# Gulfstream Customer Bulletin 196: No revision named

- Rights: © Gulfstream Aerospace Corporation. Filed by the FAA in regulations.gov docket FAA-2012-0677; AD 2012-13-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Gulfstream Customer Bulletin 196](https://openairdocs.org/service-documents/gulfstream/cb-196.md)
- Title as filed: U.S. DOT/FAA - Service Information - 2
- Pages: 17
- PDF: https://openairdocs.org/files/sha256/5f/b0/5fb067336bf54411173ebb06f0afa49b261d1f7a8da9dbbe22929ea50ee4dfc8
- Page: https://openairdocs.org/service-documents/gulfstream/cb-196/file/5fb067336bf5

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CUSTOMER BULLETIN
SUBJECT
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NUMBER 196 
FLIGHT CONTROLS (ATA 27) 
INSPECTION - FLIGHT CONTROL SURFACES 
PAINT THICKNESS 
MARCH 23, 2012

### Page 2

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Page 1 of 8 
Flight Controls (ATA 27), Inspection – Flight Control Surfaces Paint Thickness 
 
I. Planning Information:  
A. Effectivity: 
Aircraft serial numbers 612, 630 and 691 
B. Reason: 
Gulfstream has determined through routine records review that, during application, the 
flight control surfaces paint thickness may not have been properly documented on a 
number of aircraft. Excessive paint thickness will affect the balance moment of the flight 
control surface and may result in reduced control surface flutter margin.    
C. Description: 
This customer bulletin is divided into two parts: 
Part I of this customer bulletin is a one-time action to inspect the flight control surface 
paint thickness on identified aircraft and to incorporate Airplane Flight Manual 
Supplement (AFMS) GV-2012-01 imposing altitude restrictions for any aircraft found to 
have excessive paint. 
Part II of this customer bulletin is a one-time action to correct any excessive paint 
thickness conditions identified by the Part I inspection. This part will also remove the 
AFMS altitude restrictions upon completion of corrective action. 
Note: All references in this document are intended to be inclusive of any amendments 
or revisions unless otherwise stated. 
D. Compliance: 
Compliance with Part I of this customer bulletin is required within 90 days of the release 
date. 
Compliance with Part II of this customer bulletin, if necessary, is required within 12 
months from compliance with Part I of this customer bulletin. 
This customer bulletin is a managed program and should be accomplished at a 
Gulfstream Aerospace Authorized Warranty Repair Facility.  Compliance with this 
customer bulletin must be coordinated through Gulfstream Scheduling at 800-810-GULF 
(4853), or 912-965-4178. If not scheduled, down times could increase significantly. 
E. Approval:   
This customer bulletin has been FAA approved as this issue is the subject of FAA 
Airworthiness action. It does not contain any modification information nor revise the 
approved configuration and as such does not require any other regulatory approval.

### Page 3

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Page 2 of 8 
F. Manpower: 
Inspection (Part I)    -   4.5 man-hours 
Note: Listed man-hours are for Part I inspection only. Due to the potential variation of 
work requirements to correct any deficiencies, labor coverage for Part II 
corrective action must be charged on a separate work order and submitted for 
warranty consideration.  
G. Material: 
None 
H. References: 
 GV Aircraft Maintenance Manual (AMM), Chapters 20 and 27 
 GV Airplane Flight Manual (AFM) 
 GV Airplane Flight Manual Supplement (AFMS) GV-2012-01 (attached) 
 Gulfstream Aerospace Material Process Specification (GAMPS) 4000, revision F 
I. Tooling/Equipment: 
Ultrasonic Coating Thickness Gage, Positector 200 series or equivalent 
J. Opportunity for No-Charge Compliance:  
Labor and material will be provided at no charge if this customer bulletin is accomplished 
within the recommended compliance time, as stated in this document, at a Gulfstream V 
Authorized Warranty Repair Facility. 
Note: Additional labor hours incurred due to aircraft configuration or mechanical 
difficulties must be charged on a separate work order and submitted for warranty 
consideration. 
Note: Labor and materials for corrective action (Part II), if necessary, must be charged 
on a separate work order and submitted for warranty consideration. 
K. Weight and Balance: 
N/A 
Part I 
II. Accomplishment Instructions:  
CAUTION: PROTECT WIRE BUNDLES, CONNECTORS AND SURROUNDING 
STRUCTURE DURING ANY MAINTENANCE PROCEDURE FROM SHAVINGS, 
DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY CLEANED WORK 
AREA THROUGHOUT THE PROCEDURE TO ENSURE THE INTEGRITY OF 
THE AFFECTED COMPONENT / SYSTEM. VISUALLY INSPECT WORK AREA 
USING ADDITIONAL LIGHT AS NECESSA RY TO VERIFY ABSENCE OF ANY 
DEBRIS PRIOR TO COMPLETION OF PROCEDURE. FAILURE TO COMPLY 
MAY RESULT IN DAMAGE TO COMPONENTS AND / OR SYSTEMS.

