# General Electric Service Bulletin CF34-8C-AL 75-0019

Copy: Revision 01 ("CF34-8C-AL SB 75-0019 R00"), 19 pages: PDF https://openairdocs.org/files/sha256/ce/89/ce89597846c67e88b0b6ceb5b9e170b35891d0cec590c45b6d5f162f5bdc5395; text https://openairdocs.org/service-documents/ge/cf34-8c-al-75-0019/file/ce89597846c6.md. Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2017-1000; AD 2017-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [General Electric](https://openairdocs.org/service-documents/ge.md)
- Type: Service bulletin (Service Bulletin)
- Number: CF34-8C-AL 75-0019
- Latest revision known: CF34-8C-AL 75-0019, Revision 01, dated October 24, 2017 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/ge/cf34-8c-al-75-0019

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-23-06](https://openairdocs.org/ad/2017-23-06.md), effective Nov 30, 2017: Revision 01

## Text (19 pages)

Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2017-1000; AD 2017-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
1 of 19
CF34-8C SERVICE BULLETIN - 75-0019 R00 Revised:08/04/2017
SB 75-0019 R00 AIR - ECS LH AND RH DUCTING INSTALLATION
(75-00-01) - INSPECTION OF OBV FITTINGS AND OBV SYSTEM LINKS
Issued:
08/04/2017
GE PROPRIETARY INFORMATION
The information contained in this document is GE proprietary
information and is disclosed in confidence. It is the property of GE
and shall not be used, disclosed to others or reproduced without the
express written consent of GE, including, but without limitation, it is
not to be used in the creation, manufacture, development, or derivation
of any repairs, modifications, spare parts, designs, or configuration
changes or to obtain FAA or any other government or regulatory approval
to do so. If consent is given for reproduction in whole or in part,
this notice and the notice set forth on each page of this document
shall appear in any such reproduction in whole or in part.
This technical data is considered EAR controlled pursuant to 15 CFR
Parts 730-774 respectively. Transfer of this data by any means to a
Non-US Person, whether in the United States or abroad, without the
proper U.S. Government authorization (e.g., License, exemption, NLR,
etc.), is strictly prohibited.
Copyright (2017) General Electric Company, U.S.A.
1. PLANNING INFORMATION
A. Effectivity
* * * CF34-8C1/-8C5/-8C5A1/-8C5B1
This Service Bulletin is applicable to all CF34-8C engines.
The operability bleed start valve [operability bleed valve (OBV)]
and OBV system rod links are affected by this Service Bulletin.
B. Description
This Service Bulletin provides the instructions to inspect all
the CF34-8C OBVs for fuel leakage and loose rosan fittings and
all OBV system rod links for worn uniballs.
C. Compliance
Category 2
GE recommends that you do this Service Bulletin as soon as
possible without effect on revenue service, no later than the
next letter check but not exceeding 1,000 flight hours from this
Service Bulletin issue date.
Impact A
This recommendation is to address a condition that may affect
Flight Safety.
NOTE:For the engines that are not currently installed on the aircraft, such as

