# General Electric Service Bulletin CF34-10E 72-0365: Revision R04

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2021-0699; AD 2022-05-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Service Bulletin CF34-10E 72-0365](https://openairdocs.org/service-documents/ge/cf34-10e-72-0365.md)
- Title as filed: CF34-10E SB 72-0365 R04
- Pages: 23
- PDF: https://openairdocs.org/files/sha256/be/e1/bee14574076ef9f497e189b8ab1c512c1a3a01bb11c63ebd29e6cca6b2ba31eb
- Page: https://openairdocs.org/service-documents/ge/cf34-10e-72-0365/file/bee14574076e

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
1 of 23
CF34-10E SERVICE BULLETIN - 72-0365 R04 Revised:04/27/2021
SB 72-0365 R04 ENGINE - GENERAL (72-00-00) - STRAINER ASSEMBLY SCREEN
INSPECTION FOR TEFLON MATERIAL CHECK
Issued:
05/08/2020
GE Designated: -CONFIDENTIAL-
The information contained in this document is GE proprietary information and is
disclosed in confidence. It is the property of GE and shall not be used, disclosed to
others or reproduced without the express written consent of GE, including, but without
limitation, it is not to be used in the creation, manufacture, development, or
derivation of any repairs, modifications, spare parts, designs, or configuration
changes or to obtain FAA or any other government or regulatory approval to do so. If
consent is given for reproduction in whole or in part, this notice and the notice set
forth on each page of this document shall appear in any such reproduction in whole or
part.
This technical data is considered subject to the Export Administration Regulations
(EAR) pursuant to 15 CFR Parts 730-774. Transfer of this data by any means to a
Non-U.S. Person, whether in the United States or abroad, without the proper U.S.
Government authorization (e.g., License, exemption, NLR, etc.), is strictly
prohibited.
Copyright (2021) General Electric Company, U.S.A.
TRANSMITTAL INFORMATION
REVISION 4 TO SERVICE BULLETIN 72-0365
Revision 4 is issued to update paragraph 4., .APPENDIX - A
Revision 3 was issued November 16, 2020. Revision 2 was issued August 07, 2020.
Revision 1 was issued June 30, 2020. The original was issued May 08, 2020. Revision
bars in the left margin identify changes.
1. PLANNING INFORMATION
A. Effectivity
* * * CF34-10E
This Service Bulletin is applicable to these CF34-10E engines:
*CF34-10E engines, serial numbers 424714 through 424892.
NOTE:These engines have a stationary seal manufactured with epoxy adhesive EA9658 from production.
OR
*Any engine that has had a stationary seal P/N  or P/N  replaced orB1316-00453 B1316-01274
repaired after September 2014 per GEK 112081, 72-22-08, REPAIR 001.
NOTE:These engines could have a replaced stationary seal manufactured with epoxy adhesive EA9658
from new make or a stationary seal repaired with epoxy adhesive EA9658.
NOTE:If an engine has had a shop visit in September 2014 or later, it is the operator's
responsibility to review the engine shop records to determine if the stationary seal P/N 
 or P/N  has been replaced or repaired.B1316-00453 B1316-01274
NOTE:Engine serial numbers (ESNs) 994111 through 994999 and 424101 through 424713 were not impacted
from production because these engines were built before the change to the epoxy adhesive
EA9658 was introduced. Make sure to review the engine shop records as specified in the above
NOTE 2 for applicability.
AND
*High thermal stability (HTS) or high performance capability (HPC) oil is currently or has been
used in the engine anytime after September 2014. Refer to CF34-10E S/B .79-0004
NOTE:The affected stationary seals are the ones installed in the applicable engines specified in
paragraph 1.A.,  and that have operated with HTS/HPC oils for more than 56 flightEffectivity
hours (FH).
Engines with the affected stationary seal operated 56 FH or less with HTS/HPC

