# General Electric Service Bulletin 72-0528: Revision R01

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2013-0186; AD 2013-17-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Service Bulletin 72-0528](https://openairdocs.org/service-documents/ge/sb-72-0528.md)
- Title as filed: GE 90-100 Service Bulletin - 72-0528-R00
- Pages: 21
- PDF: https://openairdocs.org/files/sha256/48/c4/48c461cb61b100101aefa74e91368ae8b67cddcc01d7f7276f55defabc261908
- Page: https://openairdocs.org/service-documents/ge/sb-72-0528/file/48c461cb61b1

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
GE PROPRIETARY INFORMATION
The information contained in this document is GE proprietary information and is disclosed in
conﬁdence. It is the property of GE and shall not be used, disclosed to others or reproduced
without the express written consent of GE, including, but without limitation, it is not to be used
in the creation, manufacture, development, or derivation of any repairs, modiﬁcations, spare
parts, designs, or conﬁguration changes or to obtain FAA or any other government or regula-
tory approval to do so. If consent is given for reproduction in whole or in part, this notice and the
notice set forth on each page of this document shall appear in any such reproduction in whole
or in part.
This technical data is considered EAR controlled pursuant to 15 CFR Parts 730-774 respec-
tively. Transfer of this data by any means to a Non-US Person, whether in the United States
or abroad, without the proper U.S. Government authorization (e.g., License, exemption, NLR,
etc.), is strictly prohibited.
Copyright (2012) General Electric Company, U.S.A.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 1 of 21

### Page 2

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
1. PLANNING INFORMATION
A. Effectivity
GE90-110B1 and -115B
This Service Bulletin is applicable to these GE90-100 engines:
. GE90-100 engines, serial numbers 906-682 through 906-690, 906-701 through
906-704, 906-706 through 906-709, 906-712, 906-713, 906-716 and up.
These serial numbers are the best available data.
This Service Bulletin is also applicable to all GE90-100 engines that had the stage
1 high pressure turbine (HPT) stator shrouds P/N 1847M52P16 installed during a
shop visit (post-GE90-100 S/B 72-0363).
B. Description
This Service Bulletin provides on-wing borescope inspection (BSI) procedures for
the stage 1 HPT stator shrouds P/N 1847M52P16.
C. Compliance
Category 2
GE recommends this inspection be performed at a 2,000 cycles since new (CSN)
threshold for production engines and 2,000 cycles since installation (CSI) on
engines that had the stage 1 HPT stator shrouds P/N 1847M52P16 installed during
a shop visit.
GE also recommends this inspection be repeated at 250 cycle intervals thereafter.
NOTE 1: For engines that have accumulated more than 2,000 cycles on the stage 1
HPT stator shroud P/N 1847M52P16 at the time of initial publication of this
Service Bulletin, GE recommends the affected engine be inspected within
two months of the initial publication date of this Service Bulletin.
NOTE 2: For engines that have less than 2,000 cycles on the stage 1 HPT stator
shroud P/N 1847M52P16 at the time of initial publication of this Service
Bulletin, GE recommends the affected engine be inspected within two
months of reaching 2,000 cycles on the stage 1 HPT stator shrouds.
NOTE 3: Compliance with GE90-100 S/B 72-0348 is a terminating action for this
Service Bulletin.
NOTE 4: This Service Bulletin does not supersede GE90-100 S/B 72-0401, and has
a different effectivity.
NOTE 5: This Service Bulletin can be accomplished on wing or in shop.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 2
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 3

