# Grob Service Bulletin TM 306-29: No revision named

- Rights: © Grob. Filed by the FAA in regulations.gov docket FAA-2007-28435; AD 2011-01-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Grob Service Bulletin TM 306-29](https://openairdocs.org/service-documents/grob/tm306-29.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 4
- PDF: https://openairdocs.org/files/sha256/a1/f0/a1f097addd907eed11deb33be59e0df533f2a893e2c9cf539082e7733abf9a29
- Page: https://openairdocs.org/service-documents/grob/tm306-29/file/a1f097addd90

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

Service Bulletin  GROB
TM 306-29  ASTIR CS
GROB-  TM 320-5  SPEED ASTIR II
LUFT UND RAUMFAHRT
Subject:  Inspection and replacement of spar spigot assemblies
Concerning:  Model: ASTIR CS  TCDS No.: 306
- Series:  - S/N:
ASTIR CS  1001-1536
ASTIR CS 77  1601-1844
ASTIR CS Jeans  2001-2248
CLUB ASTIR II  5001-5061 (Suffix "C")
STANDARD ASTIR II  5001-5061 (Suffix "S")
G 102 CLUB ASTIR III  5501 & up (Suffix "C")
G 102 CLUB ASTIR IIIb  5501 & up (Suffix "Cb")
G 102 STANDARD ASTIR III  5502 & up (Suffix "S")
Model: SPEED ASTIR II  TCDS No.: 320
- Series:  - S/N:
SPEED ASTIR II  4001-4027
SPEED ASTIR IIB  4028-4107
Urgency:  See Actions
Procedure:  As a result of the replacement action of the G 103
TWIN ASTIR spar spigot assemblies, the Gliding Fede-
ration of Australia issued a directive to inspect
the similar main spigots of single-seater sailplanes.
Because the reports of ostensibly discovered cracks
are increasing, GROB has decided to issue this Ser-
vice Bulletin as a pure precautionary measure.
Actions:  The following actions are to be taken:
1. Inspection of the main spigot assembly
Before the next flight, inspect both spar spigot
assemblies for cracks using a suitable procedure
(magnifying glass with a minimum 10 times magnifi-
cation, dye penetrant, magnetic particle).
Important: When carrying out the crack inspection,
ensure that any gap between the spigot
plates and the spigot is not interpreted
If no crack is discovered and if the distance bet-
ween spigot plates and swivel bearing is (refer to
figure on page 3):
• b ≤ 10 mm: Carry out Action 2 not later than
31 December 1992
• b > 10 mm: Carry out Action 2 not later than
30 June 1991
12.07.1991  ENS 10A 1001990 COTION  BEARSEITET PREPARED B  . Altmanr  MUSTERGEPRUFT / APPROVED BY  SEITE / PAGE  1 of 4

### Page 2 (OCR)

Service Bulletin  GROB
TM 306-29  ASTIR CS
• GROB-  TM 320-5  SPEED ASTIR II
LUFT- UND RAUMFAHAT
If a crack is discovered and if the distance between
spigot plates and swivel bearing is b ≤ 10 mm, the
crack may initially be blended out (refer to page 4
for procedure):
* Removal of crack is possible:
Warning: After blending, check that dimension  Carry out Action 2 not later than 31 December 1992  b is still ≤ 10 mm.
• Removal of crack not possible:
Carry out Action 2 immediately
If a crack is discovered and if the distance between
spigot plates and swivel bearing is b › 10 mm,
Action 2 must be carried out immediately.
2. Replacement of the spar spigot assembly
Replace the spar spigot assembly in accordance
with Installation Instruction No. 306-29/320-5.
The modifications must be performed in conformance with the follow-
ing drawings:
New Drawing  Replacement for
Drawing No.  Issued  | Title  Drawing No.  Issued  Title
102-1909/1910|30.08.1990| SPIGOT ASSY  102-1012/1013  |15.02.1975| SPIGOT ASSY
| LH / RH  102C3-1012/1013|26.11.1980| RH/LH
104-1909/1910|30.08.1990|SPIGOT ASSY  104-1003/1004  |20.09.1979| SPIGOT ASSY
ILH/RH  104-1012/1013  |30.05.1978|RH/LH
Weight and  Ene y weallation of the  of g. have to be determined after
Balance:  new spar spigot assemblies.
Remarks:  Action 1 can be carried out by a competent person
who is versed in the operation of the inspection
methods and has to be certified in the logbook.
Action 2 may only be carried out by an aviation
workshop with authorization for GRP repairs.
The proper execution has to be certified in the
logbook by an authorized inspector.
Mattsies, 11 October 1990  LBA approved:
0 5. Dez. 1990
Dipl. Ing. J. Altmann
(Airworthiness engineer
Certification staff)
Approval of translation has been
done by best knowledge and judgement.
-In any case the original text  in
German language is autoritive.-
Note: If in the meantime you have sold your glider, we would
that you kindly pass this information immediately to the new
owner and forward his address and aircraft s/n to us.
ERSETZT AUSGABE / ISSUE EDITION  BEARBEITET / PREPARED BY  MUSTERGEPRÜFT / APPROVED BY
11.10.1990  J. Altmann

### Page 3 (OCR)

Service Bulletin  GROB
TM 306-29  ASTIR CS
GROB-  TM 320-5  SPEED ASTIR II
LUFT- UND RAUMFAHRT
Definition of the distance b
DATUM / DATE  ERSETZT AUSGABE / ISSUE EDITION  BEARBEITET / PREPARED BY  MUSTERGEPRÜFT / APPROVED BY  SEITE / PAGE
11.10.1990  J. Altmann  3 of 4

### Page 4 (OCR)

Service Bulletin  GROB
GROB-  TM 306-29  ASTIR CS
LUFT- UND RAUMFARRT  TM 320-5  SPEED ASTIR II
Comments to crack inspection  max. 5 mm deep
To perform the crack inspection the
section of the wrapping around the
main spigot has to be removed (max.
15 mm) and the adhesive material
removed to expose the welding seam
(max. 5 mm deep, see figure).
Be very careful  not to scratch or
otherwise damage the spigot or plate.
If the weld seam is  continuous around
the plate, the complete  toe of the
welding seam has to be inspected.
Grooves or nicks in the surface of
the welding seam which are not part
of a crack must be polished out and
the crack inspection performed again.
Procedure for blending out a crack
A crack may be blended out if the
following  conditions are fulfilled:
* crack  on one side not deeper
than 0.75 mm  polished
* cracks  on both sides not deeper
than 0.5 mm each
Blending out should be done with
grinding caps or equivalent. The
grinded surface has to be polished.
Sketch mentioned below shows a cross
section of blending out a crack.
SPIGOT PLATE
CrACk
SPIGOT
Finally apply a coating of resin to the exposed area (wood and
metal).
DATUM / DATE  ERSETZT AUSGABE / ISSUE EDITION  BEARBEITET / PREPARED BY  MUSTERE  APPROVED BY  SEITE / PAGE
19.12.1990  11.10.1990  J. Altmann  4 of 4

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
