# General Electric Service Bulletin 73-0089: No revision named

- Rights: © General Electric Company. Filed by the FAA in regulations.gov docket FAA-2021-0102, the docket of AD 2021-13-16. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [General Electric Service Bulletin 73-0089](https://openairdocs.org/service-documents/ge/sb-73-0089.md)
- Title as filed: GEnx-2b-sb-73-0089-r01
- Pages: 35
- PDF: https://openairdocs.org/files/sha256/fa/aa/faaacc96629f1ed2d9ec8e0b04f70509d1cc602fd667195f7eec2ed5027685ca
- Page: https://openairdocs.org/service-documents/ge/sb-73-0089/file/faaacc96629f

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
1 of 35
GEnx-2B SERVICE BULLETIN - 73-0089 R01 Revised:01/11/2021
SB 73-0089 R01 ENGINE FUEL AND CONTROL - FUEL NOZZLE MANIFOLDS (73-11-40) -
TOP MAIN FUEL MANIFOLD AND LOWER FUEL MANIFOLD INSPECTION - POST-GENX-2B S/B
73-0038
Issued:
05/08/2020
GE Designated: -CONFIDENTIAL-
The information contained in this document is GE proprietary information and is
disclosed in confidence. It is the property of GE and shall not be used, disclosed to
others or reproduced without the express written consent of GE, including, but without
limitation, it is not to be used in the creation, manufacture, development, or
derivation of any repairs, modifications, spare parts, designs, or configuration
changes or to obtain FAA or any other government or regulatory approval to do so. If
consent is given for reproduction in whole or in part, this notice and the notice set
forth on each page of this document shall appear in any such reproduction in whole or
part.
This technical data is considered subject to the Export Administration Regulations
(EAR) pursuant to 15 CFR Parts 730-774. Transfer of this data by any means to a
Non-U.S. Person, whether in the United States or abroad, without the proper U.S.
Government authorization (e.g., License, exemption, NLR, etc.), is strictly
prohibited.
Copyright (2021) General Electric Company, U.S.A.
TRANSMITTAL INFORMATION
REVISION 1 TO SERVICE BULLETIN 73-0089
Revision 1 is issued to update the attached FST Procedure 2237 and paragraphs 1., 
, 2., , and 3., .PLANNING INFORMATION MATERIAL INFORMATION ACCOMPLISHMENT INSTRUCTIONS
The original was issued May 08, 2020. Revision bars in the left margin identify
changes.
1. PLANNING INFORMATION
A. Effectivity
* * * GEnx-2B67, -2B67B, -2B67/P
The redesigned top main fuel manifold P/N  and lower fuel manifold2623M71G01
P/N  introduced on GEnx-2B engine, serial number 959-521 and up or2619M58G01
installed by GEnx-2B S/B  or GEnx-2B S/B  are affected by this73-0038 73-0079
Service Bulletin.
B. Description
This Service Bulletin provides instructions to do an inspection of the affected
top main fuel manifold and lower fuel manifold for cracking adjacent to the
support block pads.
NOTE:For on-wing engines, a visual inspection and an ultrasonic inspection are necessary.
NOTE:For in-shop engines, a repetitive inspection is required at every shop visit to perform a
visual inspection and fluorescent penetrant inspection (FPI).
C. Compliance
Category 2
GE recommends that you do this Service Bulletin as soon as possible without
effect on revenue service for engines with redesigned top main fuel manifold
and lower fuel manifold that have accumulated 1,700 cycles or more since the
first individual installation of the manifold. The cycle counting is
accumulated on the top main fuel manifold and the lower fuel manifold since
first installation.
On-Wing Requirement
A one-time inspection on wing is necessary at all ten support block pad
locations for the top main fuel manifold and lower fuel manifold, repetitive
inspection for on-wing engines is not required.

### Page 2

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
2 of 35
For the top main fuel manifold and/or lower fuel manifold that have 1,700 part
cycles since new (PCSN) or more at the issue date of the original of this
Service Bulletin, GE recommends completing the accomplishment instructions
within 500 cycles from the issue date of the original of this Service Bulletin.
For the top main fuel manifold and/or lower fuel manifold that have less than
1,700 PCSN at the issue date of this Service Bulletin, they must be inspected
before the top main fuel manifold and lower fuel manifold reach 2,200 cycles
since first installation.
NOTE:Deleted.
NOTE:Deleted.
NOTE:Deleted.
NOTE:Deleted.
NOTE:For on-wing engines, if the top main fuel manifold and lower fuel manifold have been
previously inspected by ultrasonic inspection as instructed by this Service Bulletin, and the
top main fuel manifold and lower fuel manifold were found within serviceable limits, the
engine is in compliance with the on-wing requirement instructed by this Service Bulletin.
NOTE:For engines that have complied with the on-wing requirement by the original revision of this
Service Bulletin, no additional on-wing inspection is required.
NOTE:If multiple removals are present in the top main fuel manifold and lower fuel manifold, no
multiple inspections on wing are required.
In-Shop Requirement
Repetitive visual inspection and FPI in shop are necessary at all ten support
block pad locations for the top main fuel manifold and/or lower fuel manifold.
This repetitive inspection is necessary for top main fuel manifold and/or lower
fuel manifold above 1,700 PCSN at each shop visit, regardless if previous
on-wing or in-shop inspections have been performed by this Service Bulletin.
Impact B
This recommendation is to address a condition that may result in an Increased
Rate of In-Flight Shutdowns (IFSD), Take-Off Aborts (TOA), Air Turn Backs (ATB)
or Diversions (DIV).
NOTE:This Service Bulletin can be done on wing or in shop.
This Service Bulletin is offered to improve the reliability or performance of
your GE product, or to help prevent the occurrence of the event or condition
described in this Service Bulletin. If the operator elects not to participate
in the bulletin, that decision will be taken into consideration by GE in
evaluating future product performance issues that may arise in the operator's
fleet.
D. Concurrent Requirements
None.
E. Reason
(1) Objective:
To improve reliability.
(2) Condition:
A crack in a lower fuel manifold segment was found in service. The crack was found in the
secondary fuel circuit (Psec) tube, adjacent to the braze that attaches the Psec tube to
the support block pad, and had propagated sufficient to induce a fuel leak.
(3) Cause:
The cause of this cracking has been identified as low cycle fatigue, due to the abrupt
transition created by the brazed support block pad that is unable to slide as intended due
to thermal loads, resulting in stresses that exceed the material fatigue capability of the
top main fuel manifold and lower fuel manifold.
(4) Inspection:
This Service Bulletin defines visual inspection, ultrasonic inspection, and FPI techniques
for the top main fuel manifold and lower fuel manifold to make sure that there are no
cracks in the top main fuel manifold and lower fuel manifold.
(5) Substantiation:
Substantiation is by fleet experience.
F. Approval
The data contained in this Service Bulletin has been reviewed by the FAA or
authorized entity representing the FAA and the repair(s) and modification(s)
herein comply with the applicable Aviation Regulations and are APPROVED for
installation in the model(s) listed in this Service Bulletin.
G. Manpower
After you get access to the engine, you will need approximately 16 man-hours
for one engine per aircraft, with an additional of 4 man-hours for two engines
per aircraft, and an additional of 2 man-hours for each additional engine per
aircraft, to accomplish this Service Bulletin.

