# General Electric Service Bulletin GE90-100: No revision named

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2011-0278, the docket of AD 2011-26-11. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Service Bulletin GE90-100](https://openairdocs.org/service-documents/ge/ge90-100.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 19
- PDF: https://openairdocs.org/files/sha256/22/2c/222ce908f37bd91b8bf244350f607b1cc7114be0cd6bcd6bad5010ecad28295c
- Page: https://openairdocs.org/service-documents/ge/ge90-100/file/222ce908f37b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
GE90-100 SERVICE BULLETIN - 72-0320 R01 Revised:05/11/2010
SB 72-0320 R01 ENGINE - HIGH PRESSURE COMPRESSOR ROTOR
ASSEMBLY (72-31-00) - INSPECTION OF HPC STAGES 2-5 SPOOL SEAL
TEETH
Issued:
06/12/2009
GE PROPRIETARY INFORMATION
The information contained in this publication is GE proprietary information and is disclosed in confidence. It
is the property of GE and shall not be used, disclosed to others or reproduced without the express written
consent of GE, including, but without limitation, it is not to be used in the creation, manufacture,
development, or derivation of any repairs, modifications, spare parts, designs, or configuration changes or to
obtain FAA or any other government or regulatory approval to do so. If consent is given for reproduction in
whole or in part, this notice and the notice set forth on this media shall appear in any such reproduction in
whole or in part. This technical data is considered ITAR and/or EAR controlled pursuant to 22 CFR Part 120-
130 and 15 CFR Parts 730-774 respectively. Transfer of this data by any means to a Non-U.S. Person,
whether in the United States or abroad, without the proper U.S. Government authorization (e.g., License,
exemption, NLR, etc.), is strictly prohibited.
All technical documentation and information contained herein, with respect to assembly and disassembly,
cleaning, inspection methods and limits, repair methods and limits, operational limits, life limits and the like,
have been developed and approved for use with engines and parts that have been manufactured and/or
approved by GE and that have been maintained in accordance with GE technical documentation and
recommendations. GE has no contractual or legal obligation for, nor knowledge of, non-GE-approved parts
and repairs. Accordingly, this documentation is not intended to apply to non-GE-approved parts and repairs.
Copyright (2010) General Electric Company, U.S.A.
TRANSMITTAL INFORMATION
REVISION 1 TO SERVICE BULLETIN 72-0320
Revision 1 is issued to update paragraphs 1., PLANNING INFORMATION and 
3., ACCOMPLISHMENT INSTRUCTIONS.
The original was issued June 12, 2009. Revision bars in the left margin identify changes.
1. PLANNING INFORMATION
A. Effectivity
* * * GE90-110B1 and -115B
This Service Bulletin is applicable to all GE90-100 engines.
 The spools stages 2-5 [high pressure compressor (HPC) stages 2-5 spools] 
P/N 351-103-106-0 , P/N 351-103-107-0 , P/N 351-103-108-0 , P/N 351-103-109-0 , P/N 351-103-
141-0, P/N 351-103-142-0 , P/N 351-103-143-0 , and P/N 351-103-144-0  are affected by this
Service Bulletin.

### Page 2

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
B. Description
This Service Bulletin provides procedures to do eddy current inspection (ECI) or spot fluorescent
penetrant inspection (Spot FPI) of the stages 1-2 rotating seal of the HPC stages 2-5 spool.
C. Compliance
Category 3
 GE recommends that you do this Service Bulletin at the next shop visit of the engine, excluding
low pressure turbine (LPT) stage 6 (GE90-100 S/B 72-0226) and outlet guide vane (OGV) leaf
seal quick turn replacement (GE90-100 S/B 72-0338).
NOTE: This Service Bulletin can be accomplished in two ways:
A. With the HPC upper half case and/or HPC lower half case removed.
B. With HPC rotor assembled, or bladed HPC stages 2-5 spool, or at piece part level.
This Service Bulletin is offered to improve the reliability or performance of your GE product, or to
help prevent the occurrence of the event or condition described in this Service Bulletin. If the
operator elects not to participate in the bulletin, that decision will be taken into consideration by
GE in evaluating future product performance issues that may arise in the operator’s fleet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
Inspect HPC stages 2-5 spool for potential cracking at stages 1-2 seal teeth.
(2) Condition:
An engine in service has experienced a crack in the stages 1-2 seal teeth.
(3) Cause:
Crack initiated at the tip of the forward seal tooth of stages 1-2 rotating seal.
(4) Inspection:
Inspect stages 1-2 seal teeth for evidence of cracking.
(5) Substantiation:
The inspection techniques described in this Service Bulletin have been demonstrated to be
effective in other revenue service engines.
F. Approval
 This Service Bulletin has been reviewed by the appropriate governmental authority and the
repair(s) and modification(s) herein comply with the applicable Aviation Regulations and are
APPROVED for installation in the model(s) listed in this Service Bulletin.
G. Manpower
After you get access to the HPC stages 2-5 spool, you will need approximately 
2 man-hours to do the inspection portion of this Service Bulletin.
H. Weight and Balance
Weight and balance are not changed.

