# Leonardo Alert Service Bulletin 139-609: Revision A

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0579; AD 2021-20-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Alert Service Bulletin 139-609](https://openairdocs.org/service-documents/leonardo/sb-139-609.md)
- Title as filed: Leonardo Helicopters ASB 139-609 Rev A
- Pages: 29
- PDF: https://openairdocs.org/files/sha256/1b/c6/1bc6a0f8dcffca4534c8cd60c8eb401155612547ad8b349319f8905b576b924c
- Page: https://openairdocs.org/service-documents/leonardo/sb-139-609/file/1bc6a0f8dcff

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

N° 1 39-609 
DAT E:  December 18, 2019 
REV. :  A - Ap ril 13, 2021 
Pag e 1 of 28 
TITLE 
ATA 63 - MGB BEARING LOCK-NUT REPLACEMENT 
REVISION LOG 
The Revision A of this Service Bulletin supersedes the first issue dated December 18, 2019. 
He
licopters that have complied with previous issue of this Service Bulletin do not need any 
additional action. 
Revision A is issued in order to add MGB P/N 3G6320A00136 S/N AW1, AW2, AW3, AW5, 
AW10 to Effectivity. 
Revision bars identify changes. 
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
ALERT
SERVICE BULLETIN

### Page 2

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 2 of 28 REVISION: A - April 13, 2021 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
AB139/AW139 helicopters equipped with MGB P/N 3G6320A00131,  
P
/N 3G6320A00132, P/N 3G6320A00133, P/N 3G6320A00134, P/N 3G6320A00135, 
P/N 3G6320A00136 (S/N AW1, AW2, AW3, AW5, AW10), P/N 4G6320A00132,  
P/N 4G6320A00133 or P/N 3G6320A22031 and NOT equipped with MGB bearing lock-
nut P/N 3G6320A09152. 
NOTE 
MGB without bearing lock-nut P/N recorded on the 
component Log Card are affected by this Service 
Bulletin. 
B. COMPLIANCE 
 For MGB already compliant with Service Bulletin 139-567: within twenty eight 
thousand (28000) landings or at next overhaul, whichever occurs first, from the 
accomplishment date of Service Bulletin 139-567. 
 For MGB having S/N listed in the following Table 1: within twenty eight thousand 
(28000) landings or at next overhaul, whichever occurs first, since 14 May 2018. 
 
P/N S/N 
3G6320A00133 M23 
3G6320A00134 
M6 P124 P129 
P131 P162 P184 
Q230 Q243 Q249 
R272 V163 V21 
V211 V241 V272 
V281 V384 V386 
V39 V622 V96 
N76 N92 - 
 
Table 1 
 For MGB having S/N not listed in the above Table 1 and having logged twenty six 
thousand (26000) landings or more from new: within two thousand (2000) landings 
or at next overhaul, whichever occurs first, from the original issue date of this Service 
Bulletin. 
 For MGB having S/N not listed in the above Table 1 and having logged less than 
twenty six thousand (26000) landings from new: within two thousand (2000) landings

### Page 3

S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 3 of 28 
upon reaching twenty six thousand (26000) landings or at next overhaul, whichever 
occurs first. 
NOTE 
If the number of landings applicable to each single MGB 
is not known throughout the entire service life  
of the MGB, the number of landings shall be  
calculated multiplying the MGB flight hours by  
a factor of six (6). 
C. CONCURRENT REQUIREMENTS 
This Service Bulletin cancels and supersedes Service Bulletin 139-567 Rev. B. 
D. REASON 
This Service Bulletin is issued to manage the one-off replacement of the MGB bearing 
l
ock-nut P/N 3G6320A09151 with MGB bearing lock-nut P/N 3G6320A09152. 
E. DESCRIPTION 
As a consequence of an in service issue reported during non-destructive testing of the 
st
andard overhaul activity, LHD has reviewed MGB overhaul procedures introducing the 
replacement of MGB lock-nut P/N 3G6320A09151 and issued Service  
Bulletin 139-567 to prescribe the same one-off replacement in the operating fleet. 
This Service Bulletin prescribes the introduction of the new MGB bearing lock-nut  
P/N 3G6320A09152. 
The main difference between the existing nut P/N 3G6320A09151 and the new  
P/N 3G6320A09152 is related to the increase in the fillet radius between the cylindrical 
threaded part of the component and the flanged end; this allows reduction of the local 
peak stress in the critical areas of the nut which were found cracked in service. The new 
spherical bearing lock nut P/N 3G6320A09152 will be introduced on new built MGB and 
wi
ll be in any case replaced on all MGBs at next Overhaul. 
NOTE 
Replacement of existing MGB lock-nuts  
P/N 3G6320A09151 with P/N 3G6320A09151 is not 
allowed. 
NOTE 
MGB lock-nut replacement procedure described in this 
Service Bulletin, has also been introduced in CR&OP