### Page 2

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
2 of 23
oils are not affected by this Service Bulletin, if the oil has been changed to
non-HTS/HPC oil.
NOTE:Engines with affected seal that have operated with HTS/HPC oils for more than 56 FH have to be
inspected per the recommended intervals specified in paragraph 1.C., .Compliance
If the operator elects to change to non-HTS/HPC oil before 56 FH on the
affected stationary seal operated with HTS/HPC oils, procedure to change oil
specified in paragraph 6.,  must be done.APPENDIX - C
B. Description
This Service Bulletin provides instructions to do a periodic inspection of the
A-sump strainer (strainer assembly) for Teflon particles. If Teflon particles
are found in the strainer assembly, this indicates that the stationary seal may
be failing. If enough Teflon particles are captured in the strainer assembly,
the A-sump scavenge system will be plugged resulting in overboard loss of oil
and loss of oil pressure which may result in an in-flight shutdown (IFSD).
C. Compliance
Category 2
GE recommends that you do this Service Bulletin per the below inspection
threshold intervals:
*For engines with less than 2,250 FH on the affected stationary seal, do the first inspection
as soon as possible after the engine reaches 2,250 FH, but no later than 2,350 FH.
*For engines with 2,250 FH or more, but less than 10,000 FH on the affected stationary seal, do
the first inspection within the next 100 FH.
*For engines with less than 9,500 FH on the affected stationary seal, as of the issuance of
Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center
to have the stationary seal repaired or replaced by 10,000 FH.
*For engines with 9,500 FH or more on the affected stationary seal, as of the issuance of
Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a service center
to have the stationary seal repaired or replaced within the next 500 FH.
Once the first inspection of the affected stationary seal has been completed,
do the inspection of the affected stationary seal per the following inspection
intervals:
*Every 750 FH for engines with the stationary seal that have 2,250 FH to 7,000 FH.
*Every 375 FH for engines with the stationary seal that have 7,001 FH to 10,000 FH.
*Every 100 FH for engines with the stationary seal that have more than 10,000 FH.
If customer/shop is not able to confirm what oil has been used in the engine or
if the affected stationary seal was repaired in the past, it is recommended to
comply with this Service Bulletin.
Impact B
This recommendation is to address a condition that may result in an Increased
Rate of In-Flight Shutdowns (IFSD), Take-Off Aborts (TOA), Air Turn Backs (ATB)
or Diversions (DIV).
NOTE:This Service Bulletin can be accomplished on wing or in shop.
This Service Bulletin is offered to improve the reliability or performance of
your GE product, or to help prevent the occurrence of the event or condition
described in this Service Bulletin. If the operator elects not to participate
in the bulletin, that decision will be taken into consideration by GE in
evaluating future product performance issues that may arise in the operator's
fleet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
To reduce significant events.
(2) Condition:
Since October 2018, the CF34-10E fleet has experienced several IFSDs and unexpected engine
removals (UERs) as a result of the stationary seal polytetrafluoroethylene [PTFE (Teflon)]
disbonding from the aluminum housing when used with HTS or HPC oils.
(3) Cause:
The properties of the adhesive used on the affected stationary seals deteriorate, resulting
in disbonding of the Teflon abradable from the aluminum housing. The stationary seal
deterioration is accelerated by the exposure to higher than expected temperatures and to