### Page 3

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
I. References (Use the latest version of these documents)
GEK 9250, Commercial Engine Standard Practices Manual (SPM)
GEK 109993, GE90-100 Engine Manual (EM)
GEK 110005, GE90-100 Illustrated Parts Catalog (IPC)
 GE90-100 S/B 72-0226, ENGINE - Low Pressure Turbine Rotor/Stator Assembly (72-56-00) -
Stage 6 LPT Blade Replacement
 GE90-100 S/B 72-0338, ENGINE - Stage 9 OGV (72-41-03) - Repair of Engines with Missing
Stage 9 OGV Leaf Seals
National Aerospace Standard 410 (NAS-410)
J. Publications Affected
None.
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
None.
(3) Consumables:
Code Number Description
C04-003 Solvent, General
(acetone)
C04-035 Solvent, General
(isopropyl alcohol)
C05-003 Marking Pen
C10-040 Tape, Teflon
B. Industry Support Information
None.
C. Configuration Chart
Not applicable.
D. Parts Disposition

### Page 4

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
HPC stages 2-5 spools found unserviceable per paragraph 3., ACCOMPLISHMENT
INSTRUCTIONS, must be removed and replaced. Refer to the appropriate GE90-100 EM
instructions. After removal, return unserviceable HPC stages 2-5 spools to GE. Please contact
your local GE representative for shipping details.
E. Tooling - Price and Availability
Tool Number Description
9C1578G01 Eddy Current Inspection Kit (inspection kit)
ELOTEST B1 SDM/U Eddy Current Test Instrument
Nortec NDT 19 Eddy Current Flaw Detector
Nortec NDT 19E2 Eddy Current Flaw Detector
Nortec NDT 1000 Eddy Current Flaw Detector
  
To order the inspection kit, please contact:
 Customer Support Center
Phone: (331) 6414-8866
Fax: (331) 6479-8555
E-mail: snecma.csc@snecma.fr
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
(1) This procedure starts when the HPC stages 2-5 spool is exposed and after any of the
following conditions is met:
(a) Removal of the HPC upper half case and/or HPC lower half case. Refer to the GE90-100
EM, 72-00-00, SPECIAL PROCEDURES 002, TASK 72-00-00-800-802.
(b) At HPC rotor exposure during standard HPC overhaul. Refer to the GE90-100 EM, 72-
30-00, DISASSEMBLY 001.
B. ECI of the HPC Stages 2-5 Spool Seal Teeth
(1) Prepare ECI of the HPC stages 2-5 spool seal teeth (Figure 1), as follows:
(a) Personnel requirements:
1 Personnel who do these inspections must be certified by National Aerospace
Standard (NAS) 410/EN4179, Level 2 minimum or an equivalent document accepted
by the local regulatory agencies.
2 It is recommended that personnel who do these inspections receive complete
instruction on the use of this procedure. They must show they are able to do the
calibration, inspection, and analysis before accept/reject authority is given.
3 The following instructions do not certify a person as an inspector by NAS
410/EN4179, Level 2 minimum or any local agency.

