# Leonardo Alert Service Bulletin 139-725: Revision A

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2022-1419, the docket of AD 2023-03-03. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Alert Service Bulletin 139-725](https://openairdocs.org/service-documents/leonardo/sb-139-725.md)
- Title as filed: Leonardo Helicopters EASB 139-725 Rev A
- Pages: 21
- PDF: https://openairdocs.org/files/sha256/5d/8d/5d8d7c2da4565d4a80a1e82c96aaf3cbc4726df808cb5813c8edc0820e65973c
- Page: https://openairdocs.org/service-documents/leonardo/sb-139-725/file/5d8d7c2da456

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 of 20 
N° 139-725 
DATE:  July 25, 2022 
REV. :  A - August 9, 2022 
TITLE 
ATA 64 – TAIL ROTOR DUPLEX BEARING INSPECTION AND REPLACEMENT 
REVISION LOG 
Revision A is issued in order to prescribe the TRA P /N 3G6730V00731  or 
P/N 3G6730V00732 replacement when relative rotation between the trunnion and the PCR 
is found.  
Helicopters already compliant with the previous issue of this Service Bulletin and that have 
found rotation according to the inspection of section 3 “Accomplishment instructions” of the 
Service Bulletin Part I step 3 or Part III step 4 shall replace before next flight the TRA with a 
new item in accordance with section 3 “Accomplishment instructions” of the Service Bulletin 
Part I step 4.4 or Part III step 7.4. 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
EMERGENCY ALERT
SERVICE BULLETIN

### Page 2

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 2 of 20 REVISION: A - August 9, 2022 
 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
Part I and Part II:  
All AB139/AW139 helicopters installing tail rotor duplex bearings P/N 3G6430V00151, 
P/N 3G6430V00152 or P/N 3G6430V00153 that have less than 2400 FH and that have 
been removed and reinstalled on sliding control assembly P/N 3G6430A02531. 
Part III: 
All AB139/AW139 helicopters installing tail rotor duplex bearings P/N 3G6430V00151, 
P/N 3G6430V00152 or P/N 3G6430V00153 that have logged 2400 FH or more. 
Part IV: 
NOTE 
Each letter  A thru E of the list below identifies the 
affected components to be replaced in accordance with 
the compliance times, identified by the same letters in 
the list of the Compliance Part IV. 
A. All duplex bearings P/N 3G6430V00151, P/N 3G6430V00152 or  
P/N 3G6430V00153 that have less than 2400  FH and that have been removed 
and reinstalled on sliding control assembly P/N 3G6430A02531;  
B. All duplex bearings P/N 3G6430V00151, P/N 3G6430V00152 or  
P/N 3G6430V00153 that have less than 2400 FH and that have NOT been 
removed and reinstalled on sliding control assembly P/N 3G6430A02531; 
C. All duplex beari ngs P/N 3G6430V00151, P/N 3G6430V00152 or  
P/N 3G6430V00153 that have logged 2400 FH or more; 
D. All duplex  bearings P/N 3G6430V00151, P/N 3G6430V00152 or 
P/N 3G6430V00153 kept in stock and that have been removed from a sliding 
control assembly P/N 3G6430A02531; 
E. All duplex bearings P/N 3G6430V00151, P/N 3G6430V00152 or 
P/N 3G6430V00153 that have been removed and reinstalled on a sliding control 
assembly P/N 3G6430A02531 kept in stock. 
B. COMPLIANCE 
Part I: 
Before next flight and then every 10 FH until the bearing is replaced.

### Page 3

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 3 of 20 
Part II:Scegliere un elemento. 
Within and not later than 10 FH after the issue of this Service Bulletin and then every  
50 FH until the bearing is replaced. 
Part III: 
Before next flight and then every 5 FH until the bearing is replaced. 
Part IV: 
NOTE 
Each letter A thru E below is the applicable compliance 
time for the components identified with the same letters 
in the list of Effectivity Part IV. 
A. Within and not later than 200 FH after the first application of Part II or before 
exceeding 2400 FH of the bearings whichever occurs first; 
B. When the bearings reach 2400 FH; 
C. Within and not later than  10 FH after the first application of  
Part III; 
D. Before next installation; 
E. Before next installation. 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to prescribe the inspection of the tail rotor duplex 
bearing P/N 3G6430V00151, P/N 3G6430V00152 or P/N 3G6430V00153 and its 
replacement when necessary.  
E. DESCRIPTION 
Leonardo Helicopters has developed this Service Bulleti n following a reported 
occurrence of a tail r otor duplex bearing found damaged on an AW139. The 
investigation found that the bearing was removed and reinstalled on another sliding 
control assembly, even though AMP procedures do not allow reinstallation of a 
previously removed bearing. 
The AW139 AMPI Chapter 5 DM 39-A-05-13-00-00A-028E-P will be revised to update 
the bearings Discard Time to 2400 FH.  
Part I of this Service Bulletin applies to the helicopters installing tail rotor duplex bearings 
that have less than 2400 FH and that have been reinstalled on sliding control assembly