### Page 3

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
3 of 35
H. Weight and Balance
Weight and balance are not changed.
I. References (Use the latest version of these documents)
GEnx-2B, Boeing 747-8 Aircraft Maintenance Manual (AMM)
GEK 9250, Commercial Engine Standard Practices Manual (SPM)
GEK 114119, GEnx-2B Engine Manual (EM)
GEK 114120, GEnx-2B Cleaning, Inspection, and Repair Manual (CIR)
GEK 114122, GEnx-2B Engine Illustrated Parts Catalog (EIPC)
GEnx-2B S/B , ENGINE - Heat Shields (72-00-02) - Introduction of New72-0130
Stainless Steel Heat Shields
GEnx-2B S/B , ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40)73-0034
- Fuel Manifold Field Inspection
GEnx-2B S/B , ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40)73-0038
- Introduction of New Fuel Manifold System Hardware
GEnx-2B S/B , ENGINE FUEL AND CONTROL - General (73-00-00) - Fuel73-0079
Manifold Intermix on GEnx-2B Engines
Field Support Technology (FST) Procedure 2237, GEnx-2B Fuel Manifold Tube
Ultrasonic Inspection
NOTE:The reference documents listed below are for the engine manufacturer's internal use only:
BPP/EPEX No.: 19-72-40-83909
J. Publications Affected
None.
K. Interchangeability
Not applicable.
L. Software Accomplishment Summary
Not applicable.
2. MATERIAL INFORMATION
A. Material - Price and Availability
(1) Parts necessary to do this Service Bulletin:
None.
(2) Other Spare Parts:
Part Number
Qty/
Eng Part Name Unit ($) Price Pkg Qty
Lead Time
Days
2619M58G01 (1) Manifold, Lower Fuel 47,730.00 (1) 5
2623M71G01 (1) Manifold, Top Main Fuel 47,730.00 (1) 5
NOTE:Prices are provided for planning purposes and are subject to change.
(3) Consumables:
Code Number Description
C02-019 Oil, Engine Lubricating
(engine oil)
C02-023 Oil, Engine Lubricating
(engine oil)
C04-035 General Solvent
(isopropyl alcohol)
B. Industry Support Information
GE Aviation will provide the following industry support:
(1) Labor compensation in the form of a back-end service credit will be provided as follows
based on the labor man-hours customer actually incurred in performing the inspection and
based on the number of installed engines inspected per each aircraft maintenance check:
*One engine serial number: Up to 16 man-hours
OR
*Two engine serial numbers: Up to 20 man-hours
OR
*Three engine serial numbers: Up to 22 man-hours
OR
*Four engine serial numbers. Up to 24 man-hours
(2) Labor compensation in the form of a back-end service credit will be provided for up to 4
labor man-hours actually incurred by customer in performing the inspection for each
uninstalled engine.
(3) All labor man-hours will be credited at the customer warranty labor rate specified per the
active general terms agreement (GTA) between GE and customer.
(4) The back-end service credit is available for customers who complete the inspection no later
than two years from the issue date of this GEnx-2B S/B . All claims must be73-0089
submitted to GE within 12 months of completion of the inspection and no later than three

### Page 4

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
4 of 35
years from the issue date of this GEnx-2B S/B .73-0089
(5) Service credits may be applied by customer to future invoices for services, parts, and
materials provided by GE Engine Services, LLC or GE Engine Services Distribution LLC.
All claims submitted to GE must contain complete information including:
*Engine serial number
*Date of compliance
*Engine cycles since new and cycles since shop visit (installation of post-GEnx-2B S/B 73-0038 
top main fuel manifold and lower fuel manifold) at compliance
*Documentation showing the labor man-hours incurred in completing the inspection
*Reference customer dispensation number D-1240-3GO
*Reference to GEnx-2B S/B  with current revision number73-0089
All claims must be submitted electronically via the  portal.myGEAviation.com
The support offered in this Service Bulletin is contingent on the customer
having an active GTA for the applicable GE engine model. This offer may not be
assigned or otherwise transferred to any other party without the written
consent of GE, which consent shall be in the sole and complete discretion of
GE. The offer is extended to the customer based on unique facts and
circumstances, which the customer hereby acknowledges to be a non-precedent
setting between the customer and GE. The commitment is subject to the terms and
conditions of the current GTA between the customer and GE for the applicable GE
engine model. By accepting the support listed in this section as offered by GE,
the customer agrees that this Service Bulletin offering satisfies customer's
commercial needs. The terms and conditions of the customer's GTA are applicable
and remain in effect.
Please contact your Customer Support Manager (CSM) if you have any question
regarding this support.
C. Configuration Chart
None.
D. Parts Disposition
Contact your local Field Service Engineer (FSE) or GE Aviation representative
to return unserviceable top main fuel manifold and lower fuel manifold.
E. Tooling - Price and Availability
Tool Number Description
GE-FQAP-677 GEnx-2B Fuel Manifold Tube Ultrasonic Inspection
Kit
To obtain an ultrasonic kit, additional items, or replacement items, contact
the GE Inspection Technologies Group via the following method:
GE Inspection Technologies
50 Industrial Park Road
Lewistown, PA 17044
Attn: NDE Kit Coordinator
Email: ndttooling@ge.com
3. ACCOMPLISHMENT INSTRUCTIONS
A. General
(1) This Service Bulletin gives instructions to do an inspection of the top main fuel manifold
(1, and lower fuel manifold (2) for cracks with an ultrasonic inspectionFigure 1) 
technique. The inspection only involves the Psec fuel tube of the top main fuel manifold
(1) and lower fuel manifold (2) at locations adjacent to the ten support block pads.
NOTE:The ultrasonic inspection procedure is the same as the one instructed in GEnx-2B S/B 
. Same technique and equipment.73-0034
B. On-Wing Instructions
(1) To safely open the left and right thrust reversers on the applicable engine, do as follows:
(a) Make sure that the ENGINE START switch and the FUEL CONTROL switch are not operated as
follows:
1 On the pilot's overhead panel, P5, make sure that the applicable ENGINE START
switch is in the NORM (pushed-in) position and do as follows:
a Put a DO-NOT-OPERATE tag on the applicable ENGINE START switch.
2 On the pilot's aisle control stand, P8, make sure that the applicable FUEL CONTROL
switch is in the CUTOFF position and do as follows:
a Put a DO-NOT-OPERATE tag on the applicable FUEL CONTROL switch.
WARNING:THE THRUST REVERSER MUST BE SECURELY HELD OPEN WHILE PERFORMING
MAINTENANCE. ALWAYS BE SURE THE THRUST REVERSER IS FULLY AND PROPERLY
SUPPORTED TO PREVENT INJURY TO PERSONS.
(b) Make sure to do the tasks in the sequence that follows to safely open the left and
right thrust reversers on the applicable engine as follows:

### Page 5

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
5 of 35
1 Retract the leading edge flaps. Refer to the GEnx-2B, Boeing 747-8 AMM, 27-81-00,
MAINTENANCE PRACTICES, TASK 27-81-00-862-019.
2 Do the deactivation of the retracted leading edge flaps. Refer to the GEnx-2B,
Boeing 747-8 AMM, 27-81-00, MAINTENANCE PRACTICES, TASK 27-81-00-042-023.
3 Do the deactivation of the thrust reverser for ground maintenance. Refer to the
GEnx-2B, Boeing 747-8 AMM, 78-31-00, MAINTENANCE PRACTICES, TASK
78-31-00-910-807-G00.
4 For the left and right fan cowl panels, open the applicable fan cowl panels. Refer
to the GEnx-2B, Boeing 747-8 AMM, 71-11-04, MAINTENANCE PRACTICES, TASK
71-11-04-010-801-G00 and Table 1 below:
Table 1
Number Name/Location
413AL Left Fan Cowl
414AR Right Fan Cowl
423AL Left Fan Cowl
424AR Right Fan Cowl
433AL Left Fan Cowl
434AR Right Fan Cowl
443AL Left Fan Cowl
444AR Right Fan Cowl
5 For the left and right thrust reversers, open the applicable thrust reversers.
Refer to the GEnx-2B, Boeing 747-8 AMM, 78-31-00, MAINTENANCE PRACTICES, TASK
78-31-00-000-801-G00 and Table 2 below:
Table 2
Number Name/Location
415AL Left Thrust Reverser
416AR Right Thrust Reverser
425AL Left Thrust Reverser
426AR Right Thrust Reverser
435AL Left Thrust Reverser
436AR Right Thrust Reverser
445AL Left Thrust Reverser
446AR Right Thrust Reverser
(2) Before you start the inspection of the top main fuel manifold (1,  and lowerFigure 1)
fuel manifold (2), you can remove the aft skirt heat shields (1, 2, and 3,  andFigure 2)
aft skirt segment heat shield (4), if necessary, to get access to the lower fuel manifold
(2,  as follows:Figure 1)
WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET
(SDS) FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF
THIS PRODUCT.
(b) Apply C02-019 or C02-023 engine oil to the channel nuts on the aft skirt heat shields
(1, 2, and 3,  and aft skirt segment heat shield (4) before the removal ofFigure 2)
the machine bolts (13).
(c) If it is necessary to get better access to the lower fuel manifold (2, Figure 1),
remove the aft skirt heat shield (1,  as follows:Figure 2)
1 Remove the machine bolts (9) that attach the cushioned loop clamps (10) and lower
fuel manifold (11) to the tube and hose support bracket (12).
2 Remove the six machine bolts (13) that attach the aft skirt heat shield (1) to the
aft skirt heat shield (2) and aft skirt segment heat shields (5 and 6).
3 Remove the aft skirt heat shield (1).
(d) If it is necessary to get better access to the lower fuel manifold (2, Figure 1),
remove the aft skirt heat shield (2,  as follows:Figure 2)
1 Remove the nine machine bolts (13) that attach the aft skirt heat shield (2) to
the aft skirt heat shield (3), aft skirt segment heat shields (6 and 7), panel
(14) and seal (15).
2 Remove the aft skirt heat shield (2).
(e) If it is necessary to get better access to the lower fuel manifold (2, Figure 1),
remove the aft skirt heat shield (3,  as follows:Figure 2)
1 If necessary, remove the machine bolt (16) that attaches the support bracket (17)
to the aft skirt heat shield (3).
NOTE:The machine bolt (16) and support bracket (17) apply to pre-GEnx-2B S/B 72-0130 
engines only.
2 Remove the four machine bolts (13) that attach the aft skirt heat shield (3) to
the aft skirt segment heat shields (4 and 7).
3 Remove the aft skirt heat shield (3).
(f) If it is necessary to get better access to the lower fuel manifold (2, Figure 1),