### Page 5

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
4 Changes in the procedures or the equipment will change the inspection sensitivity.
When you want to do or use something different, the procedure and the equipment
must be examined and approved by GE Aircraft Engines. Please contact your local
GE representative.
WARNING: USE PROTECTIVE GLOVES TO PREVENT INJURY FROM SHARP EDGES AND
ROUGH SURFACES.
CAUTION: USE ONLY APPROVED MARKING MATERIALS ON THE HPC STAGES 2-5 SPOOL.
THE HPC STAGES 2-5 SPOOL IS A TITANIUM PART. TITANIUM REACTS TO
CHLORINATE AND HALOGEN PRODUCTS. IF YOU DO NOT USE APPROVED
MARKING MATERIALS, DAMAGE CAN OCCUR.
CAUTION: YOU CAN DAMAGE THE SEAL TEETH VERY EASILY.
(b) Prepare the HPC stages 2-5 spool for the ECI, as follows:
1 Do a visual inspection of the HPC stages 2-5 spool seal teeth. Make a mark with an
approved marking pen (C05-003) or equivalent on the part at the location of all
blends, nicks, or other anomalies which can cause an indication during the visual
inspection. Refer to the SPM, 70-16-02, TEMPORARY MARKING.
NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC
lower half case is removed, do not turn the HPC rotor while you inspect the HPC
stages 2-5 spool seal teeth. Turn the HPC rotor first and then inspect exposed
area of the HPC stages 2-5 spool.
 NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC
lower half case is removed, handle the blades of HPC stage 1 blisk to manually
turn the HPC rotor clockwise aft looking forward (ALF).
2 Put a mark to locate the inspected area on the HPC stages 2-5 spool seal tooth with
an approved marking pen (C05-003) or equivalent. Refer to the SPM, 70-16-02,
TEMPORARY MARKING.
3 Repeat steps 3.B.(1)(b)1 and 2 to perform a 360 degrees inspection of the HPC
stages 2-5 spool.
 NOTE: After the visual inspection, turn the HPC rotor clockwise ALF and visually check
that the entire circumference of seal tooth has been inspected.
(c) Calibrate the ECI instrument to the initial settings, as follows:
1 Allow the ECI instrument to warm up. Refer to the manufacturer's instructions.
2 Set one of the approved ECI instruments types shown below to the initial settings,
as follows:
Instrument Type Settings
ELOTEST B1 SDM/U
(version 3)
OR
ELOTEST B1 SDM/U
with 
Probe Adapter:
Rohmann
Frequency: 500 kHz
BW: HF
Gain: 16V and 16H dB
Y-Spread: 0 dB (version 4)
X-Spread: 0 dB

### Page 6

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
P/N: B1 NOB 8H with PreAmp: 0 dB or more
Filter: 100 Hz LP
HP: Off
Phase: Approx. 195 degrees
 
 
 
Instrument Type Settings
Nortec NDT 19
OR
Nortec NDT 19E2
Frequency: 500 kHz
H Gain: 47.650 dB
V Gain: 47.650 dB
Probe Drive: Hi (2.0)
Phase/Angle: Approx. 245 degrees
P.H.: 128
P.V.: 128
Alarm: Box
 
 
 
 
 
 
 
Instrument Type Settings
Nortec NDT 1000
with
Probe Adapter:
Nortec N1000PA8B
Frequency: 500 kHz
H Gain: 45.0 dB
V Gain: 45.0 dB
Angle: 57 degrees
V-Pos: 50.0 percent 
H-Pos: 50.0 percent
HP Filter: Off
LP Filter: 100 Hz
HGPSSP: 4-Pole
Sweep: Off
Sweep Eras: On

### Page 7

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Probe Drive: High
Horn: Off
DT/BX: Box
DSTERS: Off
Capture: 10.0 s
PRSIST: 4 s
Graticule: On
Alarm Dwel: 0.0
Alarm: Box
Box 1: Positive
Bottom: 80 percent
Top: 98.5 percent
Right: 50.5 percent
Left: 0.5 percent
Box 2: Off
Bottom: 25.0 percent
Top: 75.0 percent
Right: 75.0 percent
Left: 25.0 percent
Box 3: Off
Bottom: 25.0 percent
Top: 75.0 percent
Right: 75.0 percent
Left: 25.0 percent
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3 Apply Teflon tape (C10-040) to the probe of the inspection kit 9C1578G01.
4 Put the probe on the calibration standard edge, away from the electrical discharge
machining (EDM) notches, and null the probe (Figure 3).
5 Adjust the phase to reach a horizontal lift-off line from the left to the middle of the
screen (Figure 4).
6 Scan across the EDM notch and adjust the instrument gain and phase to have a
peak response of the 0.06 inch (1.5 mm) EDM notch with an amplitude equal to "4"
horizontal major screen divisions (Figure 5).
7 Make a record of the initial calibration data. Refer to the HPC Stages 2-5 Spool
Calibration And Inspection Record Form (Figure 9).

