# General Electric Service Bulletin 72-0749: No revision named

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2017-0668, the docket of AD 2018-07-05. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Service Bulletin 72-0749](https://openairdocs.org/service-documents/ge/sb-72-0749.md)
- Title as filed: CF6-80A SB 72-0749 R02
- Pages: 9
- PDF: https://openairdocs.org/files/sha256/8b/e6/8be662f1b23291a99e4d9dfb13eee93ea650374167edc146731497f4cea94b27
- Page: https://openairdocs.org/service-documents/ge/sb-72-0749/file/8be662f1b232

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
GE PROPRIETARY INFORMATION
The information contained in this document is GE proprietary information and is disclosed in con-
ﬁdence. It is the property of GE and shall not be used, disclosed to others or reproduced without
the express written consent of GE, including, but without limitation, it is not to be used in the cre-
ation, manufacture, development, or derivation of any repairs, modi ﬁcations, spare parts, designs, or
conﬁguration changes or to obtain FAA or any other government or regulatory approval to do so. If
consent is given for reproduction in whole or in part, this notice and the notice set forth on each page
of this document shall appear in any such reproduction in whole or in part.
This technical data is considered EAR controlled pursuant to 15 CFR Parts 730-774 respectively.
Transfer of this data by any means to a Non-US Person, whether in the United States or abroad,
without the proper U.S. Government authorization (e.g., License, exemption, NLR, etc.), is strictly
prohibited.
Copyright (2016) General Electric Company, U.S.A.
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 1 of 9

### Page 2

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
TRANSMITTAL INFORMATION
REVISION 2 TO SERVICE BULLETIN 72-0749
Revision 2 is issued to update paragraphs 1.D., C ompliance, 1.I., R eferences,a n d2 . A . ,Material -
Price and Availability.
Revision 1 was issued June 10, 2014. The original was issued May 16, 2000. Revision bars
in the left margin identify changes.
1. PLANNING INFORMATION
A. Effectivity
CF6-80A/A1/A2/A3
Low pressure turbine (LPT) stage 3 nozzles 9290M52P05, 9290M52P06 and stage
4 nozzles 9290M53P05, 9290M53P06 are affected by this Service Bulletin.
B. Concurrent Requirements
None.
C. Description
This Service Bulletin recommends replacement of stage 3 nozzles 9290M52P05,
9290M52P06 with 9290M52P07, 9290M52P08, 9290M52P09, 9290M52P10 and
stage 4 nozzles 9290M53P05, 9290M53P06 with 9290M53P07, 9290M53P08,
9290M53P09, 9290M53P10.
Stage 3 nozzles 9290M52P07, 9290M52P08, 9290M52P09 and stage 4 nozzles
9290M53P07, 9290M53P08, 9290M53P09 were identi ﬁed in Spare Parts Release
Service Bulletins as indicated in A PPENDIX A. Stage 3 nozzle 9290M52P10 and
stage 4 nozzles 9290M53P10 are introduced in this Service Bulletin.
D. Compliance
For stage 3 nozzles:
Category 2
GE recommends that you do stage 3 nozzles P/N 9290M52P05, P/N 9290M52P06
replacement as soon as possible without effect on revenue service but before 36
months from Service Bulletin revision effective date.
Impact B
This recommendation is to address a condition that may result in an increased rate
of In-Flight Shutdowns (IFSD), T akeoff Aborts (TOA), Air Turn Backs (ATB), or
Diversions (DIV).
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 2
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 3

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
For stage 4 nozzles:
Category 5
GE recommends you do as soon as the stage 4 nozzles P/N 9290M53P05, P/N
9290M53P06 are removed from the engine.
Impact E
This recommendation is to improve the cost of ownership, reduce maintenance
requirements, or is a product improvement.
E. Reason
(1) Objective:
REDUCE SIGNIFICANT EVENTS - UNCONTAINED FAILURES
Improve the reliability of the LPT .
(2) Condition:
Stage 3 nozzles 9290M52P05/P06 and stage 4 nozzles 9290M53P05/P06
have cracked ( ﬁgure 1).
(3) Cause:
Cracks are high cycle fatigue caused by high stress.
(4) Improvement / Inspection:
The previously introduced stage 3 nozzles 9290M52P07/P08 and stage 4
nozzles 9290M53P07/P08 provide improved geometry that reduces stress
fatigue.
The previously introduced stage 3 nozzles 9290M52P09 and stage 4 nozzles
9290M53P09 have the improved geometry but also have CODEP and
chromide coatings to increase corrosion resistance.
The new 9290M52P10 and 9290M53P10 also have improved geometry, and
CODEP and chromide coatings.
(5) Substantiation:
The impact of the new coatings on fatigue life was tested. No reduction
in fatigue life was indicated.
F. Approval
This Service Bulletin has been reviewed by the FAA and the repair(s) and
modiﬁcation(s) herein comply with the applicable Federal Aviation Regulations and
are FAA APPROVED for installation in the model(s) listed in this Service Bulletin.
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 3
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 4