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
This Service Bulletin is offered to improve the reliability or performance of your GE
product, or to help prevent the occurrence of the event or condition described in this
Service Bulletin. If the operator elects not to participate in the bulletin, that decision
will be taken into consideration by GE in evaluating future product performance
issues that may arise in the operator’s ﬂeet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
T o improve reliability and reduce signi ﬁcant events.
(2) Condition:
The stage 1 HPT stator shrouds show an accelerated deterioration that can
result in an unserviceable condition.
(3) Cause:
The cause for the accelerated distress is currently under investigation.
(4) Inspection:
Inspect the stage 1 HPT stator shrouds for corrosion/oxidation and missing
material/holes.
(5) Substantiation:
Substantiation is by ﬂeet experience and analysis.
F. Approval
This Service Bulletin contains no modi ﬁcation information that revises the approved
conﬁguration and therefore does not require FAA approval.
G. Manpower
After you get access to the borescope port of the stage 1 HPT stator shrouds, you
will need approximately 4 man-hours to do the inspection portion of this Service
Bulletin.
H. Weight and Balance
Weight and balance are not changed.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 3
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 4

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
I. References (Use the latest version of these documents)
GE90-100 Boeing 777 Aircraft Maintenance Manual (AMM)
GEK 110005, GE90-100 Illustrated Parts Catalog (IPC)
GE90-100 S/B 72-0348, ENGINE - HPT Stage 2 Nozzle Assembly (72-52-00) -
Stage 1 HPT Stator Shroud and Stage 1 HPT Stator Shroud Hanger - New and
Rework
GE90-100 S/B 72-0363, ENGINE - General (72-00-00) - Spare Parts Release for
GE90-100 Engines
GE90-100 S/B 72-0401, ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing
Borescope Inspection of Stage 1 HPT Stator Shroud
J. Publications Affected
GE90-100 Boeing 777 Aircraft Maintenance Manual (AMM)
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
None.
(3) Consumables:
None.
B. Industry Support Information
Contact your Customer Support Manager (CSM).
C. Conﬁguration Chart
Not applicable.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 4
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 5

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
D. Parts Disposition
None.
E. Tooling - Price and Availability
Tool Number Description
-- T orque Wrench capable of up to 220 lb in. (25 N·m)
-- Flexible Borescope ( ﬂexscope) 6 mm or 8 mm diameter
minimum of 3.5 meters in length (recommended equipment)
NOTE:A ﬂexscope shorter than 3.5 meters cannot be used to accomplish
this inspection.
3. ACCOMPLISHMENT INSTRUCTIONS
A. Stage 1 HPT Stator Shroud BSI with a 3.5-Meter or Longer Flexscope
NOTE 1: Video BSI or photos are strongly recommended when this inspection
is done.
NOTE 2: Stage 1 HPT stator shroud damage has been seen at all clock
positions. Damage occurs more at mid chord and aft on stage 1 HPT
stator shroud surface. Inspection of the entire stage 1 HPT stator
shroud surface is required. You must look between the blades and
under the blade tips to make sure that no indications are missed.
WARNING: USE THERMAL GLOVES WHEN YOU MOVE OR TOUCH HOT OR
COLD PARTS. HOT OR COLD PARTS CAN CAUSE INJURY .
CAUTION: MAKE SURE THE TEMPERATURE OF THE ENGINE AND THE
ADJACENT AREAS NEAR THE BSI PORTS ARE LESS THAN 150
F (66 C) DEGREES. DO NOT DO A BSI IF THE ADJACENT AREAS
ARE TOO HOT TO TOUCH. DO THE BSI WHEN THE ENGINE
TEMPERATURE IS LESS THAN 150 F (66 C) DEGREES. THIS WILL
PREVENT DAMAGE TO THE BORESCOPE EQUIPMENT .
(1) Do a 360-degree BSI of the stage 1 HPT stator shroud (1, Figure 1) leading
edge (LE) and mid chord. Refer to the GE90-100 Boeing 777 AMM, TASK
72-00-00-290-805-H01, SUBTASK 72-00-00-290-007-H01, and do as follows:
NOTE 3:A ﬂexscope less than 3.5 meters in length cannot be used to do the
BSI of the stage 1 HPT stator shrouds.
(a) Remove the borescope plug at the "Q" location.
(b) Insert a ﬂexscope into the borescope port of the combustor diffuser
nozzle (CDN) and pass it into the ﬂow path.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 5
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 6

