# Gulfstream Service Bulletin 280-53-287: No revision named

- Rights: © Gulfstream Aerospace Corporation. Filed by the FAA in regulations.gov docket FAA-2020-0334, the docket of AD 2020-15-02. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Gulfstream Service Bulletin 280-53-287](https://openairdocs.org/service-documents/gulfstream/sb-280-53-287.md)
- Title as filed: SB 280-53-287
- Pages: 17
- PDF: https://openairdocs.org/files/sha256/6f/6f/6f6fa254bf816ddd5a45bbb7a0d32c7381bdd381a14161a5ff4dbfb5080562c9
- Page: https://openairdocs.org/service-documents/gulfstream/sb-280-53-287/file/6f6fa254bf81

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SERVICE BULLETIN
SUBJECT
 
   
 
 
 
 
 
 
  
 
  
 
 
 
 
 
 
 
 
NUMBER 280-53-287 
 
 
  
 
FUSELAGE (ATA 53) – FUSELAGE – FORWARD 
FUEL TANK PROBE CLEARANCE 
VERIFICATION 
  
 
 
 
 
 
 
RECORD ONLY 
SEPTEMBER 26, 2019

### Page 2

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 1 of 15
FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION
PLANNING INFORMATION
202
1. Effectivity
Aircraft serial numbers 2001 through 2184
2. Concurrent Requirement
None
3. Reason
During check of the forward fuel tank it has been found that the distance between the 
probe to the forward fuel tank structure doesn’t meet the minimum 8.0 mm (0.31 inch) 
requirements (probe No. 1 to the lower skin and probe No. 3 to the upper skin and angle 
P/N 30P371126800-501).
4. Description
This service bulletin provides instruction to access to the forward probe No. 1 and aft 
probe No. 3 fuel probes in the forward fuel tank in order to measure each probe’s 
distance to the adjacent skin, and if the minimum 8.0 mm (0.31 inch) distance 
requirement is not met, implementation of this service bulletin’s rework instructions are 
required.
5. Compliance
Compliance with this service bulletin is mandatory no later than November 30, 2022.
6. Approval
This service bulletin has been reviewed by the Civil Aviation Administration of Israel 
(CAAI). The design content herein complies with the applicable Civil Aviation 
Regulations and is CAAI-approved.
7. Manpower
The following information is for planning purposes only:
Estimated man-hours: 20
8. Weight and Balance
None 
September 26, 2019

### Page 3

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 2 of 15
9. Electrical Load Data
No Change 
10. Software Accomplishment Summary
None 
11. References
G280 Aircraft Maintenance Manual (AMM), chapters 12, 20 and 28.
Gulfstream Aerospace LP G280 TC design change MOD G25-10077
Doc. 30P045/060794, table 3-1 and table 8-2
Doc. 30P650/071366 para 5.2.6
NOTE: This Service Bulletin incorporates design data approved under G280 TC 
design change MOD G25-10077 for installation on the standard type 
certificated aircraft. Approval for any deviation from the instructions 
contained in this service bulletin should be obtained, if required, from the 
local regulatory authority in accordance with the local relevant regulations.
12. Other Publications Affected
G280 AMM
G280 IPC
NOTE: Data concerning this service bulletin will be published in a future revision of 
the affected manual(s). This service bulletin will provide technical data until 
the revisions are published.
13. Interchangeability or In termixability of Parts
None
September 26, 2019

### Page 4

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 3 of 15
MATERIAL INFORMATION
1. Material - Availability
The parts required to accomplish this service bulletin are available by contacting Spare 
Parts Sales at 800-810-GULF (4853) or 912-965-4178.
2. Warranty Information - Structure
Labor and materials will be at no charge for this service bulletin if the aircraft is still 
within the related warranty period as of the original issue date of this service bulletin 
and work is accomplished within the recommended compliance time, as stated in this 
document, at a Gulfstream Authorized Warranty Facility or Factory Authorized Service 
Center with related aircraft model certification. * 
*Coverage is granted per the terms and conditions of the Gulfstream Aircraft Sales 
Agreement to the original purchaser or subsequent owner with appropriate Assignment 
of Warranties on file with Gulfstream.
NOTE: Additional labor hours incurred due to aircraft configuration or mechanical 
difficulties must be charged as a separate discrepancy and submitted for 
warranty consideration.
3. Material Necessary for Each Aircraft
A. Material to be Procured:
New P/N Keyword Old P/N Qty
30P371100008-501A01-505 Sensor bracket 
assembly
-1
30P371100008-501A01-507 Sensor bracket 
assembly
-1
30P371100008-501A01-509 Sensor bracket 
assembly
-1
NAS1802-3-10 Screw, hex head, 
cruciform recess, 
non-lock
-3
NAS1149C0332R Washer, flat, plain, #10 
size, 0.032 inch
-A / R
NAS6703U3 Bolt, t ension, hex head - 3
NAS1149C0363R Washer, flat, plain, #10 
size, 0.063 inch
-A / R
September 26, 2019