### Page 4

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 4 of 28 REVISION: A - April 13, 2021 
with IETP Issue 35. 
NO
TE 
MGB bearing lock-nut P/N 3G6320A09152 is fully 
interchangeable with MGB bearing lock-nut  
P/N 3G6320A09151, but the mixing of the current and 
new P/N on the same assembly is NOT allowed. 
NOTE 
MGB lock-nut P/N 3G6320A09152 has been classified 
as Critical Part, having a Retirement Life introduced in 
AMPI Chapter 4 Issue 12. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
E
ASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin one hundred and ninety (190) MMH are deemed 
n
ecessary. 
MMH are based on hands-on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A.

### Page 5

S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 5 of 28 
I. REFERENCES 
1) PUBLICATIONS 
DATA MODULE DESCRIPTION PART 
DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe 
maintenance. 
- 
DM02 39-A-63-20-00-00A-520A-A Main gearbox group - Remove 
procedure 
- 
DM03 39-A-63-20-00-00A-720A-A Main gearbox group - Install 
procedure 
- 
DM04 39-A-71-11-07-00A-520A-A Forward sliding fairing - Remove 
procedure 
- 
DM05 39-A-71-11-07-00A-720A-A Forward sliding fairing - Install 
procedure 
- 
DM06 39-A-63-20-00-00A-364A-A Main gearbox group  – leak check  - 
2) ACRONYMS 
AMDI Aircraft Material Data Information  
A
MP Aircraft Maintenance Publication 
AMPI Air vehicle maintenance planning information 
CR&OP Component Repair and Overhaul Publication 
DM Data Module 
IETP Interactive Electronic Technical Publication 
ITEP Illustrated Tools and Equipment Publication 
LHD Leonardo Helicopter Division 
MGB Main Gearbox 
MMH Maintenance Man Hours 
3) ANNEX 
Annex A MGB bearing lock-nut replacement 
J. PUBLICATIONS AFFECTED 
N.A. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 6

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 6 of 28 REVISION: A - April 13, 2021 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 A259A04-06  SCREW 2  (1) 139-609L1 
2 MS21043-3  NUT 12  (1) 139-609L1 
3 NAS1149C0332R  WASHER 22  (1) 139-609L1 
4 NAS1149D0332K  WASHER 16  (1) 139-609L1 
5 3G6320V00451  LIP SEAL 1  (1) 139-609L1 
6 M83248/1-174 AS3209-174 PACKING 2  (1) 139-609L1 
7 A866A55803W  PACKING 2  (1) 139-609L1 
8 NAS1149D0432K  WASHER 10  (1) 139-609L1 
9 NAS1149C0432R  WASHER 10  (1) 139-609L1 
10 MS21043-4  NUT 10  (1) 139-609L1 
11 3G6320A09152  RING NUT 5  (1) 139-609L1 
12 3G6320A05751 A871A0490B SPRING 5  (1) 139-609L1 
13 3G6320A21131  RETAINING PLATE 5  (1) 139-609L1 
14 MS21043-5  NUT 30  (1) 139-609L1 
15 NAS1149C0532R  WASHER 30  (1) 139-609L1 
16 NAS1149D0532K  WASHER 22  (1) 139-609L1 
17 AS3209-014  PACKING 6  (1) 139-609L1 
18 AS3209-018  PACKING 8  (1) 139-609L1 
19 A259A05-08  SCREW 3  (1) 139-609L1 
20 NAS1802-3-20  SCREW 10  (1) 139-609L1 
21 AS3209-131  O-RING 3  (1) 139-609L1 
22 AS3209-121  O-RING 2  (1) 139-609L1 
23 AS3209-020  O-RING 2  (1) 139-609L1 
24 AS3209-011  O-RING 1  (1) 139-609L1 
25 M25988/1-028  O-RING 2  (1) 139-609L1 
26 M83248/1-247 AS3209-247 O-RING 1  (1) 139-609L1 
27 AS3209-013  PACKING 4  (1) 139-609L1 
28 MS35266-62 MS9565-05 SCREW 4  (1) 139-609L1 
29 AS3208-02  PACKING 4  (1) 139-609L1 
2) CONSUMABLES 
T
he following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 
30 Commercial Linth-free cloth (C011) AR (2) - 
31 MIL-PRF-680, Type II Cleaning solvent (C010) Ardrox 5503A AR (2) - 
32 MS20995C32 Safety wire (C014) AR (2) - 
33 MIL-PRF-81322F Grease (C009) AR (2) - 
34 ASTM D5363 Adhesive (C029) Loctite 222 AR (2) - 
35 AWMS05-001 Type I class B grade 2 MC-780 B 2 (C355) AR (2) - 
36 Commercial Cleaner (C023) Loctite quick clean 7031 AR (2) - 
37 Commercial Parker “Super O-Lube” oil – Grease (C115) AR (2) - 
38 Commercial Grease (C147) or SYN-TECH 3913-G1 AR (2) - 
39 DOD-L-85734 Turbo Oil (C008) AR (2) - 
40 MIL-S-46163, Type II grade N Loctite 242 AR (2) -

