# Leonardo Alert Service Bulletin 139-686: No revision named

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2022-0283, the docket of AD 2022-11-20. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Alert Service Bulletin 139-686](https://openairdocs.org/service-documents/leonardo/sb-139-686.md)
- Title as filed: Leonardo Helicopters ASB No. 139-686
- Pages: 12
- PDF: https://openairdocs.org/files/sha256/c7/fc/c7fc6db7b1a444caf85839f3fd150da17afb80f979512b59865af32af7c98441
- Page: https://openairdocs.org/service-documents/leonardo/sb-139-686/file/c7fc6db7b1a4

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

P age 1 of 11 
N ° 139-686 
D ATE:  November 8, 2021 
REV. :  / - March 15, 2017 
TITLE 
ATA 53 – TAIL GEAR BOX FITTING INSPECTION 
REVISION LOG 
First Issue 
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
ALERT
SERVICE BULLETIN

### Page 2

S.B. N°139-686 ALERT 
 DATE: November 8, 2021 
Page 2 of 11 REVISION: / 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
All AB/AW139 helicopters installing TGB fittings P/N 3G5351A01151 or 
P/N 3G5351A01152 with more than 3000 FH. 
NOTE 
During the installation of a new/repaired tail boom 
assembly, verify the applicability of this SB on the TGB 
fitting installed on the tail boom. 
B. COMPLIANCE 
Part I:  
Within and not later than 25 (twenty-five) FH after the issue date of this Service Bulletin. 
Part II:  
Immediately after compliance with Part I, if evidence of cracks is found during the 
inspection. 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to provide the necessary instruction on how to 
perform a detailed inspection of the TGB fitting.  
E. DESCRIPTION 
This Service Bulletin prescribes a detailed inspection of the TGB fitting in order to detect 
potential cracks. If cracks are found, the Service Bulletin prescribes the immediate 
replacement of the component.  
Part I prescribes the detailed inspection of RH and FWD parts of the TGB fitting with the 
mandatory use of a borescope.  
Part II prescribes the TGB fitting replacement in case of findings found during the 
application of the Part I.

### Page 3

S.B. N°139-686 ALERT 
DATE: November 8, 2021 
REVISION: / Page 3 of 11 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin, the following Maintenance-Man-Hours (MMH) are 
deemed necessary:  
Part I: approximately four (4) MMH;  
Part II: approximately thirty-six (36) MMH. 
Maintenance-Man-Hours are based on hands-on time and can change with personnel 
and facilities available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
Following Data Modules refer to AMP: 
DATA MODULE DESCRIPTION PART 
DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe 
maintenance. 
I, II 
DM02 39-A-52-44-01-00A-520A-A Access panels - Remove 
procedure. 
II 
DM03 39-A-52-44-01-00A-720A-A Access panels - Install procedure. II 
Following Data Modules refer to ASRP: 
DATA MODULE DESCRIPTION PART 
DM04 39-A-53-52-07-00A-920A-D Tail gearbox fitting - Replacement  II

### Page 4

S.B. N°139-686 ALERT 
 DATE: November 8, 2021 
Page 4 of 11 REVISION: / 
2) ACRONYMS & ABBREVIATIONS 
AMDI Aircraft Material Data Information 
AMP Aircraft Maintenance Publication 
AMPI Aircraft Maintenance Planning Information 
ASRP Aircraft Structural Repair Publication 
DM Data Module 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
FH Flight Hours 
FWD Forward  
LHD Leonardo Helicopters 
MMH Maintenance Man Hours 
P/N Part Number 
S/N Serial Number 
TGB Tail Gear Box 
3) ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
N.A. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 5

S.B. N°139-686 ALERT 
DATE: November 8, 2021 
REVISION: / Page 5 of 11 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
PART I 
N.A. 
PART II 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 3G5351A01152  TGB fitting 1 . (1) - 
 
Refer also to IPD for the spares materials required to comply with the AMP DMs 
referenced in the accomplishment instructions. 
2) CONSUMABLES 
The following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# SPEC./LHD CODE NUMBER DESCRIPTION Q.TY NOTE PART  
2 CCC-C-440, Class I Cheesecloth (C028) AR  I 
3 TT-N-95-B Code No. 531055030 Aliphatic Naphtha (C059) AR  I 
4 P-D-680, Type II or MIL-PRF-680B, Type II Cleaning solvent (C010) AR  I 
 
Refer also to AMDI for the consumable materials required to comply with the AMP 
DM referenced in the accomplishment instructions. 
3) LOGISTIC MATRIX 
N.A.  
NOTE 
(1) For helicopters installing the fitting P/N 3G5351A01151 it is possible also to install 
P/N 3G5351A01151 as a valid alternative to P/N 3G5351A01152. 
B. SPECIAL TOOLS 
The following special tools, or equivalent, are necessary to accomplish this Service 
Bulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
5 RMGE-DS-06-2010-LH or 
approved alternative Platform left (GG-01-00) 1 (B1) I, II 
6 RMGE-SL-06-2010-RH or approved alternative Platform right (GG-02-00) 1 (B1) I, II

### Page 6

S.B. N°139-686 ALERT 
 DATE: November 8, 2021 
Page 6 of 11 REVISION: / 
# P/N DESCRIPTION Q.TY NOTE PART 
7 Commercial Borescope 1 (B1) I 
8 Commercial Flash light 1 (B1) I 
9 3G5305G12331 Tool TGB/IGB fitting inst 1 (B2) (B3) II 
 