### Page 4

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Page 3 of 8 
A. Prepare the aircraft for safe maintenance. Refer to AMM, Safe Ground Maintenance 
Procedure, Chapter 20. 
B. Gain access to all flight control surfaces (aileron, rudder and elevator). 
C. Using the paint thickness measurement maps (Tables 1, 2 and 3) mark the reading 
points on both sides of each flight control surface. 
D. Using an ultrasonic coating thickness gage, Positector 200 series or equivalent, 
measure the paint thickness on the flight control surfaces at each reading point as 
shown on the paint thickness measurement map for each respective flight control 
surface. Record readings on the appropriate tables. See Tables 1, 2 and 3.  
E. Calculate the average paint thickness for each surface by adding all of the readings for 
that surface and dividing by the number of readings. For example, in Table 1 the left 
aileron point readings for mid-chord and rear, upper and lower surfaces would be totaled 
and then divided by 24, which is the number of reading points. 
F. Table 4 contains maximum allowable paint thickness averages for individual aircraft 
serial numbers. These thickness allowances have been determined using historical 
balance information for each individual flight control surface to determine maximum paint 
thickness that could be applied without negatively affecting the balance moment, and are 
not required paint thicknesses. Confirm part number and serial number of the respective 
flight control surface prior to using the values on this chart.  If the part number and/or 
serial number do not match the chart information, default values of 5.0 mils must be 
used. 
G. Compare average paint thickness recorded on Tables 1, 2 and 3 with the maximum 
allowable paint thickness average for each flight control surface shown in Table 4. For 
each flight control surface perform the following: 
1. If average paint thickness is equal to or less than 5.0 mils – no further action is 
required, proceed to Step II.H. Report Part II of this customer bulletin as “Not 
Applicable – No action required from Part I.” 
2. If average paint thickness is greater than 5.0 mils, but equal to or less than the serial 
number specific allowances provided in Table 4 - no further action is required, 
proceed to Step II.H. Report Part II of this customer bulletin as “Not Applicable – No 
action required from Part I.” 
3. If average paint thickness is greater than the serial number specific allowances 
provided in Table 4, but less than 13 mils – Incorporate AFMS GV-2012-01 into the 
Airplane Flight Manual for continued operation at or below 45,000 feet until condition 
is corrected. Compliance with Part II of this customer bulletin is required within 12 
months from compliance with Part I. 
4. If average paint thickness is greater than the serial number specific allowances 
provided in Table 4, and exceeds 13.0 mils  – Continued operation is not allowed, 
contact Gulfstream Customer Support for instructions on compliance with Part II of 
this customer bulletin.   
H. Ensure work area is clean and clear of foreign objects (FOD).