### Page 7

S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 7 of 28 
# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 
41 MIL-PRF-23699G Oil (C007) AR (2) - 
42 DOD-PRF-85734 Oil (C366) AR (2) - 
43 MIL-PRF-23699F Oil (C548) AR (2) - 
44 MIL-PRF-85285 Type I High-Solids Paint, grey, n. 16440 (C380) AR (2) - 
45 MIL-PRF-23377 Primer (C393) AR (2) - 
Refer also to AMDI for the consumable materials required to comply with the AMP 
DM referenced in the accomplishment instructions. 
3) LOGISTIC MATRIX 
I
n order to apply this Service Bulletin, the following Logistic P/N can be ordered in 
accordance with the applicable notes: 
LOGISTIC P/N Q.TY (PER HELO) NOTE PART 
139-609L1 1 (1) (3) - 
3G6320A09152 5 (1) (4) - 
NOTE 
(1) This item is required for MGB bearing lock-nut replacement procedure described in 
Annex A. 
(2) Item to be procured as local supply. 
(3) This item is NOT required for Customers who have already been provided with 
logistic P/N 139-567L1. 
(4) This item is required only for Customers who have already been provided with 
logistic P/N 139-567L1. 
B. SPECIAL TOOLS 
The following special tools, or equivalent, are necessary to accomplish this Service 
B
ulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
46 3G6320A00231A188A Work trolley 1 (B1) - 
47 3G6320A00231A029C Removal tool, lip seal 1 (B1) - 
48 3G6320A00231A181C Lifting tool, mast-planetary assembly 1 (B1) - 
49 3G6320A00231A029B Removal tool, roller bearing 1 (B1) - 
50 3G6320A07231A188A Work trolley, mast-planetary assembly 1 (B1) (B2) - 
51 3G6320A00231A029E Extractor 3 (B1) - 
52 3G6320A07231A023D Reaction tool assembly 1 (B1) - 
53 3G6320A00231A023G Tool, upper module lip seal installation 1 (B1) - 
54 
3G6320A00131A181A  
or 
3G6305G00431 
Lifting tool 1 (B1) - 
55 3G6320A00231A023M Clamps 4 (B1) - 
56 4F6320A00231A023B Clamps 3 (B1) - 
57 3G6320A00231A029F Disassembly tool, planetary crown 1 (B1) - 
58 3G6320A00131A029A Extractor tool, oil union 1 (B1) - 
59 3G6320A00231A181B Lifting tool, upper module 4 (B1) - 
60 3G6320A00231A023D Aligning pin 2 (B1) - 
61 3G6320A00231A181A Lifting tool, ring gear 1 (B1) -

### Page 8

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 8 of 28 REVISION: A - April 13, 2021 
# P/N DESCRIPTION Q.TY NOTE PART 
62 3G6320A00231A023C Bearing installation tool 1 (B1) - 
63 3G0000X00533A182C Wooden support 1 (B1) - 
Refer also to ITEP for the special tools required to comply with the AMP DM referenced 
in the accomplishment instructions. 
SPECIAL TOOLS NOTE 
 This item is required for MGB bearing lock-nut replacement procedure described 
in Annex A. 
 This tool may be assembled using P/N 3G6320A07235A026A, P/N MN3-00155 
and P/N MN3-00138. 
C. INDUSTRY SUPPORT INFORMATION 
WARRANTY: Owners/Operators who comply with the instructions of this Service 
B
ulletin no later than the applicable date in the “Compliance” section will be eligible to 
receive REQUIRED MATERIALS on free of charge basis, except for Consumable 
Materials and Special Tools. 
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy. 
NOTE: Customers who have already been provided with MGB bearing lock-nuts  
P/N 3G6320A09151 shall return these to LHD in order to receive the superseding  
P/N 3G6320A09152 on a free of charge basis. Contact dedicated Spares Orders 
administrator to arrange parts exchange. 
Please Issue relevant MMIR form to your Warranty Administration Dpt. 
NOTE: Please contact LHD order administration in advance from the scheduled Service 
Bulletin application to request the tools supplying on loan. As soon as the present 
Service Bulletin is implemented, the tools supplied on loan must be promptly returned 
to LHD.

