engine
The
material
for
each
spare
engine
is
as
stated
in
the
preceding
material
information
section.
Reidentified
Parts
Not
Applicable.
Necessary
T
ools
See
Reference
5,
NDIP-1205,
in
the
Inspection
Procedures
section
of
the
Appendix
for
the
Support
Equipment
necessary
to
perform
this
inspection.
Other
Material
Information
Data
Not
Applicable.
September
30/19
EAGP7-A72-426
Page
6
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 7

Accomplishment
Instructions
For
Fan
Blades
Installed
In
An
Engine
NOTE
:
Service
Bulletin
incorporation
on
engines
installed
on
aircraft
may
be
desirable
and
should
be
individually
evaluated.
NOTE
:
See
Reference
5,
NDIP-1205
in
the
Inspection
Procedures
section
of
the
Appendix
for
the
consumable
materials
necessary
to
perform
this
inspection.
1.
Do
an
ultrasonic
inspection
of
the
fan
blades,
PN
5700531,
PN
5702931,
PN
5702931CL1,
and
PN
5702931CL2,
as
specified
in
Reference
5,
NDIP-1205.
See
Figure
1
and
the
Inspection
Procedures
section
of
the
Appendix.
2.
Fan
blade(s)
with
rejectable
ultrasonic
indication(s)
as
specified
in
Reference
5,
NDIP-1205,
must
be
removed
from
service
as
follows:
A.
Remove
the
inlet
cone,
front
and
rear
segments,
as
specified
in
Reference
4,
AMM
T
ask
72-31-41-000-803-A:
Removal
of
the
Inlet
Cone
or
Reference
3,
EM
T
ask
72-00-31-020-001:
Remove
The
Inlet
Cone.
CAUTION
:
YOU
MUST
USE
THE
STEPS
AND
THE
T
OOLS
(PW
A
107918,
PW
A
107919,
PW
A
107426
AND
PW
A
107525)
SPECIFIED
IN
THE
PROCEDURE
BELOW
T
O
REMOVE
THE
F
AN
BLADE
LOCK.
USE
OF
AL
TERNA
TE
T
OOLING
T
O
REMOVE
THE
F
AN
BLADE
LOCK
IS
NOT
PERMITTED.
IF
YOU
DO
NOT
OBEY
THIS
INSTRUCTION,
YOU
CAN
DAMAGE
THE
HUB
WHICH
CAN
CAUSE
THE
HUB
T
O
BE
DISCARDED
OR
POSSIBL
Y
CAUSE
ENGINE
OR
AIRCRAFT
DAMAGE.
B.
Remove
the
af
fected
fan
blade(s)
as
specified
in
Reference
4,
AMM
T
ASK
72-31-42-000-802-A:
Removal
of
the
LP
Compressor
1st
Stage
(Fan)
Blades
or
Reference
3,
EM
T
ask
72-00-31-020-002:
Remove
The
1st
Stage
Compressor
Rotor
Fan
Blades.
(1)
See
Reference
6,
SI
No.
863F-19
or
Reference
7,
SI
No.
864F-19
as
applicable.
CAUTION
:
YOU
MUST
USE
THE
STEPS
AND
THE
T
OOLS
(PW
A
107918,
PW
A
107919,
PW
A
107426
AND
PW
A
107525)
SPECIFIED
IN
THE
PROCEDURE
BELOW
T
O
INST
ALL
THE
F
AN
BLADE
LOCK.
USE
OF
AL
TERNA
TE
T
OOLING
T
O
INST
ALL
THE
F
AN
BLADE
LOCK
IS
NOT
PERMITTED.
IF
YOU
DO
NOT
OBEY
THIS
INSTRUCTION,
YOU
CAN
DAMAGE
THE
HUB
WHICH
CAN
CAUSE
THE
HUB
T
O
BE
DISCARDED
OR
POSSIBL
Y
CAUSE
ENGINE
OR
AIRCRAFT
DAMAGE.
C.
Install
the
replacement
fan
blade(s)
as
specified
in
Reference
4,
AMM
T
ASK
72-31-42-400-802-A:
Installation
of
the
LP
Compressor
1st
Stage
(Fan)
Blades
or
Reference
3,
EM
T
ask
72-00-31-420-004:
Install
The
1st
Stage
Compressor
Rotor
Fan
Blades.
(1)
See
Reference
6,
SI
No.
863F-19
or
Reference
7,
SI
No.
864F-19
as
applicable.
D.
Install
the
inlet
cone,
front
and
rear
segments,
as
specified
in
Reference
4,
AMM
T
ask
72-31-41-400-803-A:
Installation
of
the
Inlet
Cone
or
Reference
3,
EM
T
ask
72-00-31-420-005:
Install
The
Inlet
Cone.
E.
Return
the
fan
blade(s)
with
rejectable
ultrasonic
indication(s)
to
the
repair
vendor
for
further
engineering
evaluation.
September
30/19
EAGP7-A72-426
Page
7
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 8