### Page 4

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 4 of 20 REVISION: A - August 9, 2022 
 
P/N 3G6430A02531 during application of AMPI Chapter 5 task 64-26 (2400 FH 
inspection) or AMPI Chapter 5 tasks 64-23 or 64-24 (4 Years inspection) or any other 
reason. Part I requires to apply a slippage mark between the PCR and the trunnion 
installed on the back-end of the TRA and to perform repetitive inspections for absence 
of rotation of the parts. If the inspection fails, the bearing must be replaced immediately. 
If rotation is found, also the TRA P/N 3G6730V00731 or P/N 3G6730V00732 must be 
replaced before next flight.  
Part II of this Service Bulletin gives instructions to inspect the tail rotor duplex bearings 
that have less than 2400 FH and that have been reinstalled on sliding control assembly 
P/N 3G6430A02531 during application of AMPI Chapter 5 task 64 -26 (2400 FH 
inspection) or AMPI Chapter 5 tasks 64 -23 or 64-24 (4 Years inspection) or any other 
reason. Aim of the inspection is  to check the bearings condition, absence of parti cles 
within bearing grease and to perform the roughness check. If any of the inspections fails, 
the bearing must be replaced immediately. 
Part III of this Service Bulletin gives instructions to inspect the tail rotor duplex bearings 
that have logged 2400 FH or more, in order to check their condition and to perform an 
inspection for absence of rotation as described for Part I. If any of the inspections fails, 
the bearing must be replaced immediately.  If rotation is found , also the TRA P/N 
3G6730V00731 or P/N 3G6730V00732 must be replaced before next flight. 
Part IV of this Service Bulletin gives instructions to replace the bearings in accordance 
with the applicable compliance time. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states manda tory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting  the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin.

### Page 5

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 5 of 20 
G. MANPOWER 
To comply with this Service Bulletin the following MMH are deemed necessary: 
Part I: approximately half (0,5) MMH if panel installation is not requested or one (1) 
MMH if requested; add approximately ten (10) MMH if bearing and TRA are 
replaced. 
Part II: approximately eight (8) MMH without bearing replacement or nine (9) MMH 
with bearing replacement. 
Part III: approximately eight (8) MMH without bearing or TRA replacement, twelve (12) 
MMH with bearing replacement or fourteen (14) MMH with bearing and TRA 
replacement. 
Part IV: approximately eight (8) MMH. 
MMH are based on hands -on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
Following Data Modules refer to AMP: 
DATA MODULE DESCRIPTION PART 
DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe 
maintenance 
I, II, III, IV 
DM02 39-A-06-41-00-00A-010A-A Access doors and panels - 
General data 
I, III 
DM03 39-A-20-00-00-00A-69CA-A Assembled parts - Slippage 
Marks 
I 
DM04 39-A-64-31-04-00A-520A-A Sliding control assembly - 
Remove procedure 
I, II, III, IV 
DM05 39-A-64-31-04-01A-320A-B Duplex bearing (sliding control 
assembly) - Operation test 
II 
DM06 39-A-67-32-01-00A-520A-A Tail rotor servoactuator - Remove 
procedure 
I, III 
DM07 39-A-67-32-01-00A-720A-A Tail rotor servoactuator - Install 
procedure 
I, III 
DM08 39-A-64-31-04-00A-720A-A Sliding control assembly - Install 
procedure 
I, II, III, IV 
DM09 39-A-64-31-03-00A-520A-A Cover - Remove procedure III 
DM10 39-A-64-31-03-00A-720A-A Cover - Install procedure III

### Page 6

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 6 of 20 REVISION: A - August 9, 2022 
 
