# Agusta Alert Service Bulletin 119-156: No revision named

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2025-2264, the docket of AD 2025-17-10. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Agusta Alert Service Bulletin 119-156](https://openairdocs.org/service-documents/leonardo/sb-119-156.md)
- Title as filed: ASB 119-156
- Pages: 15
- PDF: https://openairdocs.org/files/sha256/2e/ce/2ececc539ea29988cc0d975dcb83f78f737edc562f9d21a861c4035cee3a729a
- Page: https://openairdocs.org/service-documents/leonardo/sb-119-156/file/2ececc539ea2

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 of 14 
N° 119-156 
DATE:  July 1, 2025
REV. :  / - January 21, 2025 
TITLE 
ATA 67 – CYCLIC CONTROL SYSTEM PITCH AND ROLL ACTUATORS ATTACHING 
BOLTS INSPECTION 
REVISION LOG 
First Issue 
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
ALERT
SERVICE BULLETIN

### Page 2

S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 2 of 14 REVISION: / 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
 All A119 helicopters. 
 All AW119MKII helicopters from S/N 14701 to S/N 14999, from S/N 15001 to 
S/N 15035, from S/N 15521 to S/N 15535 and from S/N 15801 to S/N 15927 
(except S/N 15809 and S/N 15810). 
B. COMPLIANCE 
Within and not later than 25 flight hours after the issue of this Service Bulletin. 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is consequence of an in-service event, related to human factor, 
concerning the incorrect installation direction of the bolt that connects the roll (lateral) 
actuator assy to the related bellcrank assy of the cyclic control system in the upper 
deck area. 
Leonardo Helicopters issued this Service Bulletin in order to prescribe a visual 
inspection of the installation direction of the bolts that connect the pitch (longitudinal) 
and roll (lateral) actuator assemblies to the related bellcrank assemblies and to 
prescribe, if necessary, the required corrective actions. 
 
To avoid future potential issues, Leonardo Helicopters updated the following AMP DMs 
with the AMP issue 009 dated on February 19, 2025: 
 19-A-67-10-00-00A-271A-A – Rotor control – Adjust; 
 19-A-67-12-07-00A-520A-A - Roll linear actuator - Remove procedure; 
 19-A-67-12-07-00A-720A-A - Roll linear actuator - Install procedure; 
 19-A-67-12-10-00A-520A-A - Pitch linear actuator - Remove procedure; 
 19-A-67-12-10-00A-720A-A - Pitch linear actuator - Install procedure; 
and the IPD DM 19-A-67-12-00-010-941A-A - Cyclic pitch control installation – 
Illustrated Parts Data with the IPD issue 008 dated on February 19, 2025 (refer to IETP 
issue 32, update of March 31, 2025). 
The previous revisions of the above DMs are no longer considered applicable.

### Page 3

S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 3 of 14 
E. DESCRIPTION 
This Service Bulletin provides the necessary instructions to perform a visual inspection 
of the two bolts that connect the bellcrank assemblies to the pitch and roll actuator assy 
of the longitudinal and lateral cyclic control lines in the upper deck area, to verify their 
installation direction. Based on the inspection findings, it is prescribed to perform the 
installation correction and the adjust procedure of the cyclic control lines or to contact 
the PSE of Leonardo Helicopters in order to receive further instructions. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA 
nr. EASA.21.J.005.  
For helicopters registered under Aviation Authorities other than those of EASA Member 
States, the applicable Aviation Authority’s approval must be verified with the Local 
Aviation Authority prior to applying the Service Bulletin. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness 
Directives. If an aircraft listed in the effectivity embodies a modification or repair not 
Leonardo Helicopters certified and affecting the content of this Service Bulletin, it is 
responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority 
having jurisdiction on the aircraft, for any adaptation necessary before incorporation of 
the present Service Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin, the following MMH are deemed necessary: 
 approximately one (1), to perform the bolt inspection; 
 approximately thirty-nine (39), to perform the rigging procedure (ONLY in case 
of findings). 
 
MMH are based on hands-on time and can change with helicopter configuration, 
personnel and facilities available. MMH are not comprehensive of the overall hours 
necessary to get access to work areas and to remove all the equipment that interferes 
with the application of the prescribed instructions. 
H. WEIGHT AND BALANCE 
N.A.