3.
After
ultrasonic
inspection,
witness
marks
may
be
visible
on
the
fan
blade
airfoil
due
to
dirt/debris
becoming
trapped
between
the
probe
and
airfoil
during
inspection.
See
Figure
2.
A.
These
marks
are
serviceable
if
they
are
superficial.
NOTE
:
A
superficial
mark
is
defined
as
an
imperfection
which
disrupts
the
surface
and
appears
to
have
a
smooth
edge
but
does
not
penetrate
the
surface
roughness
texture.
This
condition
is
so
slight
that
there
is
no
perceptible
depth.
B.
If
the
marks
are
not
superficial,
refer
to
fan
blade
airfoil
damage
limits
(hollow
area)
for
disposition.
See
Reference
4,
AMM
T
ASK
72-31-42-210-803-A:
V
isual
Inspection
of
the
Low-Pressure-Compressor
(LPC)
1st-Stage
(Fan)
Blade-Airfoil
for
Surface
Damage
and
Cracks
or
Reference
3,
EM
T
ask
72-00-31-220-010:
V
isually
Inspect
The
Low
Pressure
Compressor
(LPC)
Module
For
Serviceability
.
September
30/19
EAGP7-A72-426
Page
8
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 9

For
Fan
Blades
Not
Installed
In
An
Engine
NOTE
:
See
Reference
5,
NDIP-1205
in
the
Inspection
Procedures
section
of
the
Appendix
for
the
consumable
materials
necessary
to
perform
this
inspection.
1.
Do
an
ultrasonic
inspection
of
the
fan
blades,
PN
5700531,
PN
5702931,
PN
5702931CL1,
and
PN
5702931CL2,
as
specified
in
Reference
5,
NDIP-1205.
See
Figure
1
and
the
Inspection
Procedures
section
of
the
Appendix.
2.
Fan
blade(s)
with
rejectable
ultrasonic
indication(s)
as
specified
in
Reference
5,
NDIP-1205,
must
be
removed
from
service
as
follows:
A.
Return
the
fan
blade(s)
with
rejectable
ultrasonic
indication(s)
to
the
repair
vendor
for
further
engineering
evaluation.
3.
After
ultrasonic
inspection,
witness
marks
may
be
visible
on
the
fan
blade
airfoil
due
to
dirt/debris
becoming
trapped
between
the
probe
and
airfoil
during
inspection.
See
Figure
2.
A.
These
marks
are
serviceable
if
they
are
superficial.
NOTE
:
A
superficial
mark
is
defined
as
an
imperfection
which
disrupts
the
surface
and
appears
to
have
a
smooth
edge
but
does
not
penetrate
the
surface
roughness
texture.
This
condition
is
so
slight
that
there
is
no
perceptible
depth.
B.
If
the
marks
are
not
superficial,
refer
to
fan
blade
airfoil
damage
limits
(hollow
area)
for
disposition.
See
Reference
4,
AMM
T
ASK
72-31-42-210-803-A:
V
isual
Inspection
of
the
Low-Pressure-Compressor
(LPC)
1st-Stage
(Fan)
Blade-Airfoil
for
Surface
Damage
and
Cracks
or
Reference
3,
EM
T
ask
72-00-31-220-010:
V
isually
Inspect
The
Low
Pressure
Compressor
(LPC)
Module
For
Serviceability
.
September
30/19
EAGP7-A72-426
Page
9
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 10 (OCR)

ED Engine Allance
_5700531, 5702931, 5702931CL1, 5702931CL2,
1ST STAGE LPC RO  OR BLADE ASSEMBLY
(FAN BLADE)  INSPE  T AS SPECIFIED
IN THE ACCOMPLISHMENT INSTRUCTIONS
B529116
LOCATION OF THE 1ST STAGE LPC ROTOR BLADE ASSEMBLY (FAN BLADE)
72-00-31
FIGURE 1
September 30/19  EAGP7-A72-426
Page 10
ENGINE ALLIANCE, LLC PROPRIETARY INFORMATION
Subject to the export control restrictions on the cover or first page.

### Page 11 (OCR)

ER  Engine Alliance
WITNESS MARKS
B529115
VIEW OF THE WITNESS MARKS ON THE FAN BLADE
FIGURE 2
September 30/19  EAGP7-A72-426
Page 11
ENGINE ALLIANCE, LLC PROPRIETARY INFORMATION
Subject to the export control restrictions on the cover or first page.

### Page 12

Appendix
Added
Data
Internal
Reference
Information
Revision
No.
Reference
Document
Origination
Original
EA19AC157
CL/JEJ
Number
values
shown
in
parentheses
adjacent
to
U.S.
values
are
International
System
of
units
(SI)
equivalents.
T
o
calculate
part
life,
include
the
hours
and/or
cycles
since
the
part
was
made.
Use
the
total
hours
or
cycles
to
calculate
life
limits
that
are
the
result
of
part
modification,
a
part
used
in
an
engine
with
dif
ferent
thrust,
or
for
some
other
reason.
September
30/19
EAGP7-A72-426
Page
12
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 13

Inspection
Procedures
Reference
5,
Non-Destructive
Inspection
Procedure,
NDIP-1205
follows:
September
30/19
EAGP7-A72-426
Page
13
ENGINE
ALLIANCE,
LLC
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
export
control
restrictions
on
the
cover
or
first
page.