DATA MODULE DESCRIPTION PART 
DM11 39-A-64-31-04-01A-921A-B Duplex bearing (sliding control 
assembly) - Replacement 
(remove and install a new item) 
I, II, III, IV 
2) ACRONYMS & ABBREVIATIONS 
AMDI Aircraft Material Data Information 
AMP Aircraft Maintenance Publication 
AMPI Aircraft Maintenance Planning Information 
DM Data Module 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
FH Flight Hours 
IPD Illustrated Parts Data 
ITEP Illustrated Tools and Equipment Publication 
LHD Leonardo Helicopters Division 
MMH Maintenance Man Hours 
MMIR Maintenance Malfunction Inspection Report 
P/N Part Number 
PCR Pitch Control Rod 
S/N Serial Number 
TRA Tail Rotor Actuator 
3) ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
AW139 AMPI Chapter 5. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 7

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 7 of 20 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
PART I 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 3G6430V00153  Duplex bearing 1 . (1) - 
2 3G6730V00732  Tail rotor actuator 1 . (1) - 
PART II 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
3 3G6430V00153  Duplex bearing 1 . (1) - 
PART III 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
4 3G6430V00153  Duplex bearing 1 . (1) - 
5 3G6730V00732  Tail rotor actuator 1 . (1) - 
PART IV 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
6 3G6430V00153  Duplex bearing 1 .  - 
 
Refer also to IPD for the spares materials required to comply with the AMP DMs 
referenced in the accomplishment instructions. 
2) CONSUMABLES 
The following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 
7 TT-N-95-B / Code No. 531055030 Aliphatic Naphtha (C059) AR (2) II, III  
8 DX 70002 Marking paint (C263) AR (2) I 
 
Refer to AMDI for the consumable materials required to comply with the AMP  DM 
referenced in the accomplishment instructions. 
3) LOGISTIC MATRIX 
N.A. 
NOTE 
(1) Item required only in case its replacement is needed because of a failed inspection. 
(2) Item to be procured as local supply.

### Page 8

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 8 of 20 REVISION: A - August 9, 2022 
 
B. SPECIAL TOOLS 
The following special tools, or equiva lent, are necessary to accomplish this Service 
Bulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
9 Commercial Light source 1 (B1) I 
10 Commercial Transparent container 1 (B1) II, III 
11 Commercial Spatula 1 (B1) II, III 
12 Commercial Magnet 1 (B1) II, III 
13 3G6405G04032 Tool kit, T/R duplex bearing removal/installation 1 (B2) I, II, III, IV 
 
Refer to ITEP for the special tools required to comply with the AMP DM referenced in 
the accomplishment instructions. 
SPECIAL TOOLS NOTE 
 Item to be procured as local supply. 
 Item needed only if bearing replacement is required. 
C. INDUSTRY SUPPORT INFORMATION 
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance ” section will be eligible to receive required 
materials on free of charge basis, except for Consumable Materials and Special Tools. 
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy. 
If any of the inspections prescribed in Part I, Part II or Part III fails, please Issue relevant 
MMIR form to your Warranty Administration Dpt. Including the following 
information/documents: 
- Pictures of sliding control assembly P/N 3G6430A02531; 
- Log card of sliding control assembly P/N 3G6430A02531; 
- Inspection Report in Figure 4, completed in every part; 
- Evidence of reinstallation of the bearing, if applicable; 
- Picture of Pin’s rotation on TRA P/N 3G6730V 00731 or P/N 3G6730V00732, only if 
rotation in found following the related inspection required on Part I and Part III. 
If all the required documentation will not be provided, MMIR will be rejected. 
NOTE: WRM will include RETURN MATERIAL AUTHORIZATION (RMA ) number; the 
TRA P/N 3G6730V00731 or P/N 3G6730V00732 disembarked from the aircraft has to 
be returned to LHD within fifteen (15) calendar days after the shipment of the 
replacement part. In case of missing return within fifteen (15) calendar days, Customer 
will be invoiced for the price of the replacement part.