### Page 5

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 4 of 15
B. Materials Supplied by the Operator:
PR1750 sealant or equivalent
4. Reidentified Parts
None
5. Special Tooling
Fuel Quantity Test Set, GSE 2800142 or equivalent
Fuel Quantity Measurement System (FQMS), GSE 2820595 or equivalent
NAS1802-3-16 Screw, hex head, 
cruciform recess, 
non-lock
-1
NAS1149C0316R Washer, flat, plain, #10 
size, 0.016 inch
-A / R
New P/N Keyword Old P/N Qty
September 26, 2019

### Page 6

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 5 of 15
ACCOMPLISHMENT INSTRUCTIONS
CAUTION: PROTECT WIRE BUNDLE S, CONNECTORS AND SURROUNDING 
STRUCTURE DURING ANY MAINTENANCE PROCEDURES FROM 
SHAVINGS, DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY 
CLEANED WORK AREA THROUGHOUT THE PROCEDURE TO ENSURE THE 
INTEGRITY OF THE AFFECTED COMPONENT/SYSTEM. VISUALLY 
INSPECT WORK AREA USING ADDITIONAL LIGHT AS NECESSARY TO 
VERIFY ABSENCE OF ANY DEBRIS PRIOR TO COMPLETION OF 
PROCEDURE. FAILURE TO COMPLY MAY RESULT IN DAMAGE TO 
COMPONENTS AND/OR SYSTEMS.
1. Prepare aircraft for safe maintenance. Re fer to Aircraft Maintenance Manual (AMM), 
Chapter 20.
CAUTION: MAKE SURE ELECTRICAL POWER IS DISCONNECTED FROM AIRCRAFT. 
FAILURE TO COMPLY MAY RESULT IN INJURY TO PERSONNEL AND/OR 
DAMAGE TO AIRCRAFT.
2. Disconnect external electrical power from  aircraft. Refer to AMM, Chapter 20.
3. Defuel forward tank if required and drain fo rward fuel tank. Refer to AMM, Chapter 12.
4. Open forward fuel tank access panels  123BR, 123ER, 123FR and 152DR to access 
fuel probes No. 1 and No. 3. Refer to Figure 1.
5. Measure the gaps between the probes No. 1 and No. 3 and fuel structure (upper skin, 
lower skin and stringers).
A. If all gaps measured are equal  to or greater than 8.0 mm (0.31 inch), proceed to 
step 9.
B. If any gaps measured are less than 8.0 mm  (0.31 inch), proceed to the next step 
for that gap.
6. Remove forward fuel tank probes No. 1 and  No. 3 as required. Refer to AMM, Chapter 
28 and Figure 2.
7. Install forward fuel tank  probe No. 3 as follows:
NOTE: For screw, nut and bolt Installation refer to AMM, Chapter 20.
A. Install sensor bracket assembly, P/N 30P37110008-501A01-509 (1) using flat 
washer, P/N NAS1149C0332R (2) and bolt, P/N NAS6703U3 (3). 
Refer to Figure 3.
September 26, 2019

### Page 7

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 6 of 15
B. Install upper part of probe No. 3, P/N 30P884200200-001 on sensor bracket 
assembly as follows:
 (1) Install screw, P/N NAS1802-3-16 (4) with flat washer, P/N NAS1149C0332R 
(5) and adjust the gap between the probe and the fuel tank upper skin to be 
between 8.0 - 9.0 mm (0.31 - 0.35 inch) using washers,
P/N NAS1149C0332R (6), P/N NAS1149C0363R (7) and
P/N NAS1149C0316R (8) as required.
 (2) Reinstall lower part of probe No. 3, P/N 30P884200200-001 to its original 
position using screw, P/N NAS1802-3-10 (9), and flat washer,
P/N NAS1149C0332R (10).
 (3) Adjust the forward probe to attain 8.0 - 9.0 mm (0.31 - 0.35 inch) distance 
from inner surface of the fuel tank upper skin and stiffener,
P/N 30P371126800-501.
 (4) Ensure gap between probe and lower skin is equal to or greater than 8.0 
mm (0.31 inch).
C. Record the measured gaps fr om steps 7.B.(1) and 7.B.(3).
8. Install forward fuel tank  probe No. 1 as follows:
A. Install sensor bracket assembly , P/N 30P371100008-501A01-505 (11) and
P/N 30P371100008-501A01-507 (7) as follows (Refer to Figure 4):
 (1) Install bolts, P/N NAS6703U3 (13), with flat washers P/N NAS1149C0332R 
(14) and screw, P/N NAS1802-3-10 (15) with flat washer,
P/N NAS1149C0332R (16).
 (2) Install sensor bracket a ssembly, P/N 30P371100008-501A01-507 (7).
B. Reinstall probe No. 1, P/N 30P884200000-001 in place using bolt,
P/N NAS6703U3 (17) with washer, P/N NAS1149C0332R (18), and screw
P/N NAS1802-3-10 (19) with washer, P/N NAS1149C0332R (20).
C. Ensure gap between the af t probe and the fuel tank upper and lower skins is 
equal to or greater than 8.0 mm (0.31 inch).
D. Record the measured  gaps from step 8.C.
9. Install all fuel tank access panels removed in Step 4. for forward fuel tank probes 
removal.
September 26, 2019