### Page 14

GP7000 1st Stage LPC Rotor (Fan) Blade Assembly Airfoil Ultrasonic Inspection for 
Cracks (Fan Blade installed or uninstalled) 
NDIP 1205 
Revision 1 
September 23, 2019 
 
Written By: 
Ningli Yang 
William Brown 
Approved By:  Kevin D. Smith 
 
______________________________________________________________________________
Director – Non Destructive Evaluation, P&W MPE PL-4 
RESTRICTION 
PAGES OF THIS DOCUMENT MARKED WITH THE NOTICES SET FORTH BELOW CONTAIN CONTRACTOR 
COMPETITION SENSITIVE DATA AND/OR PRATT & WHITNEY PROPRIETARY DATA WHICH IS SUBMITTED IN 
CONFIDENCE. NO DISCLOSURE OR USE OF THIS INFORMATION IS PERMISSIBLE WITHOUT PRIOR WRITTEN 
CONSENT OF UNITED TECHNOLOGIES CORPORATION EXCEPT FOR OFFICIAL PURPOSES WITHIN THE U.S. 
GOVERNMENT. 
DOCUMENT PROPERTY RIGHTS NOTICE 
THIS DOCUMENT IS THE PROPERTY OF UNITED TECHNOLOGIES CORPORATION (UTC).  YOU MAY NOT POSSESS, 
USE, COPY OR DISCLOSE THIS DOCUMENT OR ANY INFORMATION IN IT, FOR ANY PURPOSE, INCLUDING 
WITHOUT LIMITATION TO DESIGN, MANUFACTURE OR REPAIR PARTS, OR OBTAIN FAA OR OTHER 
GOVERNMENT APPROVAL TO DO SO, WITHOUT UTC’S EXPRESS WRITTEN PERMISSION.  NEITHER RECEIPT NOR 
POSSESSION OF THIS DOCUMENT ALONE, FROM ANY SOURCE, CONSTITUTES SUCH PERMISSION.  POSSESSION, 
USE, COPYRIGHT OR DISCLOSURE BY ANYONE WITHOUT UTC’S EXPRESS WRITTEN PERMISSION IS NOT 
AUTHORIZED AND MAY RESULT IN CRIMINAL AND OR CIVIL LIABILITY.   
NOTICES 
P&W PROPRIETARY INFORMATION        
This document contains technical data subject to EAR.  U.S. Export Classification: EAR 99

### Page 15

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      1 
 
Table of Contents 
1. GENERAL INFORMATION  ......................................................................................................................... 2 
2. REQUIRED EQUIMENT .............................................................................................................................. 3 
3. EQUIPMENT CONNECTIONS  .................................................................................................................. 13 
4. INITIAL SETUP  ........................................................................................................................................ 17 
5. CALIBRATION ......................................................................................................................................... 23 
6. BLADE CLEANING  .................................................................................................................................. 41 
7. ON-WING BLADE SCANNING  ................................................................................................................. 42 
8. BENCH-TOP BLADE SCANNING ............................................................................................................... 56 
9. DATA EVALUATION ................................................................................................................................ 58 
10. CERTIFICATE OF CONFORMITY & NONCONFORMANCES FORM ............................................................. 79 
        APPENDIX A: CALIBRATION & DATA COLLECTION SHEET 
        APPENDIX B: CALIBRATION CARD EXAMPLE 
        APPENDIX C: CERTIFICATE OF CONFORMITY 
        APPENDIX D: NONCONFORMANCES FORM

### Page 16

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      2 
 
1.0 General Information 
1.1 Scope 
1.1.1 The purpose of this shear-wave ultrasonic (UT) inspection is to detect internal 
chord-wise cracks in the GP7000 hollow fan blades (HFB) in a high stress area on 
concave side. The procedure is to provide the technician with direction to 
operate the Ultrasonic Automatic Scanning system. The inspection is conducted 
on installed or disassembled fan blades that have been thoroughly cleaned.  
1.1.2 Inspection area:  
 
Figure 1.1. Inspection area 
1.1.2.1 Inspection covers the chord-wise fatigue cracks on interior surface of 
the convex side.  
1.1.2.2 The inspection area is an 8” by 6” rectangle and centered at 7.0” 
chord-wise from TE and 21.2” from bottom of blade. 
1.2 Approach 
1.2.1 A 45o shear wave phase array Ultrasonic method is employed. 
1.3 Inspection qualification 
1.3.1 The inspection is to be performed by personnel qualified by PW MPE-NDE only.

### Page 17

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      3 
 
2.0 Required Equipment 
2.1 System Diagram, Figure 2.1 
 
Figure 2.1

### Page 18

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      4 
 
2.2 2-Axis (X, M axis) UniWest Inspection Carriage, P/N, Figure 2.2a, and UniWest Motion 
Controller, Figure 2.1b.  
 
Figure 2.2a  
 
Figure 2.2b

### Page 19

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      5 
 
2.1.1 Note the Inspection carriage should always be transported and mounted (onto 
either calibration fixture or fan blade) with the inspection head in the 
disengaged position as in Figure 2.1.1.  Note the white pin locks the inspection 
head at the top of the slide assembly. 
 
Figure 2.1.1

### Page 20

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      6 
 
2.2 Couplant pump and reservoir 
2.2.1  A single pump and reservoir is used to feed both Leading Edge (LE) and Trailing 
Edge (TE) side couplant, Figure 2.2a, via a flow rate device, Figure 2.2b.  
2.2.2 Mix Mix EAC-0928 glycerin and water in the Couplant Reservoir as noted with 
the red arrow in figure 2.2.a.  Nominal ratio is 15% Mix EAC-0928 glycerin and 
85% water.  Both glycerin & water to be at ambient temperature.   
2.2.2.1 Ensure glycerin and water and well mixed before and during use 
  
Figure 2.2a 
 
Figure 2.2b 
Power 
Switch 
Couplant 
Supply 
Tube 
Couplant 
Reservoir

### Page 21

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      7 
 
2.3 Calibration Fixture, UniWest P/N 100457, Figure 2.3 
 
Figure 2.3

### Page 22

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      8 
 
2.4 Phased array probes and wedge 
2.4.1 Olympus 10L16-4.96X5-A00-P-2.5-OM Probes, quantity 2, 10MHz, Figure 2.4. 
2.4.1.1 LE probe for root to tip scan 
2.4.1.2 TE probe for tip to root scan 
2.4.2 Wedge with foam pad to hold two 10L16 phase array probes and generate 45o 
shear wave in Ti, integrated into the probe carriage 
2.4.2.1 Extra small hole in the weep should be toward the TE. 
 
