# General Electric Alert Service Bulletin 72-A0335: Revision R02

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2019-0919; AD 2021-18-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Alert Service Bulletin 72-A0335](https://openairdocs.org/service-documents/ge/72-a0335.md)
- Title as filed: CF34-8C Alert SB 72-A0335 R02
- Pages: 8
- PDF: https://openairdocs.org/files/sha256/e9/14/e914984e21189e455c0f78752ef654c685f554093c794f45c4cfb1072e80ba3a
- Page: https://openairdocs.org/service-documents/ge/72-a0335/file/e914984e2118

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CF34-8C Service Bulletins (SBs)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
Date Printed:
2021/06/16
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
1 of 8
CF34-8C ALERT SERVICE BULLETIN - 72- A0335 R02 Revised:02/25/2020
SB 72-A0335 R02 ENGINE - COMBUSTION CHAMBER LINER ASSEMBLY (72-44-00) -
BORESCOPE INSPECTION OF COMBUSTION OUTER LINER SHELL
Issued:
06/27/2019
GE Designated: -CONFIDENTIAL-
The information contained in this document is GE proprietary information and is
disclosed in confidence. It is the property of GE and shall not be used, disclosed to
others or reproduced without the express written consent of GE, including, but without
limitation, it is not to be used in the creation, manufacture, development, or
derivation of any repairs, modifications, spare parts, designs, or configuration
changes or to obtain FAA or any other government or regulatory approval to do so. If
consent is given for reproduction in whole or in part, this notice and the notice set
forth on each page of this document shall appear in any such reproduction in whole or
part.
This technical data is considered subject to the Export Administration Regulations
(EAR) pursuant to 15 CFR Parts 730-774. Transfer of this data by any means to a
Non-U.S. Person, whether in the United States or abroad, without the proper U.S.
Government authorization (e.g., License, exemption, NLR, etc.), is strictly
prohibited.
Copyright (2020) General Electric Company, U.S.A.
TRANSMITTAL INFORMATION
REVISION 2 TO ALERT SERVICE BULLETIN 72-A0335
Revision 2 is issued to update paragraphs 1.,  and 3., PLANNING INFORMATION
.ACCOMPLISHMENT INSTRUCTIONS
Revision 1 was issued September 23, 2019. The original was issued June 27, 2019.
Revision bars in the left margin identify changes.
1. PLANNING INFORMATION
A. Effectivity
* * * CF34-8C1/-8C5/-8C5B1
This Alert Service Bulletin is applicable to all CF34-8C engines.
The outer shell combustion liners (combustion outer liner shells) P/N 
, P/N , and P/N  are affected by this Alert4124T04G04 4124T04G05 5159T35G02
Service Bulletin.
B. Description
This Alert Service Bulletin provides instructions to do a repetitive borescope
inspection (BSI) of an affected combustion outer liner shell panel P4 with more
than 17,500 flight hours time since new (TSN) or time since repair (TSR) per
GEK 105091, 72-44-06, REPAIR 023.
NOTE:If it is not possible to determine the TSN or TSR of the combustion outer liner shell, engine
flight hours since new must be used.
C. Compliance
Category 2
(1) For engines with combustion outer liner shells that have accumulated more than 17,500
flight hours TSN/TSR at the original Alert Service Bulletin issue date (June 27, 2019), GE
recommends that you do the first inspection as soon as possible without effect on revenue
service, but before 500 flight hours from the original Alert Service Bulletin issue date.
(2) For engines with combustion outer liner shells that have not accumulated more than 17,500
flight hours TSN/TSR at the original Alert Service Bulletin issue date (June 27, 2019), GE
recommends that you do the first inspection when the combustion outer liner shell reaches
17,500 flight hours TSN/TSR, or as soon as possible without effect on revenue service, but
before 500 flight hours (before 18,000 flight hours TSN/TSR).
(3) For engines with combustion outer liner shells that have accumulated more than 17,500
flight hours TSN/TSR, repeat the inspection every 500 flight hours following the inspection
criteria defined in Table 1 of paragraph 3., , until theACCOMPLISHMENT INSTRUCTIONS
combustion outer liner shell is either repaired per GEK 105091, 72-44-06, REPAIR 023 or