### Page 9

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 9 of 20 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTE 
Place an identification tag on all components that are re-
usable, including the attaching hardware that has been 
removed to gain access to the modifi cation area and 
adequately protect them until their later re-use. 
PART I 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
NOTE 
When the inspection is repeated the slippage mark will 
be present and the removal of the panels may not be 
necessary as visual access may be possible thru the 
panels grids. 
2. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 1, 
remove all external panels  as required to gain access to the area affected by the 
inspection. 
3. With reference to Figure 1 and Figure 2, perform the inspection for rotation between the 
parts according to the following procedure: 
3.1 If Part I is applied for the first time perform the inspection and the slippage marking 
application according to the following procedure, otherwise skip to step 3.2: 
3.1.1 With reference to Figure 2 views B1 and B2, check that the castellated 
holes of the trunnion are aligned with those of the pitch control rod that 
goes thru it and check that the cotter pin is perfectly straight and not 
bended by a rotation movement. If rotation is found skip to step 4.  
3.1.2 With reference to Figure 1 view A and in accordance with the applicable 
steps of AMP DM 39-A-20-00-00-00A-69CA-A apply a slippage mark on 
the mating edge between the trunnion and the pitch control rod  on the 
rearward facing side, near the cotter pin.  
3.1.3 Skip to step 5.

### Page 10

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 10 of 20 REVISION: A - August 9, 2022 
 
NOTE 
If necessary, a light source can be used to better lighten 
the inspection area when looking thru the panels grids. 
3.2 If Part I has already been applied before, with reference to Figure 1 view A, check 
for the alignment of the slippage mark.  If rotation is found proceed to step  4, 
otherwise skip to step 5. 
4. Replace the duplex bearing and the TRA in accordance with the following procedure: 
4.1 Send pictures of sliding control assembly P/N  3G6430A02531 log card,  
with indication of bearing FH, evidence of reinstallation of the bearing, if applicable, 
the Inspection Report in Figure 4 and pictures of the back -end of the TRA with 
clear evidence of the rotation, as those in Figure 2 views B1 and B2, thru technical 
query on Leon ardo WebPortal or to Product Support Engineering 
(engineering.support.lhd@leonardo.com). 
4.2 In accordance with AMP DM 39-A-64-31-04-00A-520A-A and with refer ence to 
Figure 3, remove the sliding control assembly from the helicopter. 
4.3 In accordance with AMP DM 39-A-64-31-04-01A-921A-B and with reference to 
Figure 3, replace the tail rotor duplex bearing with a new item an d discard the 
removed one. 
4.4 In accordance with AMP DM 39-A-67-32-01-00A-520A-A and 
39-A-67-32-01-00A-720A-A and with reference to Figure 1, replace the TRA  
P/N 3G6730V00731 or P/N 3G6730V00732 with a new item. Send the removed 
TRA to LHD. 
4.5 In accordance with AMP DM 39-A-64-31-04-00A-720A-A and with reference to 
Figure 3, install the sliding control assembly on the helicopter. 
5. Return the helicopter to flight configuration and record for compliance with Part I of this 
Service Bulletin on the helicopter logbook. 
6. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”

### Page 11

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 11 of 20 
PART II 
1. In accordance with  AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. In accordance with AMP DM 39-A-64-31-04-00A-520A-A and with reference to Figure 3, 
remove the sliding control assembly from the helicopter. 
NOTE 
To perform the inspection of the duplex bearing do not 
remove it form sliding control assembly  
P/N 3G6430A02531. 
3. Perform the inspection of the duplex bearing in accordance with the following procedure: 
3.1 Inspect the visible parts of the duplex bearing (including the seals) for absence of 
wear, damages, corrosion; if present skip to step 4, otherwise proceed to step 3.2. 
3.2 Check the visible part of the duplex bearing for particles absence; if particles  are 
present skip to step 4, otherwise proceed to step 3.3. 
3.3 Check for grease leakage on the visible part of the duplex bearing; if any leakage 
is present proceed to step 3.4, otherwise skip to step 3.6. 
3.4 Check if any particle is found in the grease leakage by finger touch; if present skip 
to step 4, otherwise proceed to step 3.5. 
3.5 Perform grease inspection for magnetic/metallic particles according to the following 
procedure: 
3.5.1 Put a small quantity of leaked grease using a small spatula in a 
transparent container. 
3.5.2 Add a solvent (aliphatic naphtha). 
3.5.3 Put a magnet on the bottom out side of the container. 
3.5.4 Check for presence of magnetic particles in the solution; if present skip 
to step 4, otherwise proceed to step 3.6. 
3.6 In accordance with AMP DM 39-A-64-31-04-01A-320A-B, perform the duplex 
bearing operation test and check for absence of roughness in its movement; if test 
fails proceed to step 4, otherwise skip to step 5. 
4. Replace the duplex bearing in accordance with the following procedure: 
4.1 In accordance with AMP  DM 39-A-64-31-04-01A-921A-B and with reference to 
Figure 3, replace the tail rotor duplex bearing with a new item  and discard the 
removed one.  
4.2 Send pictures of sliding control assembly P/N 3G6430A02531 log card,  
with indication of bearing FH, evidence of reinstallation of the bearing and the