### Page 6

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
6 of 35
remove the aft skirt segment heat shield (4,  as follows:Figure 2)
1 Remove the eight machine bolts (13) that attach the aft skirt segment heat shield
(4) to the aft skirt segment heat shield (7) and main body assembly heat shied
(8).
2 Remove the aft skirt segment heat shield (4).
(3) If necessary, you can remove the support brackets attached to the top main fuel manifold
(1) and lower fuel manifold (2) pigtails. Refer to GEnx-2B S/B .73-0054
(4) After you get access, do a visual inspection of the top main fuel manifold (1, Figure 1)
and lower fuel manifold (2) tubing and braze joints. Use a flashlight and mirrors as
necessary.
WARNING:REFER TO THE PRODUCT LABEL AND THE MANUFACTURER'S (MATERIAL) SAFETY DATA SHEET (SDS)
FOR INSTRUCTIONS ON THE HAZARDS, STORAGE, SAFE HANDLING AND PROPER USE OF THIS PRODUCT.
(5) Clean the inspection areas of the top main fuel manifold (1,  and lower fuelFigure 1)
manifold (2) with C04-035 isopropyl alcohol.
CAUTION:LET THE TEMPERATURE OF THE TOP MAIN FUEL MANIFOLD (1), LOWER FUEL MANIFOLD (2), AND
ADJACENT HARDWARE DECREASE TO AMBIENT TEMPERATURE BEFORE YOU DO THE ULTRASONIC
INSPECTION OF THE TOP MAIN FUEL MANIFOLD (1) AND LOWER FUEL MANIFOLD (2). OTHERWISE,
DAMAGE TO THE PROBES CAN OCCUR IF THEY CONTACT HOT SURFACES.
(6) Do an ultrasonic inspection of the top main fuel manifold (1,  and lower fuelFigure 1)
manifold (2) for cracks in the pilot secondary fuel tube of the manifold assembly adjacent
to the ten support block pads. Refer to paragraph 4.,  and as follows:APPENDIX - A
(a) If the ultrasonic inspection cannot be done on one of the brazed support block pad
locations due to engine variation and possible clearance issues, do a class A FPI on
the concerned brazed block location. Refer to the SPM, 70-32-03,
SPOT-FLUORESCENT-PENETRANT INSPECTION or GEnx-2B, Boeing 747-8 AMM, 70-11-06,
MAINTENANCE PRACTICES, TASK 70-11-06-200-801-G00.
*Indications of 0.03 inch (0.8 mm) or less are permitted.
NOTE:This procedure can be done only if the ultrasonic inspection cannot be performed.
(7) If you find cracks or leakage in the top main fuel manifold (1,  and/or lowerFigure 1)
fuel manifold (2), replace the affected top main fuel manifold (1) and/or lower fuel
manifold (2) as follows:
(a) For on-wing replacement of the top main fuel manifold (1,  refer to GEnx-2BFigure 1),
S/B .73-0079
(b) For replacement of the lower fuel manifold (2,  you must remove the engine.Figure 1),
Refer to GEnx-2B S/B .73-0038
NOTE:The lower fuel manifold (2,  cannot be replaced on wing.Figure 1)
(c) If you do not find cracks, no further inspection is necessary and the inspection is
complete.
(8) If you removed the support brackets attached to the top main fuel manifold (1, Figure 1)
and lower fuel manifold (2) pigtails, install the support brackets before you install the
aft skirt heat shields (1, 2, and 3,  and aft skirt segment heat shield (4).Figure 2)
Refer to GEnx-2B S/B .73-0054
(9) If removed, install the aft skirt heat shields (1, 2, and 3,  and aft skirtFigure 2)
segment heat shield (4) again as follows:
(a) Install the aft skirt segment heat shield (4) as follows:
1 Put the aft skirt segment heat shield (4) in its position on the main body
assembly heat shied (8) and aft skirt segment heat shield (7).
2 Install the eight machine bolts (13) that attach the aft skirt segment heat shield
(4) to the main body assembly heat shied (8) and aft skirt segment heat shield
(7).
3 Torque the machine bolts (13) to 51 to 59 lb in. (5.7 to 6.6 Nm).
(b) Install the aft skirt heat shield (3,  as follows:Figure 2)
1 Put the aft skirt heat shield (3) in its position on the aft skirt segment heat
shields (4 and 7).
2 Install the four machine bolts (13) that attach the aft skirt heat shield (3) to
the aft skirt segment heat shields (4 and 7).
3 Torque the machine bolts (13) to 51 to 59 lb in. (5.7 to 6.6 Nm).
4 If necessary, install the support bracket (17) to the aft skirt heat shield (4)
with the machine bolt (16) and do as follows:
NOTE:The machine bolt (16) and support bracket (17) apply to pre-GEnx-2B S/B 72-0130 
engines only.
a Torque the machine bolt (16) to 51 to 59 lb in. (5.7 to 6.6 Nm).
(c) Install the aft skirt heat shield (2,  as follows:Figure 2)
1 Put the aft skirt heat shield (2) in its position on the aft skirt segment heat
shields (6 and 7), panel (14), seal (15), and aft skirt heat shield (4).
2 Install the nine machine bolts (13) that attach the aft skirt heat shield (2) to
the aft skirt segment heat shields (6 and 7), panel (14), seal (15), and aft skirt
heat shield (4).
3 Torque the machine bolts (13) to 51 to 59 lb in. (5.7 to 6.6 Nm).
(d) Install the aft skirt heat shield (1,  as follows:Figure 2)
1 Put the aft skirt heat shield (1) in its position on the aft skirt heat shield (2)

### Page 7

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
7 of 35
and aft skirt segment heat shields (5 and 6).
2 Install the six machine bolts (13) that attach the aft skirt heat shield (1) to
the aft skirt heat shield (2) and aft skirt segment heat shields (5 and 6) and do
as follows:
a Torque the machine bolts (13) to 51 to 59 lb in. (5.7 to 6.6 Nm).
3 Install the machine bolts (9) that attach the cushioned loop clamps (10) and the
lower fuel manifold (11) to the tube and hose support bracket (12) and do as
follows:
a Torque the machine bolts (9) to 32 to 38 lb in. (3.6 to 4.2 Nm).
(10)Put the airplane back to its usual condition as follows:
(a) Do the tasks in the sequence that follows to safely close the left and right thrust
reversers on the applicable engine as follows:
1 For the left and right thrust reversers, close the applicable thrust reversers.
Refer to the GEnx-2B, Boeing 747-8 AMM, 78-31-00, MAINTENANCE PRACTICES, TASK
78-31-00-400-801-G00 and Table 3 below:
Table 3
Number Name/Location
415AL Left Thrust Reverser
416AR Right Thrust Reverser
425AL Left Thrust Reverser
426AR Right Thrust Reverser
435AL Left Thrust Reverser
436AR Right Thrust Reverser
445AL Left Thrust Reverser
446AR Right Thrust Reverser
2 For the left and right fan cowl panels, close the applicable fan cowl panels.
Refer to the GEnx-2B, Boeing 747-8 AMM, 71-11-04, MAINTENANCE PRACTICES, TASK
71-11-04-410-801-G00 and Table 4 below:
Table 4
Number Name/Location
413AL Left Fan Cowl
414AR Right Fan Cowl
423AL Left Fan Cowl
424AR Right Fan Cowl
433AL Left Fan Cowl
434AR Right Fan Cowl
443AL Left Fan Cowl
444AR Right Fan Cowl
3 Do the activation of the retracted leading edge flaps. Refer to the GEnx-2B,
Boeing 747-8 AMM, 27-81-00, MAINTENANCE PRACTICES, TASK 27-81-00-442-027.
4 Do the activation of the thrust reverser after ground maintenance. Refer to the
GEnx-2B, Boeing 747-8 AMM, 78-31-00, MAINTENANCE PRACTICES, TASK
78-31-00-910-808-G00.
(b) Do these steps to remove the DO-NOT-OPERATE tags from the applicable ENGINE START
switch and FUEL CONTROL switch:
1 On the pilot's overhead panel, P5, remove the DO-NOT-OPERATE tag from the
applicable ENGINE START switch and do as follows:
a Put the applicable ENGINE START switch to the NORM (pushed-in) position.
2 On the pilot's aisle control stand, P8, remove the DO-NOT-OPERATE tag from the
applicable FUEL CONTROL switch and do as follows:
a Put the applicable FUEL CONTROL switch to the CUTOFF position.
C. In-Shop Instructions
(1) Remove the top main fuel manifold (1,  Refer to the GEnx-2B EM, 72-41-00,Figure 1).
DISASSEMBLY 001, CONFIG 01, Subtask 72-41-00-040-024 or CONFIG 02, Subtask
72-41-00-040-032.
NOTE:GEnx-2B S/B  can be used as reference to help with the removal of the top main fuel73-0038
manifold (1, Figure 1).
(2) Remove the lower fuel manifold (2,  Refer to the GEnx-2B EM, 72-41-00,Figure 1).
DISASSEMBLY 001, CONFIG 01, Subtask 72-41-00-040-024 or CONFIG 02, Subtask
72-41-00-040-032.
NOTE:GEnx-2B S/B  can be used as reference to help with the removal of the lower fuel73-0038
manifold (2, Figure 1).
(3) Do an inspection of the top main fuel manifold (1,  and lower fuel manifold (2).Figure 1)
Refer to the GEnx-2B CIR, 72-41-80, INSPECTION 001.
NOTE:GEnx-2B CIR, 72-41-80, INSPECTION 001 indicates that FPI of the brazed joints is not
necessary. However, FPI of the brazed joints is necessary and must be accomplished as