### Page 3

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
3 of 23
HTS or HPC oil.
(4) Inspection:
Do an inspection of the strainer assembly as specified in paragraph 1.C.,  forCompliance
all engines that operate under these three conditions:
(a) Engines with the affected stationary seal operated more than 56 FH with HTS or HPC oil
class E/G. Refer to CF34-10E S/B .79-0004
(b) Engines with a stationary seal manufactured or repaired with epoxy adhesive EA9658
(repaired or installed in September 2014 or later). Refer to GEK 112081, 72-22-08,
REPAIR 001.
(c) Engines where the affected stationary seal has accumulated 2,250 FH or more since
installation or repair.
For engines with less than 9,500 FH on the affected stationary seal, as of the issuance
of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a
service center to have the stationary seal repaired or replaced by 10,000 FH.
For engines with 9,500 FH or more on the affected stationary seal, as of the issuance
of Revision 2 of this Service Bulletin, GE recommends that the engine be sent to a
service center to have the stationary seal repaired or replaced within the next 500 FH.
(5) Substantiation:
Substantiation is by analysis.
F. Approval
This Service Bulletin contains no modification information that revises the
approved configuration and therefore does not require FAA or regulatory
approval.
G. Manpower
After you get access to the strainer assembly, you will need approximately 1.0
man-hour to do the inspection portion of this Service Bulletin.
If borescope inspection (BSI) for fly-on allowance is performed per paragraph
4., , consider the following estimated labor hours:APPENDIX - A
*1.5 hours to do a BSI through the plug S1 on the HPC.
*0.5 hour to do a BSI through the 2:00 or 3:00 o'clock position (or any adjacent door) variable
by-pass valve (VBV) door.
H. Weight and Balance
Weight and balance are not changed.
I. References (Use the latest version of these documents)
GEK 9250, Commercial Engine Standard Practices Manual (SPM)
GEK 112081, CF34-10E Engine Manual (EM)
GEK 112081-1, CF34-10E Line Maintenance Manual (LMM)
GEK 112082, CF34-10E Illustrated Parts Catalog (IPC)
GEK 112085, CF34-10E Illustrated Tool and Equipment Manual (ITEM)
CF34-10E S/B , Oil - General (79-00-00) - Approved Oils79-0004
J. Publications Affected
None.
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
Part Number Qty/ Eng Part Name
Unit ($)
Price Pkg Qty
Lead Time
Days
1963M80P15 (1) Packing, Preformed Quote (-) Quote
J1438P022 (ALT) Packing, Preformed Quote (-) Quote
1963M80P40 (1) Packing, Preformed Quote (-) Quote
J1438P905 (ALT) Packing, Preformed Quote (-) Quote
1963M80P07 (1) Packing, Preformed Quote (-) Quote
J1438P014 (ALT) Packing, Preformed Quote (-) Quote
1963M80P17 (1) Packing, Preformed Quote (-) Quote
J1438P029 (ALT) Packing, Preformed Quote (-) Quote
NOTE:Prices are provided for planning purposes and are subject to change.
(3) Consumables:
Code Number Description

