# Leonardo Emergency Alert Service Bulletin 139-731: No revision named

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2022-1307, the docket of AD 2022-22-03. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Emergency Alert Service Bulletin 139-731](https://openairdocs.org/service-documents/leonardo/sb-139-731.md)
- Title as filed: Leonardo Helicopters EASB No. 139-731
- Pages: 24
- PDF: https://openairdocs.org/files/sha256/e2/b0/e2b07ed36e2bc38daa9a434ac6e9428576b01c9d89b0e86c7a36e61e8966f277
- Page: https://openairdocs.org/service-documents/leonardo/sb-139-731/file/e2b07ed36e2b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

N ° 139-731 
D ATE:  October 11, 2022 
REV. :  / - 2 
P age 1 of 23 
TITLE 
ATA 00 – FORWARD CABIN ROOF CEILING HARNESS INSPECTION 
REVISION LOG 
First Issue. 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
EMERGENCY ALERT
SERVICE BULLETIN

### Page 2

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 2 of 23 REVISION: / 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
All AB/AW139 from S/N 31005 to S/N 31984 (except S/N 31007, S/N 31803, 
S/N 31959, S/N 31967, S/N 31969, S/N 31974, S/N 31982 and S/N 31983), from 
S/N 41001 to S/N 41580 and from S/N 41801 to S/N 41806. 
B. COMPLIANCE 
Part I: 
Within and not later than ten (10) FH from the issue date of this Service Bulletin. 
Part II: 
Within and not later than twenty-five (25) FH from the issue date of this Service Bulletin. 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to prescribe one-off inspections of the Forward 
Cabin Roof Ceiling Harnesses and their installation in the area between STA 3120 and 
3900 to identify potential chafing conditions. 
E. DESCRIPTION 
Part I of this Service Bulletin is developed to prescribe a one-off inspection of the 
Forward Cabin Roof Ceiling Harnesses installation in the area between STA 3120 and 
3400 to verify the proper installation of the C/As in the area. 
Part II of this Service Bulletin is developed to prescribe a one-off inspection of the 
harness installation in the area between STA 3400 and 3900 where the diode A77 is 
located. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LH certified and 
affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to

### Page 3

S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: /  Page 3 of 23 
obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any 
adaptation necessary before incorporation of the present Service Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin, the following MMH are deemed necessary: 
Part I: approximately two (2) MMH; 
Part II: approximately ten (10) MMH; 
MMH are based on hands-on time and can change with helicopter configuration, 
personnel and facilities available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
Following Data Modules refer to AMP: 
DATA MODULE DESCRIPTION PART 
DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe 
maintenance. 
I, II 
DM02 39-A-24-91-01-00A-520A-A Circuit breaker panel - Remove 
procedure 
I 
DM03 39-A-24-91-01-00A-720A-A Circuit breaker panel - Install 
procedure 
I 
Following Data Modules refer to CSRP: 
DATA MODULE DESCRIPTION PART 
DM04 CSRP-A-51-21-02-02A-257A-D  
 
Waterborne chromate free 
primer (AWMS28-002) - Paint 
and apply marking 
I 
DM05 CSRP-A-51-21-06-00A-644A-D Chromate conversion 
treatments of aluminum alloys 
– Chromate 
I 
2) ACRONYMS & ABBREVIATIONS 
AMP Aircraft Maintenance Publication 
AR As Required 
ATA Air Transport Association 
AMDI Aircraft Material Data Information 
C/A Cable Assy 
CSRP Common Structural Repair Publication  
DM Data Module

### Page 4

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 4 of 23 REVISION: / 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
FH Flying Hours 
ITEP Illustrated Tool and Equipment Publication 
IPD Illustrated Part Data 
LH Leonardo Helicopter 
MMH Maintenance Man Hours 
N.A. Not Applicable 
P/N Part Number 
3) ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
N.A. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 5

