# Leonardo Emergency Alert Service Bulletin 109S-079: Revision A

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2020-1139; AD 2021-05-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Emergency Alert Service Bulletin 109S-079](https://openairdocs.org/service-documents/leonardo/109s-079.md)
- Title as filed: Leonardo Helicopters EASB 109S-079 Rev A
- Pages: 16
- PDF: https://openairdocs.org/files/sha256/7e/dd/7edd0e2da70cb60f0ae7283c687cba6afc3ac43353d05feb476d14d8e411b742
- Page: https://openairdocs.org/service-documents/leonardo/109s-079/file/7edd0e2da70c

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

N° 1 09S-079 
DA TE:  May 28, 2018 
REV. : A -June 4, 2018 
P
ag e 1 of 15 
TITLE
AT
A 53 - BAGGAGE FAIRING ASSY FWD UP P/N 109-0344-31-1 01, MODIFICATION OF 
REVISION LOG 
Revision A is issued to: 
- 
modify and add some alternatives to the required materials 
- add adhesive RTV732 as preferable to adhesive EC776 
- correct the last note of the accomplishment instructions (Part II^) 
Revision bars in the margin identify changes.  
Helicopters that have complied with previous issues of this Service Bulletin do not need any 
additional action. 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
EMERGENCY ALERT
SERVICE BULLETIN

### Page 2

S.B. N°109S-079 EMERGENCY ALERT  
 DATE: May 28, 2018 
Page 2 of 15 REVISION: A - June 4, 2018 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
The A109S Leonardo Helicopters S/N 22702 and 22703. 
B. COMPLIANCE 
Part I^: 
Before the next flight. 
 
Part II^:  
Within and no later than 15 (fifteen) flight hours since the issuance of revision / of this 
Service Bulletin. 
NOTE 
If Part II^ is applied before Part I^, consider Part I^ as not 
applicable. 
 
C.  CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to provide the necessary instructions on how to 
both install a new decal with temporary limitation related to baggage compartment and 
introduce a new page within RFM (Part I^) and  modify the baggage fairing assy fwd 
up P/N 109-0344-31-101 (Part II^). 
E. DESCRIPTION 
A case of wire chafing, which led to fire ignition and smoke in the baggage 
compartment, has been reported on an AW109SP helicopter.  
The investigation concluded that this chafing was caused by the blind rivets of the 
hinge P/N 109-0344-31-123 pushed towards the cables arriving at the 50 Amps CB 
installed on the CB panel by unrestrained baggage. 
In the meantime the final corrective action is put in place, Leonardo Helicopters, as a 
precautionary measure, issued this Service Bulletin in order to introduce a temporary 
limitation to the baggage compartment loading (Part I^) until the introduction of Part II^.

### Page 3

S.B. N°109S-079 EMERGENCY ALERT    
DATE: May 28, 2018 
REVISION: A - June 4, 2018 Page 3 of 15 
The Part II of this SB provide the instructions to shim the installation of the baggage 
fairing assy fwd up P/N 109-0344-31-101 to move it away from the CB panel and 
install a silicon rubber protection over the blind rivets of the hinge. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA 
nr. EASA.21J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness 
Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin the following Maintenance-Man-Hours (MMH) are 
deemed necessary: 
Part I^ : approximately 1 (one) MMH 
Part II^ : approximately 3 (three) MMH 
MMH are based on hands-on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
DATA MODULE DESCRIPTION PART 
DM01 0B-A-00-20-00-00A-120A-A Helicopter on ground for a safe 
maintenance 
I,  II 
DM02 0B-A-06-41-00-00A-010A-A Access doors and panels - 
General data 
II

### Page 4

S.B. N°109S-079 EMERGENCY ALERT  
 DATE: May 28, 2018 
Page 4 of 15 REVISION: A - June 4, 2018 
2) ACRONYMS 
AFT After 
CB Circuit Breaker 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
FWD Forward 
LHD Leonardo Helicopters Division 
MMH Maintenance Man Hours 
N.A. Not Applicable 
P/N Part Number 
3) ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
0B-A-IPB-00-X Illustrated Parts Data Publication 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 5