2.4.3  
Figure 2.4 
 
2.4.4 Couple probes to wedge with “UltraGel” or “UltraGel II” ultrasonic couplant 
  
Wedge 
Probe 
Couplant 
Lines 
Foam Pad 
TE weep hole 
Leading Edge 
Probe 
Trailing Edge 
Probe

### Page 23

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      9 
 
2.4.5 Element 1, denoted by the number “1” of both Leading & Trailing Edge probes 
should be aligned with the Leading Edge side of the Wedge, Figure 2.4.5a & 
2.4.5b.  You CAN NOT rely on the arrows of the Probe housing for alignment 
 
Figure 2.4.5a 
 
Figure 2.4.5b 
  
Leading Edge Element 1 
Leading Edge 
Element 1

### Page 24

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      10 
 
2.5 UT system  
2.5.1 Olympus OmniScan™ MX2 UT phase array instrument, Figure 2.5.1 
 
Figure 2.5.1

### Page 25

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      11 
 
2.5.2 Y-adapter (Olympus NDT PN AAUX202A) to support two phase array probes, 
Figure 2.5.2 
2.5.2.1 Leading Edge Probe is connected to PA1 port on the y-Connector.  
Trailing edge probe is connected to PA2 port on the y-Connector.  See 
Figure 2.5.2a for a bench-top view & Figure 2.5.2b as installed on the 
OmniScan MX2 instrument. 
 
Figure 2.5.2a 
  
Figure 2.5.2b 
Trailing Edge 
Probe Connection 
PA2 
Leading Edge 
Probe Connection 
PA1 
Trailing Edge 
Probe Connection 
PA2 
Leading Edge 
Probe Connection 
PA1

### Page 26

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      12 
 
2.5.3 Olympus TomoView™, PC-based software for data acquisition, visualization of 
ultrasonic signals and data analysis.  
2.6 Consumables 
Name Manufacturer Part Number / 
Identification 
Usage / Notes 
Glycerin Various EAC-0928 Glycerin, 
USP Grade 99.5% 
minimum 
Room Temperature; 
Coupling; 
Approx. 1L engine set 
(qty 24 blades) 
UltraGel  MagnaFlux 3 oz container Probe Coupling 
Alcohol Wipes Various Various Blade cleaning 
Lint-free Dry Wipes Various Various Blade cleaning 
TEC Marker Various EAC-0023 Marker 
(TEC) 
Mark inspection region 
Water N/A N/A Room Temperature; 
Coupling 
Foam Wedge Pads UniWest N/A Coupling 
Aqueous Cleaner, 
Liquid Wipe Type 
Various EAC-0058 Cleaner, 
Aqueous (Liquid 
Wipe Type) 
Blade Cleaning 
Isopropyl Alcohol Various EAC-0004 Alcohol, 
Isopropyl, 
Technical Grade  
Blade Cleaning 
Tampico Brushes Tampico EAC-0511 Brush, 
Tampico 
Blade Cleaning 
Silver Pencil Various EAC-0020 Pencil, 
Metal Marking 
(Silver) 
Blade Marking 
Abrasive Pad Various EAC-0048-2 Pad, 
Abrasive (Very 
Fine) or EAC-0048-
1 Pad, Abrasive 
(Ultra Fine) 
Blade Cleaning 
Cotton Cloth Various EAC-0206 Blade Cleaning

### Page 27

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      13 
 
3.0 Equipment Connections 
3.1 Umbilical Lifeline cable connects the Motion Controller to the Scanner Carriage.  Separate 
connections for motor power, motor communications, and the motor I/O connect into the 
back panel of the controller, Figure 3.1a, and into the scanner carriage, Figure 3.1b. 
  
Figure 3.1a 
 
Figure 3.1b 
3.2 Ethernet cable connects the motion controller in the “PC” connection, Figure 3.1a, to the 
computer. 
3.3 Couplant Supply Tube connects from the water pump, Figure 2.2a, to the Scanner Carriage, 
Figure 2.4.

### Page 28

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      14 
 
3.4 The Encoder cable is hard-wired from the Scanner Carriage and connects to the OmniScan 
“Motion Control” connection, Figure 3.4a.  Connect this cable prior to powering the UT 
instrument.  Note that alignment is made by the red marks as in Figure 3.4b. 
  