### Page 8

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 7 of 15
10. Perform Fuel Quantity Measurement S ystem – Capacitance / Resistance Check
Adjustment / Test for the Forward Fuel Tank Probes as follows:
CAUTION: DAMAGE TO SENSITIVE COMPONENTS MAY OCCUR IF ELECTROSTATIC 
DISCHARGE SAFETY PRECAUTIONS ARE NOT OBSERVED.
Tank Unit (Fuel Probes) Capacitor Checks
A. Select the POWER ON / OFF switch to the ON position.
B. Verify there is no in dication of a low battery in the display window.
C. Wait 3 minutes befor e staring the test.
D. Select the FUNCTION SELECT kn ob to the MEASURE EXT Position.
E. Select the MEGGAR SELECT  knob to the TU position.
F. Connect a ground cable from the CHASSIS c onnector of the fuel quantity test set
to aircraft ground.
G. Connect test harness connector to  forward tank connector 84YP.
H. Connect the interface test harness connector J9 to the fuel quantity test set to
TANKS UNITS LO-Z connector.
I. Connect the interface test harness connector J7 to the fuel quantity test set to
TANKS UNITS HI-Z connector.
J. Verify all the switches on the interface box are selected to the GROUND position.
NOTE: In order to check each probe value, only select the applicable tank unit
(fuel probe) to TEST position. After reading capacitance value, return 
the switch to the GROUND position.
K. Select applicable interfac e box switch (SW-1, SW-2 or SW-3) to the TEST
position to check each tank unit (fuel probe) capacitance value. After reading
each capacitance value, return the switch to the GROUND position.
September 26, 2019

### Page 9

Gulfstream
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 8 of 15
L. Verify the measured tank units (fuel probes) capacit ance values are with the
specified ranges per the following table:
Forward Tank Wiring Checkout
NOTE: Reading of 0 ohm indicates a short circuit.
An indication of “-Or.-” while reading the SHIELD positions is an acceptable 
reading as this reading is infinitely higher than what can be read on the 
display for any SHIELD position and meets the requirement.
M. On the fuel quantity test set FREQUENCY SELECT knob, select MΩ.
N. On the interface box, select SW-1, SW-2 and SW-3 to the MEGGAR position.
O. Select SW-1 to the TEST position.
P. Verify measured values are as specified in Table 2.
Q. Select SW-1 back to  the MEGGAR position.
R. Select SW-2 to the TEST position.
S. Verify measured values ar e as specified in Table 2.
T. Select SW-2 back to the MEGGAR position.
U. Select SW-3 to the TEST position.
V. Verify measured values are as specified in Table 2.
W. Select SW-3 back to the MEGGAR position.
Table 1: 
FORWARD TANK UNITS (FUEL PROBES) CAPACITANCE VALUES
Tank Unit (Probe) Switch M inimum (pF) Maximum (pF)
1Q 2 149.30 165.10
2Q 1 113.00 125.10
3Q 3 76.10 84.20
September 26, 2019

### Page 10

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 9 of 15
X. For each of the fuel t ank harnesses, the following MEGGAR SELECT switch
positions are to be checked to verify that forward fuel probes insulation
resistance are within the required values:
11. After rework completion perfo rm leakage test as follows:
A. Refuel the forward tank per  AMM, Chapter 12 and verify that the maximum fuel
quantity reading of the forward tank is within the required range (refer to the
relevant row in table below according to the fuel type and temperature)
12. Check for fuel leaks ar ound work area and access panel(s) per the following
requirements:
(a) If fuel leak is detected, repair source of fuel leak.
Table 2: 
TEST POSITION MINIMUM VALUE (M Ω)
LO-Z/HI-Z 0.43 - 2.25
LO-Z/SHIELD 100
HI-Z/SHIELD 100
SHIELD/GND 100
LO-Z/GND 100
HI-Z/GND 100
Table 3: Fuel Quantity for FWD Fuel Tank
Fuel Tank Fuel Type
Fuel 
Temperature 
[°C]
Minimum 
Fuel 
Quantity 
(LBs)
Maximum 
Fuel 
Quantity 
(LBs)
Fuel 
Quantity 
results (LBs)
FWD TANK
Brayco 0 – 9 1450 1600
JET A 0 – 9 1390 1550
Brayco 10 – 30 1350 1560
JET A 10 – 30 1370 1510
Brayco 31 – 40 1310 1520
JET A 31 – 40 1350 1470
September 26, 2019