### Page 2

CF34-8C Service Bulletins (SBs)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
Date Printed:
2021/06/16
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
2 of 8
replaced with a new combustion outer liner shell at which time the combustion outer liner
shell time is reset to zero flight hours. Follow the on-wing inspection recommendation
defined in the latest version of CF34-8C S/B  until the new/repaired combustion71-0000
outer liner shell reaches 17,500 flight hours again and then repeat this Alert Service
Bulletin.
NOTE:It is only possible to reset the life of the combustion outer liner shell life by performing
GEK 105091, 72-44-06, REPAIR 023. The examples that follow must be taken into consideration:
*Example 1: A combustion outer liner shell with 19,000 flight hours TSN is inspected at
piece-part level (GEK 105091, 72-44-06, INSPECTION) in the overhaul shop and found to be
serviceable (GEK 105091, 72-44-06, REPAIR 023 was not performed). This engine must remain on a
500-hour reduced BSI interval as defined in this Alert Service Bulletin.
*Example 2: A combustion outer liner shell with 19,000 flight hours TSN is sent to the
component repair shop where GEK 105091, 72-44-06, REPAIR 023 was performed. This engine must
follow the on-wing inspection recommendations defined in CF34-8C S/B .71-0000
Impact B
This recommendation is to address a condition that may result in an Increased
Rate of In-Flight Shutdowns (IFSD), Take-Off Aborts (TOA), Air Turn Backs (ATB)
or Diversions (DIV).
NOTE:This Service Bulletin can be accomplished on wing as part of a normally scheduled BSI of the
combustor liner assembly.
NOTE:This Service Bulletin can be accomplished in shop via BSI or visual inspection of the
combustion outer liner shell (hot side/flow path) after the combustor liner assembly is
removed from the engine.
This Alert Service Bulletin is offered to improve the reliability or
performance of your GE product, or to help prevent the occurrence of the event
or condition described in this Alert Service Bulletin. If the operator elects
not to participate in the bulletin, that decision will be taken into
consideration by GE in evaluating future product performance issues that may
arise in the operator's fleet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
To reduce significant events.
(2) Condition:
Ten CF34-8 engines have experienced an unscheduled engine removal (UER) due to significant
distress in the combustion outer liner shell, resulting in buckling/material loss of the
combustion outer liner shell (  Three of the 10 engines suffered an operationalFigure 1).
event, including two engines that had an IFSD due to severe thermal distress of the high
pressure turbine (HPT)/low pressure turbine (LPT) hardware including burn through of the
LPT case (Figure 2).
(3) Cause:
The root cause evaluation shows that an axial crack can initiate at the trailing edge (TE)
of the combustion outer liner shell panel P4, propagate across the combustion outer liner
shell panel P3 into the combustion outer liner shell panel P2 (  and thenFigure 3),
connect to a circumferential crack on the combustion outer liner shell panel P2, causing
buckling (  of the combustion outer liner shell as well as oxidation of largeFigure 1)
sections of it (Figure 5).
(4) Inspection:
A BSI of the combustion outer liner shell panel P4 is defined to detect and monitor the
onset of distress.
(5) Substantiation:
Substantiation is by fleet experience.
F. Approval
The data contained in this Service Bulletin has been reviewed by the FAA or
authorized entity representing the FAA and the repair(s) and modification(s)
herein comply with the applicable Aviation Regulations and are APPROVED for
installation in the model(s) listed in this Alert Service Bulletin.
G. Manpower
After you get access to the engine, you will need approximately 3 man-hours for
each engine or component.
NOTE:For on-wing engines, you will need approximately 3 man-hours after the engine has cooled down.
H. Weight and Balance
Weight and balance are not changed.
I. References (Use the latest version of these documents)
GEK 105091, CF34-8C Engine Manual (EM)
GEK 105091-1, CF34-8C Line Maintenance Manual (LMM)
GEK 105092, CF34-8C Illustrated Parts Catalog (IPC)

### Page 3

CF34-8C Service Bulletins (SBs)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
Date Printed:
2021/06/16
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
3 of 8
CF34-8C S/B , POWERPLANT - General (71-00-00) - Consolidated On-Wing71-0000
Inspection Recommendations and Servicing Tasks List
J. Publications Affected
GEK 105091, CF34-8C Engine Manual (EM)
GEK 105091-1, CF34-8C Line Maintenance Manual (LMM)
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
None.
(3) Consumables:
None.
B. Industry Support Information
None.
C. Configuration Chart
None.
D. Parts Disposition
None.
E. Tooling - Price and Availability
None.
3. ACCOMPLISHMENT INSTRUCTIONS
A. Inspection
(1) For a description and the locations of the borescope ports, refer to GEK 105091-1,
72-00-00, INSPECTION 003, Subtask 72-00-00-210-002.
(2) Remove the high-voltage igniters from the combustion chamber frame as follows:
(a) Remove the high-voltage igniter from S16. Refer to GEK 105091-1, 74-00-00, SPECIAL
PROCEDURES 009.
(b) Remove the high-voltage igniter from S17. Refer to GEK 105091-1, 74-00-00, SPECIAL
PROCEDURES 008.
(3) Set the light source ON/OFF switch to the ON position and turn the brightness switch from
the L position to the H position.
(4) Put the flexible borescope probe into S16 and examine the combustion outer liner shell.
Refer to Table 1 for inspection limits and do as follows:
NOTE:It is not necessary to examine the other features of the combustor liner assembly
(combustion inner liner shell or combustor baffles included).
Table 1. Combustion Outer Liner Shell - BSI Limits
Inspection Inspection Interval
Axial (non-circumferential) crack can be connected
with circumferential crack.
If you do not find cracks on panel P4 of the
combustion outer liner shell, do a repetitive BSI at
an interval of 500 hours. Refer to  Figure 3.
For any length of crack on panel P4 of the
combustion outer liner shell, do a repetitive BSI at
an interval of 500 hours. Refer to  Figure 3.
If a crack on the combustion outer liner shell
connects across the entire length of panel P4 into
panel P3, increase the frequency of the BSI to
intervals of 300 hours. Refer to  Figure 3.
If a crack on the combustion outer liner shell
connects across the entire length of panels P4 and
P3 and goes into panel P2, send the engine to an
overhaul facility to replace or repair the
combustion outer liner shell within 5 hours in
accordance with GEK 105091, 72-44-06, REPAIR 023.
Refer to  Figure 3.
NOTE:Figure 4 shows an example of a combustion outer liner shell panel P4 with no cracks.
NOTE:Figure 3 shows a schematic of the combustion outer liner shell with axial crack
examples.
(a) For all other inspection criteria, refer to GEK 105091-1, 72-00-00, INSPECTION 003,
Table 805.
(5) Put the flexible borescope probe into S17 and examine the combustion outer liner shell.
Refer to Table 1 for inspection limits.