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
(c) Follow the direction of the stage 1 HPT nozzle and continue to insert the
ﬂexscope over the top of the engine. Continue to feed the ﬂexscope into
the ﬂow path until you can see the ﬂexscope insertion point ( ﬂexscope
entering through the borescope port).
NOTE: It is very important that you can see the borescope entry point
to make sure that a full 360 degrees ﬂexscope travel has been
accomplished for the inspection.
(d) Carefully remove the ﬂexscope. Make sure to examine the stage 1 HPT
stator shrouds as you remove the ﬂexscope. Inspect the mid chord of
the stage 1 HPT stator shrouds (area of the stage 1 HPT stator shrouds
between the blades) and the LE of the stage 1 HPT stator shrouds.
(e) While you examine the stage 1 HPT stator shrouds, evaluate each stage
1 HPT stator shroud as speci ﬁed in paragraph 3.B., I nspection Results
Evaluation, and complete the Inspection Findings Report Form as
speciﬁed in paragraph 3.C., I nspection Findings Reporting, and Figure 3.
(f) When you complete the inspection, install the borescope plug. Refer to
the GE90-100 Boeing 777 AMM, SUBTASK 72-00-00-410-011-H01.
(2) Do a 360-degree BSI of the stage 1 HPT stator shroud (1, Figure 1) trailing
edge (TE) and mid chord as follows:
NOTE:A ﬂexscope less than 3.5 meters in length cannot be used to do the
BSI of the stage 1 HPT stator shrouds.
(a) Remove the borescope plug at the "R" location.
(b) Insert a ﬂexscope into the borescope port of the HPT case and pass
it into the ﬂow path.
(c) Follow the direction of the stage 2 HPT nozzle and continue to insert
the ﬂexscope under the bottom of the engine. Continue to feed the
ﬂexscope into the ﬂow path until you can see the ﬂexscope insertion
point (ﬂexscope entering through the borescope port).
NOTE: It is very important that you can see the borescope entry point
to make sure that a full 360 degrees ﬂexscope travel has been
accomplished for the inspection.
(d) Carefully remove the ﬂexscope. Make sure to examine the stage 1 HPT
stator shrouds as you remove the ﬂexscope. Inspect the mid chord of
the stage 1 HPT stator shrouds (area of the stage 1 HPT stator shrouds
between the blades) and the TE of the stage 1 HPT stator shrouds.
(e) While you examine the stage 1 HPT stator shrouds, evaluate each stage
1 HPT stator shroud as speci ﬁed in paragraph 3.B., I nspection Results
Evaluation, and complete the Inspection Findings Report Form as
speciﬁed in paragraph 3.C., I nspection Findings Reporting, and Figure 4.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 6
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 7

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
(f) When you complete the inspection, install the borescope plug. Refer to
the GE90-100 Boeing 777 AMM, SUBTASK 72-00-00-410-014-H01.
B. Inspection Results Evaluation
(1) Use the shroud serviceability limits published in the GE90-100 Boeing 777
AMM, TASK 72-00-00-290-805-H01, SUBTASK 72-00-00-290-007-H01,
except for the following:
NOTE: Refer to Figure 2 for examples of the stage 1 HPT stator shrouds
thermal distress.
(a) Holes within 0.35 inch (8.9 mm) of the LE are serviceable on a reduced
inspection interval of every 50 cycles.
(b) Holes beyond 0.35 inch (8.9 mm) of the LE less than 0.15 inch (3.8 mm)
in diameter [maximum area of 0.018 sq in. (0.12 sq cm)] are serviceable
on a reduced inspection interval of every 25 cycles if the LE of the
shroud is present forward of the hole.
NOTE: If you can see the stage 1 hanger internal baf ﬂe, the damage is
more than 0.35 inch (8.9 mm) from the LE and must be evaluated
in accordance with the serviceability requirements listed above
in this Service Bulletin.
(c) Holes beyond 0.35 inch (8.9 mm) of the LE between 0.15 inch (3.8 mm)
in diameter [maximum area of 0.018 sq in. (0.12 sq cm)] and 0.25 inch
(6.4 mm) in diameter [maximum area of 0.049 sq in. (0.32 sq cm)] are
serviceable on a reduced inspection interval of every 10 cycles if the LE
of the shroud is present forward of the hole.
NOTE: If you can see the stage 1 hanger internal baf ﬂe, the damage is
more than 0.35 inch (8.9 mm) from the LE and must be evaluated
in accordance with the serviceability requirements listed above
in this Service Bulletin.
(d) Lifting of the shroud split line, LE or TE is acceptable if the area of the
lifting material meets the requirements in the GE90-100 Boeing 777
AMM, SUBTASK 72-00-00-290-007-H01 for missing material.
(e) Black oxide/corrosion build up ar ound the shroud cooling holes on
shroud ﬂow path surface is acceptable for repeat inspection interval
of every 250 cycles.
(f) Black oxide/corrosion build up on shroud surface that blocks cooling
holes is acceptable for repeat inspection interval of every 100 cycles.
C. Inspection Findings Reporting
(1) Report the inspection ﬁndings to GE Group Field Service/PSE Representative.
Fill out the Inspection Findings Report Form. Refer to Figure 3 and Figure 4.
November 15, 2012 GE90-100 S/B 72-0528
PAGE 7
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 8

ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
(2) Video borescope/photograph the inspection of the stage 1 HPT stator
shrouds. Retain the inspection records for one year (12 months).
(3) Send the completed Inspection Findings Report Form and pictures to:
kyle.blomgren@ge.com
November 15, 2012 GE90-100 S/B 72-0528
PAGE 8
GE PROPR IETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 9 (OCR)

GE (O  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
FWD
A-A
1 (REF)
LEGEND:
1. STAGE 1 HPT STATOR SHROUD (QTY-40)  1368214-00
Location of the Stage 1 HPT Stator Shroud
Figure 1, ( Sheet 1 of 3 )
November 15, 2012  GE90-100 S/B 72-0528
PAGE 9
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 10 (OCR)

GE O  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
TE STAGE 1 HPT  • STAGE 1 HPT STATOR
NOZZLE  SHROUD HANGER
LE STAGE 2 HPT
NOZZLE
1 (REF)
STAGE 1 HPT ROTOR
BLADE TIP TE
1368219-00
Location of the Stage 1 HPT Stator Shroud
Figure 1, ( Sheet 2)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 10
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 11 (OCR)

GEN  ) - 100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
DISTANCE FROM SHROUD
LE TO FORWARD
SIDE OF SHROUD RAIL
0.200  LE  0.350
(5.08)  (8.89)
STAGE 1 SHROUD
APPROXIMATED
DIMENSIONS TO
COOLING HOLE ROWS
0.200  TE  LE
(5.08)
NOTES:
1. BLACK DOTS ARE THE AIR FLOW EXIT HOLES
OF THE STAGE 1 HPT STATOR SHROUD.
2. DIMENSIONS FOR HOLE COOLING HOLE
LOCATIONS ARE FOR THE STAGE 1 HPT
STATOR SHROUD P/N 1847M52P16.
3. DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.
4. DIMENSIONS ARE APPROXIMATE AND TO
BE USED FOR REFERENCE ONLY.  1368220-00
Location of the Stage 1 HPT Stator Shroud
Figure 1, ( Sheet 3)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 11
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 12 (OCR)