### Page 11

Gulfstream
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 10 of 15
(b) Use lint free cloth to clean all spil led fuel on aircraft and / or floor.
(c) Use compressed air to dry hard to reach areas.
13. Ensure work area is clean a nd clear of foreign objects (FOD).
14. Record compliance with this service bulleti n in the aircraft’s permanent maintenance
records and return aircraft to flight status.
15. Report compliance with this service bu lleting to Gulfstream Computerized
Maintenance Program (CMP) by uploading the attached service reply card, along with
the CMP task card(s) sign-off using MyGulfstream, MyCMP Document Upload or
e-mail to cmp.docproc@campsystems.com.
If technical assistance is required, contact your area Gulfstream Field Service 
Representative or call Gulfstream Customer Support at 800-810-GULF (4853).
September 26, 2019

### Page 12

Gulfstream.............................................
SERVICE BULLETIN
Service Bulletin No. 280-53-287
Page 11 of 15
Access Panel Location
Figure 1
September 26, 2019

### Page 13 (OCR)

Gulfstream
SERVICE BULLETIN
FWD
VIEW LKG DOWN
→ RHS
30P 884200200-001 REF.
FORWARD TANK
PROBE NO. 3
SECTION A-A
• 30P884200000 REF
FORWARD TANK PROBE NO. 1
SECTION B-B  SB280-53-287-001-S01
FWD Fuel Tank Probe No. 1 and No. 3
Figure 2
September 26, 2019  Service Bulletin No. 280-53-287
Page 12 of 15

### Page 14 (OCR)

Gulfstream
SERVICE BULLETIN
SEE DETAIL ON SHEET 2
OP884200200-001 REF
ORWARD TANK PROBE NO. :
10
SB280-53-287-002-S01
Probe No. 3 - Installation Rework
Figure 3 (Sheet 1)
September 26, 2019  Service Bulletin No. 280-53-287
Page 13 of 15

### Page 15 (OCR)

Gulfstream
SERVICE BULLETIN
- GAP BETWEEN PROBE
AND UPPER SKIN
- 30P884200200-001 REF.
FORWARD TANK
PROBE NO. 3
4
7  5
SB280-53-287-002-S02
Probe No. 3 - Installation Rework
Figure 3 (Sheet 2)
September 26, 2019  Service Bulletin No. 280-53-287
Page 14 of 15

### Page 16 (OCR)

Gulfstream
SERVICE BULLETIN
FORWARD TANK
PROBE NO. 1
30P884200000-001
11
15
16
12-
18
19  SB280-53-287-003-S01
20
Probe No. 1 - Installation Rework
Figure 4
September 26, 2019  Service Bulletin No. 280-53-287
Page 15 of 15

### Page 17

RECORD ONLY SERVICE BULLETIN 
GULFSTREAM G280 
SERVICE BULLETIN NO. 280-53-287 
SERVICE REPLY CARD 
 
PROPRIETARY NOTICE:  These materials include proprietary information and data of Gulfstream Aerospace Corporation.  
Unauthorized distribution is strictly prohibited. ©2018 Gulfstream Aerospace Corporation.  All rights reserved. 
 
EAR EXPORT CONTROLLED WARNING:  This document contains technical data that is subject to U.S. Export Controls.  Release 
to foreign persons, export transfer or re-export of this technical data requires approval from the Department of Commerce. 
 
 
Please upload this page, along with the CMP task card(s) sign-off using MyGulfstream, 
MyCMP Document Upload, or e-mail to cmp.docproc@campsystems.com 
  
This is a Record Only Service Bulletin with its own unique CMP code. Operators that have 
accomplished this SB and want to show compliance in CMP must contact their CMP 
analyst to have this custom code entered into CMP. 
 
The following Service Bulletin (SB) has been addressed: 
SB CMP NUMBER A/C AIRCRAFT TYPE COMPLIANCE  DATE 
982870  Gulfstream G280  
 
Aircraft Hours _______________ 
Aircraft Landings__________________  
 
This Service  Bulletin is not applicable because: 
 
_______ Serial Number not affected 
_______ Equipment not installed 
_______Previously complied with (annotate method of compliance below) 
_______Other (explain reason below) 
 
 
   
SIGNATURE TITLE / CERTIFICATE    
NUMBER 
COMPANY 
 
   
COMMENTS / SUGGESTIONS / ACTIONS TAKEN:

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.