Figure 3.4a 
  
Figure 3.4b 
  
Red Line on 
Encoder Cable 
Red mark on rear side 
of OmniScan MX2

### Page 29

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      15 
 
3.5 Ethernet cable connects OmniScan, Figure 3.5, to the Laptop, communicating with 
TomoView PC. 
 
Figure 3.5

### Page 30

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      16 
 
3.6 Phased Array Probes connect to the OmniScan, Figure 3.6a, via the Y-Adapter, Figure 3.6b.   
3.6.1 Note that the Leading Edge probe connects to the PA1 port on the Y-Adaptor 
3.6.2 Note that the Trailing Edge probe connects to the PA2 port on the Y-Adaptor 
  
Figure 3.6a 
 
Figure 3.6b 
 
  
Trailing Edge 
Probe Connection 
PA2 
Leading Edge 
Probe Connection 
PA1 
Trailing Edge 
Probe Connection 
PA2 
Leading Edge 
Probe Connection 
PA1

### Page 31

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      17 
 
4.0 Initial setup 
4.1 Make all connections as outlined in Section 3.0 Equipment Connections 
4.2 Turn on components in this order: 
4.2.1 UniWest Motion Controller 
4.2.2 Omniscan MX2 
4.2.3 Laptop computer 
4.3 Log in to the Laptop with Username and Password labeled on the Laptop 
4.4 Start UXY on motion control computer.  
4.4.1 Ensure the E-Stop is not engaged; twist and pull outward to disengage 
4.4.2 Check UXY M-Axis and choose “OK”, see Figure 4.4.2 
 
Figure 4.4.2 
4.4.3 Ensure UXY carriage motion will not damage any components or pull any wire 
or water hoses.  Select “Yes”, see Figure 4.4.3. 
 
Figure 4.4.3

### Page 32

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      18 
 
4.4.4 Input User Name “etc” and Password “etc”, select “OK”.  See Figure 4.4.4. 
 
Figure 4.4.4 
 
4.4.5 Select “Yes” to move all axes to home position, Figure 4.4.5. 
 
Figure 4.4.5

### Page 33

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      19 
 
4.5 The OmniScan communicates to the Laptop via a program named “BootP” that runs in the 
system icon tray, see Figure 4.5.  “BootP” must display a green light to signify successful 
communication.  Figure 4.5 shows “BootP” WITHOUT the green light – this is the 
disconnected state. 
 
Figure 4.5

### Page 34 (OCR)

NDIP 1205
4.6 After the OmniScan boots up, it will display a screen with the message in red font Message
from DSP : BootP registration Failed", Figure 4.6. This indicates the OminScan has not yet
connected to the Laptop
omnIscan MX2  TV Controller installed
omniscan
4) Platform Type: Omniscan MX PX G2
) UTS driver (version =3.5D5T15, d=37, compVers= 1.0RO
2) Message from DSP: PlatformDriver driver (version =3.5D5T4, Id=31, compVers= 1.0RO)
Internal temperature (C): 38.7
Figure 4.6
4.7 When the OmniScan displays the message in white font iMessage from DSP : BootP
registration success. IP address: 192.168.0.111" communication is successful between the
Omniscan and the Laptop, Figure 4.7.
• omnIscan MX2  TV Controller installed
omniscan
7) # PA Chain Qty 144₽
Internal temperature (C): 36.2
Figure 4.7
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.
20

### Page 35 (OCR)

NDIP 1205
4.8 When communication has been established, as in step 4.7, the BootP program will show a
green indicator light and there will be "Active pods: 1", as in Figure 4.8.
Olympus NDT Bootp Server
Status: Running
Active pods: 1
2:28 PM
4x 9/19/2019
~ lype here to searc  1 H C dx 2:28 PM
Figure 4.8
4.9 Double click the BootP program to bring up the "Bootp status" box. If it displays the
message "There is no problem with the Bootp on your computer." Figure 4.9, click the
"Close" button and go to step 4.10.
There is no problem with the Bootp on you
~ 08 × 9/19/2019
Figure 4.9
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.

### Page 36

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      22 
 
4.10 If connection through BootP cannot be made: 
4.10.1 Ensure the Ethernet cable supplied is connected to both the Laptop and 
Omniscan.  Note, this is a cross-over cable and is NOT typical of Ethernet cables 
available at most stores or IT departments. 
4.10.2 Restart the OmniScan and Laptop and repeat steps 4.5 through 4.10. 
4.10.3 Contact NDE Engineering if connection issues persist. 
4.11 Start TomoView  on the UT PC.  On the splash screen select “Inspection”.  See 
Figure 4.11. 
 
Figure 4.11 
4.11.1 Wait until “OmniScanMX2’ appearing in the “Select Device Configuration” 
window.  Select this device and click “OK”.  See Figure 4.11.1. 
 
Figure 4.11.1 
4.12 For on-wing inspections number all blades in the engine with an approved marking 
device such as a TEC marker 
4.12.1 Determine the #1 blade by comparing any blade Serial Number to its position 
using the Engine “Balance Sheet” as provided by the customer

### Page 37

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      23 
 
5.0 Calibration 
5.1 Before the calibration, always clean the wedge, foam, and calibration standard.  Calibration 
is performed by placing the inspection carriage on a calibration fixture that contains a plate 
with defined calibration notches. 
5.2 Figure 5.2 shows the calibration fixture.  Note the location pins highlighted with red arrows. 
 
Figure 5.2 
5.3 Place the inspection carriage on the calibration fixture with the inspection carriage on the 
location pins of the calibration fixture – note the red arrows in Figure 5.3. 
 
Figure 5.3

### Page 38

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      24 
 
5.4 Ensure the inspection head is disengaged by holding the head with one hand and pulling 
the white pin with the other hand.  Slowly raise the head until the white pin clears the top 
of the head, then release the white pin to lock it in the up/disengaged position, Figure 5.4. 
 