### Page 8

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
8 Increase the vertical gain by +6 dB.
9 Rotate the phase 15 degrees clockwise (CW) for phase adjustment (Figure 6).
10 Adjust phase and amplitude to "3" vertical major screen divisions with respect of
horizontal amplitude (Figure 7).
11 Make a record of the final calibration data. Refer to the HPC Stages 2-5 Spool
Calibration And Inspection Record Form (Figure 9).
(2) Do an ECI on the stages 1-2 seal teeth of the HPC stages 2-5 spool, as follows:
WARNING: USE PROTECTIVE GLOVES TO PREVENT INJURY FROM SHARP EDGES AND ROUGH
SURFACES.
CAUTION: YOU CAN DAMAGE THE SEAL TEETH VERY EASILY.
(a) Do an ECI on the forward seal tooth (Figure 2), as follows:
1 Put the probe of the inspection kit 9C1578G01 on the forward seal tooth.
2 Null the probe and adjust the phase to align the horizontal lift-off signature with the
master signal (Figure 6).
NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC
lower half case is removed, handle the blades of HPC stage 1 blisk to manually
turn clockwise the HPC rotor.
3 Scan 360 degrees around the seal tooth.
NOTE: The scans do not have to be continuous for 360 degrees. You can divide the HPC
stages 2-5 spool into sections and do an ECI of each section. Make sure that you
overlap all the scans.
NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC
lower half case is removed, do not turn the HPC rotor while you inspect the HPC
stages 2-5 spool seal teeth. Turn the HPC rotor first and then inspect exposed
area of the HPC stages 2-5 spool.
NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC
lower half case is removed, handle the blades of HPC stage 1 blisk to manually
turn clockwise the HPC rotor.
CAUTION: USE ONLY APPROVED MARKING MATERIALS ON THE HPC STAGES 2-5 SPOOL.
THE HPC STAGES 2-5 SPOOL IS A TITANIUM PART. TITANIUM REACTS TO
CHLORINATE AND HALOGEN PRODUCTS. IF YOU DO NOT USE APPROVED
MARKING MATERIALS, DAMAGE CAN OCCUR.
4 Monitor the ECI responses and record any vertical indication which is equal to or
greater than a total of "3" vertical major screen divisions. Reinspect all indications
for repeatability when you see it. Make a record of each indication on the HPC
Stages 2-5 Spool Inspection Record Form (Figure 9). Identify locations of indications
on the part using an approved marking pen (C05-003) or equivalent. Refer to the
SPM, 70-16-02, TEMPORARY MARKING.
(b) Do an ECI of the aft seal tooth. Refer to step 3.B.(2)(a)1 through 3.B.(2)(a)4. For the aft
seal tooth, the connector on the probe must point forward. When you inspect a seal
tooth, make sure the probe touches the adjacent seal tooth as a guide. Refer to Figure 2
for the correct probe position.
NOTE: The HPC stages 2-5 spool angular positions are in CW direction ALF with the "0" angle
at the location of the stage 2 blade slot number "1" (Figure 8).

### Page 9

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
(3) Do a calibration/check after HPC stage 2-5 spool inspection, as follows:
(a) Do a calibration/check after each ECI of the HPC stages 2-5 spool and when a system
component or the inspector is changed, or when the inspector suspects that a change
may have occurred in the inspection system.
NOTE: You must do the calibration/check with initial settings and the following changes:
1 Reduce the vertical gain by -6 dB.
2 Return to the horizontal lift-off signal and then rotate the phase 15 degrees
counterclockwise (CCW).
(b) If the peak notch response is "3.5" to "4.5" vertical major screen divisions, the calibration
is satisfactory.
(c) If the peak notch horizontal response is less than "3.5" vertical major screen divisions,
calibrate the probe and repeat the ECI.
(d) If the peak notch horizontal response is "4.5" vertical major screen divisions or more, and
there were no rejected indications, the test is satisfactory.
(e) If the peak notch horizontal response is "4.5" vertical major screen divisions or more and
there were confirmed indications which are equal to or greater than "3" vertical major
screen divisions, repeat the calibration and reinspect all indications.
(4) Do an evaluation of the data, as follows:
(a) All indications which are equal to or greater than "3" vertical major screen divisions must
be visually evaluated, refer to step 3.B.(4)(b) below.
(b) If the source of the indication is a nick, a damaged seal tooth, or both, please contact
GE90-100 Product Support Engineering (PSE).
(5) Dispose parts, as follows:
(a) If there is an ECI indication equal to or greater than "3" vertical major screen divisions,
the part is not serviceable. Refer to paragraph 
2.D., Parts Disposition for instructions.
(b) Record the results and the disposition of parts on the HPC Stages 2-5 Spool Calibration
And Inspection Record Form (Figure 9). Send a copy to the following GE90-100 PSE:
e-mail: jacques.tschora@snecma.fr
e-mail: francois.pagliano@snecma.fr
C. Alternate Procedure - Spot FPI of the HPC Stages 2-5 Spool Seal Teeth
WARNING: ACETONE IS EXPLOSIVE, AN IRRITANT, AN ALLERGEN, AND HAS POISONOUS
DETERIORATION. USE VAPOR/FUME CONTROL OR USE A RESPIRATOR.
WARNING: USE PROTECTIVE GLOVES TO PREVENT INJURY FROM SHARP EDGES AND ROUGH
SURFACES.
WARNING: ISOPROPYL ALCOHOL IS TOXIC AND FLAMMABLE. USE PERSONAL PROTECTION
EQUIPMENT. USE IN A WELL-VENTILATED AREA.
CAUTION: HPC BLADES AND HPC STAGES 2-5 SPOOL ARE TITANIUM PARTS. TITANIUM REACTS TO
CHLORINATE AND HALOGEN PRODUCTS. MAKE SURE THAT TITANIUM PARTS CANNOT BE
IN CONTACT WITH PROHIBITED SOLVENTS SUCH AS TRICHLOROETHYLENE,
TRICHLOROETHANE, OR PERCHLOROETHYLENE, TO AVOID TITANIUM CONTAMINATION.