GE (  • - 100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
APPROXIMATE DISTANCE BETWEEN
COOLING HOLE ROWS 0.300 (7.62)
APPROXIMATE DISTANCE BETWEEN
COOLING HOLE ROWS 0.200 (5.08)
BLOCKED COOLING HOLES
SERVICEABLE ON A 100 CYCLE
RE-INSPECTION
LE HPT STAGE 1 ROTOR BLADE
NO BLOCKED COOLING HOLES  REFER TO
SERVICEABLE ON A 250 CYCLE  TE STAGE 1 HPT NOZZLE  NOTE 3
RE-INSPECTION  LE STAGE 1 HPT  OUTER PLATFORM
STATOR SHROUD
MATERIAL BUILD-UP IS A
SERVICEABLE CONDITION
1. THE DISTANCE FROM THE LE OF
THE STAGE 1 HPT STATOR SHROUD TO THE
LE OF THE STAGE 1 HPT ROTOR
BLADE IS APPROXIMATELY 0.35 (8.9).
THIS CAN BE USED AS A REFERENCE TO
DETERMINE THE APPROXIMATE LOCATION
OF ANY MISSING MATERIAL.
2. INSPECT BETWEEN THE STAGE 1 HPT ROTOR
BLADE AIRFOILS.
3. OXIDE/CORROSION BUILD UP IS BLACK OR SILVER
MATERIAL ON SHROUD FLOW PATH
4. DIMENSIONS ARE IN INCHES WITH
MILLIMETERS IN PARENTHESES.  1368221-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 1 of 8)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 12
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 13 (OCR)

GE O  • - 100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
HOLED STAGE 1 HPT STATOR
SHROUD FOUND AT SHOP VISIT
NOT A SERVICEABLE CONDITION
1. STAGE 1 HPT STATOR SHROUD DAMAGE
IS FOUND ANYWHERE AROUND THE
CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT
STATOR SHROUD FROM LE TO TE MUST BE
ACCOMPLISHED.  1368223-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 2)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 13
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 14 (OCR)

GE Q  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
HOLED STAGE 1 HPT STATOR
SHROUD FOUND AT SHOP VISIT
NOT A SERVICEABLE CONDITION
NOTES:
1. STAGE 1 HPT STATOR SHROUD DAMAGE
IS FOUND ANYWHERE AROUND THE
CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT
STATOR SHROUD FROM LE TO TE MUST BE
ACCOMPLISHED.  1368321-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 3 )
November 15, 2012  GE90-100 S/B 72-0528
PAGE 14
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 15 (OCR)

GE (O  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
HOLED STAGE 1 HPT STATOR
SHROUD FOUND AT SHOP VISIT
NOT A SERVICEABLE CONDITION
NOTES:
1. STAGE 1 HPT STATOR SHROUD DAMAGE IS
FOUND ANYWHERE AROUND THE
CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT
STATOR SHROUD FROM LE TO TE MUST BE
ACCOMPLISHED.  1368237-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 4)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 15
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 16 (OCR)

GE (O  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847 M52P16
18 021 12
68123
BSI OF HOLED STAGE 1
HPT STATOR SHROUD LE
NOT A SERVICEABLE CONDITION
TYPICAL BSI RESULTS SHOWING
MATERIAL BUILDUP ON STAGE 1
HPT STATOR SHROUD SURFACE LE
BLOCKED COOLING HOLES
SERVICEABLE ON A 100 CYCLE INSPECTION
1. STAGE 1 HPT STATOR SHROUD DAMAGE IS FOUND ANYWHERE
AROUND THE CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT STATOR SHROUD FROM
LE TO TE MUST BE ACCOMPLISHED.  1368322-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 5)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 16
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 17 (OCR)

GE (O  • - 100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
09 Nov 12
15:57
THROUGH HOLE FOUND DURING BSI
FROM THE TE BORESCOPE
NOT A SERVICEABLE CONDITION
NOTES:
1. STAGE 1 HPT STATOR SHROUD DAMAGE IS FOUND ANYWHERE
AROUND THE CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT STATOR SHROUD FROM
LE TO TE MUST BE ACCOMPLISHED.  1368323-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 6)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 17
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 18 (OCR)

GE (O  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
07 Nov 12
05:33
DAMAGED COOLING HOLE OF THE STAGE 1 HPT STATOR SHROUD.
NOT A THROUGH HOLE. SERVICEABLE CONDITION
NOTES:
1. STAGE 1 HPT STATOR SHROUD DAMAGE IS FOUND ANYWHERE
AROUND THE CIRCUMFERENCE OF THE ENGINE.
2. DAMAGE IS FOUND AT MID CHORD AND AFT.
3. INSPECTION OF THE ENTIRE STAGE 1 HPT STATOR SHROUD FROM
LE TO TE MUST BE ACCOMPLISHED.  1368324-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 7)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 18
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 19 (OCR)