### Page 8

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
8 of 35
specified in step 3.C.(4) of this Service Bulletin.
(4) Do a Class A FPI of the ten brazed block joints on the top main fuel manifold (1, Figure
 and lower fuel manifold (2). Refer to the SPM, 70-32-02, SPOT-FLUORESCENT-PENETRANT1)
INSPECTION and do as follows:
(a) Indications of 0.03 inch (0.8 mm) or less are permitted.
(5) Deleted.
(6) If you find cracks or indications on the top main fuel manifold (1,  or lowerFigure 1)
fuel manifold (2), replace the affected top main fuel manifold (1) and lower fuel manifold
(2) and do as follows:
(a) Send the unserviceable top main fuel manifold (1) and/or lower fuel manifold (2) back
to GE Aviation. Refer to paragraph 2.D., .Parts Disposition
(7) Install the top main fuel manifold (1,  Refer to the GEnx-2B EM, 72-40-00,Figure 1).
ASSEMBLY 001, CONFIG 01, Subtask 72-40-00-440-023 or CONFIG 02, Subtask 72-40-00-440-052.
NOTE:GEnx-2B S/B  can be used as reference to help with the removal of the top main fuel73-0038
manifold (1, Figure 1).
(8) Install the lower fuel manifold (2,  Refer to the GEnx-2B EM, 72-40-00,Figure 1).
ASSEMBLY 001, CONFIG 01, Subtask 72-40-00-440-023 or CONFIG 02, Subtask 72-40-00-440-052.
NOTE:GEnx-2B S/B  can be used as reference to help with the installation of the lower73-0038
fuel manifold (2, Figure 1).
(9) Do an engine test in a test cell as follows:
(a) Do a dry motoring check, an idle leak check, and a high power leak check. Refer to the
GEnx-2B EM, 72-00-00, TESTING 001 and TESTING 002.

### Page 9 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
LEGEND:
1. TOP MAIN FUEL MANIFOLD  AFT LOOKING FORWARD
2. LOWER FUEL MANIFOLD  6016747-00
Top Main Fuel Manifold and Lower Fuel Manifold Location
Figure 1
[GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without  the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  9 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 10 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
→A
FWD
6016729-00
Aft Skirt Heat Shield and Aft skirt Segment Heat Shield Location
Figure 2 (Sheet 1)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  10 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 11 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
D
LEGEND:
1. AFT SKIRT HEAT SHIELD
2. AFT SKIRT HEAT SHIELD
3. AFT SKIRT HEAT SHIELD
4. AFT SKIRT SEGMENT HEAT SHIELD
5. AFT SKIRT SEGMENT HEAT SHIELD
6. AFT SKIRT SEGMENT HEAT SHIELD  A-A
7. AFT SKIRT SEGMENT HEAT SHIELD
8. MAIN BODY ASSEMBLY HEAT SHIELD  FORWARD LOOKING AFT  6016730-00
Aft Skirt Heat Shield and Aft Skirt Segment Heat Shield Location
Figure 2 (Sheet 2)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  11 of 35
Person, without USG authorization, is strictly prohibited.

### Page 12 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
2 (REF) -
_5 (REF)
6 (REF)
1 (REF)
2 (REF)
LEGEND:
9. MACHINE BOLT (QTY-2)
10. CUSHIONED LOOP CLAMP (QTY-2)
11. LOWER FUEL MANIFOLD
12. TUBE AND HOSE SUPPORT BRACKET
13. MACHINE BOLT (QTY-27)  6016731-00
Aft Skirt Heat Shield and Aft Skirt Segment Heat Shield Location
Figure 2 (Sheet 3)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  12 of 35
Person, without USG authorization, is strictly prohibited.

### Page 13 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
4 (REF)
5 (REF)
1, (REF)
8 (REF)
3 (REF)
15  11 (REF)
7 (REF)
6 (REF)
13 (REF)
2 (REF)
LEGEND:
14. PANEL
15. SEAL  6016732-00
Aft Skirt Heat Shield and Aft Skirt Segment Heat Shield Location
Figure 2 (Sheet 4)
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others  or
Date Printed:  reproduced without the express written consent of GE. Technical data  is  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  13 of 35
Person, without USG authorization, is strictly prohibited.

### Page 14 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
8 (REF)
4 (REF)
7 (REF)
~ 2 (REF)
13 (REF)
LEGEND:
16. MACHINE BOLT
17. SUPPORT BRACKET
NOTE:  3 (REF)
THE MACHINE BOLT (16) AND
SUPPORT BRACKET (17) APPLY
TO PRE-GENX-2B S/B 72-0130 ENGINES ONLY.  6016733-00
Aft Skirt Heat Shield and Aft Skirt Segment Heat Shield Location
Figure 2 (Sheet 5)
4. APPENDIX - A
A•  Refer to the attached inspection procedure.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others  or
Date Printed:  reproduced without the express written consent of GE. Technical data  is  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  14 of 35
Person, without USG authorization, is strictly prohibited.

### Page 15 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
INSPECTION PROCEDURE  NUMBER:  FST Procedure  2237
ISSUE DATE:  May 1, 2014
APPLICABILITY:  FST
Inspection Sites
SUBJECT:  GEnx-2B Fuel Manifold Tube Ultrasonic Inspection
Certified  Certifying Agent
Prepared by:  Technical Approval:  Approval / Issue
Michael Fields  Michael Fields  Tony Mellors
NDE Lead Technologist  NDE Lead Technologist  Senior NDE Engineer
Fleld Support Technology  Field Support Technology  | Field Support Technology
REVISIONS
*=*  Michael Fields  Michael Fields  Tony Mellors
NDE Lead Technologist  NDE Lead Technologist  Senior NDE Engineer
2  Field Support Technology  Field Support Technology..  Field Support Technalogy
***  Michael Fields  James O'Connell  Michael Fields
NDE Staff Technologist  NDE Staff Technologist  NDE Staff Technologist
Field Support Technology  Field Support Technology  Field Support Technology
#  Michael Fields  James O'Connell  Michael Fields
NDE Staff Technologist  NDE Staff Technologist  NDE Staff Technologist
Field Support Technology  Field Support Technology  Field Support Technology
Michael Fields  James O'Connell  Michael Fields
NDE Staff Technologist  NDE Staff Technologist  NDE Staff Technologist
Field Support Technology  Field Support Technalogy  Field Support Technalogy
###
Michael Fields  Karen Morgan  James O'Connell
Senior Technologist  NDE Specialist  Staff Engineer
Field Support Technology  Field Support Technology  Field Support Technology
@  Michertie Fiel  Karen Morgan 09/oslau Michael Fet Leela,
Senior Technologist °9/02/24 NDE Specialist  Senior Technologist 9/02/20
7  Field Support Technology  Field Support Technology  Field Support Technology
GE PROPRIETARY INFORMATION
The infonnatlon contained in this document is GE Proprietary information and is disclosed in confidence. It Is the property of GE and shall not be used,
dIsclosed to others or reproduced without the consent of GE. If consent is given for reproduction in whole or in part, this notice and the notice set forth
on each page of this document shall appear in any such reproductlon in whole or In part. The information contained in this document may also be
controlled by the U.S. export control laws. Unauthorized export or re-export is prohibited.
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  15 of 35
Person, without USG authorization, is strictly prohibited.