Refer also to ITEP for the special tools required to comply with the AMP DM referenced 
in the accomplishment instructions. 
SPECIAL TOOLS NOTES 
 Item to be procured as a local supply. 
 Tool P/N 3G5305G12331 is required to perform Part II and may be supplied as 
part of tool P/N 3G5350G00831. 
 Please contact Leonardo Helicopters Division order administration to request the 
tools supply on loan. As soon as the present Service Bulletin is implemented the 
tools supplied on loan shall be promptly returned to Leonardo Helicopters Division. 
C. INDUSTRY SUPPORT INFORMATION 
In ref. to PART II application:  
As reported on PART I step 3, only if Product Support Engineering confirms the 
replacement, please Issue relevant MMIR form to your Warranty Administration Dpt.  
Please note that “Product Support Engineering’s approvals” is mandatory to evaluate 
your request, otherwise MMIR could be rejected.  
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance” section will be eligible to receive required 
materials on free of charge basis, except for Consumable Materials and Special Tools.  
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy.  
Please Issue relevant MMIR form to your Warranty Administration Dpt

### Page 7

S.B. N°139-686 ALERT 
DATE: November 8, 2021 
REVISION: / Page 7 of 11 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTES 
a) Place an identification tag on all components that 
are re-usable, including the attaching hardware 
removed to gain access to the modification area and 
adequately protect them until their later re-use. 
b) Exposed thread surface and nut must be protected 
using a layer of tectyl according to MIL-C-16173 
grade I. 
PART I 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. Put the platform (GG-01-00), or an approved alternative, adjacent to the left side of the 
fuselage. 
3. Put the platform (GG-02-00), or an approved alternative, adjacent to the right side of the 
fuselage 
4. In accordance with AMP DM 39-A-52-44-01-00A-520A-A, remove the access panels 
360AL, 360AT and 360CT to get access to the right side of the fin. 
NOTE 
With reference to the following step, the use of 
borescope is mandatory to comply with the required 
inspection.  
5. With reference to Figures 1 and 2 perform, with t he use of a borescope, a detailed 
inspection for cracks of the RH and FWD sides of the TGB fitting (area delimitated by 
circles in Figure 1) in accordance to the following procedure: 
5.1 Properly illuminate the area to inspect (if necessary use a flash light). 
5.2 Clean the area to inspect with the Cheesecloth (C028) and the Aliphatic naphtha 
(C059) or Cleaning solvent (C010). 
5.3 With reference to Figure 1 View C and View D, accurately examine the outer 
surfaces of the forward and right side of TGB fitting body above the horizontal row 
of fastener holes (area delimitated by circles in figure), making sure there are not 
cracks or damage. 
5.4 Accurately examine the area around the vertical and horizontal row of fastener

### Page 8

S.B. N°139-686 ALERT 
 DATE: November 8, 2021 
Page 8 of 11 REVISION: / 
holes (refer also to Figure 2 “View looking forward side of TGB fitting”) of the inner 
forward side of the tail gearbox attachment-fitting. 
5.5 Accurately examine the area around the vertical and horizontal row of fastener 
holes (refer also to Figure 2 “View looking right side of TGB fitting”) of the inner 
right side of the tail gearbox attachment-fitting. 
6. In case of any finding resulting from the inspection required by step 5, take a picture of the 
crack and of the involved area and contact Product Support Engineering 
(engineering.support.lhd@leonardocompany.com) to send photos of the cracks. Record 
for compliance with Part I of this Service Bulletin on the helicopter logbook and 
immediately proceed with Part II.  
7. In accordance with AMP DM 39-A-52-44-01-00A-720A-A, reinstall the access panels 
360AL, 360AT and 360CT. 
8. Remove the platforms from the fuselage sides. 
9. Return the helicopter to flight configuration and record for compliance with Part I of this 
Service Bulletin on the helicopter logbook. 
10. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 9

S.B. N°139-686 ALERT 
DATE: November 8, 2021 
REVISION: / Page 9 of 11 
PART II 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
NOTE 
With reference to step 2, apply ASRP DM  
39-A-53-52-07-00A-920A-D also to install 
P/N 3G5351A01151, if required.  
2. In accordance with ASRP DM 39-A-53-52-07-00A-920A -D replace the damaged TGB 
fitting with a new one.  
3. In accordance with AMP DM 39-A-52-44-01-00A-720A-A, install all the access panels 
previously removed. 
4. Remove the platforms from the fuselage sides. 
5. Return the helicopter to flight configuration and record for compliance with Part II of this 
Service Bulletin on the helicopter logbook. 
6. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 10

Figure 1 
 S.B. N°139-686 ALERT 
 DATE: November 8, 2021 
Page 10 of 11 REVISION: / 
C
3G5351A01152
TGB ATTACHMENT-FITTING (REF)
FWD
B
DETAIL A
DETAIL A
STRUCTURE AND SYSTEMS ARE PARTIALLY OMITTED FOR BETTER CLARITY PURPOSE
D
VIEW B
VIEW FROM THE INNER SIDE
VIEW C
STA
13349.3
STA
13208.6
WL
3 .3 920
INSPECTION AREA
VIEW D
VIEW LOOKING AFT
INSPECTION AREA
BL
0.0
WL
3786.7
3G5351A01152
TGB ATTACHMENT-FITTING (REF)
3G5351A01152
TGB ATTACHMENT-FITTING (REF)
RIGHT
SIDE
FORWARD
SIDE

### Page 11

Figure 2 
S.B. N°139-686 ALERT 
DATE: November 8, 2021 
REVISION: / Page 11 of 11 
 
VIEW LOOKING FORWARD SIDE OF TGB FITTING
VIEW LOOKING RIGHT SIDE OF TGB FITTING
(FOR REFERENCE ONLY)
(FOR REFERENCE ONLY)

### Page 12

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
