# Leonardo Alert Service Bulletin 139-679: No revision named

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0885, the docket of AD 2021-22-13. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Alert Service Bulletin 139-679](https://openairdocs.org/service-documents/leonardo/sb-139-679.md)
- Title as filed: Leonardo Helicopters Emergency ASB No. 139-679
- Pages: 16
- PDF: https://openairdocs.org/files/sha256/97/ee/97ee74ef7225fac96695c2716e797ad856a8930940f3428ba5b31e8c8a25f38b
- Page: https://openairdocs.org/service-documents/leonardo/sb-139-679/file/97ee74ef7225

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

P
age 1 of 15 
N ° 139-679 
D ATE:  August 5, 2021 
REV. :  / - March 15, 2017 
TITLE 
ATA 25 - HOIST RATED LOAD CHECK 
REVISION LOG 
First Issue 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
EMERGENCY ALERT
SERVICE BULLETIN

### Page 2

S.B. N°139-679 EMERGENCY ALERT 
 DATE: August 5, 2021 
Page 2 of 15 REVISION: / 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
 All hoists P/N 3G2591V00331 (Vendor P/N BL-20200-421), P/N 3G2591V02931 
(Vendor P/N BLH-20200-431-1), P/N 3G2591V02932 (Vendor  
P/N BLH-20200-431-2) and P/N 3G2591V01431 (Vendor P/N BL-20200-422)  
that have replaced the hoist cable (Vendor P/N BL-62 60 or Vendor  
P/N BL-9149-8, as applicable) without having performed, at the issue date of the 
Service Bulletin, the “rated load check” according to the instructions of Breeze 
Flight Line Operation and Maintenance Manual TD-03-008 or TD-08-002 or  
TD-03-009, as applicable. 
 All hoists P/N 3G2591V00331 (Vendor P/N BL-20200-421), P/N 3G2591V02931 
(Vendor P/N BLH-20200-431-1), P/N 3G2591V02932 (Vendor  
P/N BLH-20200-431-2) and P/N 3G2591V01431 (Vendor P/N BL-20200-422) 
installed on the helicopter after having been kept in stock for more than one year, 
that do not have performed, at the issue date of the Service Bulletin, the “rated 
load check” according to the instructions of Breeze Flight Line Operation and 
Maintenance Manual TD-03-008 or TD-08-002 or TD-03-009, as applicable. 
B. COMPLIANCE 
Before the next use of the hoist P/N 3G2591V00331 (Vendor P/N BL-20200-421), 
P/N 3G2591V02931 (Vendor P/N BLH-20200-431-1), P/N 3G2591V02932 (Vendor 
P/N BLH-20200-431-2) or P/N 3G2591V01431 (Vendor P/N BL-20200-422). 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to prescribe the “rated load check” of the hoists 
P/N 3G2591V00331, P/N 3G2591V02931, P/N 3G2591V02932 or P/N 3G2591V01431. 
E. DESCRIPTION 
This Service Bulletin prescribes the “rated load check” to hoists Breeze 
P/N 3G2591V00331 (Vendor P/N BL-20200-421), P/N 3G2591V02931 (Vendor 
P/N BLH-20200-431-1), P/N 3G2591V02932 (Vendor P/N BLH-20200-431-2) or  
P/N 3G2591V01431 (Vendor P/N BL-20200-422) for those helicopters that have

### Page 3

S.B. N°139-679 EMERGENCY ALERT 
DATE: August 5, 2021 
REVISION: / Page 3 of 15 
replaced the hoist cable, or that have installed a hoist kept in stock for more than one 
year, without having performed the mentioned check.  
The check is composed of two consecutive tests, both performed in hovering condition, 
where two loads are tested, one of 300 lb (136 kg) and the other of 600 lb (272 kg).  
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin one (1) MMH is deemed necessary. 
MMH are based on hands-on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
N.A. 
2) ACRONYMS & ABBREVIATIONS 
AMP Aircraft Maintenance Publication 
DM Data Module 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
lb Pound 
MMH Maintenance Man Hours

### Page 4

S.B. N°139-679 EMERGENCY ALERT 
 DATE: August 5, 2021 
Page 4 of 15 REVISION: / 
P/N Part Number 
3) ANNEX 
Annex A Rescue hoist system - Rated load - Operation test 
J. PUBLICATIONS AFFECTED 
N.A. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 5

S.B. N°139-679 EMERGENCY ALERT 
DATE: August 5, 2021 
REVISION: / Page 5 of 15 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
N.A. 
2) CONSUMABLES 
N.A. 
3) LOGISTIC MATRIX 
N.A. 
B. SPECIAL TOOLS 
N.A. 
C. INDUSTRY SUPPORT INFORMATION 
N.A.