GE  • -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847M52P16
14:45
LIFTING MATERIAL AT
STAGE 1 HPT STATOR
SHROUD TE AND SPLIT
LINE
SERVICEABLE IF IT MEETS
THE REQUIREMENTS FOR
MISSING MATERIAL PUBLISHED
IN THE GE90-100 BOEING AMM
1368222-00
Stage 1 HPT Stator Shrouds - Thermal Distress
Figure 2, ( Sheet 8)
November 15, 2012  GE90-100 S/B 72-0528
PAGE 19
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 20 (OCR)

GE (  -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847 M52P16
Description of Findings
Clock  position  ALF  9 o'clock  6 o'clock  3 o'clock  12 o'clock
Angle  306  297  288  279  270  261  252  243  234  225  216  207  198  189  180  171  162  153  144  126  117  108  45  360  351  342  333  324  315
Shroud  Number  23  24  25  26  28  29  30  33  35  36  39
Borescope Port  Location  Port Q Start Here
28  27  26  25  24  23  Please circle damaged shrouds on the schematic  above and record findings in the table to the right.  Note: Identify shroud No. 1 as the first shroud to be inspected when the  flexscopeis fullyinserted and the entrance point is visible (BSI Port Q).  Shroud No.2 should be the next shroud to be inspected as the flexscope  is pulled out anti-clockwise and so on, no.40 shroud should be the last  shroud inspected before the flexscope is removed from the insertion  The final report should also contain photographs of damaged areas
12 o'clock  36 35 34  33  37 3130  17 18  16  Aft Looking Forward(ALF)  labeled with location and damage dimensions.  e-mail completed inspection findings report form to:
flexscope  39  insertion  direction  ESN  Hours  Cycles  A/C Tail Number  Engine Position  Nexscope  removal  and  F  inspection  direction  15  kyle.blomgren@ge.com
40
Port Q  point.  1368224-00
Inspection Findings Report Form - LE
Figure 3
November 15, 2012  GE90-100 S/B 72-0528
PAGE 20
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page

### Page 21 (OCR)

GE (  -100 SERIES
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - HPT Stage 2 Nozzle (72-52-00) - On-Wing Borescope Inspection of Stage 1 HPT
Stator Shrouds P/N 1847 M52P16
Description of Findings
Clock  position  ALF  9 o'clock  6 o'clock  3 o'clock  12 o'clock
Angle  306  297  288  279  270  261  252  243  234  225  216  207  198  189  180  171  162  153  144  135  126  117  108  45  360  351  342  333  324  315
Shroud  Number  17  23  24  25  26  28  29  30  33  35  36  39
Borescope Port  Location  Port R Start Here
28  27  26  25  24  23  Please circle damaged shrouds on the schematic  above and record findings in the table to the right.  Note: Identify shroud No. 1 as the first shroud to be inspected when the  flexscopeis fullyinserted and the entrance point is visible (BSI Port R).  Shroud No.2 should be the next shroud to be inspected as the flexscope  is pulled out anti-clockwise and so on, no.40 shroud should be the last  shroud inspected before the flexscope is removed from the insertion  The final report should also contain photographs of damaged areas
29
30
31  Aft Looking Forward(ALF)
32
12 o'clock  36 35 34  33  37  flexscope  insertion  direction  A/C Tail Number  Engine Position  Nexscope  removal  and  inspection  direction  13 14  16 17  15  labeled with location and damage dimensions.  e-mail completed inspection findings report form to:
39  Hours  Cycles  11 12  kyle.blomgren@ge.com
40
9
Port R  point.  1368325-00
Inspection Findings Report Form - TE
Figure 4
November 15, 2012  GE90-100 S/B 72-0528
PAGE 21
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