### Page 16 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
TABLE OF CONTENTS
1.  SCOPE
2.  APPLICABLE DOCUMENTS...
3.  PERSONNEL REQUIREMENTS
4.  EQUIPMENT REQUIREMENTS
5.  INITIAL EQUIPMENT SETUP..
6.  PRE-INSPECTION PREPARATION
7.  EQUIPMENT CALIBRATION
8.  INSPECTION..  4
9.  CALIBRATION CHECK  5
10. INDICATION EVALUATION.
11. DOCUMENTATION..  FIGURE 1 - FUEL MANIFOLD AND ASSEMBLY .  10100
FIGURE 2 - INSPECTION METHOD..
FIGURE 3 - MANIFOLD MOUNT BLOCK LOCATIONS...
FIGURE 4 - FUEL MANIFOLD TUBE IDENTIFICATION AND INSPECTION AREA
FIGURE 5 - CALIBRATION STANDARD..
FIGURE 6 - SCREEN DISPLAY - CALIBRATION.
FIGURE 7 - PROBE APPLICATION TOOL.
TABLE 1 - PRELIMINARY INSTRUMENT SETTINGS.
TABLE 2 - INSPECTION AREAS..
FORM 2237-1 CALIBRATION AND INSPECTION LOG
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  16 of 35
Person, without USG authorization, is strictly prohibited.

### Page 17 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
1.  SCOPE
1.1  This document describes the technique, equipment and procedure required for
conducting an on-engine ultrasonic inspection of the GEnx-2B fuel manifold for the
detection of localized circumferential cracking adjacent to the support blocks.
(Figures 1, 2, 3 and 4).
1.2.  This inspection is performed using 2 dedicated ultrasonic probes each containing 4
elements. Two probes are required for the clockwise and counterclockwise
directions around the manifolds. The probe wraps around the fuel lines and directs
70° shear waves toward the areas to be inspected. (Figure 2).
For specific cases where the procedures or equipment described herein cannot be
applied in total, specific exceptions shall be obtained in writing from the appropriate
technical function prior to any inspection of hardware.
2.  APPLICABLE DOCUMENTS
2.1. NAS -410 (latest revision)
2.2. Applicable manufacturer's equipment user's manual
2.3.  FST Procedure 2238 - Kit Preparation and Quality Assurance Plan
3.  PERSONNEL REQUIREMENTS
3.1.  Personnel performing this inspection must be certified in accordance with NAS-410, or
American Society of Nondestructive Testing (ASNT-TC-1A) or local certification process.
3.2.  It is strongly recommended that personnel performing this inspection receive practical
training in the use of this procedure and must demonstrate proficiency in the
calibration, inspection and evaluation routines before accept/reject authority is
delegated.
3.3.  Any training that may be provided regarding the performance of this inspection does
not imply that the personnel who receive that training have met the requirements for
inspector certification in accordance with the appropriate certification document.
1
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  17 of 35
Person, without USG authorization, is strictly prohibited.

### Page 18 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
4. EQUIPMENT REQUIREMENTS
4.1. The following is a listing of the equipment used for the inspection of the GEnx-2B Fuel
Manifold Tubes:
4.1.1. GE Aircraft Engines Inspection Kit GE-FQAP-677
Kit contents include:
Ultrasonic probe P/N 389-085-151  Qty 2
- Approved Alternate P/N 00-010012
Ultrasonic probe P/N 389-085-161  Qty 2
- Approved Alternate P/N 00-010013
Reference Standard P/N UT-2237  Qty 1
Standard Holder P/N SGP-155  Qty 1
Transducer Switch Box P/N 389-085-170  Qty 2
- Approved Alternate P/N 00-012260
Syringe - Couplant Applicator  Qty 2
Probe application tool P/N SGP-156  Qty 2
Storage Case  Qty 1
4.1.2. Couplant - glycerin
4.1.3. Ultrasonic Instrument USM Go
4.1.4. Lemo to BNC Adaptor P/N 022-509-749
4.2.  To obtain a kit, additional items, or replacement items, please submit a request to
the following Email.
E:ndttooling@ge.com
INITIAL EQUIPMENT SETUP
NOTE:  Refer to the manufacturer's equipment manual for the ultrasonic instrument being
utilized for this inspection if any questions arise about the instrument's use.
5.1. Connect the ultrasonic instrument to the appropriate power source and switch the
instrument power on. Allow the instrument to warm up for at least 10 minutes or
the manufacturer's recommended warm up time.
@  5.2.  Connect the probe cable of the probe P/N 389-085-151 to be calibrated to the
appropriate connector on the transducer switchbox.
5.3.  Connect the transducer switch box to the instrument.
5.4.  Fill the syringe with glycerin to be used for ultrasonic couplant.
2
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  18 of 35
Person, without USG authorization, is strictly prohibited.