S.B. N°109S-079 EMERGENCY ALERT    
DATE: May 28, 2018 
REVISION: A - June 4, 2018 Page 5 of 15 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
PART I^ 
N.A. 
PART II^ 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 109G5340P02-101  Baggage Fairing Inst. Retromod REF    
2 109G5340P02-103  Gasket (4.76 mm) REF. . (1)  
3 109G5340P02-105  Gasket (0.8 mm) REF. . (2)  
4 109G5340P02-113  Gasket (4.76  mm) REF. . (1)  
5 109G5340P02-115  Gasket (0.8 mm) REF. . (2)  
6 109G5340P02-107  Washer (Teflon) REF. . (3)  
7 109G5340P02-109  Washer (Teflon) REF. . (3)  
8 109G5340P02-111  Washer (Teflon) REF. . (3)  
9 A428A08C09 120-225C08-09 or AN525-832R9 Screw 4 .   
10 A428A08C10 120-225C08-10 or AN525-832R10 Screw 2 .   
2) CONSUMABLES 
The following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 
11 199-05-152 TY I, CL 2 Adhesive RTV732 AR (4)(5) II 
12 Commercial Adhesive Flexon F246 AR (4) II 
13 A-A-59588 CL 2A Grade 40 color 
red thickness 4,76 mm  Silicone rubber sheet  AR (1) (4) II 
14 A-A-59588 CL 2B Grade 40 Orange 
thickness 0,80 mm Silicone rubber sheet  AR (2) (4) II 
15 AMS3656 Type I, external diameter 
10mm Teflon Tube  AR (3) (4) II 
3) LOGISTIC MATRIX 
N.A. 
NOTE 
(1) Q.ty 1 gasket P/N 109G5340P02-103 and -113 to be obtained from silicone rubber 
sheet (A-A-59588 CL 2A Grade 40 thickness 4,76 mm - Ref to item 13 -). For 
dimensions see Figure 3. 
(2) Q.ty 1 gasket P/N 109G5340P02-105 and -115 to be obtained from silicone rubber 
sheet (A-A-59588 CL 2B Grade 40 thickness 0,8 mm - Ref to item 14 -). For

### Page 6

S.B. N°109S-079 EMERGENCY ALERT  
 DATE: May 28, 2018 
Page 6 of 15 REVISION: A - June 4, 2018 
dimensions see Figure 3. 
(3) Q.ty 2 washers P/N 109G5340P02-107, -109 and -111 to be obtained from teflon 
tube (AMS3656 Type I, external diameter 10mm - Ref to item 15 -). For 
dimensions see Figure 3. 
(4) Local supply. 
(5) Adhesive EC776 (C111 - 199-05-107 TY II, CL 5) can be used as alternative. 
B. SPECIAL TOOLS 
N.A. 
C. INDUSTRY SUPPORT INFORMATION 
WARRANTY: Owners/Operators who comply with the instructions of this Service 
Bulletin no later than the applicable date in the “Compliance” section will be eligible to 
receive REQUIRED MATERIALS on free of charge basis, except for Consumable 
Materials and Special Tools.  
NOTE: Customers who fail to comply with the instructions in this Service Bulletin 
before the compliance date are not eligible for the aforementioned special policy.  
Please Issue relevant MMIR form to your Warranty Administration Dpt.

### Page 7

S.B. N°109S-079 EMERGENCY ALERT    
DATE: May 28, 2018 
REVISION: A - June 4, 2018 Page 7 of 15 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTES 
a) Replace the hardware found damaged during the 
following operations. 
b) Let adhesive cure at room temperature for at least 
4 hours unless otherwise specified. 
c) At the end of the rework operations, remove all the 
used tools and completely remove any working 
residual using a suitable air cleaner. 
d) All lengths are in mm. 
PART I^ 
1
. In accordance with the instruction given in the DM 09-A-00-20-00-00A-120A-A, prepare 
the helicopter on ground for a safe maintenance. 
2. Locally manufacture the new decal shown in Figure 5 and install on internal side of 
baggage door D8. 
3. Cut Figure 6 along the dashed line and insert it before the RFM page 1-28. The new 
page supersedes the next one. 
4. Return the helicopter to a ready to flight condition and record for compliance with Part I 
of this Service Bulletin on the helicopter logbook. 
 