Figure 5.4 
5.5 Select the Calibration file in UXY software. 
5.5.1 In the UXY software, select “File”, then “Open”.  See Figure 5.5.1 
 
Figure 5.5.1

### Page 39 (OCR)

NDIP 1205
5.5.2 Click on the scan plan "Calibration" to open it. See Figure 5.5.2.
uni Open
1 › This PC › Documents ›  Search Documents
Organize •  New folder  BEDO
Name  Date modified  Type  Size
* Quick access
GP7K  8/20/2019 2:05 PM  File folder
_ Desktop  / Blade_inspection  8/20/2019 2:05 PM  SCN File  1 KB
• Downloads *
| Calibration  8/20/2019 12:47 PM SCN File  2 KB
• Documents *
= Pictures
GP7K Fan Blade
_ GP7K focal law
Scan_08_19
Scan_08_20
• OneDrive
• This PC
3D Objects
• Desktop
= Documents *
File name: Calibration  UXV Scanplan Files (* scn)
Open  Cancel
Figure 5.5.2
5.5.3 Click "Execute scanplan" button  Execute scanplan  - and click "Run" to move all axes
to local zero. See Figure 5.5.3
Run Scanplan  ×
- Filename  Run
- Status
READY  Close
Save
Data Collection Mode: Position Based  • Data Overlap
Figure 5.5.53
5.5.3.1  Always run this scan plan first.
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.

### Page 40 (OCR)

NDIP 1205
5.5.4 Within TomoView select "Open an existing configuration". See Figure 5.5.4
Configuration Selection
© Open the last configuration
POD2_2017_sheath_35_40c  Cancel
• Open an existing configuration
© Create a new configuration
- Do not display this box again
Figure 5.5.4
5.5.5 Select the "Calibration" file and click "Open". See Figure 5.5.5
T Open  ×
Folder:  Look in:  GP7K Fan Blade Onwing layout
Name  Date modified  Type
Temp  8/20/2019 2:04 PM  File folder
Data Files  Quick access  f Blade_scan  8/20/2019 2:03 PM  Tomoviev
• Calibration  8/20/2019 12:45 PM  Tomoviev
Desktop
Setup Files
Set as default  Libraries
This PC
Network
File name:  Calibration  Open
Files of type:  All Setup Files (* acq:*ard; *rst: "rsp)  Cancel
File Content  Processing
• Hardware setup (* acq. * srd)  Scanner setup (* son)  Merge all
Data (* dt)  Attributes (*A01)  Merge by group
• Displays setup (*rst]  _ Thickness soft C-scan
_ Part (* rsp)
Figure 5.5.5
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.

### Page 41 (OCR)

NDIP 1205
5.6 Ensure Encoder readings for TomoView and UXY are both set to X=0 Y=0
5.6.1 TomoView Encoder Settings, see Figure 5.6.1
-0.000 h. J
• Type here to search
Figure 5.6.1
5.6.2 UXY Encoder Settings, see Figure 5.6.2
× = 0.000" € = 0.00* M = 0.000*
• Type here to search  .. . .
Figure 5.6.2
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.
27

### Page 42 (OCR)

NDIP 1205
5.7 If UXY is at X=0 Y=0 but TomoView is not, Click "Set Encoders" button within TomoView,
Figure 5.7.
Scan  -0.000 in.  Index  -0.000  Set Encoders  cq. speed  2.000 in./s Mode Setup  Link O Acq. unit 135.5°F
* t Device  1 [usr:7)  Group: LinearOttor  Beam: #1;A=0.0,SK=90
General Gates TCG  DGS  Digitizer Pulser/Receiver Probe  Alams 1/0  Transmitter Receiver
Gain  Time Base  Auto Values
All beams  Group:  38.0  dB  Booster (25 dB)  Auto Set  Start:  3.986 S  Set Auto  Ref. amplitude:  80  Auto Values
• Interleaved  Beam:  dB Apply: 38.0 dB  Set Reference  Range:  15.000 = S  Set Range  Full range start:  0.00
Linear merged  Ref.:  0 dB  Reset Beam  Mode:  Full range:  61.92 S
Figure 5.7
5.8 Turn on the couplant pump and ensure flow to the inspection carriage. Couplant should fill
the tube running to the inspection carriage and flow out from under the inspection head.
Adjust couplant flow with the flow control to be in the position shown in figure 5.8. DO
NOT run the pump with an empty reservoir, this can cause the tubing inside the pump
head to fail.
Figure 5.8
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.

### Page 43

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      29 
 
5.9 Evaluate the signal in TomoView to ensure no air bubbles in the interface between the 
inspection head and calibration piece.  Bubbles are indicated with a UT response as show in 
Figure 5.9a.  Proper coupling with lack of bubbles is shown in Figure 5.9b – note a uniform 
noise level in the UT signal. 
 
Figure 5.9a 
 
Figure 5.9b 
 
5.10 Bubbles should be checked for in elements 1-8 and 9-16 of both leading edge and 
trailing edge arrays.   
5.10.1 To select the leading edge array, click in TomoView in the top left window 
changing its window header to Blue.   
5.10.2 To select the trailing edge array, click in TomoView in the top right window 
changing its window header to Blue.   
5.10.3 To select elements 1-8 in either array, click the “Beam” drop down and select #1 
as in Figure 5.10a noting that the leading edge array is selected. 
5.10.4 To select elements 9-16 in either array, click the “Beam” drop down and select 
#9 as in Figure 5.10a noting that the trailing edge array is selected.