### Page 19 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
5.5.  Adjust the ultrasonic instrument to the basic settings in Table 1.
6. PRE-INSPECTION PREPARATION
6.1. Engines shall be prepared for inspection as follows (use appropriate technical data to
accomplish):
6.1.1. Remove heat shield skirts numbers 1, 2 and 3.
6.2. The temperature of the fuel manifolds to be inspected shall be within a temperature
range of 40°F to 100°F. Temperatures outside this range can adversely affect the
inspection results, damage the transducer, or prevent proper coupling.
7. EQUIPMENT CALIBRATION
7.1. Each probe shall be calibrated separately; the method described below is the same
for each probe. Refer to figures 5 and 6.
7.2. Prepare ultrasonic instrument and probe according to section 5.0 of this document.
7.3.  Set the transducer switchbox to position number 1.
7.4. Open the spring-loaded halves of the probe and clamp the probe onto the calibration
standard with the sound directed towards the probe stop (the spring tensioner will
be pointed away from the probe stop) at a position approximately 0.5 inches away
from the stop.
7.5.  Apply couplant to the tube in front of the stop.
7.6.  Move the probe forward until it is against the probe stop.
7.7. Rotate the probe slowly around the standard keeping the probe against the stop until
the response from the EDM notch is detected.
7.8. Adjust the gain to set the response from the EDM notch to 80% of full screen height  7.8. Adiust the ga
7.9.  Adjust the instrument range so that the leading edge of the response from the EDM
notch is at the fifth major division on the instrument baseline.
7.10. Note and record the instrument settings on Form 2237-1.
7.11. Adjust the transducer switchbox to position 2.
3
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  19 of 35
Person, without USG authorization, is strictly prohibited.

### Page 20 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
7.12. Rotate the probe slowly around the standard keeping the probe against the stop until
the response from the EDM notch is detected.
7.13. Adjust the gain to set the response from the EDM notch to 80% of full screen height
(FSH).
7.14. Note and record the instrument gain settings on Form 2237-1.
7.15. Repeat 7.11 through 7.14 for the remaining 2 switch positions.
@  7.16. The highest recorded gain will be used for inspection when using the probe P/N 389-
085-151 for inspection.
@  7.17. Repeat 7.3 through 7.16 for probe P/N 389-085-161.
8.  INSPECTION
CAUTION: Access to the areas of the fuel manifold to be inspected is difficult. Ensure that
there are adequate platforms in place to so that each area can be reached easily
and safely.
8.1. Assure that initial equipment set-up, pre-inspection preparation and system
calibration are complete according to sections 5.0, 6.0, and 7.0 of this document.
8.2. Refer to Table 2 for the inspection areas and the probe to use.
8.2.1. Inspect the upper block #2 and then the lower block #4. After inspection of
these two locations, continue with the remaining block locations as instructed in
Table 2.
NOTE: Per field experience, the upper block #2 and the lower block #4 have presented
indications out of the permitted range criteria.
8.3. Select the probe to use for the area to be inspected.
8.4.  Set the instrument gain for the probe to be used - refer to gains recorded per section
7.
8.5.  Set a gate from 4.5 major divisions to the 7th major division on the instrument
baseline at a level of 40% FSH. Refer to Figure 6.
8.6. Set the transducer switchbox to position number 1.
4
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  20 of 35
Person, without USG authorization, is strictly prohibited.

### Page 21 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Open the spring-loaded halves of the probe and clamp the probe onto the tube (use
the probe application tool as required, Figure 7). Ensure that the probe is oriented
towards the fuel line support block and can be rotated around the tube while it is
against the support block and pointed towards the braze area.
8.8.  Pull the probe back slightly from the support block and apply couplant in front of the
probe.
8.9.  Move the probe against the support block and rotate the probe ensuring that the
area of braze is covered as much as possible. Refer to Figure 4. Monitor the
instrument for indications in the gate which equal or exceed 40% of FSH.
NOTE: Refer to Figure 6 to clearly understand the reject threshold of 40% and the inspection
zone from 4.5 to 7.0 on the horizontal baseline.
CAUTION: Repeat inspections can deteriorate the inspection diligence causing incorrect
inspection results. Consider break intervals to guarantee a proper inspection and prevent
operator fatigue.
8.10. Repeat 8.9 for each switch position.
8.11. Upon completion of each inspection area, place a check mark in the appropriate box
of the inspection log, Form 2237-1.
8.12. Evaluate repeatable indications which are equal to or exceed 40% FSH per section
10.0
8.13. Carefully remove the probe.
8.14. Repeat 8.2 through 8.12 for each area to be inspected.
9.  CALIBRATION CHECK
9.1.  A calibration check shall be performed after inspection. Also, check calibration
whenever any system component or operator is changed, after any loss of power and
at any time the operator suspects a change in the system.
9.2.  If the amplitude of the response from the EDM notch for any of the transducers has
increased by more than 20% FSH above the calibration amplitude, the system shall be
recalibrated prior to the inspection of additional hardware. It will be necessary to re-
inspect any rejected hardware examined since the last acceptable calibration once
correct calibration has been achieved.
5
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  21 of 35
Person, without USG authorization, is strictly prohibited.

### Page 22 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
If the amplitude of the response from the EDM notch for any of the transducers has
decreased by more than 10% FSH below the calibration amplitude, the system shall
be recalibrated, and all hardware inspected since the last acceptable calibration or
calibration check must be re-inspected.
10. INDICATION EVALUATION
10.1. Any indication(s) that equals or exceeds 40% FSH shall be evaluated as follows:
10.1.1. Verify that the calibration is acceptable per section 9.0.
10.1.2. Repeat the inspection using the correct gain for each transducer.
10.1.3. If the indication repeats and is equal to or exceeds 40% for any of the
transducers (switch positions) the fuel manifold is rejectable.
10.1.4. Record the results on the data sheet Form 2237-1.
11. DOCUMENTATION
11.1. All calibration and inspection data shall be recorded on the appropriate log (Form
2237-1).
11.2. Forward Form 2237-1 along with any supporting electronic files to the appropriate GE
Representative.
6
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  22 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 23 (OCR)

GEnx-2B Service Bulletins (SBs)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Upper manifold
FWD
Fuel Manifold
(Assembly)
CDN Case
Lower manifold
Inspection areas
(Psec tube only)
CDN Case
Mount Bracket  Fuel Manifold Mount Block
(10 Places)  (10 Places)
FST Procedure 2237  GE Proprietary informatiu.. - Juc  • we cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without  the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  23 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 24 (OCR)

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 2 - INSPECTION METHOD
Ultrasonic Probe  Fuel Manifold Mount Block
Each element switched in turn, generates 70° shear wave in tube, and
reflects off tube ID to target cracks originating from OD.
Fuel Manifold
Mount Block
Ultrasonic Probes
Psec Fuel Tube
Probe P/N 389-085-151 positioned on Psec CW side and Probe P/N 389-085-161 positioned
on the Psec CCW side.
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  24 of 35
Person, without USG authorization, is strictly prohibited.

### Page 25 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 3 - MANIFOLD MOUNT BLOCK LOCATIONS
10000000000001
Upper  050000
Upper  Block #2
Block #3
Upper
‚Upper  Block #1
Block #4
Lower
ALF  Block #1
Upper
Block #5
Lower
Lower  Block #2
Block #5
Lower
Lower  Block #3
Block #4
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE  PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  25 of 35
Person, without USG authorization, is strictly prohibited.