### Page 10

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
CAUTION: YOU CAN DAMAGE THE SEAL TEETH VERY EASILY.
 NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC lower half
case is removed, do not turn the HPC rotor while you clean or inspect the HPC stages 2-5
spool seal teeth. Turn the HPC rotor first and then inspect exposed area of the HPC stages 2-5
spool.
 NOTE: If this Service Bulletin is accomplished while the HPC upper half case and/or HPC lower half
case is removed, handle the blades of HPC stage 1 blisk to manually turn the HPC rotor
clockwise ALF.
(1) Wipe the HPC stages 2-5 spool seal teeth with a clean white cloth saturated with isopropyl
alcohol (C04-035) or acetone (C04-003).
(2) Do a visual inspection of the HPC stages 2-5 spool seal teeth for cleanliness (Figure 1).
Repeat step 3.C.(1) if necessary.
CAUTION: USE ONLY APPROVED MARKING MATERIALS ON THE HPC STAGES 2-5 SPOOL. THE
HPC STAGES 2-5 SPOOL IS A TITANIUM PART. TITANIUM REACTS TO CHLORINATE
AND HALOGEN PRODUCTS. IF YOU DO NOT USE APPROVED MARKING MATERIALS,
DAMAGE CAN OCCUR.
(3) Do a visual inspection of the HPC stages 2-5 spool seal teeth (Figure 1). Make a mark with
an approved marking pen (C05-003) or equivalent per SPM, 70-16-02, TEMPORARY
MARKING, on the part at the location of all blends, nicks, or other anomalies which can
cause an indication during the visual inspection.
(4) Do a Spot FPI of the HPC stages 2-5 spool seal teeth (Figure 1). Refer to the SPM, 70-32-
03, SPOT-FLUORESCENT-PENETRANT INSPECTION. Inspect the entire circumference
(360 degrees) of the seal teeth. Pay special attention to the forward side of the seal teeth.
Identify locations of indications on the part with an approved marking pen (C05-003) or
equivalent. Refer to the SPM, 70-16-02, TEMPORARY MARKING.
NOTE: Fluorescent penetrant inspection per SPM, 70-32-02, FLUORESCENT PENETRANT
INSPECTION, is considered as an alternate method to inspect the HPC stages 2-5 spool
forward seal teeth when the HPC stages 2-5 spool is inspected at piece part level per
GE90-100 EM, 72-31-06, INSPECTION 001.
(5) Dispose parts, as follows:
(a) FPI indications are not permitted. If indications are present, the part should be
considered unserviceable. Refer to paragraph 2.D., Parts Disposition for instructions.
(b) Record the Spot FPI results and the disposition of the inspected HPC stages 2-5 spool
on the HPC Stages 2-5 Spool Inspection Record Form (Figure 9). Send a copy to the
following GE90-100 PSE:
e-mail: jacques.tschora@snecma.fr
e-mail: francois.pagliano@snecma.fr

### Page 11

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Inspection of the HPC Stages 2-5 Spool Seal Teeth
Figure 1