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
G. Manpower
No additional man-hours are necessary to do this Service Bulletin.
H. Weight and Balance
The change in this Service Bulletin increases weight by 0.1 lbs (0.05 kg) at
approximate Engine Station 290 inches (7366 mm).
I. References (Use the latest version of these documents)
CF6-80A Engine Manual, GEK 72501 V.4001 (A/A2)
CF6-80A Engine Manual, GEK 72501 V.4010 (A1/A3)
CF6-80A Illustrated Parts Catalog (IPC), GEK 72507 (A/A2)
CF6-80A Illustrated Parts Catalog (IPC), GEK 72507-1 (A1/A3)
CF6-80A S/B 72-0455, ENGINE - Spare Parts Release For CF6-80A Engines
CF6-80A S/B 72-0723, ENGINE - Spare Parts Release For CF6-80A Engines
CF6-80A S/B 72-0746, ENGINE - Spare Parts Release For CF6-80A Engines
CF6-80A S/B 72-0809, ENGINE - Stage 4 LPT Nozzles (72-56-00) and Stages 1, 2,
and 3 LPTR Blades (72-57-00) - New/Rewor k for Improved Engine Reliability
CF6-80A S/B 72-0814, ENGINE - Low Pressure Turbine Module (72-00-04) - New
Stages 1, 2, and 3 LPT Shrouds
NOTE: The reference documents listed below are for the engine manufacturer's
internal use only:
CID: 848211
BPP:16-72-56-56833
J. Publications Affected
CF6-80A Illustrated Parts Catalog (IPC), GEK 72507 (A/A2)
CF6-80A Illustrated Parts Catalog (IPC), GEK 72507-1 (A1/A3)
K. Interchangeability
Replace the stage 3 nozzles P/Ns 9290M52P05 and 9290M52P06 with the stage 3
nozzles P/Ns 9290M52P07, 9290M52P08, 9290M52P09, and 9290M52P10, and
the stage 4 nozzles P/Ns 9290M53P05 and 9290M53P06 with the stage 4 nozzles
P/Ns 9290M53P07, 9290M53P08, 9290M53P09, and 9290M53P10.
Do not replace the stage 3 nozzles P/Ns 9290M52P07, 9290M52P08, 9290M52P09,
and 9290M52P10 with the stage 3 nozzles P/Ns 9290M52P05 and 9290M52P06,
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 4
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 5

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
and the stage 4 nozzles P/Ns 9290M53P07, 9290M53P08, 9290M53P09, and
9290M53P10 with the stage 4 nozzles P/Ns 9290M53P05 and 9290M53P06.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
Part Number
Qty/
Eng Part Name
Unit ($)
Price
Pkg
Qty
Lead
Time
Days
9290M52P07* (23) Nozzle - Stage
3
NP (-) --
9290M52P08* (1) Nozzle - Stage
3
NP (-) --
9290M52P09 (23) Nozzle - Stage
3
15,380 (1) 5
9290M52P10 (1) Nozzle - Stage
3
14,520 (1) Quote
9290M53P07* (23) Nozzle - Stage
4
NP (-) --
9290M53P08* (1) Nozzle - Stage
4
NP (-) --
9290M53P09** (23) Nozzle - Stage
4
NP (-) --
9290M53P10** (1) Nozzle - Stage
4
NP (-) --
NP = Not Provisioned.
*Superseded part, no longer available. For the latest con ﬁguration, refer to
paragraph 2.C., C onﬁguration Chart of this Service Bulletin.
**Superseded part, no longer available. For the latest con ﬁguration, refer to
CF6-80A S/B 72-0809-R01, paragraph 2.C., C onﬁguration Chart.
(2) Other Spare Parts:
None.
(3) Consumables:
None.
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 5
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 6

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
B. Industry Support Information
None.
C. Conﬁguration Chart
New
Part Number
Qty/
Eng Part Name
Old Part Number/
IPC Location
Qty/
Eng
Op
Code
Chg/
Sprt
Code
9213M59G01 (X) Rotor/Stator Assembly 9213M59G01 (X) RM -/-
.9290M52P07 (23) Nozzle, Stage 3 .9290M52P05
72-56-00-1-170
72-56-00-1A-170
(23) SU 1/B
OR
.9290M52P09 (23) Nozzle, Stage 3 .9290M52P05
72-56-00-1-170
72-56-00-1A-170
(23) SU 1/B
.9290M52P09 (23) Nozzle, Stage 3 .9290M52P07
72-56-00-1-170
72-56-00-1A-170
(23) RE 2/B
.9290M52P08 (1) Nozzle, Stage 3 .9290M52P06
72-56-00-1-190
72-56-00-1A-190
(1) SU 1/B
OR
.9290M52P10 (1) Nozzle,Stage 3 .9290M52P06
72-56-00-1-190
72-56-00-1A-190
(1) SU 1/B
.9290M52P10 (1) Nozzle, Stage 3 .9290M52P08
72-56-00-1-190
72-56-00-1A-190
(1) RE 2/B
.9290M53P07 (23) Nozzle, Stage 4 .9290M53P05
72-56-00-1-100
72-56-00-1A-100
(23) SU 1/B
OR
.9290M53P09 (23) Nozzle, Stage 4 .9290M53P05
72-56-00-1-100
72-56-00-1A-100
(23) SU 1/B
.9290M53P09 (23) Nozzle, Stage 4 .9290M53P07
72-56-00-1-100
72-56-00-1A-100
(23) RE 2/B
.9290M53P08 (1) Nozzle, Stage 4 .9290M53P06
72-56-00-1-120
72-56-00-1A-120
(1) SU 1/B
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 6
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 7