### Page 26 (OCR)

GEnx-2B Service Bulletins (SBs)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 4 - FUEL MANIFOLD TUBE IDENTIFICATION AND INSPECTION AREA
PPMU Tube not on  Inspection area
lower segment
PPMU
PSEC
PPMS
FWD
PSEC
Inspect this tube adjacent to
Fuel Manifold Mount Block  the mount blocks only
(10 Places)
CDN Case
Note: Only the Psec fuel tube inspection is required adjacent to the mount block locations.
10
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  26 of 35
Person, without USG authorization, is strictly prohibited.

### Page 27 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 5 - CALIBRATION STANDARD
Transducer Stop
Spring Tensioner
11
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
|GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  27 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 28 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 6 - SCREEN DISPLAY - CALIBRATION
GAIN  47.4 dB  0.2 AYAF  79 %  P%H=  ---- 0  79 %  JA%A  79
*
range
0.440 in
PROBE DELAY
0.000 us  Reject Threshold @
40% - 4.5 to 7.0
velocity
.1152 in/uS
CUSTOM
DISPLAY DELAY
0.000 us
12
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  28 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 29 (OCR)

GEnx-2B Service Bulletins (SBs)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FIGURE 7 - PROBE APPLICATION TOOL
13
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
|GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  29 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 30 (OCR)

GEnx-2B Service Bulletins (SBs)
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
TABLE 1 - PRELIMINARY INSTRUMENT SETTINGS
USM GO/USM GO+
GAIN  50 dB
RANGE
VEL  0.1152 in/us
DISPLAY DELAY  0.00
PROBE DELAY  0.00
FREQUENCY  15 MHz
REJECT  0%
RECTIFICATION  FULLWAVE
DUAL  OFF
PULSER TYPE  SPIKE
PULSER ENERGY  LOW
DAMPING  50 OHM
VOLTAGE  LOW
PRF MODE  AUTO LOW 400 HZ
MAIN MENU
FILE NAME  FUELMAN
ACTION  STORE REPORT
REPORT
IMAGE IN REPORT  YES
PARAM IN REPORT  YES
VIDEO
SOURCE/DEST  SD CARD
CONFIG2
FUNCTION1  FREEZE/NONE
FUNCTION2  NONE/COPY
14
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
|GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  30 of 35
[Person, without USG authorization, is strictly prohibited.

### Page 31 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
EPOCH XT
Control Description  Initial Setting  Control Description  Initial Setting
GAIN  50.0 dB  MODE  _P/E
REJECT  0 %  FILTER  A 8.0 - 15.0
RANGE  500 in  RECT  FULL
VEL  . 1152 in/us
ZERO  IP at 0.0
M:PRE  400 Hz
FREQ.  14.29 MHz
ENERGY  125 V
DAMP  50 ohms
EPOCH - LTC
Control Description  Initial Setting  Control Description  Initial Setting
BASE  PULSER
VEL  . 1152  PRE  400 Hz
ZERO  IP at 0.0  DAMP  50 OHMS
ANGLE  NA  MODE  P/E
THICK  NA  ENERGY  100 V
RECEIVER  RANGE
FILTER  HIGH PASS  RANGE  .500"
REJECT  0 %
RECT  FULL  GAIN  55.0 dB
15
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  31 of 35
Person, without USG authorization, is strictly prohibited.

### Page 32 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 RO1 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
OLYMPUS Sonic 1000 Series
Control Description  Initial Setting  Control Description  Initial Setting
PULSER  RANGE
PULSE  50ns  RANGE  0.424 in
DAMPING  50 ohms  DELAY  0.000
MODE  SINGLE  VELOCITY  0.115 in/us
VOLTAGE  150V  MAX REP  1200 Hz (HR series)
RCVR  GAIN
DISPLAY  FULLWAVE  GAIN  50.0 dB
FREQ  WB
REJECT  0 %
EPOCH 600/650
Control Description  Initial Setting
GAIN  50.0 dB
BASIC
Velocity  0.1152 in/us
Zero  0.000 us
Range  0.500
Delay  0.000
PULSER
PRF Mode  Manual
PRE  400 Hz
Energy  200V
Damp  50 Q
Mode  P/E
Pulser  Spike
RCVR
Filter  5.0 - 15.0 MHz
Rect  Full
16
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  32 of 35
Person, without USG authorization, is strictly prohibited.

### Page 33 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
TABLE 2 - INSPECTION AREAS
Psec Manifold
| cCW  cW
Upper Block #1  | 161  151
Upper Block #2  161  151
Upper Block #3  161  151
Upper Block #4  | 161  151
Upper Block #5  | 161  151
Lower Block #1  161  151
Lower Block #2  161  151
Lower Block #3  161  151
Lower Block #4  161  151
Lower Block #5  | 161  151
151  Probe P/N - 389-085-151
Alt. P/N 00-010012
161  Probe P/N - 389-085-161
Alt. P/N 00-010013
17
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
GE  PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  33 of 35
Person, without USG authorization, is strictly prohibited.

### Page 34 (OCR)

GEnx-2B Service Bulletins (SBS)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40)  - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
FORM 2237-1 CALIBRATION AND INSPECTION LOG
DATE:  SITE:
ENGINE SN:  INSPECTOR:
INSTRUMENT S/N  STANDARD S/N:
PROBE P/N 389-085-151 (P/N 00-010012)  PROBE P/N 389-085-161 (P/N 00-010013)
S/N  RANGE  S/N  RANGE
SWITCH  2  4  SWITCH 1  2  4
GAIN  GAIN
PSEC Manifold
cCW  CW  Comments
161  151
Upper
Block #1
Upper
Block #2
Upper
Block #3
Upper
Block #4
Upper
Block #5
Lower
Block #1
Lower
Block #2
Lower
Block #3
Lower
Block #4
Lower
Block #5
Post  Calibration  Accept/Reject  Accept/Reject
18
FST Procedure 2237  GE Proprietary information - Subject to restrictions on the cover page
PROPRIETARY INFORMATION - Not to be used, disclosed to others or
Date Printed:  reproduced without the express written consent of GE. Technical data  Page
2021/01/12  considered ITAR and/or EAR controlled; transfer of this data to a Non-US  34 of 35
Person, without USG authorization, is strictly prohibited.

### Page 35

GEnx-2B Service Bulletins (SBs)
SB 73-0089 R01 ENGINE FUEL AND CONTROL - Fuel Nozzle Manifolds (73-11-40) - Top Main Fuel Manifold and
Lower Fuel Manifold Inspection - Post-GEnx-2B S/B 73-0038
Date Printed:
2021/01/12
GE PROPRIETARY INFORMATION - Not to be used, disclosed to others or
reproduced without the express written consent of GE. Technical data is
considered ITAR and/or EAR controlled; transfer of this data to a Non-US
Person, without USG authorization, is strictly prohibited.
Page
35 of 35
GE Designated: - CONFIDENTIAL Subject to the restrictions on the media

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