 
PART II^ 
1. In accordance with the instructions given in the DM 09-A-00-20-00-00A-120A-A, prepare 
the helicopter on ground for a safe maintenance. 
2. In accordance with the DM 0B-A-06-41-00-00A-010A-A, open the baggage door D8. 
NOTE 
B
efore removing the fairing, disconnect the baggage light 
P/N B3550-307 (Ref. step 3). 
3. With reference to Figure 1, remove the baggage fa iring assy fwd up  
P/N 109-0344-31-101. 
4. With reference to Figure 2, inspect the installation of the terminal lugs arriving at the CB 
panels. 
4.1 Remove the rubber protections P/N 109-0746-52-105 and -107. 
4.2 Inspect the installation of the terminal lugs and if necessary restore it referencing 
to figure 2.

### Page 8

S.B. N°109S-079 EMERGENCY ALERT  
 DATE: May 28, 2018 
Page 8 of 15 REVISION: A - June 4, 2018 
4.3 Reinstall the rubber protections P/N 109-0746-52-105 and -107. 
NOTE 
S
ee Figure 3 to obtain the gasket P/N 109G5340P02-103 
and P/N 109G5340P02-105 from the Consumables 13 
and 14 (Ref. step 5). 
5. With reference to Figure 3 and 4, install the gas kets P/N 109G5340P02-103 and P/N 
109G5340P02-105 on the hinge P/N 109-0344-31-123 as described in the following 
procedure. 
5.1 With reference to Figure 3 detail C and section E-E, temporarily install the gasket  
P/N 109G5340P02-103 in its location on the hinge and countermark on it the 
position of the n. 8 hinge rivets. 
5.2 Remove the gasket P/N 109G5340P02-103 from the baggage fairing assy fwd up 
and carefully drill n. 8 Ø 6.00 mm holes. 
5.3 With reference to Figure 3 section E-E, install the gasket P/N 109G5340P02-103 
on the hinge and the gasket P/N 109G5340P02-105 on the gasket P/N 
109G5340P02-103 by mean of adhesive 199-05-152 TY I, CL 2. 
NOTE 
S
ee Figure 3 to obtain the gasket P/N 109G5340P02-113 
and P/N 109G5340P02-115 from the Consumables 13 
and 14 (Ref. step 6). 
6. With reference to Figure 3 and 4, install the gas kets P/N 109G5340P02-113 and P/N 
109G5340P02-115 on the hinge P/N 109-0344-31-115 as described in the following 
procedure. 
6.1 With reference to Figure 3 detail C and section E-E, temporarily install the gasket  
P/N 109G5340P02-113 in its location on the hinge and countermark on it the 
position of n. 8 hinge rivets. 
6.2 Remove the gasket P/N 109G5340P02-113 from the baggage fairing assy fwd up 
and carefully drill n. 8 Ø 6.00 mm holes. 
6.3 With reference to Figure 3 section E-E, install the gasket P/N 109G5340P02-113 
on the hinge and the gasket P/N 109G5340P02-115 on the gasket P/N 
109G5340P02-113 by mean of adhesive 199-05-152 TY I, CL 2.

### Page 9

S.B. N°109S-079 EMERGENCY ALERT    
DATE: May 28, 2018 
REVISION: A - June 4, 2018 Page 9 of 15 
NOTE 
F
ix the spacers with adhesive Consumable 12 to keep 
them in position (Ref. step 7). 
NOTE 
See Figure 3 to obtain the the washers P/N 
109G5340P02-107, P/N 109G5340P02-109 and P/N 
109G5340P02-111 from the Consumable 15 (Ref. step 
7). 
7. With reference to Figure 4, install the washer P/ N 109G5340P02-107, P/N 
109G5340P02-109 and P/N 109G5340P02-111 on the upper surface of the baggage 
fairing assy fwd up P/N 109-0344-31-101. 
8. With reference to Figure 1 and 4, reinstall the baggage fairing assy fwd up  
P/N 109-0344-31-101 replacing the indicated screws with the new screws P/N 
A428A08C09 and A428A08C10. 
NOTE 
I
f Part II^ is applied before Part I^ of this Service 
Bulletin, go to step 11. 
9. Remove the decal installed on baggage door as per  Part I^ of this SB. 
10. Remove the page insert on RFM as per Part I^ of this SB. 
11. Return the helicopter to a ready to flight condition and record for compliance with Part II 
of this Service Bulletin on the helicopter logbook. 
12. Send the attached compliance form to the following mail box: 
 aw109.mbx.aw@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal 
and compile the “Service Bulletin Application Communication”.