### Page 6

S.B. N°139-679 EMERGENCY ALERT 
 DATE: August 5, 2021 
Page 6 of 15 REVISION: / 
3. ACCOMPLISHMENT INSTRUCTIONS 
NOTE 
The rated load test requires testing of the hoist on the 
helicopter, in a hover, with the hoist cowlings installed. 
NOTE 
The following step is applicable only to hoist 
P/N 3G2591V00331 (Vendor P/N BL-20200-421) and 
P/N 3G2591V01431 (Vendor P/N BL-20200-422). 
1. With reference to Annex A step 2, perform the rat ed load check of the rescue hoist 
P/N 3G2591V00331 or P/N 3G2591V01431, as applicable. 
NOTE 
The rated load test requires testing of the hoist on the 
helicopter, in a hover, with the hoist cowlings installed. 
NOTE 
The following step is applicable only to hoists 
P/N 3G2591V02931 (Vendor P/N BLH-20200-431-1) 
and P/N 3G2591V02932 (Vendor  
P/N BLH-20200-431-2). 
2. With reference to Annex A step 3, perform the rat ed load check of the rescue hoist 
P/N 3G2591V02931 or P/N 3G2591V02932, as applicable. 
3. In case of test not passed and/or other findings, contact Product Support Engineering 
(engineering.support.lhd@leonardocompany.com). 
4. Return the helicopter to flight configuration and record for compliance with this Service 
Bulletin on the helicopter logbook. 
5. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 7

S.B. N°139-679 EMERGENCY ALERT 
DATE: August 5, 2021 
REVISION: / Page 7 of 15 
 
ANNEX A 
RESCUE HOIST SYSTEM - RATED LOAD - OPERATION TEST

### Page 8 (OCR)

_ LEONARDO
HELICOPTERS
Safety Conditions
WARNING
Be careful when you do the operational check procedure of the rescue hoist system. Injury to the
persons can occur if you do not obey the safety precautions that follow:
Keep your hands, cloths and body away from the components that are in movement.
- Always wear protective goggles and gloves when you work on the hoist.
- Only approved persons can stay near the helicopter during the operations on the rescue
hoist.
Do not touch the electric motor during the operation. This can cause injuries to persons.
CAUTION
The cable contamination by dirt or sand will cause damage or incorrect operation of the rescue
hoist.
Procedure
Note
1.  The rated load test of the rescue hoist must be done with the rescue hoist gearbox at ambient
temperature.
2.  One pilot is necessary to do the rated load test in flight and one approved person is necessary
as responsible of the operation of the rescue hoist. One other person is necessary to do the
ground operations.
3.  You must lift the dummy load with the rescue hoist during hover flight.
To do the rated load test, go to:
[K0067] and [K0068] step 2
[K0069] step 3.
2  [K0067] and [K0068] Rated load test (in-flight)
2.1  Put the Dummy load (136 kg (300 Ib)) (ZZ-00-00) in a free, open and safe area.
2.2  Tell the pilot to flight and hover the helicopter at approximately 15.24 m (50 ft) above the dummy load.
Refer to the Rotorcraft Flight Manual.
Page 8 of 15

### Page 9 (OCR)

K LEONARDO
HELICOPTERS
2.3  Tell the pilot to close the following circuit breaker on the circuit breaker panel (6, Figure 1):
HOIST CONTR
- HOIST PWR.
2.4  Tell the pilot to set the PWR switch (10) on the hoist control panel (9) to ON.
2.5  Unwind the hoist cable (3) of the hoist (1).
2.6  Connect the hook (2) of the hoist (1) to the dummy load with a Belt (ZZ-00-00) of the appropriate load
rating.
2.7  Tell the pilot to increase hover altitude to approximately 77.72 m (255 ft) above ground level. Refer to
the Rotorcraft Flight Manual.
2.8  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, setting the direction/speed control thumb-wheel (5) to DOWN position on the control pendant
(4).
2.9  Make the hoist cool down for 30 seconds.
Note
Make sure that the minimum speed of the cable is 1.07 m/s (210 fpm) when using the hoist operator
pendant at full deflection and the cable is on the top layer.
2.10  Tell the pilot or the hoist operator to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of
cable is left out, the dummy load connected by setting the direction/speed control thumb-wheel (5) to
UP position on the control pendant (4).
2.11  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
2.12  Make the hoist cool down for 30 seconds.
Note
Make sure that the maximum speed of the cable is 1.52 m/s (300 fpm) when using the hoist operator
pendant at full deflection and the cable is on the top layer.
2.13  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, setting the direction/speed control thumb-wheel (5) to DOWN position on the control pendant
(4) until the cable stops.
2.14  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
2.15  Make the hoist cool down for 30 seconds.
2.16  Do again the step 2.10 thru step 2.15.
Note
Make sure that the minimum speed of the cable is 1.07 m/s (210 fpm).
S.B. N°139-679 EMERGENCY ALERT
DATE: August 5, 2021
REVISION: /  Page 9 of 15

