# Erickson Service Bulletin 64B20-6: Revision A

- Rights: © Erickson. Filed by the FAA in regulations.gov docket FAA-2008-1243; AD 2012-23-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Erickson Service Bulletin 64B20-6](https://openairdocs.org/service-documents/erickson/64b20-6.md)
- Title as filed: U.S. DOT/FAA - Erickson Air-Crane Service Bulletin
- Pages: 11
- PDF: https://openairdocs.org/files/sha256/a3/af/a3af3d0ed19c55aa3d94f2118478e567f9202e7031f103860e5a475c9184a0f9
- Page: https://openairdocs.org/service-documents/erickson/64b20-6/file/a3af3d0ed19c

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

ERICKSON AIR - CRANE
INCORPORATED
FAA TYPE CERTIFICATE NO. H6EA TC TYPE CERTIFICATE NO. H-91
SERVICE BULLETIN 64B20-6
TRANSMITTAL SHEET
SERVICE BULLETIN NO. 64B20-6 - LEFT AND RIGHT SPLICE FITTING
(Transition Fitting), PYLON BULKHEAD ASSEMBLY (Canted), Rotary Rudder
Boom, and PYLON STEEL STRAP, Inspection of
This page transmits Revision A, dated December 12/2007, to Service Bulletin No.
64B20-6, dated January 5/2005.
Please insert the attached pages which are a complete reissue of Service Bulletin
64B20-6. Destroy the superseded pages so that the contents will be as follows:
Page No.  Revision  Date
1 through 9  December 12/2007
The text changed by this revision is indicated by a vertical line in the left-hand margin of
this page.
REVISION FEATURES:
Section 1. PLANNING INFORMATION - Added part numbers 6420-66341-103,
6420-66341-104.
Section 2. ACCOMPLISHMENT INSTRUCTIONS - Added part numbers
6420-66341-103, and -104 to Figure 1.
3100 WILLOW SPRINGS ROAD • P.O. BOX 3247 • CENTRAL POINT, OR 97502 • (541) 664-5544 • FAX (541) 664-2312 •
www.ericksonaircrane.com

### Page 2 (OCR)

TRANSMITTAL SHEET (Continued)
RECORD OF REVISIONS
Revision  Date
IR  January 5/2005
Erickson Air-Crane
Barbara F. Stiger
Technical Publications Manager

### Page 3 (OCR)

ERICKSON AIR - CRANE
INCORPORATED
FAA TYPE CERTIFICATE NO. HEA  TC TYPE CERTIFICATE NO. H-91
Service Bulletin
NO. 64B20-6
(E)
SUBJECT:  LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
1. PLANNING INFORMATION
A. Effectivity
Model: S-64F
Component: 6420-66341-101,  6420-66341-102,  6420-66341-103,  6420-66341-104,
6420-66340-043, 6420-66340-044, and 6420-66301-127
B. Reason
To inspect for cracks on the left and right splice fitting (transition fitting) pylon bulkhead
assembly (canted), and pylon steel strap and surrounding area.
C. Description
Requirements for the recurring visual and fluorescent penetrant inspections of the left and right
splice fitting (transition fitting), the critical areas of the pylon bulkhead assembly (canted)
installation and upper end of pylon steel strap and surrounding area.
D. Compliance
Work outlined herein is to be accomplished within 20 hours upon receipt of this Service
Bulletin. Inspections outlined in Section 2 of this Service Bulletin specifies mandatory
maintenance required under sections 43.16 and 91.403 of the Federal Aviation Regulations
unless an alternative program has been FAA approved.
January 05/2005
Revision A - December 12/2007  Page 1 of 9
3100 WILLOW SPRINGS ROAD • P.O. BOX 3247 • CENTRAL POINT, OR 97502 • (541) 664-5544 • FAX (541) 664-2312
www.ericksonaircrane.com