### Page 4

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
4 of 23
C02-019 Oil, Engine Lubricating 
(engine oil)
C03-001 Primer, Zinc Chromate 
C04-002 Solvent, General
(Stoddard solvent)
Deleted
C10-182 Cloth, Cleaning for Aircraft Structural
(cleaning cloth)
B. Industry Support Information
Contact your Customer Support Manager (CSM), reference D-1367.
C. Configuration Chart
None.
D. Parts Disposition
Discard the preformed packings (05-375, 72-63-00) and (05-355) if exposed.
The screw thread plug (05-380), the strainer assembly (05-360), the double
hexagon self-locking nut (nut) (05-370) and the flat washer (05-365) can be
reused. Refer to  in paragraph 3.,  of thisFigure 1 ACCOMPLISHMENT INSTRUCTIONS
Service Bulletin for referenced items.
E. Tooling - Price and Availability
Tool Number Description
10C1253 Fixture, Puller - Accessory Gearbox Scavenge Screens (puller fixture) (
 (or equivalent)Figure 2)
Local Purchase XLG3 Flexible Borescope with probe 3.9 mm diameter with tip forward
view PXT480FG (silver) and tip side view PXT480SG (brown)
3. ACCOMPLISHMENT INSTRUCTIONS
A. Inspection
(1) Do an inspection of the strainer assembly (05-360, 72-63-00,  as follows:Figure 1)
(a) Remove the screw thread plug (05-380) from the strainer assembly (05-360).
(b) Remove and discard the preformed packing (05-375) from the screw thread plug (05-380).
(c) Use the 10C1253 puller fixture (  or equivalent to remove the strainerFigure 2)
assembly (05-360, 72-63-00,  as follows:Figure 1)
1 Remove the nut (05-370) and flat washer (05-365) that attach the strainer assembly
(05-360) to the stud on the accessory gearbox (AGB) main assembly.
2 Put the puller adapter (Item 01,  into the strainer assembly (05-360,Figure 2)
72-63-00, Figure 1).
3 Lightly hit the body dent puller (Item 02,  to the opposite side toFigure 2)
remove the strainer assembly (05-360, 72-63-00, Figure 1).
4 Remove and discard the preformed packing (05-355).
(d) Do a visual inspection of the strainer assembly (05-360) for evidence of particles of
Teflon material. Refer to  and do as follows:Figure 3
NOTE:A visual standard to help maintenance personnel to identify the Teflon particles from
other particles commonly found in the screen is posted on :myGEAviation.com
*Log on to myGEAviation.com
*Documents
*Technical Presentations
*Reference Materials
1 If you find Teflon particles in the strainer assembly (05-360, 72-63-00, Figure
 screen this means that the stationary seal has deterioration of Teflon and you1)
must continue with paragraph 4.,  for further instructions.APPENDIX - A
2 If you do not find Teflon particles in the strainer assembly (05-360), engine
removal for stationary seal replacement is not necessary and you can continue with
the recurrent inspections of the strainer assembly (05-360). Continue with the
step 3.A.(1)(e) of this Service Bulletin to install again the strainer assembly
(05-360).
(e) Clean and flush the strainer assembly (05-360, 72-63-00,  as follows:Figure 1)
1 Alternative Procedures Available. Clean the strainer assemblies (05-360). Refer to
GEK 9250, 70-21-03, CLEANING METHOD NO. 3 - STEAM CLEANING.
2 Alternative Procedure. Clean the strainer assemblies (05-360, 72-63-00, Figure
 Refer to GEK 9250, 70-21-21, CLEANING METHOD NO. 21 - CARBON REMOVAL BY1).
AQUEOUS BASE CARBON REMOVER.
3 Alternative Procedure. Clean the strainer assemblies (05-360, 72-63-00, Figure
 Refer to GEK 9250, 70-21-22, CLEANING METHOD NO. 22 - LIGHT DUTY AQUEOUS1).
CLEANING.
4 Alternative Procedure. Clean the strainer assembly (05-360, 72-63-00, Figure 1)
as follows:

### Page 5

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
5 of 23
WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET
(SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF
THIS PRODUCT.
a Use Stoddard solvent (C04-002) to clean the strainer assembly (05-360) as
follows:
1) Use a clean container partially filled with Stoddard solvent (C04-002).
2) Immerse the strainer assembly (05-360) and shake it in the Stoddard
solvent (C04-002) to dislodge the contamination material. If necessary, do
this step again.
3) Soak a lint-free cleaning cloth (C10-182) in Stoddard solvent (C04-002).
4) Scrub any contamination material from the strainer assembly (05-360) and
mesh, if necessary, by brushing or wiping.
5) Wipe the surface dry with a different clean lint-free cleaning cloth
(C10-182).
6) Deleted.
7) Fully flush with clean and fresh water.
WARNING:USE EYE PROTECTION WHEN YOU USE COMPRESSED AIR TO CLEAN, COOL, OR DRY
PARTS OR TOOLS. PARTICLES CAN CAUSE AN INJURY TO YOUR EYES. ENSURE
COMPRESSED AIR PRESSURE IS LESS THAN 30 PSIG (207 KPA). DO NOT POINT
COMPRESSED AIR AT YOURSELF OR OTHER PERSONS.
8) Dry the strainer assembly (05-360) with filtered pressurized air at 20 to
30 psig (138 to 207 kPa gage).
(f) Install the strainer assembly (05-360, 72-63-00,  removed in step 3.A.(1)(c)Figure 1)
as follows:
WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET
(SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF
THIS PRODUCT.
1 Apply engine oil (C02-019) to the preformed packing (05-355) and to the threads of
the stud at the strainer assembly (05-360) installation location.
2 Install the strainer assembly (05-360) with the preformed packing (05-355) on the
AGB main assembly housing front.
3 Secure the strainer assembly (05-360) to the AGB main assembly housing front with
the nut (05-370) and the flat washer (05-365) and do as follows:
a Torque the nut (05-370) to 36 to 40 lb in. (4.0 to 4.5 Nm).
(g) Install the screw thread plug (05-380) on the strainer assembly (05-360) as follows:
WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET
(SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF
THIS PRODUCT.
1 Apply engine oil (C02-019) to the preformed packing (05-375).
2 Attach the preformed packing (05-375) to the screw thread plug (05-380).
3 Install the screw thread plug (05-380) on the strainer assembly (05-360) and do as
follows:
a Torque the screw thread plug (05-380) to 125 to 135 lb in. (14.1 to 15.2 Nm).
(2) Deleted.
B. Program Support
(1) An optional program support is available for data collection on engines removed and/or
borescope inspected for further engineering evaluation, and to revise the content of this
Service Bulletin. Contact GE Aviation Fleet Support to one of the contacts below and send
the information that follow:
E-mail (USA): aviation.fleetsupport@ge.com
E-mail (China and Asia): aviation.fleetsupport.cn@ge.com
U.S.A. Phone: (513) 552-3272
International Phone: (513) 552-3272
China & Asia Phone: +86 21 38777666
(a) Send strainer assembly (05-360) pictures with Teflon material.
(b) Send records of the oil consumption, pressure, and temperature.
(c) Send BSI video and/or pictures of the stationary seal.

### Page 6 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
FWD.
(05-370)
(05-365)
(05-355)
(05-360)
ALL IPC REFERENCES FROM  NOTE:  (05-380)  (05-375)
72-63-00 UNLESS SPECIFIED
DIFFERENTLY.  6013956-00
AGB Main Assembly Locator
Figure 1
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  6 of 23
Person, without USG authorization, is strictly prohibited.

### Page 7 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
STRAINER
ASSEMBLY
(TYPICAL)
ITEM 01
ITEM 02
LEGEND:
ITEM 01 PULLER ADAPTER
ITEM 02 BODY DENT PULLER
NOTE:
ITEM NUMBERS AGREE WITH ITEM
NUMBERS OF TOOL, 10C1253.  6013957-00
10C1253 Puller Fixture
Figure 2
PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without  the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  7 of 23
Person, without USG authorization, is strictly prohibited.

### Page 8 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
6013958-00
Particles of Teflon Material in Strainer Assembly
Figure 3 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  8 of 23
[Person, without USG authorization, is strictly prohibited.

### Page 9 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
6017377-00
Particles of Teflon Material in Strainer Assembly
Figure 3 (Sheet 2)
4. APPENDIX - A
If you find Teflon particles in the strainer assembly, it is necessary to remove the engine
from service and send the engine to a service center  for the replacement oi the aifectec
stationary seal, however, five cycles fly-on for engine repositioning could be permitted if the
following procedure is performed:
(1) If not already performed, remove the strainer assembly (05-360, 72-63-00, Figure 1) as
specified in step 3.A.(1)(c) of this Service Bulletin.
(2) Remove all Teflon particles from the strainer assembly and put them in a table. Refer to
Figure 3 and do as follows:
(a) Count the total quantity of Teflon particles.
(b) No fly-on is permitted if the total quantity of Teflon particles (any size) is more
than 20 particles.
(3) Review maintenance records to make sure that the oil consumption, pressure, and temperature
are within limits and as follows:
(a) No fly-on is permitted if any oil parameter is not within limits.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  9 of 23
Person, without USG authorization, is strictly prohibited.