### Page 9

S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 9 of 28 
3. ACCOMPLISHMENT INSTRUCTIONS 
NOTE 
Customer is requested to contact the usual Customer 
Support & Service Management focal point in advance 
from the Service Bulletin scheduled application, to 
request the materials and special tools and to plan the 
MGB bearing lock-nut replacement as described in 
Annex A. 
GENERAL NOTES 
a) Place an identification tag on all components that 
are re-usable, including the attaching hardware that 
has been removed to gain access to the modification 
area and adequately protect them until their later re-
use. 
b) Protect properly all those equipment not removed 
from area affected by the modification during 
installation procedure. 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A- A , prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. In accordance with AMP DM 39-A-71-11-07-00A-520A-A, remove the forward sliding 
fairing. 
3. In accordance with AMP DM 39-A-63-20-00-00A-520A-A, remove the main gearbox. 
4. Perform the MGB bearing lock-nut replacement as described in Annex A. 
5. Record the compliance with this Service Bulletin on the MGB log card. 
6. In accordance with AMP DM 39-A-63-20-00-00A-720A-A install the main gearbox. 
7. In accordance with AMP DM 39-A-63-20-00-00A-364A-A, perform the MGB leak check. 
With reference to figures A2 and A4 in Annex A, pay particular attention to: 
 the junction between the upper module assembly and the main case assembly; 
 the lip seal (46). 
If no leakage is found, seal the junction line with sealing compound MC-780. 
8. Protect the external surfaces with primer MIL-PRF-23377 and refinish paint, where 
required, applying two layers of High-Solids MIL-PRF-85285 Type I. 
9. In accordance with AMP DM 39-A-71-11-07-00A-720A-A install the forward sliding fairing.

### Page 10

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 10 of 28 REVISION: A - April 13, 2021 
10. Return the helicopter to flight configuration and record for compliance with this Service 
Bulletin on the helicopter logbook. 
11. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 11

S.B. N°139-609 ALERT 
DATE: December 18, 2019  
REVISION: A - April 13, 2021 Page 11 of 28 
ANNEX A 
MGB BEARING LOCK-NUT 
R
EPLACEMENT

### Page 12

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 12 of 28 REVISION: A - April 13, 2021 
The following procedure describes the replacement of MGB bearing lock-nut: 
NOTE 
The MGB bearing lock-nut P/N 3G6320A09151 and P/N 
3G6320A09152 will be referred to in this procedure as 
the ring nut. 
1. With reference to Figure A3, cut and remove the lo ck wire between the check valve plug 
(90) and the main case assembly.  
2. With reference to Figure A3, remove the check valve plug (90) and the relevant packing 
(91) from the main case assembly. 
3. With reference to Figure A2 detail G, cut and remove the lock wire between the plug (27) 
and the main case assembly.  
4. With reference to Figure A2 detail G, remove the plug (27) and the relevant packing (28) 
from the main case assembly 
5. With reference to Figure A3 detail Q, cut and remove the lock wire between the oil relief 
valve (95) and the main case assembly.  
6. With reference to Figure A3 detail Q, remove the oil relief valve (95) and the relevant 
packings (96) and (97) from the main case assembly. 
7. With reference to Figure A2, remove the three nylon screws (26). 
8. With reference to Figure A2 details A, B, C and D, remove nuts (15), washers (16), (17) 
and brackets (18), (19) and (20) in indicated positions. 
9. Install the MGB lifting tool P/N 3G6320A00131A181A on the top of the mast. 
10. Connect the lifting device to the MGB lifting tool P/N 3G6320A00131A181A. 
CAUTION 
Performing following step 11, the ring fixed gear, that is 
part of the upper module assy, will remain installed on 
the main case assembly.  
11. Lift with precaution the upper module until it is completely disconnected from the main 
case assembly. 
12. Put the upper module on the upper module support trolley P/N 3G6320A00231A188A and 
lock it using the lifting tool upper module P/N 3G6320A00231A181B. 
13. Remove the ring fixed gear from the main case assembly using the tool P/N 
3G6320A00231A029F. 
14. Remove the oil union (21) and the four oil unions (23) from the main case assembly, using 
the oil union extractor tool P/N 3G6320A00131A029A. 
15. With reference to Figures A1 and A4, disassemble the upper module assy as described 
in the following procedure:

### Page 13

S.B. N°139-609 ALERT 
DATE: December 18, 2019  
REVISION: A - April 13, 2021 Page 13 of 28 
15.1 With reference to Figure A1, remove the four oil jets (14A) and (16A), with related 
screws (10A), washers (11A) and O-rings (12A) and (13A). 
15.2 With reference to Figure A4, using the knob of the work trolley P/N 
3G6320A00231A188A, turn the upper module 180° on the work trolley. 
15.3 Remove nuts (55) and washers (53) (54) from the top case and the flanged outer 
race of the ball bearing. 
15.4 Install the mast-planetary assembly lifting tool P/N 3G6320A00231A181C on the 
mast-planetary assembly. Use the attaching items that are parts of the tool. 
15.5 Attach the lifting device to the mast-planetary assembly lifting tool P/N 
3G6320A00231A181C and slowly lift the mast-planetary assembly until the ball 
bearing is free from its seat. 
15.6 Put the mast-planetary assembly, using the lifting device, on the mast-planetary 
assembly work trolley P/N 3G6320A07231A188A and fix it using the applicable 
clamps. 
15.7 Remove the mast-planetary assembly lifting tool P/N 3G6320A00231A181C from 
the mast-planetary assembly. 
15.8 Turn 180° the top case (50) on the work trolley P/N 3G6320A00231A188A. 
15.9 Remove the two nylon screws (41), the nuts (42) and the washers (43) (44). 
15.10 Remove the mast cover (45) from the top of the mast-planetary assembly with the 
two extractors P/N 3G6320A00231A029E. 
15.11 Remove the lip seal (46) from the mast cover (45) using the tool P/N 
3G6320A00231A029C. 
15.12 Remove the roller bearing (48) from the top case (50) by means of tool P/N 
3G6320A00231A029B. 
16. With reference to Figures A5 thru A8, remove the ring nuts P/N 3G6320A09151 from the 
mast-planetary assembly as described in the following procedure: 
16.1 Install the reaction tool P/N 3G6320A07231A023D on the work bench, using its 
applicable hardware or a proper vice. 
16.2 Using the knob of the work trolley P/N 3G6320A07231A188A, turn the mast-
planetary assembly in order to have the tip of the mast on top. 
NOTE 
Following step 16.3 is applicable to mast planetary assy 
P/N 3G6320A07235 or to superfinished mast planetary 
assy P/N 3G6320A07236 or if main rotor oil collector 
variant P/N 3G6306P01611 is installed. 
16.3 With reference to Figures A7 and A8, remove screw s (23) and washers (24).

### Page 14

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 14 of 28 REVISION: A - April 13, 2021 
16.4 Remove the five retaining springs (10). 
16.5 Put the mast-planetary assembly on the reaction tool assembly  
P/N 3G6320A07231A023D. 
NOTE 
Following steps 16.6 and 16.7 are not applicable to mast 
planetary assy P/N 3G6320A07235 or to superfinished 
mast planetary assy P/N 3G6320A07236 or if main rotor 
oil collector variant P/N 3G6306P01611 is installed. 
16.6 Loosen and remove the ring nut (9), using the wr ench of tool  
P/N 3G6320A07231A023D. 
16.7 Repeat steps 16.5 and 16.6 on the other four ring nut positions until you have 
removed all the five ring nuts. 
NOTE 
Following steps 16.8 thru 16.10 are applicable to mast 
planetary assy P/N 3G6320A07235 or to superfinished 
mast planetary assy P/N 3G6320A07236 or if main rotor 
oil collector variant P/N 3G6306P01611 is installed. 
CAUTION 
While performing step 16.8 thru 16.9, pay attention not 
to damage the baffle (25). 
16.8 Loosen the ring nuts (9), using the wrench of to ol P/N 3G6320A07231A023D. 
16.9 Put the mast planetary assy on the work trolley P/N 3G6320A07231A188A and 
remove the ring nuts (9) using reaction tool P/N 3G6320A07231A023D. 
16.10 With reference to Figures A7 and A8, remove the retaining plates (22). 
16.11 Send the ring nuts to LHD. 
17. With reference to Figures A1, A2 and A4, assemble the upper module assy, using new 
ring nuts P/N 3G6320A09152, as described in the following procedure: 
17.1 Clean the ring nuts threads and the pins (7) using loctite quick clean 703 (C023). 
17.2 Apply two drops of adhesive loctite 222 (C029) on the middle side of the thread of 
the ring nut (9). Apply the same quantity of adhesive also on the opposite side of 
the thread. 
NOTE 
Following step 17.3 is applicable to mast planetary assy 
P/N 3G6320A07235 or to superfinished mast planetary 
assy P/N 3G6320A07236 or if main rotor oil collector