### Page 12

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 12 of 20 REVISION: A - August 9, 2022 
 
Inspection Report in Figure 4 thru technical query on Leonardo  WebPortal or to 
Product Support Engineering (engineering.support.lhd@leonardo.com). 
5. In accordance with AMP DM 39-A-64-31-04-00A-720A-A and with reference to Figure 3, 
install the sliding control assembly on the helicopter. 
6. Return the helicopter to flight co nfiguration and record for compliance with Part II of this 
Service Bulletin on the helicopter logbook. 
7. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 13

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 13 of 20 
PART III 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. In accordance with AMP DM 39-A-64-31-03-00A-520A-A and with reference to Figure 3, 
remove the cover from the helicopter. 
3. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 1, 
remove all external panels as required to gain access to the area affected by the 
inspection. 
4. With reference to Figure 2 views B1 and B2, perform the inspection for rota tion between 
the parts by checking that the castellated holes of the trunnion are aligned with those of 
the pitch control rod that goes thru it and checking that the cotter pin is perfectly straight 
and not bended by a rotation movement. If rotation is fou nd skip to step 7, otherwise 
proceed to step 5. 
5. Perform the inspection of the duplex bearing in accordance with the following procedure: 
5.1 Inspect the visible parts of the duplex bearing (including the seals) for absence of 
wear, damages, corrosion; if present skip to step 6, otherwise proceed to step 5.2. 
5.2 Check the visible part of the duplex bearing for particles ab sence; if particles are 
present skip to step 6, otherwise proceed to step 5.3. 
5.3 Check for grease leakage on the visible part of the duplex bearing; if any leakage 
is present proceed to step 5.4, otherwise skip to step 8. 
5.4 Check if any particle is found by finger touch; if present skip to step 6, otherwise 
proceed to step 5.5. 
5.5 Perform grease inspection for magnetic/metallic particles according to the following 
procedure: 
5.5.1 Put a small quantity of leaked grease using a small spatula in a 
transparent container. 
5.5.2 Add a solvent (aliphatic naphtha). 
5.5.3 Put a magnet on the bottom out side of the container. 
5.5.4 Check for presence of magnetic particles in the sol ution; if present 
proceed to step 6, otherwise skip to step 8. 
6. Replace the duplex bearing in accordance with the following procedure: 
6.1 In accordance with AMP DM 39-A-64-31-04-00A-520A-A and with reference to 
Figure 3, remove the sliding control assembly from the helicopter. 
6.2 In accordance wit h AMP DM 39-A-64-31-04-01A-921A-B and with reference to 
Figure 3, replace the tail rotor duplex bearing with a new item  and discard the

### Page 14

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 14 of 20 REVISION: A - August 9, 2022 
 
removed one. 
6.3 In accordance with AMP DM 39-A-64-31-04-00A-720A-A and with reference to 
Figure 3, install the sliding control assembly on the helicopter. 
6.4 Send pictures of sliding control assembly P/N 3G6430A02531 log card,  
with indication of bearing FH, evidence of reinstallation of the bearing, if applicable, 
and the Inspection Report in Figure 4 thru technical query on Leonardo WebPortal 
or to Product Support Engineering (engineering.support.lhd@leonardo.com). 
6.5 Skip to step 8. 
7. Replace the duplex bearing and the TRA in accordance with the following procedure: 
7.1 Send pictures of sliding control assembly P/N  3G6430A02531 log card,  
with indication of bearing FH, evidence of reinstallation of the bearing, if applicable, 
the Inspection Report in Figure 4 and pictures of the back -end of the TRA with 
clear evidence of the rotation, as those in Figure 2 views B1 and B2, thru technical 
query on Leonardo WebPortal or to Product Support Engineering 
(engineering.support.lhd@leonardo.com). 
7.2 In accordance with AMP DM 39-A-64-31-04-00A-520A-A and with reference to 
Figure 3, remove the sliding control assembly from the helicopter. 
7.3 In accordance with AMP DM 39-A-64-31-04-01A-921A-B and with reference to 
Figure 3, replace the tail rotor duplex bearing with a new item and discard the 
removed one. 
7.4 In accordance with AMP DM  39-A-67-32-01-00A-520A-A and 
39-A-67-32-01-00A-720A-A and with reference to Figure 1, replace the TRA  
P/N 3G6730V00731 or P/N 3G6730V00732  with a new item. Send the remove d 
TRA to LHD. 
7.5 In accordance with AMP DM 39-A-64-31-04-00A-720A-A and with reference to 
Figure 3, install the sliding control assembly on the helicopter. 
8. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 1, 
reinstall all external panels previously removed in step 3. 
9. In accordance with AMP DM 39-A-64-31-03-00A-720A-A and with reference to Figure 3, 
install the cover on the helicopter. 
10. Return the helicopter to flight configuration and record for compliance with Part III of this 
Service Bulletin on the helicopter logbook. 
11. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 15