### Page 2

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
2 of 19
engines in shop level maintenance, spare engines, and engines in storage, it
is recommended that this inspection is done at the earliest convenience and
before engine operation.
NOTE:This Service Bulletin can be done on wing and in shop.
This Service Bulletin is offered to improve the reliability or
performance of your GE product, or to help prevent the occurrence
of the event or condition described in this Service Bulletin. If
the operator elects not to participate in the bulletin, that
decision will be taken into consideration by GE in evaluating
future product performance issues that may arise in the
operator's fleet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
To reduce the potential for fuel leaks and undercowl fire events.
(2) Condition:
There have been two undercowl fire events due to OBV separated fittings.
Refer to the All Operator's Wire (AOW) 17-CF34-006.
(3) Cause:
Undercowl fire events have been experienced due to the pull out of the
rosan fitting from the OBV.
The cause for the rosan fitting pulling out is under investigation.
(4) Inspection:
The inspection is for all the CF34-8C OBV systems to identify possible
loose or leaking OBV fittings or worn system rod links.
NOTE:This one-time inspection is a containment plan only. The final
improvement will be provided by a future Service Bulletin.
(5) Substantiation:
Substantiation is by fleet experience.
F. Approval
The data contained in this Service Bulletin has been reviewed by
the FAA or authorized entity representing the FAA and the
repair(s) and modification(s) herein comply with the applicable
Aviation Regulations and are APPROVED for installation in the
model(s) listed in this Service Bulletin.
G. Manpower
After you get access to the OBV, you will need approximately 0.5
man-hour to do the inspection portion of this Service Bulletin.
H. Weight and Balance
Weight and balance are not changed.
I. References (Use the latest version of these documents)
All Operator's Wire (AOW) 17-CF34-006
Bombardier CRJ700/900/1000 Aircraft Maintenance Manual (AMM)
GEK 9250, Commercial Engine Standard Practices Manual (SPM)
GEK 105091, CF34-8C Engine Manual (EM)
GEK 105091-1, CF34-8C Line Maintenance Manual (LMM)
GEK 105092, CF34-8C Illustrated Parts Catalog (IPC)
CF34-8C S/B , AIR - Environmental Control System75-0014
(75-00-01) - Introduction of Redesigned Bleed Air Manifold and
Associated Components for the Operability Bleed Start Valve
J. Publications Affected
None.

### Page 3

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
3 of 19
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
Part Number
Qty/
Eng Part Name
Unit ($)
Price 
Pkg
Qty
Lead
Time
Days
4123T71P04* (1) Valve, Operability
Bleed Start
Quote (1) Quote
AS1895-1-225 (2) Coupling, Single
Latch V-Retainer
Quote (1) Quote
AS1895-7-225 (2) Seal, E Quote (1) Quote
B0308015** (AR) Bearing, Rod End NP (-) --
B0202019-11** (AR) Washer, Locking NP (-) --
CN627-0082-201** (AR) Bush NP (-) --
CN627-0045-201 ** (AR) Bush NP (-) --
NP = Not Provisioned
NOTE:Prices are provided for planning purposes and are subject to change.
*Part not supplied by GE Engine Services Distribution L.L.C. To procure
parts, contact the following:
Parker Aerospace
Aircraft On Ground (AOG)
U.S.A.
Phone: +1(949)809-8200
Commercial Purchase Order/Customer Service/Technical Inquiry
USA Phone: +1(949)809-8200
E-mail: CRC@parker.com
Fax: +1(949)272-3255
Commercial Spares Quotes(RFQ)
USA Phone: +1(949) 809-8200
E-mail: aerospacerfq@parker.com
**Part not supplied by GE Engine Services Distribution L.L.C. To procure
parts, contact the following:
Bombardier
E-mail: AOG@aero.bombardier.com
24/7 AOG phone: +1-844-272-2720
(3) Consumables:
None.
B. Industry Support Information
None.
C. Configuration Chart
None.
D. Parts Disposition