### Page 44

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      30 
 
 
Figure 5.10a 
 
Figure 5.10b 
  
Trailing Edge Display Leading Edge Display

### Page 45

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      31 
 
5.11 In UXY software a dialog box will appear stating “System going to Scan Start 1”, see 
Figure 5.11.  Select “Ok”. 
 
Figure 5.11 
5.12 UXY software will display the message “Engage head and turn on Water” as in Figure 
5.12a.   
5.12.1 Engage the inspection head is engaged, Figure 5.12.1, by holding the wedge 
with one hand, pulling the white pin with the other hand, and SLOWLY lowering 
the inspection head down to the calibration plate. 
 
Figure 5.12.1

### Page 46

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      32 
 
5.12.2 Ensure that Couplant is flowing with no air bubbles as in steps 5.9 – 5.11.  Select 
OK as seen in Figure 5.12.2. 
 
Figure 5.12.2 
5.13 The UXY software will display the message “The Head is now at the Start of the 
Inspection area” as seen in Figure 5.13.  Select “OK. 
 
Figure 5.13

### Page 47

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      33 
 
5.14 UXY software will display the message “Scan ready, start Tomoview” as in Figure 5.14a. 
5.14.1 Select TomoView and press the play button as in Figure 5.14b to begin data 
acquisition.  The play button will change to a stop icon as seen in Figure 5.14c. 
5.14.2 Once TomoView is in the acquisition mode, return to the UXY software and 
select “OK” 
 
Figure 5.14a 
 
Figure 5.14b

### Page 48

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      34 
 
 
Figure 5.14c

### Page 49 (OCR)

NDIP 1205
5.15  The UXY software will now command the Inspection carriage to scan the calibration
piece while the TomoView software acquires data. When this scan is complete TomoView
will appear as in Figure 5.15a and UXY will show a message "Scan done, stop Tomoview" as
in Figure 5.15b.
• Type here to search  ~ Fa 4* 8/20/2019
Figure 5.15a
LUXY - Calibration
Window Help
MESSAGE OK: System Going to Scan Start 1
1 Scan done, stop Tomoview
J.b50 € = 0.00 M = 5.050
• Type here to search  ....  4~12 020100
Figure 5.15b
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.
35

### Page 50 (OCR)

NDIP 1205
5.15.1 Press the stop button in Tomoview, highlighted in Figure 5.15a
5.15.2 The TomoView Screen will enter the Save As function as seen in Figure 5.15.2
· th Device |1 us 71 ]
• Type here to search  ~ F2 4* 8/20/20
Figure 5.15.2
5.15.3 Select file location to save the first calibration scan as seen in Figure 5.15.3
30 0° A: 0.0°) - A-scan (A T (m:r): 0.5 In
•Dela Pidl
• Type here to search  A Fa 8/20/2019
Figure 5.15.3
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.
36

### Page 51

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      37 
 
5.15.4 Tomoview will now enter Analysis Mode as indicated by the Return icon as seen 
in Figure 5.15.4 
 
Figure 5.15.4

### Page 52

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      38 
 
5.15.5 Select “Layout 4” in the Layout Drop-Down menu,  
5.15.6 Select the Maximum amplitude from the Leading Edge display, Figure 5.15.5 top 
three images, and record onto the Calibration & Data Collection Sheet in 
Appendix A under the “LE” column in “Cal. Amplitude”. 
 
 
Figure 5.15.5 
5.15.6.1 Note that the Calibration & Data Collection Sheet, Appendix A, is an 
Excel file with formulas.  Data should be entered directly into the Excel 
file as resulting values highlighted in yellow cells will be used in 
subsequent decisions making and instructional steps. 
5.15.6.2 Ensure Gain used during Calibration, circled in Figure 5.15.5, is entered 
into the Data Collection Sheet, Appendix A, as the Calibration Gain  
5.15.6.3 Ensure the “Calibration Gain Adjustments” for Leading Edge & Trailing 
Edge from the Calibration Card, Appendix B, is entered into the Data 
Sheet, Appendix A. 
5.15.7 Select the Maximum amplitude from the Trailing Edge display, Figure 5.15.5 
bottom three images, and record onto the Calibration & Data Collection Sheet 
in Appendix A under the “TE” column in “Cal. Amplitude”. 
5.15.8 The UXY calibration software will require you to repeat calibration steps 5.15.1 
through 5.15.5 four additional times for a total of five calibration values for 
each leading edge and trailing edge. 
  
Trailing Edge Gain 
LE 0o LE 5o LE -5o 
TE 0o TE 5o TE -5o

### Page 53

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      39 
 
5.16 Calibration Criteria: 
5.16.1 Calibration Gain for the Leading Edge cannot be higher than 40.0dB plus the 
value listed on the Calibration Card, example in Appendix B.   
5.16.2 Calibration Gain for the Trailing Edge cannot be higher than 42.0dB plus the 
value listed on the Calibration Card, example in Appendix B.   
5.16.3 If resulting Calibration Values are outside the Gain Limits of the specific 
Calibration Standard, perform the following in order: 
5.16.3.1 Clean the bottom of the wedge 
5.16.3.2 Ensure the Wedge Foam Pad is providing an adequate seal to contain 
couplant and replace Foam Pad as necessary 
5.16.3.3 Clean the top of the Calibration Standard  
5.16.3.4 Re-couple between the Probes and Wedge 
5.16.3.5 Check the bottom of the Calibration Standard to ensure no debris in 
the Calibration notch 
5.16.3.6 Change Probes and recouple the new Probes to the Wedge 
5.16.3.7 Call NDE Engineering 
5.16.4 Post Calibration cannot be greater than +2dB of the Pre-Calibration Value.  If 
outside these limits, discard all blade scans between the Pre-Calibration and the 
Post Calibration. 
5.16.5 Before rescanning blades affected by 5.16.3, ensure the most recent Calibration 
value conforms to Calibration Gain Limits set in 5.16.1 and 5.16.2.