### Page 4

S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 4 of 14 REVISION: / 
I. REFERENCES 
I.1 PUBLICATIONS 
Following Data Modules refer to AMP: 
DATA MODULE DESCRIPTION PART 
DM01 19-A-00-20-00-00A-120A-A Helicopter safety – Pre-
operation (make helicopter safe 
for maintenance) 
- 
DM02 19-A-06-40-00-00A-018A-A Access provisions – 
Introduction 
- 
DM03 19-A-12-40-02-00A-730A-A External hydraulic power – 
Connect procedure 
- 
DM04 19-A-12-40-02-00A-510A-A External hydraulic power – 
Disconnect procedure 
- 
DM05 19-A-67-10-00-00A-271A-A Rotor control – Adjust - 
 
I.2 ACRONYMS & ABBREVIATIONS 
AMDI Aircraft Material Data Information 
AMP Aircraft Maintenance Publication 
AR As Required 
DM Data Module 
DOA Design Organization Approval 
EASA European Union Aviation Safety Agency 
IPD Illustrated Parts Data publication 
ITEP Illustrated Tools and Equipment Publication 
MMH Maintenance Man Hours 
N.A. Not Applicable 
P/N Part Number 
PSE Product Support Engineer 
SB Service Bulletin 
S/N Serial Number 
I.3 ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
19-A-AMP-00-X – Aircraft Maintenance Publication (AMP) 
19-A-IPD-00-X – Illustrated Parts Data publication (IPD)

### Page 5

S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 5 of 14 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 6

S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 6 of 14 REVISION: / 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
A.1 PARTS 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 AN174-13  Bolt AR . (1) (2) (3) - 
2 MS17825-4  Nut AR . (1) (2) - 
3 MS24665-151  Cotter pin AR . (1) (2) (3) - 
 
Refer also to IPD for the spares materials required to comply with the AMP DMs 
referenced in the accomplishment instructions. 
A.2 CONSUMABLES 
Refer to AMDI for the consumable materials required to comply with the AMP DMs 
referenced in the accomplishment instructions. 
A.3 LOGISTIC MATRIX 
N.A. 
NOTES 
(1) This item is necessary in maximum q.ty 2 per helicopter, based on the result of 
the inspection. 
(2) Item to be procured as local supply. 
(3) If requested to Leonardo Helicopters, please check the relevant MSQ with your 
Order Administrator based on your fleet. Maximum q.ty 1 bag for Customer’s fleet 
could be provided. 
B. SPECIAL TOOLS 
The following special tools, or equivalent, are necessary to accomplish this Service 
Bulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
4 Commercial Source light 1 (B1) - 
5 Commercial Mirror 1 (B1) - 
 
Refer also to ITEP for the special tools required to comply with the AMP DMs 
referenced in the accomplishment instructions. 
SPECIAL TOOLS NOTES 
 Item to be procured as local supply.

### Page 7

S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 7 of 14 
C. INDUSTRY SUPPORT INFORMATION 
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance” section will be eligible to receive required 
materials on free of charge basis, except for Consumable Materials and Special Tools. 
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy. 
Please Issue relevant MMIR form to your Warranty Administration Dpt. including the 
Inspection Report Form in Figure 4, completed of pictures, signed and stamped. 
If the required documentation is not provided, the relevant MMIR will be rejected.

### Page 8

S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 8 of 14 REVISION: / 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTES 
a) Place an identification tag on all components that 
are re-usable, including the attaching hardware that 
have been removed to gain access to the 
modification area and adequately protect them until 
their later re-use. 
b) Exposed thread surface and nut must be protected 
using a layer of tectyl according to MIL-C-16173 
grade I. 
c) All lengths are expressed in mm. 
1. In accordance with AMP DM 19-A-00-20-00-00A-120A- A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. In accordance with AMP DM 19-A-06-40-00-00A-018A-A and with reference to Figures 1 
thru 3, remove all external panels required to gain access to the area affected by the cyclic 
control assy bolts inspection and perform the following procedure: 
2.1 With reference to Figure 3, perform a visual inspection to verify the installation 
position of the bolts that attach the pitch (longitudinal) actuator assy  
P/N 109-0020-86-3 and the roll (lateral) actuator assy P/N 109-0020-86-1, 
respectively to the pitch (longitudinal) bellcrank assy P/N 109-0020-69-9 (or  
P/N 109-0020-69-113) and the roll (lateral) bellcrank assy P/N 109-0020-55-9 (or 
P/N 109-0020-55-113): 
 If the bolts are not installed correctly, as shown in the Figure 3, proceed 
with the following step 2.2. 
 If the bolts are installed in the correct position, as shown in the Figure 3, 
proceed with the step 3. 
2.2 In accordance with AMP DM 19-A-12-40-02-00A-730A-A, connect the helicopter 
to the external hydraulic power supply and set it to 103.42 bar (1500 psi).