### Page 4

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
4 of 19
Discard unserviceable or worn rod ends, bushings, or washers.
Send the unserviceable OBV for repair to the following address:
Parker Aerospace
Aircraft On Ground (AOG)
U.S.A. Phone: +1(949)809-8200
Commercial Purchase Order/Customer Service/Technical Inquiry
USA phone: +1(949)809-8200
E-mail: CRC@parker.com
Fax: +1(949)272-3255
Commercial Spares Quotes(RFQ)
USA phone: +1(949) 809-8200
E-mail: aerospacerfq@parker.com
E. Tooling - Price and Availability
None.
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
(1) Before you start this procedure, read the assembly and disassembly
techniques section. Refer to GEK 9250, 70-10-00, ASSEMBLY AND DISASSEMBLY
TECHNIQUES.
(2) Do a visual inspection of all the engine parts that you can see when you do
maintenance. Examine all parts that are removed and that you will install
again. Examine all engine parts that are not removed, but that you can see
during maintenance. Refer to GEK 105091, 05-31-00, ENGINE MAINTENANCE
PROGRAM.
(3) If the engine is on wing, do the job setup. Refer to the Bombardier
CRJ700/900/1000 AMM, 75-31-01, TASK 75-31-01-000-801.
B. Inspection
(1) Do not remove the OBV or the fuel lines around and do a(Figure 1) 
detailed visual inspection of all the OBV fittings.
(2) Refer to the Table 1 below for the inspection details, unserviceable
criteria, and actions.
Table 1. OBV Inspection
Inspection Unserviceable Criteria Action
Fuel leakage from all
the OBV fittings.
A clean trail through the
normally stained/dirty rosan
ring is an indicative of fuel
leakage.
Fuel wetting observed in the
rosan ring flange or port
joint. Refer to  Figure 1.
Replace the OBV immediately.
Refer to the Bombardier
CRJ700/900/1000 AMM, 75-31-01,
REMOVAL/INSTALLATION or GEK
105091-1, 75-00-00, SPECIAL
PROCEDURES 007 for the
removal instructions and
route it for repair.
All OBV fittings
wiggle check.
Relative movement observed
between the rosan fitting and
the OBV housing when the B-nut
is wiggled with forefinger and
thumb pressure. Refer to 
 Figure 2.
Replace the OBV immediately.
Refer to the Bombardier
CRJ700/900/1000 AMM, 75-31-01,
REMOVAL/INSTALLATION or GEK
105091-1, 75-00-00, SPECIAL
PROCEDURES 007 for the
removal instructions and
route it for repair.
(3) Document the findings in the Inspection Chart Form  and send(Figure 9)
the results to GE. Refer to step 3.B.(8).

### Page 5 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
NOTE:
(*) THE ROSAN FITTING IS THE
THREADED INSERT ON EACH
OF THE OBV FUEL PORTS.
DRAIN PORT
INSPECTION AREA
RETURN PORT
INSPECTION AREA
OBV
SUPPLY PORT
INSPECTION AREA
*ROSAN RING
ROSAN
FITTING
ASSEMBLY
(TYPICAL)
5042950-00
OBV Fuel Leakage Inspection
Figure 1
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  transfer of this data to a Non-US  Person, without USG  5 of 19
authorization, is strictly prohibited.

### Page 6 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
OBV FITTING
OBV
HOUSING
SUPPLY FITTING INSPECTION
OBV  - OBV FITTING
HOUSING -
RETURN FITTING INSPECTION
OBV
HOUSING
OBV FITTING
5042951-00
OBV Fittings Wiggle Check
Figure 2
(4) If the OBV is unserviceable, remove and replace it with a serviceable OBV.
Refer to the Bombardier CRJ700/900/1000 AMM, 75-31-01, REMOVAL/INSTALLATION
Or GEK 105091-1, 75-00-00, SPECIAL PROCEDURES 007.
(5) For pre-CF34-8C S/B 75-0014 configuration, do an inspection of the bleed
air manifold (01-430, 75-00-01, Figure 3) link rod assemblies and their
attaching hardware. Do not disassemble the link rod assemblies while you do
the inspection and do as follows:
(a) Use finger force (thumb and index) to do an inspection of the two ends
of the support links (01-310, 01-450, 01-560A, and 01-570B, 75-00-01,
Figure 4) for loose or missing uniballs. Make sure that the link rod
assemblies (01-310, 01-450, 01-560A, and 01-570B) show no radial
displacement. Refer to Figure 3 and Figure 4 for details.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  6 of 19
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

### Page 7 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
(b) If there is movement of the installed rod end, do as follows:
1 Push the right side of the rod end and measure the left side rod end
uniball proud dimension.
Push the left side of the rod end and measure the right side rod end
uniball proud dimension.
NOTE:Unacceptable wear is present if the uniball can be displaced
radially by finger force and the face of the rod end uniball is
observed to protrude 0.020 inch (0.51 mm) or less from the adjacent
parallel face of the rod end (Figure 3 and Figure 4).
RADIAL
DISPLACEMENT  LINK ROD
ASSEMBLY
BLEED AIR  TYPICAL
MANIFOLD
(01-430)
NOTE:
ALL IPC REFERENCES FROM
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042953-00
Link Rod Assembly (Pre-CF34-8C S/B 75-0014)
Figure 3
GE PROPRIETARY INFORMATION - Not to be used, disclosed  to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  7 of 19
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