### Page 15

S.B. N°139-609 ALERT 
DATE: December 18, 2019  
REVISION: A - April 13, 2021 Page 15 of 28 
variant P/N 3G6306P01611 is installed. 
CAUTION 
Performing following step 17.3, make sure to install the 
retaining plate with the correct orientation, as shown in 
Figures A7 and A8. 
17.3 With reference to Figures A7 and A8, install the  retaining plate (22) inside  
the pin (7). 
CAUTION 
Performing following step 17.4, make sure that the pins 
(7) are positioned correctly in their seat, flush with the 
plate (14). 
17.4 Install the ring nut (9) on the pin (7). Tighten  the ring nut (9) with your hand. 
17.5 Torque the ring nut (9) with the installation tool P/N 3G6320A07231A023D to the 
minimum torque value of the interval: 275 thru 294 Nm (203 thru 217 lbf ft). 
17.6 Install the retaining spring (10) on the ring nut (9). Make sure that the tang of the 
retaining spring (10) engages the hole in the pin (7) correctly. If not, increase the 
torque (obey the given tolerance) of the ring nut (9) until you get a positive result. 
17.7 Repeat steps 17.1 thru 17.6 on the other four ring nut positions until you have 
installed all the five ring nuts. 
NOTE 
Following step 17.8 is applicable to mast planetary assy 
P/N 3G6320A07235 or to superfinished mast planetary 
assy P/N 3G6320A07236 or if main rotor oil collector 
variant P/N 3G6306P01611 is installed. 
17.8 With reference to Figures A7 and A8, install the  two washers (23) and the two bolts 
(24) on the planetary assembly (6) to attach the baffle (22) to the  
flange (14). Apply MIL-S-46163, Type II grade N (Loctite 242) on the screw fillets 
and torque to 3.2 thru 3.5 Nm. 
17.9 Install on the top case, in place of the roller bearing (48), the dummy roller bearing 
n° 10, part of the work trolley P/N 3G6320A00231A188A. 
17.10 Turn by 180° the top case (50), in order to set up for mast installation. 
17.11 Install the mast-planetary assembly lifting tool P/N 3G6320A00231A181C on the 
mast-planetary assembly. Use the attaching items that are parts of the lifting tool. 
17.12 Using the lifting device, lift the n° 8 rail of the work trolley  
P/N 3G6320A00231A188A on the lower side of the mast. 
17.13 Tighten the two bearing aligning pins P/N 3G6320A00231A023D in their seats on

### Page 16

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 16 of 28 REVISION: A - April 13, 2021 
the support base of the ball bearing on the top case (50). 
17.14 Lift the mast-planetary assembly and put it over and centred with the  
top case (50). 
WARNING 
BE CAREFUL WHEN YOU USE THE HEAT GUN. HOT 
PARTS CAN CAUSE INJURY TO THE PERSONS. 
ALWAYS USE APPLICABLE PROTECTIVE 
CLOTHING. 
17.15 Use the Heat gun and increase the temperature o f the top case (50) locally along 
the seat for the ball bearing (4) of the mast-planetary assembly. Obtain  
70°÷80° C maximum. 
17.16 Very carefully and slowly, put the mast-planetary assembly in the top case (50), 
centering the holes on the bearing flange (4) and on the oil collector (5) with the 
aligning pins installed on the top case(50). 
17.17 Install the ball bearing (4) in the related housing of the top case (50). Make sure 
that the flange of the ball bearing (4) fully and correctly touches the flat surface of 
the top case (50). 
17.18 Remove the two aligning pins. 
17.19 With reference to Figure A4, safety the parts in position using nuts (55) and 
washers (53) and (54). Do not tighten the nuts at this time. 
CAUTION 
Before you continue with the subsequent procedure, 
make sure that all the assembled parts are at the 
ambient temperature. 
17.20 With reference to Figure A4, with the parts at ambient temperature, torque the nuts 
(55) to 8.5÷10.7 Nm. (75 thru 95 lbf in) gradually and in a cross sequence. 
17.21 Clean and packing (51) using Parker “Super O-Lube” oil or grease (C115). 
17.22 Install the packing (51) in its groove on the top case (50). 
17.23 Attach the ring gear (52) to the ring gear lifting tool P/N 3G6320A00231A181A. 
Use the attaching items that are parts of the lifting tool. 
17.24 Connect the lifting device to the lifting tool and lift the ring gear (52). 
17.25 Put the ring gear (52) in the top case (50). Align the holes in the ring gear (52) with 
the holes of the top case (50). 
17.26 Disconnect the lifting device from the ring gear lifting tool  
P/N 3G6320A00231A181A and remove the lifting tool from the ring gear. 
17.27 Lock the ring gear (52) to the top case with the clamps