### Page 4 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT: _ LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
1. PLANNING INFORMATION (Continued)
E. Approval
FAA Approved
F. Manpower (Estimated)
No. of Men  No. of Hours  Man-Hours
Inspection  1  0.5  0.5
G. Special Tools
10X Magnifying Glass
Flashlight
H. Weight and Balance
No change
I. References
S-64F Maintenance Manual EAC006
J. Publications Affected
S-64F Manufacturer's Progressive Inspection Checklist, EAC4002-1
S-64F All Zone Progressive Checklist, EAC4002-3
K. Electrical Load Data
No change
L. Personnel Requirements
Persons performing the fluorescent penetrant inspection shall be certified as an ASNT Level II,
or equivalent, or completed an Erickson Air-Crane training course on the methods and practices
of fluorescent penetrant inspection, which would be a Level I area specific.
January 05/2005
Page 2  Revision A - December 12/2007

### Page 5 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT: LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS
Conduct the following inspections:
A. INSPECTIONS NOT TO EXCEED 20 HOURS FROM PREVIOUS INSPECTION.
(1) LEFT AND RIGHT HAND SPLICE FITTING.
(a) Visually inspect left and right splice fitting (transition fitting) in areas noted in Figure 1,
Detail A and B.
(b) If crack is suspected, use 10X magnifying glass for closer inspection.
(c) If crack is suspected during 10X magnifying glass inspection, perform fluorescent
penetrant inspection per ASTM E 1417, Type I, Method A or C.
(d) If crack is verified, replace damaged parts).
(2) PYLON BULKHEAD ASSEMBLY (Canted).
(a) Visually inspect pylon bulkhead assembly (canted) in areas indicated in Figure 2.
(b) If crack is suspected, use 10X magnifying glass for closer inspection.
(c) If crack is suspected during 10X magnifying glass inspection, perform fluorescent
penetrant inspection per ASTM E 1417, Type I, Method A or C.
(d) If crack is verified, replace damaged parts). NOTE: Some areas may be repaired in
accordance with data specifically approved by the FAA for the particular damage.
Contact Erickson Air-Crane Customer Support for repair instructions.
(3) EXTERIOR PYLON STEEL STRAP AREA. (Figure 3.)
(a) Visually inspect area at top of strap.
(b) Inspect upper 12.0 inches of strap for indications of cracks or working rivets as shown
in Figure 3.
January 05/2005
Revision A - December 12/2007  Page 3

### Page 6 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT: LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS
(c) Inspect pylon skin 6.0 inches above and adjacent to the strap for indications of cracks or
working rivets as shown in Figure 3.
(d) If crack is suspected on outside of pylon, use 10X magnifying glass for closer
inspection.
(e) If crack is suspected during 10X magnifying glass inspection, perform fluorescent
penetrant inspection per ASTM E 1417, Type I, Method A or C.
(t) If crack is verified, replace damaged parts). NOTE: Some areas may be repaired in
accordance with data specifically approved by the FAA for the particular damage.
Contact Erickson Air-Crane Customer Support for repair instructions.
B. INSPECTIONS NOT TO EXCEED 155 HOURS.
(1) INTERIOR PYLON STEEL STRAP AREA.
(a) Remove inspection panel on forward and aft sides of pylon as shown in Figure 3.
Visually inspect longeron and bulkhead interior area 12.0 inches below to 6.0 inches
above end of strap for indications of cracks or working rivets.
(b) If crack is suspected in longeron use 10X magnifying glass for closer inspection.
(c) If crack is suspected during 10X magnifying glass inspection, perform fluorescent
penetrant inspection per ASTM E 1417, Type I, Method A or C.
(d) If crack is verified, replace damaged parts). NOTE: Some areas may be repaired in
accordance with data specifically approved by the FAA for the particular damage.
Contact Erickson Air-Crane Customer Support for repair instructions.
January 05/2005
Page 4  Revision A - December 12/2007