### Page 8 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
PWD  FWD
LINK ROD ASSEMBLY
(01-310)
NOTE:  C
ALL IPC REFERENCES FROM
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042954-00
Link Rod Assemblies Inspection (Pre-CF34-8C S/B 75-0014)
Figure 4 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  8 of 19
transfer of this data to a Non-US  Person, without USG
authorization, is strictly prohibited.

### Page 9 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
LINK ROD ASSEMBLY
(01-450)
LINK ROD ASSEMBLY
(01-560A)  LINK ROD ASSEMBLY
(01-570B)
NOTE:
ALL IPC REFERENCES FROM
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042955-00
Link Rod Assemblies Inspection (Pre-CF34-8C S/B 75-0014)
Figure 4 (Sheet 2)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  9 of 19
transfer of this data to a Non-US  Person, without USG
authorization, is strictly prohibited.

### Page 10 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
ROD END
*0.020 MINIMUM
(0.51)
*0.020 MINIMUM
(0.51)
* ROD END
UNIBALL
NOTES:
1. DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.
2. (*) DIMESIONS EQUAL OR LESS THAN 0.020 (0.51) ARE NOT PERMITTED.
DIMENSIONS MORE THAN 0.020 (0.51) ARE PERMITTED.  5042952-00
Link Rod Assemblies Inspection (Pre-CF34-8C S/B 75-0014)
Figure 4 (Sheet 3)
(c) If one or more of the link rod assemblies (01-310, 01-450, 01-560A,
and/or 01-570B, 75-00-01, Figure 4) or their attaching hardware have
wear beyond the limits specified in steps 3.B.(5)(a) and 3.B.(5) (b),
remove and replace the damaged hardware with a serviceable part, one at
a time. Refer to Figure 5 and GEK 105091-1, 75-00-00, SPECIAL
PROCEDURES 010, Subtask 75-00-00-051-029 and Subtask 75-00-00-051-030
for the removal instructions and Subtask 75-00-00-451-024 and Subtask
75-00-00-451-027 for the installation instructions.
NOTE: Some of the link rod assembly catalog sequence numbers (CSNs) could
not be mentioned in GEK 105091-1, 75-00-00, SPECIAL PROCEDURES 010.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  10 of 19
transfer of this data to a Non-US Person, without  USG
authorization, is strictly prohibited.

### Page 11

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
11 of 19
For those cases, the parts identified with the base CSNs or part
numbers are used for the applicable removal/installation instructions
and must be used in accordance with GEK 105092, CF34-8C IPC.
NOTE:Before you disassemble the removed link rod assembly, the total length
from rod end to rod end must be measured.
(d) In order not to use alignment tooling and reduce the adjustment cycle,
it is recommended to measure the removed link rod assemblies (01-310,
01-450, 01-560A, and 01-570B, 75-00-01,  before disassembly,Figure 4)
set-up the length as the baseline for new part setup, count the
threads, and measure the rod end uniball center to center length.
NOTE:If no serviceable link rod assembly hardware is available for the
replacement, the engine can be returned to service for an additional
50 flight cycles if the OBV rosan rings and fittings are examined for
fuel leaks and looseness as in Table 1, at the end of each flight day.
(e) Document the findings in the Inspection Chart Form  and(Figure 9)
send the results to GE. Refer to step 3.B.(8).