### Page 9

S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 9 of 14 
2.3 Move the cyclic control stick through its full travel and with reference to Figure 3, 
using a source light and a mirror, as necessary, perform a visual inspection in the 
area between the incorrectly installed bolt and the support assy  
P/N 109-0020-70-105 to verify the presence of interferences and/or any type of 
damage: 
 If no interferences and/or damages are detected during the inspection, 
proceed with the following step 2.4 
 In case of any interference and/or damage findings, contact the PSE to 
receive further instructions. 
NOTE 
“XXXXX” in the subject line below is the helicopter S/N. 
2.4 Compile the Inspection Report Form in Figure 4 a nd send it with Subject line  
“SB 119-156 – S/N XXXXX Inspection Report Form” to the following mail box: 
   engineering.support.lhd@leonardo.com  
and (for North, Central and South America) also to: 
   AWPC.Engineering.Support@leonardocompany.us 
2.5 With reference to Figure 2, remove and retain the fixing hardware listed below that 
attaches the pitch (longitudinal) actuator assy P/N 109-0020-86-3 or the roll 
(lateral) actuator assy P/N 109-0020-86-1, respectively to the pitch (longitudinal) 
bellcrank assy P/N 109-0020-69-9 (or P/N 109-0020-69-113) or the roll (lateral) 
bellcrank assy P/N 109-0020-55-9 (or P/N 109-0020-55-113), as applicable: 
 the bolt P/N AN174-13; 
 the washer P/N A160A0432K; 
 n°2 washers P/N NAS1149D0432K; 
 the nut P/N MS17825-4 (discard); 
 the cotter pin P/N MS24665-151 (discard). 
2.6 With reference to Figure 2, perform a visual inspection on the bolt previously 
removed to verify the presence of any type of damage: 
 In case of damage, replace it with a new serviceable one; 
 If no damage is detected during the inspection, retain the current bolt.

### Page 10

S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 10 of 14 REVISION: / 
2.7 With reference to Figure 2, fix the pitch (longitudinal) actuator assy  
P/N 109-0020-86-3 or the roll (lateral) actuator assy P/N 109-0020-86-1, 
respectively to the pitch (longitudinal) bellcrank assy P/N 109-0020-69-9 (or 
P/N 109-0020-69-113) or the roll (lateral) bellcrank assy P/N 109-0020-55-9 (or 
P/N 109-0020-55-113), as applicable, by means of the previously removed fixing 
hardware listed below, ensuring it is installed in the correct orientation: 
 the bolt P/N AN174-13; 
 the washer P/N A160A0432K; 
 n°2 washers P/N NAS1149D0432K; 
 the new nut P/N MS17825-4; 
 the new cotter pin P/N MS24665-151. 
2.8 With reference to Figure 2, torque the bolt to 2.82 – 3.95 Nm. 
2.9 In accordance with AMP DM 19-A-67-10-00-00A-271A-A, perform the cyclic 
control system rods adjustment procedure and the mixing control stop screw 
rigging procedure (refer to step 2 and step 4 of DM). 
2.10 In accordance with AMP DM 19-A-12-40-02-00A-510A-A, disconnect the 
helicopter from the external hydraulic power supply. 
3. In accordance with AMP DM 19-A-06-40-00-00A-018A-A, re-install all external panels 
previously removed. 
4. Return the helicopter to flight configuration and record for compliance with this Service 
Bulletin on the helicopter logbook. 
5. Gain access to My Communications section on Leonardo Customer Portal and compile 
the “Service - Technical Bulletin Application”.  
As an alternative, send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com  
and (for North, Central and South America) also to: 
 AWPC.Engineering.Support@leonardocompany.us 
 
  Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione 

### Page 11

Figure 1 
S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 11 of 14 
 
 
FRONT VIEW
STRUCTURE AND SYSTEMS ARE P ARTIALLY OMITTED FOR BETTER CLARITY PURPOSE
109-0020-69-9 (OR 109-0020-69-1 13)
PITCH LONGITUDINAL BELLCRANK ASSY
(REF)
109-0020-55-9 (OR 109-0020-55-113)
R
OLL  BELLCRANK ASSYLATERAL
(REF)
109-0020-86-1
R
OLL LA TERAL ACTUATOR ASSY
(REF)
WL
1550.0
REF 
WL
1400.0
REF 
BL
9.0 52
RH REF 
 A 
 (SEE FIGURE ) 2
109-0020-86-3
PITCH LONGITUDINAL ACTUATOR ASSY
(REF)
  C
 (SEE FIGURE 3) 
109-0020-70-105 SUPPORT ASSY
(REF)