### Page 17

S.B. N°139-609 ALERT 
DATE: December 18, 2019  
REVISION: A - April 13, 2021 Page 17 of 28 
P/N 3G6320A00231A023M. 
17.28 Using the knob on the work trolley P/N 3G6320A00231A188A, turn the  
top case (50) 180°. 
17.29 Remove mounting rail n° 8. 
17.30 Using two screws (M8), remove the guide and the dummy roller bearing n° 10 from 
the top of the top case. 
WARNING 
BE CAREFUL WHEN YOU USE THE HEAT GUN. HOT 
PARTS CAN CAUSE INJURY TO THE PERSONS. 
ALWAYS USE APPLICABLE PROTECTIVE 
CLOTHING. 
17.31 Use the Heat gun and increase the temperature o f the top case (50) locally along 
the seat for the roller bearing (48) of the mast-planetary assembly. Obtain 70°÷80° 
C maximum. 
17.32 Lubricate with Parker “Super O-Lube” the packing (49) and put it in position on the 
top case (50). 
17.33 Install the roller bearing in its housing on the top case with the bearing installation 
tool P/N 3G6320A00231A023C. Make sure that the flange of the roller bearing (48) 
is against the top case (50). 
CAUTION 
Performing the following steps, always make sure that 
you do not cause damage to the lip seal (46). 
 The primary cause of the failure of the lip seal is the 
contamination that comes from dust or particles.  
To prevent contamination, always be careful when 
you touch the lip seal. Do not use grease or oil that 
contains silicone. 
 Lubricate the mating surfaces of the lip seal and of 
the gear with the Grease (C147) or  
SYN-TECH 3913-G1. 
 Install the lip seal keeping the open side on the inner 
side of the MGB. 
17.34 Install the lip seal (46) in the seal cover us i ng the seal installation tool  
P/N 3G6320A00231A023G.  
17.35 Put the mast cover (45) on the basement of the seal installation tool  
P/N 3G6320A00231A023G.

### Page 18

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 18 of 28 REVISION: A - April 13, 2021 
17.36 Push the lip seal in the seal cover using the seal installation tool 
(3G6320A00231A023G). 
17.37 Lubricate the packing (47) with the Grease (C115). 
17.38 Install the packing (47) in the related groove of the seal cover (45). 
17.39 Carefully put the seal cover (45) on the mast-planetary assembly. Move the seal 
cover (45) down until it touches the flange of the roller bearing (48). 
17.40 Attach the seal cover (45) and the roller bearing (48) to the top case (50) with 
washers (43), (44) and nuts (42). Torque the 12 nuts (42) to 3.8 thru 5.0 N m  
(34 thru 45 lbf in) gradually and in a cross sequence. 
NOTE 
Apply a small quantity of Grease (C009) in the holes for 
the two screws (41) in the top case (50). 
17.41 Install the two screws (41) in their related ho les in the top case (50). If necessary, 
adjust the length of each screw during their installation. 
17.42 With reference to Figure A1, install the four oil jets (14A) and (16A), with related 
screws (10A), washers (11A) and O-rings (12A) and (13A). 
18. With reference to Figure A2, install the upper module assembly as described in the 
following procedure: 
18.1 Lubricate the retaining plate (22) and the two packings (24), (25) using Parker 
“super o-lube”. 
18.2 Install the two retaining plates (22) on each oil union (21) and the two packings 
(24) on each oil union (23). 
18.3 Install the packing (25) in its seat on the main gearbox assembly. 
18.4 Lubricate the teeth and the pins of the five planetary gears, the teeth of the collector 
gear and the bearing. 
18.5 Put the oil union (21) in position in its seat on the upper side of the main case 
assembly (TR drive zone). 
18.6 Put the four oil unions (23) in position in their seat on the upper side of the main 
case assembly. 
18.7 Tighten the lifting tool on the main rotor mast and move the upper module assembly 
over the main case assembly. 
NOTE 
Performing following step 18.8, remove the clamps  
P/N 3G6320A00231A023M that fix the planetary gear to 
the upper module assy. 
18.8 Align the upper module assembly to the main cas e  assembly and slowly move it