### Page 10

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
10 of 23
(4) Clean the electrical chip detector (01-450, 72-00-05,  and self-closing valveFigure 4)
(01-430). Refer to GEK 112081-1, 77-00-00, REMOVAL 008 and REMOVAL 018.
(5) Do a BSI of the stationary seal through the forward sump seal air tube (05-100, 72-00-01, 
 for evidence of missing or unbonded Teflon material in the track as follows:Figure 5)
(a) Alternative Procedure Available. Get access through the plug S1 on the high pressure
compressor at the 2:00 o'clock position directly upstream to reach the pressurization
tube between the struts of the fan hub frame (FHF) at the 2:00 or 3:00 o'clock
position. Refer to Figure 6.
(b) Alternative Procedure. Get access through the VBV door at the 2:00 or 3:00 o'clock
position (or any adjacent door) to reach the pressurization tube between the struts of
the FHF at the 2:00 or 3:00 o'clock position as follows:
1 Use nitrogen bottle gas to open the VBV door as specified in GEK 112081, 72-00-00,
SPECIAL PROCEDURES 007, Subtask 72-00-00-480-002, or disconnect the VBV door to
let you open it manually as follows:
a Remove the VBV door (35-150, 72-23-00,  as follows:Figure 10)
1) Remove the rod end bearing (bearing) (35-140) and by-pass valve clevis
(by-pass clevises) (35-120) assemblies from the door bellcrank (35-20) and
VBV door (35-150) as follows:
a) Remove the flat washers (35-180), double hexagon head shear bolts
(bolts) (35-170), and 12 point self-locking nuts (nuts) (35-190).
b) Make a trial and do a check if you can slightly open the VBV door
(35-150) to insert the borescope probe. If it is possible to insert
the borescope probe, continue with step 4.A.(5)(b) 1)f). If it is not1a
possible to insert the borescope probe, continue with step 4.A.(5)(b)1
1)c).a
c) Remove the bearing (35-140) and by-pass clevis (35-120) assembly from
the VBV door (35-150).
d) Remove the bolt (35-110) and nut (35-100).
e) Remove the bearing (35-140) and by-pass clevis (35-120) assembly from
the door and door bellcrank (35-20).
f) Open the VBV door (35-150), insert the BSI probe, and continue with
step 4.A.(6).
b If you disconnected the VBV door (35-150) manually, reconnect it once you have
completed the BSI of the stationary seal and removed the BSI equipment as
follows:
1) Install the bearing (35-140) and by-pass clevis (35-120) assemblies in the
door bellcrank (35-20) and VBV door (35-150) as follows:
a) Apply zinc chromate primer (C03-001) to all areas of the flat washers
(35-180) and bolts (35-170) that touch aluminum parts.
b) Install a bearing (35-140) and by-pass clevis (35-120) assembly on the
door bellcrank (35-20). Attach it with a bolt (35-110) and a nut
(35-100). Install the bolt (35-110) from the bottom.
c) Torque the nut (35-100) to 32.2 to 37.8 lb in. (3.63 to 4.27 Nm).
d) Attach the bearing (35-140) and by-pass clevis (35-120) assembly to
the VBV door (35-150) with flat washers (35-180), bolts (35-170), and
nuts (35-190).
e) Install a flat washer (35-180) on the bolt (35-170) and install the
bolt (35-170) in a counterclockwise direction, aft looking forward
(ALF), on the VBV door (35-150) and bearing (35-140). Attach it with
the flat washer (35-180) and nut (35-190).
c If you performed the procedure specified in GEK 112081, 72-00-00, SPECIAL
PROCEDURES 007, Subtask 72-00-00-480-002 to open the VBV door (35-150), use
nitrogen bottle gas to retract the actuator to close the VBV door (35-150)
that you opened to do the inspection once you completed the BSI of the
stationary seal and removed the BSI equipment. If you opened the door by a
detachment of the bypass clevis (35-120), then this step is not necessary.
(6) Enter the borescope probe into the pressurization tube until you reach the No. 1 seal port.
(7) Move the borescope probe through the seal passage until you reach the Teflon track.
(8) Do a 360 degrees BSI of the Teflon track circumference and as follows:
(a) The missing Teflon must be not more than a circumferential length of 2.00 inches (50.8
mm) accumulated.
NOTE:Teflon seal total circumferential length is approximately 35.0 inches (889 mm).
(b) No fly-on is permitted if missing Teflon is more than 2.00 inches (50.8 mm)
accumulated.
(9) Do a BSI of the forward sump scavenge oil tube and hose (10-165, 72-00-01,  oilFigure 4),
scavenge tube (15-100, 72-23-00, , and forward sump seal oil tube (05-50,Figure 7)
72-00-01,  as follows:Figure 5)
(a) Remove and do a BSI of the forward sump scavenge oil tube and hose (10-165, 72-00-01, 
 and as follows:Figure 4)
1 No fly-on is permitted if the forward sump scavenge oil tube and hose (10-165) is
blocked and the blockage cannot be removed.
(b) Do a BSI of the oil scavenge tube (15-100, 72-23-00,  Look for blockage inFigure 7).
the line and for Teflon particles in the strut hole and as follows:

### Page 11

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
11 of 23
1 No fly-on is permitted if the oil scavenge tube (15-100) is blocked and the
blockage cannot be removed.
2 No fly-on is permitted if there are particles in the strut hole that cannot be
removed.
(c) Do a BSI of the forward sump seal oil tube (05-050, 72-00-01,  Look forFigure 5).
blockage in the line or in the seal port forward to the tube entrance and as follows:
1 No fly-on is permitted if the forward sump seal oil tube (05-50) is blocked and
the blockage cannot be removed.
2 No fly-on is permitted if Teflon particles are accumulated in the seal port that
cannot be removed.
(d) Remove the BSI equipment and reassemble the removed hardware.
(e) Remove and do an inspection of the strainer assembly (05-360, 72-63-00,  onFigure 1)
the opposite engine according to paragraphs 3.A.(1)(a) through 3.A.(1)(d) of this
Service Bulletin and as follows:
1 No fly-on is permitted if any quantity of the Teflon particles is accumulated in
the strainer assembly (05-360) of the opposite engine.
(f) Install again the strainer assembly (05-360) on the two engines according to paragraphs
3.A.(1)(e) through 3.A.(1)(g) of this Service Bulletin.
(g) Do an oil system leak check. Refer to GEK 112081-1, 72-00-00, TESTING 003.

### Page 12 (OCR)

CF34-10E Service Bulletins (SBS)
SB 72-0365 R04 ENGINE - General (72-00-00)  - Strainer Assembly Screen Inspection for Teflon Material Check
(01-430)
(D++ 10)
(01-435)
(01-450)
NOTE:
ALL IPC REFERENCES FROM
72-00-05 UNLESS SPECIFIED
DIFFERENTLY.  6017035-00
Electrical Chip Detector and Forward Sump Scavenge Oil Tube and Hose Location
Figure 4 (Sheet 1)
PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  12 of 23
Person, without USG authorization, is strictly prohibited.

### Page 13 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
(10-165)
NOTE:
ALL IP REFERENCES FROM
72-00-01 UNLESS SPECIFIED
DIFFERENTLY.  6017036-00
Electrical Chip Detector and Forward Sump Scavenge Oil Tube and Hose Location
Figure 4 (Sheet 2)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  13 of 23
Person, without USG authorization, is strictly prohibited.

### Page 14 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
(05-100)
(05-050)
NOTE:
ALL IPC REFERENCES FROM
72-00-01 UNLESS SPECIFIED
DIFFERENTLY.
6017037-00
Forward Sump  Seal Oil Tube Location
Figure 5
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  14 of 23
Person, without USG authorization, is strictly prohibited.

### Page 15 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
S9  S7
SB  S6 S5 S4  S2  S1
(PLUG S1 ON THE HPC)
6016069-00
BSI of the Teflon Track
Figure 6 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  15 of 23
Person, without USG authorization, is strictly prohibited.