### Page 12 (OCR)

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
FORWARD  SEE DETAIL
IHPC
* STAGES 2-5
SPOOL
DETAIL A
FOR STAGES 1-2 SEAL TEETH
TO
FREQUENCY
GENERATOR
TOROID
E/C COIL
PROBE
FORWARD SEAL TOOTH
TO
FREQUENCY
GENERATOR
PROBE
TOROID
E/C COIL
AFT SEAL TOOTH  1278810-00
HPC Stages 2-5 Spool - Interstage Seal Teeth Probe Positions
Figure 2
https://customer.geae.com/….=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]

### Page 13 (OCR)

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
0.039 X 0.002 IN.
(1.00 X 0.05 mm)
0.030 X 0.002 IN  0.059 X 0.002 IN.  0.055-0.063 IN
(0.76 X 0.05 mm)  (1.50 X 0.05 mm)  (1.40-1.60 mm)
SEE DETAIL B
2.36 IN.
(60 mm)  1.89 IN.
(48.0 mm)
3.15 IN.  0.236 IN.
(80.0 mm)  (6.00 mm)
DETAIL B  0.055-0.063 IN.
(1.40-1.60 mm)
0.295 IN.
(0.75 mm)
0.050 IN.
(1.27 mm)
0.0080-0.0120 IN.
(0.203-0.305 mm)  SEE DISK DIAMETER ON
CORRESPONDING STAGE
0.059-0.071 IN. RAD
(1.50-1.80 mm)
0.0984-0.1102 IN
(2.500-2.800 mm)
7-15 -8°45 ~
1278812-00
Calibration Standard - Description
Figure 3
https://customer.geae.com/…=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]

### Page 14

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Lift-Off Adjustment
Figure 4

### Page 15

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Amplitude Adjustment
Figure 5

### Page 16

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Phase Adjustment
Figure 6

### Page 17

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Evaluation Level
Figure 7

### Page 18

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
https://customer.geae.com/...=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]
Top Location - 12 O'clock Position
Figure 8

### Page 19 (OCR)

GE90-100 - SB 72-0320 R01 ENGINE - High Pressure Compressor Rotor Assembly (72-31-00) - Inspection of HPC Stages 2-5 Spool Seal Teeth
HPC STAGES 2-5 SPOOL
INSPECTION RECORD FORM
DATE  ESN: 900.  ... AL  LOCATION  Spoo/Module S/N
INSPECTION LEVEL:  On-wing
Top/Boltom Case  1 Bladed Rotor  1 Piece Part
INSPECTION PERFORMED
TEddy Current Inspection (ECI)  - Spot Fluorescent Penetrant Inspection (Spot FPI)
EDDY CURRENT INSPECTION
INSPECTOR  Instrument Type Model  S/N :
Calibration Standar SAN  Probe S/N :
CALIBRATION
Initial Calibration
Notch Response  .. Div.  Vert. Gain :  dB  Horiz. Gain  dE  Phase :  ... degrees
Final Calibration (Vert. Gain + 6 cB. Phase rotated 15 degrees CW)
Notch Response  Vert. Gain :  Horiz Gain  dB  Phase  degrees
Calibration Check (after inspection) Vert. Gain:  Notch Response :  Threshold  Div.  dB  Horiz Gain  dB  Phase:  .. degrees
SPOT FLUORESCENT PENETRANT INSPECTION
INSPECTOR
INSPECTION FINDING SUMMARY
Disposition of inspected areas :  Serviceable  I Not Serviceable
Number of ECI or Spot FPI indication found out of limits (see note)
Length of EGI or Spot FPI indication found out of limits : .  millimeters  inches
Angular location of ECI or Spot FPI indication found out of limits
Note : If ECT indication out of limit is found, please report its peak response (Screen Division) and its phase
(degrees). If several ECI indication out of limit have been found, please make a report for each indication using
this inspection record for.
OTHER FINDINGS:
Send e-mail copy of these results to:
Jacques Tschora - E-mail :  jacques.Ischora@snecma.fr
Francois Pagliano - E-mail :  francois.pagliano@snecma.fr
1278818-00
HPC Stages 2-5 Spool Inspection Record Form
Figure 9
GE PROPRIETARY INFORMATION - Subject to the restrictions on the media.
https://customer.geae.com/…=ge90-100-sb-72-0320-r01.htm&strAction=View&open=openwindow&enginefamily=GE90-100[5/17/2010 10:03:26 AM]

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