### Page 19

S.B. N°139-609 ALERT 
DATE: December 18, 2019  
REVISION: A - April 13, 2021 Page 19 of 28 
down until it touches the main case assembly. 
CAUTION 
Do not seal the junction between the upper module 
assembly and the main case assembly before 
performing the leak check of the MGB. 
18.9 With reference to Figure A2, install the six bra ckets (18) and the brackets (19) and 
(20), using nuts (15) and washers (16), (17), according to details A, B, C and D. 
Torque the nuts to 24.5÷25.5Nm (217 thru 226 lbf in) gradually and in a cross 
sequence. 
NOTE 
Apply a small quantity of Grease (C009) in the holes for 
the nylon screws (26). 
18.10 With reference to Figure A2, install the nylon screws (26) with an over-torque  
of 60° ÷ 120°. 
19. With reference to Figure A3, lubricate with Parker “Super O-Lube” the  
packing (91) and put it on the check valve plug (90). Apply a small quantity of grease MIL-
PRF-81322 on the plug fillets. 
20. With reference to Figure A3, install the packing (91) and the check valve plug (90). Torque 
the check valve plug (90) to 29.4 thru 34.3 Nm. Safety the plug (90) to the main case 
assembly with the lock wire. 
21. With reference to Figure A3 detail Q, lubricate with Parker “Super O-Lube” the  
packings (96) and (97) and put them on the oil relief valve (95). Apply a small quantity of 
grease MIL-PRF-81322 on the oil relief valve (95). 
22. With reference to Figure A3 detail Q, install the packings (96) and (97) and the oil relief 
valve (95). Torque the oil relief valve (95) to 26.7 thru 31.4 Nm. Safety the valve (95) to 
the main case assembly with the lock wire. 
23. With reference to Figure A2 detail G, lubricate with Parker “Super O-Lube” the  
packing (28) and put it on the plug (27). Apply a small quantity of grease  
MIL-PRF-81322 on the plug (27). 
24. With reference to Figure A2 detail G, install the packing (28) and the plug (27). Torque the 
plug (27) to 4.4 thru 4.8 Nm. Safety the plug (27) to the main case assembly with the lock 
wire. 
25. Complete the assembly as described in the following procedure: 
CAUTION 
Do not seal the junction between the upper module 
assembly and the main case assembly before

### Page 20

S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 20 of 28 REVISION: A - April 13, 2021 
performing the leak check of the MGB. 
25.1 Seal with sealing compound MC-780 all the mating  surfaces, except the  
anti-torque beam junction line and the upper module assembly-main case 
assembly junction line. 
25.2 Seal all the washers, nuts and nylon screws.

### Page 21 (OCR)

K LEONARDO
HELICOPTERS
DETAIL F  DETAIL D
DETAIL F  DETAIL D
16A  12A  13A
DETAIL F  (TYP 2 PLCS)
15A
• 0  DETAIL D  (TYP 2 PLCS)
Figure A1
S.B. N°139-609 ALERT
DATE: December 18, 2019
REVISION: A - April 13, 2021  Page 21 of 28

### Page 22 (OCR)

LEONARDO
HELICOPTERS
22  DETAIL D  16
22 PLACES
23  DETAIL G
20
24  DETAIL C
DETAIL E  DETAIL B
DETAIL E
o
DETAIL A
26  ) × 3
18
LOWER MODULE ASSY
DETAIL A
DETAIL A
DETAIL A  ADAPTER
COOLER ASSY
DETAIL A  DETAIL A
28
DETAIL A  DETAIL C  DETAIL G
DETAIL A
TOP VIEW
Figure A2
S.B. N°139-609 ALERT
DATE: December 18, 2019
Page 22 of 28  REVISION: A - April 13, 2021

### Page 23

Figure A3 
S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 23 of 28

### Page 24 (OCR)

LEONARDO
HELICOPTERS
42  × 12
43  ) × 12
53  × 10
54  × 10
55  × 10
51
UPPER MODULE ASSY
52
Figure A4
S.B. N°139-609 ALERT
DATE: December 18, 2019
Page 24 of 28  REVISION: A - April 13, 2021

### Page 25

Figure A5 
S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 25 of 28

### Page 26

Figure A6 
 S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 26 of 28 REVISION: A - April 13, 2021

### Page 27

Figure A7 
S.B. N°139-609 ALERT 
DATE: December 18, 2019 
REVISION: A - April 13, 2021 Page 27 of 28

### Page 28

Figure A8 
 S.B. N°139-609 ALERT 
 DATE: December 18, 2019 
Page 28 of 28 REVISION: A - April 13, 2021

### Page 29

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.