### Page 5

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Page 4 of 8 
I. Record compliance with Part I of this customer bulletin in the aircraft’s permanent 
maintenance records and return aircraft to flight status. 
J. Report compliance with Part I of this customer bulletin to Gulfstream Computerized 
Maintenance Program (CMP) via electronic transmittal or fill out and fax the attached 
service reply card. 
Part II 
III. Accomplishment Instructions  
CAUTION: PROTECT WIRE BUNDLES, CONNECTORS AND SURROUNDING 
STRUCTURE DURING ANY MAINTENANCE PROCEDURE FROM SHAVINGS, 
DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY CLEANED WORK 
AREA THROUGHOUT THE PROCEDURE TO ENSURE THE INTEGRITY OF 
THE AFFECTED COMPONENT / SYSTEM. VISUALLY INSPECT WORK AREA 
USING ADDITIONAL LIGHT AS NECESSA RY TO VERIFY ABSENCE OF ANY 
DEBRIS PRIOR TO COMPLETION OF PROCEDURE. FAILURE TO COMPLY 
MAY RESULT IN DAMAGE TO COMPONENTS AND / OR SYSTEMS. 
A. Prepare the aircraft for safe maintenance. Refer to AMM, Safe Ground Maintenance 
Procedure, Chapter 20. 
B. For affected surfaces having an overall average thickness greater than the values shown 
on Table 4 as described in Part I, Steps II.G.3. and II.G.4., one of the following corrective 
actions shall be required within the specified compliance time. Contact Gulfstream 
Customer Support for assistance in determining the appropriate corrective action. 
1. Remove flight control surface and rebalance per AMM, Chapter 27. 
2. Strip and repaint with average thickness less than 5.0 mils. Re-measure thickness. 
Refer to GAMPS 4000, revision F. 
3. Sand/buff down to 5.0 mils or less and re-measure thicknesses (not recommended 
on surfaces with averages exceeding 7.0 mils). Refer to GAMPS 4000, revision F. 
C. Ensure work area is clean and clear of foreign objects (FOD). 
D. Remove Airplane Flight Manual Supplement GV-2012-01 from the Airplane Flight 
Manual. 
E. Record compliance with Part II of this customer bulletin in the aircraft’s permanent 
maintenance records and return aircraft to flight status. 
F. Report compliance with Part II of this customer bulletin to Gulfstream Computerized 
Maintenance Program (CMP) via electronic transmittal or fill out and fax the attached 
service reply card. 
If technical assistance is required, contact your area Gulfstream Field Service Representative or call 
Gulfstream Customer Support at 800-810-GULF (4853) or 912-965-4178 (fax 912-965-4184).

### Page 6 (OCR)

Gulfstream V  Customer Bulletin No. 196
"March 23, 2012"
REAR
УМОТ
PAINT THICKNESS READINGS (MIL,0.001")  RIGHT HAND  -aIW  -aIW  REAR  CHORD
REAR
LOWER
PAINT THICKNESS MEASUREMENT MAP  MEASUREMENTS COLLECTED BY  INSTRUMENT AND CAL EXPIRY  LEFT HAND  MID-  REAR  CHORD  N/A  N/A  N/A  NA
AIRCRAFT S/N  SITE/REPAIR STATION  DATE  PAINT TYPE  UPPER  PT  MID-  CHORD  N/A  N/A  N/A  N/A  AVG  Aileron Measurement Map  Table 1
INBOARD  OUTBOARD
MID-CHORD 4 PT @ 8" SPACING  REAR 8 PT @ 4" SPACING  DEVIATIONS UP TO 1 INCH RADIUS FROM THE POINTS SHOWN ARE ACCEPTABLE
AILERON
LH SHOWN  RH SIMILAR
Page 5 of 8

### Page 7 (OCR)

Gulfstream V  Customer Bulletin No. 196
"March 23, 2012"
RIGHT HAND  -GIW
PAINT THICKNESS READINGS (MIL,0.001")  -aIW
LOWER  REAR
PAINT THICKNESS MEASUREMENT MAP  MEASUREMENTS COLLECTED BY  INSTRUMENT AND CAL EXPIRY  LEFT HAND  MID-  REAR  CHORD  N/A  N/A  N/A  N/A  N/A  N/A  N/A  N/A
AIRCRAFT S/N  SITE/REPAIR STATION  DATE  PAINT TYPE  UPPER  PT  MID-  CHORD  N/A  N/A  OL  N/A  11  N/A  12  N/A  13  N/A  14  N/A  15  N/A  16  AVG
INBOARD  OUTBOARD
MID-CHORD 8 PT @ 24" SPACING  REAR 16 PT @ 12" SPACING  LH SHOWN  RH SIMILAR  DEVIATIONS UP TO 1 INCH RADIUS FROM THE POINTS SHOWN ARE ACCEPTABLE
Page 6 of 8