### Page 10 (OCR)

* LEONARDO
HELICOPTERS
109-0344-31-101
FAIRING ASSY FWD UP (REF)
DETAIL C  ¢в
109-0344-31-111
DOOR AFT (REF)
VIEW A
Figure 1
S.B. N°109S-079 EMERGENCY ALERT
DATE: May 28, 2018
Page 10 of 15  REVISION: A - June 4, 2018

### Page 11 (OCR)

: LEONARDO
HELICOPTERS
109-0746-52-107  109-0746-52-105
RUBBER PROTECTION (REF)  RUBBER PROTECTION (REF)
"HATTERY BUS
VIEW D
(Terminal Lugs Installation - for reference only)
Typ. for both CB panels
Figure 2
S.B. N°109S-079 EMERGENCY ALERT
DATE: May 28, 2018
REVISION: A - June 4, 2018  Page 11 of 15

### Page 12 (OCR)

* LEONARDO  HELICOPTERS
100.01
109G5340P02-113 GASKET
109G5340P02-103 GASKET
109G5340P02-115 GASKET
109G5340P02-105 GASKET
DETAIL C
165
109G5340P02-103 and 109G5340P02-105 GASKET
BOND -113 TO STRUCTURE AND -113 TO
115 WITH ADHESIVE 199-05-152 TY I CL 2
(TYP FOR -103 AND -105)
140.0
109G5340P02-113 and 109G5340P02-115 GASKET
-115 REF
-113 REF
@ 10.0  • 10.0  ø 10.0
SECTION E-E  ø 4.27 - 4.39  ø 4.27 - 4.39  ø 4.27 - 4.39
109G5340P02-107  109G5340P02-109  109G5340P02-111
WASHER  WASHER  WASHER
Figure 3
S.B. N°109S-079 EMERGENCY ALERT
DATE: May 28, 2018
Page 12 of 15  REVISION: A - June 4, 2018

### Page 13 (OCR)

: LEONARDO
HELICOPTERS
109G5340P02-111
WASHER
BOND TO STRUCTURE WITH
ADHESIVE FLEXON F246
A428A08C09 SCREW
TYP 4 PLCS
109G5340P02-107
WASHER
BOND TO STRUCTURE WITH
ADHESIVE FLEXON F246
A428A08C10 SCREW
/ TYP 2 PLCS
109G5340P02-109
WASHER
BOND TO STRUCTURE WITH
ADHESIVE FLEXON F246
109-0344-31-115
HALF HINGE (REF)
109-0344-31-113
SHIM (REF)
109-0344-31-111  VIEW B
DOOR FWD (REF)
109-0344-31-123
HINGE (REF)
109-0344-31-121
SHIM (REF)
109-0344-31-119
DOOR AFT (REF)
Figure 4
S.B. N°109S-079 EMERGENCY ALERT
DATE: May 28, 2018
REVISION: A - June 4, 2018  Page 13 of 15

### Page 14

Figure 5 
 S.B. N°109S-079 EMERGENCY ALERT  
 DATE: May 28, 2018 
Page 14 of 15 REVISION: A - June 4, 2018 
 
 
 
 
 
 
 
 
 
 
DECAL 
SCALE 1 : 1

### Page 15 (OCR)

≤ LEONARDO  HELICOPTERS
Section 1  A109S TREKKER - RFM
Limitations  Document N°
109G0040A034
MISCELLANEOUS LIMITATIONS
Pilots) must not use sun glasses with polarized type lenses.
FUEL MANAGEMENT SYSTEM
It is prohibited to rely upon Fuel Flow data for flight planning and navigation.
PASSENGERS CABIN LIMITATIONS
Baggage storage under the seat is prohibited.
BAGGAGE COMPARTMENT LIMITATIONS
NO LOAD ALLOWED IN THE BAGGAGE COMPARTMENT
TRAINING MODE OF THE ENGINES
Use of the engines Training Mode is restricted to Category A Training proce
dure.
Page 1-28a  SB 109S-079
Figure 6
S.B. N°109S-079 EMERGENCY ALERT
DATE: May 28, 2018
REVISION: A - June 4, 2018  Page 15 of 15

### Page 16

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.