### Page 10 (OCR)

< LEONARDO
HELICOPTERS
2.17  Tell the pilot or the hoist operator to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of
cable is left out, with the dummy load connected by setting the direction/speed control thumb-wheel (5)
to UP position on the control pendant (4).
2.18  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
2.19  Make the hoist cool down for 30 seconds.
Note
Current values must not exceed 155 amps for the motor and 5 amps for the control circuit at 25 VDC
minimum.
2.20  If the speed requirements of the hoist cable (3) are not in the limits, repeat step 2.8 thru step 2.19 checking
that current and voltage values.
2.21  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, for approximately 15.24 m (50 ft).
2.22  Tell the pilot to decrease hover altitude until the dummy load touches the ground.
2.23  Disconnect the hook (2) of the hoist (1) from the dummy load.
2.24  Put the Dummy load (272 kg (600 Ib)) (ZZ-00-00) in a free, open and safe area.
2.25  Tell the pilot to flight and hover the helicopter above the dummy load. Refer to the Rotorcraft Flight
Manual.
2.26  Connect the hook (2) of the hoist (1) to the dummy load with a Belt (ZZ-00-00) of the appropriate load
rating.
2.27  Tell the pilot to increase hover altitude to approximately 77.72 m (255 ft) above ground level. Refer to
the Rotorcraft Flight Manual.
2.28  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected by setting the direction/speed control thumb-wheel (5) to DOWN position on the control
pendant (4).
2.29  Make the hoist cool down for 30 seconds.
Note
Make sure that the minimum speed of the cable is 0.66 m/s (130 fpm) when using the hoist operator
pendant at full deflection and the cable is on the top layer.
2.30  Tell the pilot or the hoist operator to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of
cable is left out, with the dummy load connected, setting the direction/speed control thumb-wheel (5) to
UP position on the control pendant (4).
2.31  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
S.B. N°139-679 EMERGENCY ALERT
DATE: August 5, 2021
Page 10 of 15  REVISION: /

### Page 11 (OCR)

· LEONARDO  HELICOPTERS
2.32  Make the hoist cool down for 30 seconds.
Note
Make sure that the maximum speed of the cable is 1.52 m/s (300 fpm).
2.33  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, setting the direction/speed control thumb-wheel (5) to DOWN position on the control pendant
(4) until the cable stops.
2.34  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
2.35  Make the hoist cool down for 30 seconds.
2.36  Do again the step 2.30 thru step 2.35.
Note
Make sure that the minimum speed of the cable is 0.66 m/s (130 fpm) when using the hoist operator
pendant at full deflection and the cable is on the top layer.
2.37  Tell the pilot or the hoist operator to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of
cable is left out, with the dummy load connected by setting the direction/speed control thumb-wheel (5)
to UP position on the control pendant (4).
2.38  Tell the pilot or the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on
the control pendant (4).
2.39  Make the hoist cool down for 30 seconds.
Note
Current values must not exceed 155 amps for the motor and 5 amps for the control circuit at 25 VDC
minimum.
2.40  If the speed requirements of the hoist cable (3) are not in the limits, repeat step 2.28 thru step 2.39
checking that current and voltage values.
2.41  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, for approximately 15.24 m (50 ft).
2.42  Tell the pilot to decrease hover altitude until the dummy load touches the ground.
2.43  Disconnect the hook (2) of the hoist (1) from the dummy load.
2.44  Fully wind up the hoist cable (3) of the hoist (1).
2.45  Tell the pilot to land and stop the engines. Refer to the Rotorcraft Flight Manual.
2.46  If the current values in step 2.40 are in the correct limits, check the temperature of external surface of
the large drum flange. It must not exceed 94 °C (200 °F).
2.47  Make the helicopter safe for maintenance. Refer to 39-A-00-20-00-00A-120A-A.
S.B. N°139-679 EMERGENCY ALERT
DATE: August 5, 2021
REVISION: /  Page 11 of 15