### Page 8 (OCR)

Gulfstream V  Customer Bulletin No. 196
"March 23, 2012"
PAINT THICKNESS READINGS (MIL, 0.001")  RIGHT HAND  MID-  REAR  CHORD
MEASUREMENTS COLLECTED BY  INSTRUMENT AND CAL EXPIRY  LEFT HAND  REAR
SITE/REPAIR STATION  MORD
AIRCRAFT S/N  DATE  PAINT TYPE  PT  10  11  12  AVERAGE
PAINT THICKNESS MEASUREMENT MAP  Upper  Lower  Rudder Measurement Map
MID-CHORD 6 PT (@ 24" SPACING  REAR 12 PT @ 12" SPACING  Table 3
RUDDER  DEVIATIONS UP TO 1 INCH RADIUS FROM THE POINTS SHOWN ARE ACCEPTABLE
Page 7 of 8

### Page 9 (OCR)

Gulfstream V  Customer Bulletin No. 196
"March 23, 2012"
ELEVATOR RH
Allowable  Coating (mil)  5.0 Default  5.0 Default  5.0 Default
TOTAL COATING ALLOWANCE (MIL)  ELEVATOR LH  SIN  P/N  Note: Confirmation of part number and serial number must be made. If not corresponding with Table, default to 5.0 mil allowance
Allowable  Coating (mil)  5.0 Default  5.0 Default  5.0 Default  Allowable Paint Thickness  Table 4
S/N  0117  0133  S14
AILERON RH  P/N  1159CS55005-001  1159CS55005-001  1159CS55005-001
Allowable  Coating (mil)  5.5  8.7
CONTROL SURFACE COATING ALLOWANCE -S/N SPECIFIC  SIN  0117  0133  S14
AILERON LH  P/N  1159CS55004-003  1159CS55004-003  1159CS55004-005
Allowable  Coating (mil)  7.5  5.5
Model  GV
A/C S/N  612
Page 8 of 8

### Page 10

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Customer Bulletin prepared by Gulfstream Aerospace, 500 Gulfstream Road, P.O. Box 2206, Savannah, Georgia 31402-2206, USA.  
 
© 2012 Gulfstream Aerospace. 
All rights reserved, including the right to reproduce this publication. No part may be reproduced, stored in any retrieval system, or transmitted in any part or form or 
by any means, electronic, photocopying, microfilm, microfiche, mechanical, or otherwise, without prior written permission of Gulfstream Aerospace. 
 
This technical data is controlled under the Export Administration Regulations by General License TSU.  It may not be transferred to a third party 
without the prior written approval of the U.S. Department of Commerce. 
 
GA 611A 2/97 
Part I 
Service Reply Card 
 
Please fax this page to Gulfstream CMP at 800-944-1775 or 912-963-0265. 
 
The following Customer Bulletin (CB) has been addressed: 
 
CB Number A/C A/C Type Compliance Date 
981960  GV  
 
 
Aircraft Hours  
Aircraft Landings  
 
 
This Customer Bulletin is not applicable because: 
 
 Serial Number not affected 
 Appliance not installed 
______Previously complied with (annotate method of compliance below) 
 
 
   
Signature Title/Certificate Number Company 
 
 
Comments / Suggestions:

### Page 11

Gulfstream V Customer Bulletin No. 196 
“March 23, 2012” 
 
 
Customer Bulletin prepared by Gulfstream Aerospace, 500 Gulfstream Road, P.O. Box 2206, Savannah, Georgia 31402-2206, USA.  
 
© 2012 Gulfstream Aerospace. 
All rights reserved, including the right to reproduce this publication. No part may be reproduced, stored in any retrieval system, or transmitted in any part or form or 
by any means, electronic, photocopying, microfilm, microfiche, mechanical, or otherwise, without prior written permission of Gulfstream Aerospace. 
 
This technical data is controlled under the Export Administration Regulations by General License TSU.  It may not be transferred to a third party 
without the prior written approval of the U.S. Department of Commerce. 
 
GA 611A 2/97 
Part II 
Service Reply Card 
 
Please fax this page to Gulfstream CMP at 800-944-1775 or 912-963-0265. 
 