### Page 12 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
ROD END UNIBALL
SERVICEABLE ROD END  WORN ROD END
ROD END
UNIBALL
SERVICEABLE ROD END  WORN ROD END
5042956-00
Serviceable and Worn Rod Ends (Pre-CF34-8C S/B 75-0014)
Figure 5
(6) For post-CF34-8C S/B 75-0014 configuration, do an inspection of the bleed
air manifold (01-430, 75-00-01, Figure 6) link rod assemblies and their
attaching hardware. Do not disassemble the link rod assemblies while you do
the inspection and do as follows:
(a) Use finger force (thumb and index) to do an inspection of the two ends
of the support links (01-310A, 01-450, and 01-560B, 75-00-01, Figure
7) for loose or missing uniballs. Make sure that the link rod
assemblies (01-310A, 01-450, and 01-560B) show no radial displacement.
Refer to Figure 6 and Figure 7 for details.
(b) If there is movement of the installed rod end, do as follows:
1  Push the right side of the rod end and measure the left side rod end
uniball proud dimension.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  12 of 19
transfer of this data to a Non-US Person, without  USG
authorization, is strictly prohibited.

### Page 13 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Push the left side of the rod end and measure the right side rod end
uniball proud dimension.
NOTE:Unacceptable wear is present if the uniball can be displaced
radially by finger force  and the face of the rod end uniball is
observed to protrude 0.020 inch (0.51 mm) or less from the adjacent
parallel face of the rod end (Figure 6 and Figure 7).
RADIAL
DISPLACEMENT  LINK ROD
ASSEMBLY
BLEED AIR  TYPICAL
MANIFOLD
(01-430)
NOTE:
ALL IPC REFERENCES FROM
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042957-00
Link Rod Assembly (Post-CF34-8C S/B 75-0014)
Figure 6
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
2017/09/19  Date Printed:  others or reproduced without the express written consent of  GE. Technical data is considered ITAR and/or EAR controlled;  13 of 19  Page
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

### Page 14 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
FWD
LINK ROD ASSEMBLY
(01-310A)
NOTE:  C
ALL IPC REFERENCES FROM
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042958-00
Link Rod Assemblies Inspection (Post-CF34-8C S/B 75-0014)
Figure 7 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  14 of 19
transfer of this data to a Non-US  Person, without USG
authorization, is strictly prohibited.

### Page 15 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
LINK ROD ASSEMBLY
(01-450)
LINK ROD
ASSEMBLY
(01-560B)
LINK ROD
ASSEMBLY
(01-560B)
e
NOTE:  ALL IPC REFERENCES FROM  (3 LOCATIONS)  (TYPICAL)
75-00-01 UNLESS SPECIFIED
DIFFERENTLY.  5042959-00
Link Rod Assemblies Inspection (Post-CF34-8C S/B 75-0014)
Figure 7 (Sheet 2)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  15 of 19
transfer of this data to a Non-US  Person, without USG
authorization, is strictly prohibited.

### Page 16 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
ROD END
*0.020 MINIMUM
(0.51)
*0.020 MINIMUM
(0.51)
ROD END
UNIBALL
NOTES:
1. DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.
2. (*) DIMESIONS EQUAL OR LESS THAN 0.020 (0.51) ARE NOT PERMITTED.
DIMENSIONS MORE THAN 0.020 (0.51) ARE PERMITTED.  5042796-00
Link Rod Assemblies Inspection (Post-CF34-8C S/B 75-0014)
Figure 7 (Sheet 3)
(c) If one or more of the link rod assemblies (01-310A, 01-450, and/or
01-560B, 75-00-01, Figure 7) or their attaching hardware have wear
beyond the limits specified in steps 3.B.(6)(a) and 3.B.(6) (b), remove
and replace the damaged hardware with a serviceable part, one at a
time. Refer to Figure 8 and GEK 105091-1, 75-00-00, SPECIAL PROCEDURES
010, Subtask 75-00-00-051-029 and Subtask 75-00-00-051-031 for the
removal instructions and Subtask 75-00-00-451-024 (paragraph 3.I.) and
Subtask 75-00-00-451-027 for the installation instructions.
NOTE: Some of the link rod assembly CSNs could not be mentioned in GEK
105091-1, 75-00-00, SPECIAL PROCEDURES 010. For those cases, the parts
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  16 of 19
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