### Page 12

Figure 2 
 S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 12 of 14 REVISION: / 
 
 
TO PERFORM ONLY IF THE BOL T IS 
INSTALLED IN THE DIRECTION INCORRECT 1
DETAIL B
ROTA TED 90° CW
STRUCTURE AND SYSTEMS ARE PARTIALL Y OMITTED FOR BETTER CLARITY PURPOSE
VIEW A
TOP VIEW
STRUCTURE AND SYSTEMS ARE PARTIALLY OMITTED FOR BETTER CLARITY PURPOSE
(REFER TO FIGURE 1)
REMOVE/RE-INSTALL:
AN174-13 BOLT (DISCARD, IF NECESSARY)
A160A0432K WASHER (UNDER BOLT HEAD)
NAS1149D0432K WASHER (QTY 2) 
(UNDER A160A0432K WASHER AND UNDER NUT) 
MS17825-4 NUT (DISCARD)
 COTTER PIN (DISCARD)MS24665-151
INSTALL:
MS17825-4 NUT (NEW ITEM)
 COTTER PIN (NEW ITEM)MS24665-151
TORQUE TO:
2.82 – 3.95 Nm
1
109-0020-86-3
PITCH LONGITUDINAL ACTUA TOR ASSY
(REF)
109-0020-86-1
R
OLL LATERAL ACTUATOR ASSY
(REF)
109-0020-69-9 (OR 109-0020-69-113)
P
ITCH LONGITUDINA BELLCRANK ASSY
(REF)
109-0020-55-9 (OR 109-0020-55-1 13)
R
OLL  BELLCRANK ASSYLATERAL
(REF)
DETAIL B
109-0020-86-1
ROLL LATERAL ACTUATOR ASSY
(REF)
109-0020-86-3
P
ITCH LONGITUDINAL ACTUATOR ASSY
(REF)
FWD
FWD

### Page 13

Figure 3 
S.B. N°119-156 ALERT 
DATE: July 1, 2025 
REVISION: / Page 13 of 14 
 
 
INCORRECT DIRECTION
FOR REFERENCE ONLY
CORRECT DIRECTION
FOR REFERENCE ONLY
FWD
FWD
STA
2023.5
REF 
WL
1550.0
REF 
WL
1400.0
REF 
109-0020-70-105 SUPPORT ASSY
(REF)
109-0020-86-1
R
OLL LA TERAL ACTUA TOR ASSY
(REF)
DETAIL DIRECTION
(  SHOWN)OPPOSITE SIDE
VIEW C
STRUCTURE AND SYSTEMS ARE PARTIALLY OMITTED FOR BETTER CLARITY PURPOSE
(REFER TO FIGURE 1)
109-0020-86-3
PITCH LONGITUDINAL ACTUATOR ASSY
(REF)
109-0020-69-9 (OR 109-0020-69-113)
PITCH LONGITUDINAL BELLCRANK ASSY
(REF)
109-0020-55-9 (OR 109-0020-55-113)
ROLL  BELLCRANK ASSYLA TERAL
(REF)
FWD

### Page 14

Figure 4 
 S.B. N°119-156 ALERT 
 DATE: July 1, 2025 
Page 14 of 14 REVISION: / 
SB 119-156 Rev. / – INSPECTION REPORT FORM 
DATE  
HELICOPTER 
S/N 
 
CUSTOMER  
PITCH (LONGITUDINAL) 
ACTUATOR ASSY – BELLCRANK 
ASSY CONNECTION 
☐ CORRECT 
☐ NOT CORRECT (1) 
ROLL (LATERAL) ACTUATOR 
ASSY – BELLCRANK ASSY 
CONNECTION 
☐ CORRECT 
☐ NOT CORRECT (1) 
Q.TY REQUIRED 
AN174-13 ☐ 1 ☐ 2 
MS17825-4 ☐ 1 ☐ 2 
MS24665-151 ☐ 1 ☐ 2 
NOTES: 
 
 
 
 
 
 
 
 
 
 
 
 
(1) Photographs of the inspected connections are MANDATORILY required.

### Page 15

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.