The following Customer Bulletin (CB) has been addressed: 
 
CB Number A/C A/C Type Compliance Date 
981961  GV  
 
 
Aircraft Hours  
Aircraft Landings  
 
 
This Customer Bulletin is not applicable because: 
 
 Serial Number not affected 
 No action required from Part I 
______Previously complied with (annotate method of compliance below) 
 
 
   
Signature Title/Certificate Number Company 
 
 
Comments / Suggestions:

### Page 12 (OCR)

GULFSTREAM AEROSPACE
GV AIRPLANE FLIGHT MANUAL
SUPPLEMENT NO. GV-2012-01
Gulfstream Aerospace Corporation  Supplement No. GV-2012-01
P.O. Box 2206
Savannah, Ga. 31402-2206
FAA APPROVED
AIRPLANE FLIGHT MANUAL
SUPPLEMENT
FOR
GULFSTREAM MODEL GV
REGISTRATION NUMBER:
SERIAL NUMBER:
This Supplement must be attached to the FAA Approved GV Airplane
excessive paint thickness on the fight control surfaces (SIN 612, 6ve
and 691).
The information contained herein supplements or supersedes the
information of the basic Airplane Flight Manual. For Limitations, Normal
Procedures, Abnormal Procedures, Emergency Procedures and
Performance information not contained in this supplement, consult the
basic Airplane Flight Manual.
FAA APPROVED: _  Down I Sapley
fr  William S. Whitton, Jr.
ODA Lead Administrator
ODA-511131-CE
DATE:  March 13,2012

### Page 13

This page intentionally left blank.

### Page 14

GULFSTREAM AEROSPACE 
GV AIRPLANE FLIGHT MANUAL 
SUPPLEMENT NO. GV-2012-01 
 
FAA APPROVED  BASIC ISSUE 
13 March 2012 Page 1 
Introduction 
Gulfstream has determined that, durin g application, the flight control 
surfaces paint thickness was not properly documented on a number of 
aircraft. Excessive paint thickness will affect the balance moment of the 
flight control surface and may result in reduced control surface flutter 
margin. 
The purpose of this Airplane Flight Manual Supplement is to allow 
temporary continued operation for non -conforming surfaces. It imposes 
a 6000 ft altitude ceiling reduction to allow for continued flight of aircraft 
with surfaces inspected and found having excess coatings.  
Section 0: PREFACE  
No Change 
Section 1: LIMITATIONS 
Under 01-03-30: Maximum Operating Altitude, add CB limitation, 
note, and altitude envelope: 
Altitude Operating Restriction for Continued Flight of Aircraft with 
Non-Conforming Coatings: 
 
Continued operation within CB compliance time and altitude restriction 
of 45,000 ft.

### Page 15 (OCR)

GULFSTREAM AEROSPACE
GV AIRPLANE FLIGHT MANUAL
SUPPLEMENT NO. GV-2012-01
NOTE:
Airplanes having flight control surfaces inspected and found
to have excessive paint thickness will have a maximum
operating altitude of 45,000 ft.
55
50
45  - MAX ALTITUDE 45,000 FT
43,500 FT
PRESSURE ALTITUDE - 1000 FT  40  VACH 0.885
35
32,160 FT
MACH 0.885
30  27,860 FT
MACH 0.85
20  Vmo = 340 KCAS
15  TAKEOFF &
LANDING
10
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
MACH NUMBER
96467B00
Figure 1. Altitude / Mach Flight Envelope
BASIC ISSUE  FAA APPROVED
Page 2  13 March 2012

### Page 16

GULFSTREAM AEROSPACE 
GV AIRPLANE FLIGHT MANUAL 
SUPPLEMENT NO. GV-2012-01 
 
FAA APPROVED  BASIC ISSUE 
13 March 2012 Page 3 
Section 2: NORMAL PROCEDURES 
No Change 
Section 3: ABNORMAL PROCEDURES 
No Change 
Section 4: EMERGENCY PROCEDURES 
No Change 
Section 5: PERFORMANCE 
No Change

### Page 17

BASIC ISSUE FAA APPROVED 
Page 4 13 March 2012 
 
This page intentionally left blank.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