### Page 17

CF34-8C Service Bulletins (SBs)
SB 75-0019 R00 AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
Date Printed:
2017/09/19
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
others or reproduced without the express written consent of
GE. Technical data is considered ITAR and/or EAR controlled;
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.
Page
17 of 19
identified with the base CSNs or part numbers are used for the
applicable removal/installation instructions and must be used in
accordance with GEK 105092, CF34-8C IPC.
NOTE:Before you disassemble the removed link rod assembly, the total length
from rod end to rod end must be measured.
(d) In order not to use alignment tooling and reduce the adjustment cycle,
it is recommended to measure the removed link rod assemblies (01-310A,
01-450, and 01-560B, 75-00-01,  before disassembly, set-upFigure 7)
the length as the baseline for new part setup, count the threads, and
measure the rod end uniball center to center length.
NOTE:If no serviceable link rod assembly hardware is available for the
replacement, the engine can be returned to service for an additional
50 flight cycles if the OBV rosan rings and fittings are examined for
fuel leaks and looseness as in Table 1, at the end of each flight day.
(e) Document the findings in the Inspection Chart Form  and(Figure 9)
send the results to GE. Refer to step 3.B.(8).

### Page 18 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
ROD END UNIBALL
SERVICEABLE ROD END  WORN ROD END
ROD END
UNIBALL
SERVICEABLE ROD END  WORN ROD END
5042960-00
Serviceable and Worn Rod Ends (Post-CF34-8C S/B 75-0014)
Figure 8
(7) If the engine is on wing, put the aircraft back to its usual condition.
Refer to the Bombardier CRJ700/900/1000 AMM, 75-31-01, TASK
75-31-01-400-801, Step 5 (Close Out).
(8) Send a copy of the Inspection Chart Form (Figure 9) to the GE Product
Support Engineering (PSE):
* Alan Morales (Alan.Morales@ge.com)
GE PROPRIETARY INFORMATION - Not to be used, disclosed  to
Date Printed:  others or reproduced without the express written consent of  Page
GE. Technical data is considered ITAR and/or EAR controlled;  18 of 19
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

### Page 19 (OCR)

CF34-8C Service Bulletins (SBs)
SB 75-0019 ROO AIR - ECS LH and RH Ducting Installation (75-00-01) - Inspection of OBV
Fittings and OBV System Links
INSPECTION CHART
ENGINE SERIAL NUMBER:  TIME SINCE NEW (TSN):
AIRCRAFT REGISTRATION:  CYCLES SINCE NEW (CSN):
POSITION:  DATE:
PLENUM/MANIFOLD CONFIGURATION:  OBV SN:
LEAKAGE TRACES IN THE  SUPPLY  RETURN  DRAIN
OBV PORT JOINTS FOUND?  FITTING  FITTING  FITTING
YES
NO
OBV FUEL FITTING FOUND LOOSE (WIGGUNG)?
YES
NO
WERE LINK ROD ASSEMBLIES (01-560A,  ROD END  BEARING  OTHER
01-570B, 01-450, OR 01-310, 75-00-01) WORN?  PLENE D  CASE  PLENERLD CASE  SPECIFY
FRONT RIGHT
FRONT LEFT
REAR
10" STAGE DUCT
WERE LINK ROD ASSEMBLIES  ROD END  BEARING  OTHER
WORN?  (01-560B, 01-450, OR 01-310A, 75-00-01)  IANIFOLI  LENI  CASE  MANIFOLD  PLENUM  CASE  SPECIFY
FRONT RIGHT
FRONT LEFT
REAR
10" STAGE DUCT
INSPECTION PERFORMED BY:
NOTE:
WRITE N/A WHEN THE REQUEST IS NOT APPLICABLE TO YOUR ENGINE CONFIGURATION.  5042961-00
Inspection Chart Form
Figure 9
GE PROPRIETARY INFORMATION - Subject to the restrictions on the media.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to
Date Printed:  others or reproduced without the express written consent of  Page
2017/09/19  GE. Technical data is considered ITAR and/or EAR controlled;  19 of 19
transfer of this data to a Non-US Person, without USG
authorization, is strictly prohibited.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