### Page 4 (OCR)

CF34-8C Service Bulletins (SBS)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
NOTE: It is not necessary to examine the other features of the combustor liner assembly
(combustion inner liner shell or combustor baffles included).
(6) Install the high-voltage igniter into the S16 igniter port. Refer to GEK 105091-1,
74-00-00, SPECIAL PROCEDURES 009.
(7) Install the high-voltage igniter into the S17 igniter port. Refer to GEK 105091-1,
74-00-00, SPECIAL PROCEDURES 008.
06/23/2017 11:36  257 OLYMPUS
6002802-00
Combustion Outer Liner Shell Buckling on Panel P4
Figure 1
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/06/16  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  4 of 8
Person, without USG authorization, is strictly prohibited.

### Page 5 (OCR)

CF34-8C Service Bulletins (SBS)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
6002804-00
LPT Case Burn Through
Figure 2
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/06/16  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  5 of 8
Person, without USG authorization, is strictly prohibited.

### Page 6 (OCR)

CF34-8C Service Bulletins (SBS)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
ANY LENGTH OF AN AXIAL
CRACK ON COMBUSTION
OUTER LINER SHELL
PANEL P4 (REFER TO NOTE 1)
AXIAL CRACK ON COMBUSTION
OUTER LINER SHELL
THAT EXTENDS ENTIRELY ACROSS
PANEL P4 INTO PANEL P3
(REFER TO NOTE 2)
AXIAL CRACK ON COMBUSTION
OUTER LINER SHELL
THAT EXTENDS ENTIRELY
ACROSS PANEL P4 AND
PANEL P3 INTO PANEL P2
(REFER TO NOTE 3)
P4
P2
P1
PO
1. DISPOSITION:
SERVICEABLE WITH A 500-HOUR REDUCED BSI INTERVAL.
2. DISPOSITION:
SERVICEABLE WITH A 300-HOUR REDUCED BSI INTERVAL.
3. DISPOSITION:
UNSERVICEABLE, THE ENGINE MUST BE RETURNED TO AN OVERHAUL FACILITY TO REPLACE
THE APPLICABLE HARDWARE WITHIN 5 HOURS.
4. FOR OTHER COMBUSTION OUTER LINER SHELL DISTRESS CONDITIONS NOT SHOWN
IN FIGURE 3, YOU CAN USE GEK 105091-1, 72-00-00, INSPECTION 003, TABLE
805 AS REFERENCE.
6002805-01
Combustion Outer Liner Shell
Figure 3
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Pag‹
2021/06/16  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  6 Of
Person, without USG authorization, is strictly prohibited.

### Page 7 (OCR)

CF34-8C Service Bulletins (SBS)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
6002803-00
Combustion Outer Liner Shell Panel P4 (No Cracks)
Figure 4
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/06/16  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  7 of 8
Person, without USG authorization, is strictly prohibited.

### Page 8 (OCR)

CF34-8C Service Bulletins (SBS)
SB 72-A0335 R02 ENGINE - Combustion Chamber Liner Assembly (72-44-00) - Borescope Inspection of Combustion
Outer Liner Shell
6002806-00
Combustor Outer Liner Shell Missing Material
Figure 5
GE Designated: - CONFIDENTIAL Subject to the restrictions on the media
PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/06/16  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  8 of 8
[Person, without USG authorization, is strictly prohibited.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