S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 15 of 20 
PART IV 
NOTE 
Perform step 1 only for bearings kept in stock; refer to 
letter D in the lists of Effectivity and Compliance Part IV. 
1. If the duplex bearing is kept in stock, discard it. Skip to step 10. 
NOTE 
Perform step 2 only for bearings installed on sliding 
control assemblies kept in stock; refer to letter E in the 
lists of Effectivity and Compliance Part IV. 
2. If the duplex bearing has been reinstalled on sliding control assy P/N 3G6430A02531 kept 
in stock, replace it with a new item in accordance with  AMP 
DM 39-A-64-31-04-01A-921A-B and with reference to Figure 3. Skip to step 9. 
NOTE 
Perform step s 3 thru 10  for bearings installed on the 
helicopter; refer to letters A, B or C in the list s of 
Effectivity and Compliance Part IV. 
3. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
4. In accordance with AMP DM 39-A-64-31-04-00A-520A-A and with reference to Figure 3, 
remove the sliding control assembly from the helicopter. 
5. In accordance with AMP DM 39-A-64-31-04-01A-921A-B and with reference to Figure 3, 
replace the tail rotor duplex bearing with a new item and discard the removed one. 
6. In accordance with AMP DM 39-A-64-31-04-00A-720A-A and with reference to Figure 3, 
install the sliding control assembly on the helicopter. 
7. Return the helicopter to flight configuration and record for compliance with Part IV of this 
Service Bulletin on the helicopter logbook. 
8. Send pictures of sliding control assembly P/N 3G6430A02531 log card,  
with indication of bearing FH, evidence of reinstallation of the bearing, if applicable, and 
the Inspection Report in Figure 4  thru technical query on Leonardo WebPorta l or to 
Product Support Engineering (engineering.support.lhd@leonardo.com). 
9. Record for compliance with Part IV of this Service Bulletin on the sliding control assembly 
P/N 3G6430A02531 log card. 
10. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com

### Page 16

S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 16 of 20 REVISION: A - August 9, 2022 
 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”. 
  Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione

### Page 17

Figure 1 
S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 17 of 20 
 
REARWARD

### Page 18

Figure 2 
S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 18 of 20 REVISION: A - August 9, 2022

### Page 19

Figure 3 
S.B. N°139-725 EMERGENCY ALERT 
DATE: July 25, 2022 
REVISION: A - August 9, 2022 Page 19 of 20

### Page 20

Figure 4 
S.B. N°139-725 EMERGENCY ALERT 
 DATE: July 25, 2022 
Page 20 of 20 REVISION: A - August 9, 2022 
SB 139-725 Rev. A – Inspection Report 
 
Date  
 Helicopter 
S/N  FH Landings 
   
Sliding Control Assembly 
where bearing is installed 
S/N FH 
  
TR Duplex Bearing 
P/N S/N FH 
   
TR Duplex Bearing previously 
removed and reinstalled 
YES NO 
☐ ☐ 
 
SB Part performed 
Part I Part II Part III Part IV 
☐ ☐ ☐ 
A B C D E 
☐ ☐ ☐ ☐ ☐ 
* For Part I, Part II or Part III please also fill the applicable parts of the table below. 
* For Part IV flag the Effectivity/Compliance applicable case. 
 
PROCEDURE STEP FAILED DESCRIPTION OF FINDINGS 
Part I Step 3 or 
Part III Step 4 
 
☐ 
  
  
  
  
Parts II Step 3.1 or 
Part III Step 5.1 
 
☐ 
Parts II Step 3.2 or 
Part II Step 5.2 
 
☐ 
Parts II Step 3.4 or 
Part II Step 5.4 
 
☐ 
Parts II Step 3.5 or 
Part II Step 5.5 
 
☐ 
Part II Step 3.6 
 
☐ 
Notes:

### Page 21

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