### Page 16 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
BORESCOPE
PATH
(SEAL TEFLON TRACK LOCATION)
A
(SEAL TEFLON TRACK LOCATION)  6016070-00
BSI of the Teflon Track
Figure 6 (Sheet 2)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  16 of 23
[Person, without USG authorization, is strictly prohibited.

### Page 17 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 RO4 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
FRONT
STATIC SEAL
ROTATING
SEAL
-FRONT  TEFLON
STATIC  TRACK
ROTATING  SEAL
SEAL
TEFLON TRACK
(TYPICAL BSI VIEW OF THE TEFLON TRACK)  (TYPICAL BSI VIEW OF THE TEFLON TRACK)
FRONT STATIC SEAL
ROTATING SEAL
TEFLON TRACK
(TYPICAL BSI VIEW OF THE TEFLON TRACK)
6016071-00
BSI of the Teflon Track
Figure 6 (Sheet 3)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  17 of 23
Person, without USG authorization, is strictly prohibited.

### Page 18 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
2
(15-100)
NOTE:
ALL IPC REFERENCES FROM
72-23-00 UNLESS SPECIFIED  A-A
DIFFERENTLY.  6017038-00
Oil Scavenge Tube Location
Figure 7
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  18 of 23
Person, without USG authorization, is strictly prohibited.

### Page 19 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
FIGURE DELETED
99de0011
Deleted
Figure 8
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  19 of 23
[Person, without USG authorization, is strictly prohibited.

### Page 20 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
FIGURE DELETED
99de0011
Deleted
Figure 9
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  20 of 23
[Person, without USG authorization, is strictly prohibited.

### Page 21 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
6020140-00
VBV Door Location
Figure 10 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  21 of 23
Person, without USG authorization, is strictly prohibited.

### Page 22 (OCR)

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
(35-020)  FWD
(35-100)
(35-120)
(35-140)
(35-110)
(35-170)
~ (35-180)
(35-190)  (35-150)
NOTE:
ALL IPC REFERENCES FROM
72-23-00 UNLESS SPECIFIED
DIFFERENTLY.  6020141-00
VBV Door Location
Figure 10 (Sheet 2)
5. APPENDIX - B
Deleted.
6. APPENDIX - C
Procedure to change the HTS/HPC oil to non-HTS/HPC oil. Change the HTS/HPC oil as follows:
(1) Drain the engine oil system (oil tank and AGB) that has HTS oil. Refer to GEK 112081-1,
79-00-00, SERVICING 002, Subtask 79-00-00-610-005.
(2) Drain the oil filter housing. Refer to GEK 112081-1, 79-00-00, REMOVAL 004.
NOTE:An oil filter replacement is not necessary at this step.
(3) Clean the A-sump screen.
(4) Do the servicing of the lube oil tank. Refer to GEK 112081-1, 79-00-00, SERVICING 001 and
do as follows:
(a) Use a non-HTS/HPC oil. Refer to CF34-10E S/B 79-0004.
(5) Operate the engine at idle for 20 minutes to circulate oil through the oil system.
CAUTION: MAKE SURE THAT THE OIL LEVEL IS NOT BELOW 20 PERCENT AND THE OIL PRESSURE IS NOT BELOW
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/04/29  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  22 of 23
Person, without USG authorization, is strictly prohibited.

### Page 23

CF34-10E Service Bulletins (SBs)
SB 72-0365 R04 ENGINE - General (72-00-00) - Strainer Assembly Screen Inspection for Teflon Material Check
Date Printed:
2021/04/29
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
23 of 23
(6) Flush the oil system. Refer to GEK 112081-1, 79-00-00, SERVICING 003 and do as follows:
(a) Use a non-HTS/HPC oil to refill. Refer to CF34-10E S/B 79-0004.
(7) Engine is ready for continued operation until it is removed to replace the affected
stationary seal.
GE Designated: - CONFIDENTIAL Subject to the restrictions on the media

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