### Page 7 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT:  LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS
C. AT SPLICE FITTING REPLACEMENT.
(1) Perform a visual inspection of pylon skin panels to check for indications of cracking,
particularly around fastener holes (Figure 1, Detail A).
(2) Perform a fluorescent liquid penetrant inspection of the area around the fastener holes
attaching the splice fitting to the tail boom and pylon bulkhead assembly (Figure 1, Detail
B) in accordance with ASTM E 1417, Type I, Method A or C.
(3) If crack is verified, replace damaged parts). NOTE: Some areas may be repaired in
accordance with data specifically approved by the FAA for the particular damage. Contact
Erickson Air-Crane Customer Support for repair instructions.
D. Record of Compliance
(1) Make an appropriate aircraft record entry to show compliance with this Service Bulletin.
January 05/2005
Revision A - December 12/2007  Page 5

### Page 8 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT:  LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS (Continued)
TRANSITION FITTING
INSPECTION AREA
RIGHT AND LEFT
SIDES TYPICAL
SEE DETAIL A & B
6420-66341-101, -102,
-103, and -104
SPLICE FITTING
(TRANSITION FITTING)
INSPECTION AREA
LEFT AND RIGHT TYPICAL
INSPECT 100% PAYING
PARTICULAR ATTENTION
TO THE ATTACHMENT HOLES
DETAIL A (INBOARD LOOKING OUT)
RIGHT SIDE SPLICE FITTING  LEFT SIDE SPLICE FITTING
PYLON SKIN ATTACHMENT  PYLON SKIN ATTACHMENT
INSPECTION AREA  INSPECTION AREA
(RIGHT SIDE TYPICAL)  (LEFT SIDE TYPICAL)
DETAIL B (OUTBOARD LOOKING IN)
C3101.64B20-6.Rev A
Figure 1.
January 05/2005
Page 6  Revision A - December 12/2007

### Page 9 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT: LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS (Continued)
VISUALLY INSPECT 100%
OF PYLON BULKHEAD ASSEMBLY
(CANTED); PAY PARTICULAF
ATTENTION TO AREAS INDICATED
INSPECTION AREA
...
ne e
VIEW LOOKING AFT
(CANTED) BULKHEAD ASSEMBLY
C3121.64B20-6
Figure 2.
January 05/2005
Revision A - December 12/2007  Page 7

### Page 10 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT:  LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
2. ACCOMPLISHMENT INSTRUCTIONS (Continued)
VISUALLY INSPECT THE LAST 12
INCHES OF THE STRAP AND ANOTHER
6420-66301-127  6 INCHES BEYOND THE UPPER END.
STRAP  INCLUDE THE AREAS AROUND THE
INSPECTION AREA  STRAP AS INDICATED.
STEP (REF)
INSPECTION ACCESS
COVER REMOVED (REF)
ECTION
VISUALLY INSPECT
THE AREA OF THE STRAP  INSIDE OF PYLON IN  - 6420-66301-127  STRAP
INSPECT AREA AS DESCRIBED
PYLON (REF)  IN PARAGRAPH A. (3)
NOTE:
REMOVE AFT INSPECTION COVER -
(NOT SHOWN) AND VISUALLY INSPECT
THE UPPER LEFT LONGERON IN THE
AREAADJACENT TO THE STRAP
INSPECTION AREA. (I.E. THE LAST 12
INCHES AND ANOTHER 6 INCHES
BEYOND THE UPPER END).
C3267.64B20-6
Figure 3.
January 05/2005
Page 8  Revision A - December 12/2007

### Page 11 (OCR)

ERICKSON AIR-CRANE
SERVICE BULLETIN NO. 64B20-6
SUBJECT: LEFT AND RIGHT SPLICE FITTING (Transition Fitting), PYLON BULKHEAD
ASSEMBLY (Canted), Rotary Rudder Boom, and PYLON STEEL STRAP,
Inspection of
3. MATERIAL INFORMATION
A. Basis for Material Data
None
B. Bill of Material
None
C. Consumable Material
As required  Fluorescent Penetrant System  SAE AMS 2644D
January 05/2005
• Revision A - December 12/2007  Page 9

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