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
New
Part Number
Qty/
Eng Part Name
Old Part Number/
IPC Location
Qty/
Eng
Op
Code
Chg/
Sprt
Code
OR
.9290M53P10 (1) Nozzle, Stage 4 .9290M53P06
72-56-00-1-120
72-56-00-1A-120
(1) SU 1/B
.9290M53P10 (1) Nozzle, Stage 4 .9290M53P08
72-56-00-1-120
72-56-00-1A-120
(1) RE 2/B
*Parts were previously released as indicated in A PPENDIX A.
The P/Ns 9290M52P07, 9290M52P08, 9290M52P09, and 9290M52P10 parts are
acceptable, but P/Ns 9290M52P09, 9290M52P10, 9290M53P09, and 9290M53P10
nozzles have the added bene ﬁt of a corrosion protection coating.
Operation Codes
RE = Replace
RM = Remains
SU = Superseded
Change Codes
1 = One-way interchangeable.
2 = Two-way interchangeable.
Support Codes
B = Old parts will be supplied until all old parts are sold.
D. Parts Disposition
Discard stage 3 nozzles P/Ns 9290M52P05, 9290M52P06 and stage 4 nozzles
P/Ns 9290M53P05 and 9290M53P06.
E. Tooling - Price and Availability
None.
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
Assembly and disassembly of the old and new stage 3 and stage 4 nozzles are
not changed. Refer to the CF6-80A EM, 72-56-00, LOW PRESSURE TURBINE
STATOR ASSEMBLY 5-570, 5A-210, or 8-140, 72-00-04 - ASSEMBLY and LOW
PRESSURE TURBINE STATOR ASSEMBLY 5-570, 5A-210, and 8-140, 72-00-04
- DISASSEMBLY .
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 7
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

### Page 8 (OCR)

CF6-80A
GE Aircraft Engines
SERVICE BULLETIN
ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
A
AIRFOIL
LEADING
EDGE  - AIRFOIL
LEADING
EDGE  LEADING EDGE CRACKING
AIRFOIL  SEDGE  LEADING  B  AIRFOIL
_LEADING
EDGE
LEADING EDGE CRACKING  AIRFOIL/PLATFORM CRACKING
1181307-00
LPT Stage 3 and Stage 4 Cracking
Figure 1
May 16, 2000  CF6-80A S/B 72-0749
Revision 02, August 31, 2016  PAGE 8
GE PROPRIETARY INFORMATION - Subject to the restrictions on the cover or first page.

### Page 9

ENGINE - LPT (72-56-00) - Stage 3 and 4 Nozzles - Replacement
4. APPENDIX A - LPT STAGE 3 AND STAGE 4 NOZZLE PARTS PROGRESSION CHART
Part Number Part Name
Identiﬁed By
Service Bulletin No. Improvements
9290M52P05 LPT Stage 3
Nozzle
Baseline --
9290M52P06 LPT Stage 3
Nozzle
Baseline --
9290M52P07 LPT Stage 3
Nozzle
S/B 72-0455 Shape
9290M52P08 LPT Stage 3
Nozzle
S/B 72-0455 Shape
9290M52P09 LPT Stage 3
Nozzle
S/B 72-0746 Coatings
9290M52P10 LPT Stage 3
Nozzle
S/B 72-0749 Coatings
9290M53P05 LPT Stage 4
Nozzle
Baseline --
9290M53P06 LPT Stage 4
Nozzle
Baseline --
9290M53P07 LPT Stage 4
Nozzle
S/B 72-0455 Shape
9290M53P08 LPT Stage 4
Nozzle
S/B 72-0455 Shape
9290M53P09 LPT Stage 4
Nozzle
S/B 72-0723 Coatings
9290M53P10 LPT Stage 4
Nozzle
S/B 72-0749 Coatings
May 16, 2000 CF6-80A S/B 72-0749
Revision 02, August 31, 2016 PAGE 9
GE PROP RIETARY INFORMATION - Subject to the restrictions on the cover or ﬁrst page.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