### Page 54

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      40 
 
6.0 Blade cleaning 
6.1 Clean blade surfaces, both Concave/Pressure and Convex/Suction, in the area to be scanned 
as follows: 
6.1.1 Clean the Fan Blade perEAP-2201, with EAC-0004 Isopropyl Alcohol orEAP-
2202A, with EAC-0058 Aqueous Cleaner. 
6.1.2 Wet surface and  abrasive pad (EAC-0048-2) or (EAC-0048-1) with EAC-0058 or 
EAC-0004 and lightly scrub, without scratching the coating, both the 
Pressure/Concave Side and Suction/Convex Side to remove debris.   
6.1.2.1 CAUTION: When using abrasive pads, ensure both surfaces are wet to 
avoid scratching the surface. 
6.1.3 With a clean EAC-0206 cotton cloth wet with EAC-0058 orEAC-0004 and wipe 
blades until clean of debris. 
6.1.4 Repeat until clean. 
6.1.5 Note: EAC-0511 Tampico Brush may be used to scrub the fan blades.

### Page 55

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      41 
 
7.0 Blade Scanning 
7.1 When transporting the Scanning Carriage from the Calibration Fixture or between blades, 
ensure the Inspection Head is disengaged as in Figure 5.4a. 
7.2 Before mounting onto a blade ensure the Couplant Pump is turned off, Figure 2.2a, and 
calibration has been performed successfully as in Section 5.0. 
7.3 When installed on an on-wing blade the weight of the Scanning Carriage will cause the 
engine to rotate.  To prevent rotation ensure the blades are locked with Blade Wedges, 
Figure 7.3. 
 
Figure 7.3

### Page 56

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      42 
 
7.4 Blades can be clocked with 0° as the topmost, 12:00, blade and 270° as the left most, 9:00, 
position. Mount the Scanning Carriage on to a blade in the 255° or 240° position to allow 
adequate coupling, Figure 7.4.   
7.4.1 Scan blades in the 255° position, then scan the blade in the 240° position.  
When these two blades are scanned, rotate the engine to locate two un-
scanned blades into the 255° & 240° positions and scan those new blades. 
 
Figure 7.4 
  
270° 
Do not inspect here 
255° 
Inspect here 
240° 
Inspect here

### Page 57

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      43 
 
7.5 Install absorbent pads/mats/towels along the green inlet surface to absorb couplant run-off 
and also to preserve the surface condition of this very delicate area, Figure 7.5. 
7.5.1 Ensure the pads/mats/towels will not get caught by rotating the fan blades.  
Tape the pads down if necessary. 
 
Figure 7.5

### Page 58

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      44 
 
7.6 Mount the Inspection Carriage such that the three contact points are positively located on 
the blade.  See the red arrows in Figure 7.6.   
7.6.1 Ensure the Couplant supply line and Probe cables are run under the Inspection 
Carriage, as in Figure 7.6.  Also ensure they will not become entangled during 
operation and there is enough slack to ensure full range of motion. 
 
Figure 7.6 
 
7.7 Turn the Couplant Supply Pump on, Figure 2.2a, and ensure couplant is flowing through the 
Inspection Head and onto the blade via the Flow Control, Figure 2.2b. 
  
Couplant Line & 
Probe Cables

### Page 59 (OCR)

NDIP 1205
7.8 In TomoView Open the Scan File by clicking the Folder icon, Figure 7.8
2000 in/s
2) Linear merged
• Type here to search
Figure 7.8
7.9 Select the file "Blade _Scan"  ", Figure 7.9
a File Toolbars Part & Overlav Wev
Bix 01 72 68 52  5:180 0-, A: 0:0 - A-scan (A)
• Type here to search  A 1 8/20
Figure 7.9
Pratt & Whitney Proprietary Information - This page is subject to the restrictions on the cover page of this document.
45

### Page 60

NDIP 1205   
 
Pratt & Whitney Proprietary Information – This page is subject to the restrictions on the cover page of this document.   
                                                                      46 
 
7.10 During Calibration the Excel spreadsheet, Appendix A, calculates a Calculated Gain.  The 
Blade Scan Gain is +2dB greater than the latest Calculated Gain, PLUS an additional 
adjustment based on the Calibration Card (in the example of Appendix B, the adjustment is 
+1.2dB for Leading Edge).  Input the Calculated Gains for Leading Edge into TomoView in 
the following: 
7.10.1 Adjust 1st channel by selecting Group “LinearOttor”, Figure 7.10   
7.10.2 Adjust 2nd channel by selecting Group “LinearP5ttor”, Figure 7.10 
7.10.3 Adjust 2nd channel by selecting Group “LinearN5ttor”, Figure 7.10 
 
Figure 7.10

The text continues at https://openairdocs.org/service-documents/engine-alliance/eagp7-a72-426/file/2ab92ce754f4.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