### Page 12 (OCR)

< LEONARDO  HELICOPTERS
[K0069] Rated load test (in-flight)
Note
The tolerance of the dummy load is +27 kg (50 Ibf).
3.1  Put the Dummy load (136 kg (300 Ib)) (ZZ-00-00) in a free, open and safe area.
3.2  Tell the pilot to flight and hover the helicopter at approximately 15.24 m (50 ft) above the dummy load.
Refer to the Rotorcraft Flight Manual.
3.3  Tell the pilot to close the following circuit breaker on the circuit breaker panel (6, Figure 1):
HOIST CONTR
HOIST PWR.
3.4  Tell the pilot to set the PWR switch (10) on the hoist control panel (9) to ON.
3.5  Unwind the hoist cable (3) of the hoist (1).
3.6  Connect the hook (2) of the hoist (1) to the dummy load with a Belt (ZZ-00-00) of the appropriate load
rating.
3.7  Tell the pilot to increase hover altitude to approximately 92.96 m (305 ft) above ground level. Refer to
the Rotorcraft Flight Manual.
3.8  Tell the pilot to unwind the hoist cable (3) of the hoist (1), with the dummy load connected, setting the
hoist control switch (8) to DN position on the collective stick (7).
3.9  Make the hoist cool down for 30 seconds.
3.10  Tell the pilot to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of cable is left out, with the
dummy load connected, setting the hoist control switch (8) to UP position on the collective stick (7).
3.11  Make the hoist cool down for 30 seconds.
3.12  Tell the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load connected,
setting the direction/speed control thumb-wheel (5) to DOWN position (full speed) on the control pendant
(4) until the cable stops.
3.13  Tell the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on the control
pendant (4).
3.14  Make the hoist cool down for 30 seconds.
3.15  Tell the hoist operator to wind up the hoist cable (3) of the hoist (1) until 3.048 m (10 ft) of cable is left
out, with the dummy load connected, setting the direction/speed control thumb-wheel (5) to UP position
(tull speed) on the control pendant (4).
Page 12 of 15

### Page 13 (OCR)

K LEONARDO  HELICOPTERS
3.16  Tell the hoist operator to set the direction/speed control thumb-wheel (5) to OFF position on the control
pendant (4).
3.17  Make the hoist cool down for 30 seconds.
3.18  Tell the pilot or the hoist operator to unwind the hoist cable (3) of the hoist (1), with the dummy load
connected, for approximately 15.24 m (50 ft).
3.19  Tell the pilot to decrease hover altitude until the dummy load touches the ground.
3.20  Disconnect the hook (2) of the hoist (1) from the dummy load.
Note
The tolerance of the dummy load is +27 kg (50 b).
3.21  Put the Dummy load (272 kg (600 Ib)) (ZZ-00-00) in a free, open and safe area.
3.22  Do again step 3.2 thru step 3.7 and step 3.12 thru step 3.20.
3.23  Fully wind up the hoist cable (3) of the hoist (1).
3.24  Tell the pilot to land and stop the engines. Refer to the Rotorcraft Flight Manual.
3.25  Make the helicopter safe for maintenance. Refer to 39-A-00-20-00-00A-120A-A.
Requirements After Job Completion
1  Remove all the tools and the other items from the work area. Make sure that the work area is clean.
S.B. N°139-679 EMERGENCY ALERT
DATE: August 5, 2021
REVISION: /  Page 13 of 15

### Page 14 (OCR)

· LEONARDO
HELICOPTERS
TYPICAL
ICN-39-A-259100-G-00001-33345-A-001-01
Figure 1 (Sheet 1 of 2) Rescue hoist system - Rated load - Operation test
Page 14 of 15

### Page 15 (OCR)

LEONARDO
HELICOPTERS
OFF
ICN-39-A-259100-G-00001-33346-A-001-01
Figure 1 (Sheet 2 of 2) Rescue hoist system - Rated load - Operation test
S.B. N°139-679 EMERGENCY ALERT
DATE: August 5, 2021
REVISION: /  Page 15 of 15

### Page 16

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