S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: /  Page 5 of 23 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
PART I 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 3P5315A12931   STRIP ASSY REF . (1) - 
2 AW001CL504B-N6  Support 3 .. (1) - 
3 MS21075L3N MS21075L3 Nut plate 2 .. (1) - 
4 NAS1097AD3-3  Rivet 0.1 kg .. (1) - 
5 NAS1720H5L2A  Rivet 3 .. (1) - 
6 3P5315A10531  STRIP ASSY REF . (1) - 
7 AW001CL504B-N6  Support 3 .. (1) - 
8 MS21075L3N MS21075L3 Nut plate 2 .. (1) - 
9 MS20426AD3-3  Rivet 0.1 kg .. (1) - 
10 NAS1720H5L2A  Rivet 3 .. (1) - 
PART II 
N.A. 
2) CONSUMABLES 
The following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# SPEC./LH CODE NUMBER DESCRIPTION Q.TY NOTE PART  
11 Commercial Aluminium Sheet AL-ALY 2024,  AMS-QQ-A-250/5, thickness 0.81 mm AR (2) (3) I 
 
Refer also to AMDI for the consumable materials required to comply with the AMP DM 
referenced in the accomplishment instructions. 
3) LOGISTIC MATRIX 
N.A. 
NOTES 
(1) The quantity of items to be ordered depends on the results of the inspection. 
(2) Item to be procured as local supply. 
(3) As alternative it is possible to use material AMS-QQ-A-250/4 and thickness 1.02 
mm.

### Page 6

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 6 of 23 REVISION: / 
B. SPECIAL TOOLS 
The following special tools, or equivalent, are necessary to accomplish this Service 
Bulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
12 Comercial Borescope 1  I 
 
Refer also to ITEP for the special tools required to comply with the AMP DM referenced 
in the accomplishment instructions. 
C. INDUSTRY SUPPORT INFORMATION 
As reported in Part I step 4 and Part II step 3, only if Product Support Engineering 
confirms the replacements, please Issue relevant MMIR form to your Warranty 
Administration Dpt. 
Please note that “Product Support Engineering’s approvals” is mandatory to evaluate 
your request, otherwise MMIR could be rejected. 
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance” section will be eligible to receive required 
materials on free of charge basis, except for Consumable Materials and Special Tools. 
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy. 
Please Issue relevant MMIR form to your Warranty Administration Dpt.

### Page 7

S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: /  Page 7 of 23 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTES 
a) Place an identification tag on all components that 
are re-usable, including the attaching hardware that 
has been removed to gain access to the modification 
area and adequately protect them until their later re-
use. 
b) Shape the cables in order to prevent interference 
with the structure and the other existing installations, 
using where necessary suitable lacing cords and 
plastic cable tiedown. 
c) Let adhesive cure at room temperature for at least 
24 hours. 
d) All lengths are in mm.  
PART I 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. With reference to Figure 1 thru Figure 5 perform the inspection of the Forward Cabin Roof 
Ceiling Harnesses and installation in the area between STA 3120 and 3400 as described 
in the following procedure: 
2.1 With reference to Figure 1 thru Figure 5, perform a visual inspection of the harness 
installation on strips P/N 3P5315A10531 and 3P5315A12931 according to the 
following steps: 
2.1.1 In accordance with the applicable steps of AMP  
DM 39-A-24-91-01-00A-520A-A and with reference to Figure 1, open the 
circuit breaker panel assy without removing it. 
2.1.2 With reference to Figure 1, insert the borescope inside the lightening 
holes showed to access the area of the inspection. 
2.1.3 Perform a visual inspection of the C/As installation.

### Page 8

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 8 of 23 REVISION: / 
NOTE 
When C/A installation is correct, C/A are installed below 
the RH/LH strips P/N 3P5315A10531 and 
P/N 3P5315AA12931, as shown in Figure 3. 
2.1.4 If C/As are installed above the strips P/N 3P5 315A10531 and/or 
P/N 3P5315A12931 as per Figure 4 “Incorrect Installation”, go to step 3.  
2.1.5 If C/As are installed correctly as shown in Figure 3, go to step 5 and 
close SB Part I application.  
NOTE 
Perform step 3 only in case the C/As are installed as per 
step 2.1.4.  
3. In accordance with AMP DM 39-A-06-41-00-00A-010A- A and with reference to Figure 1 
thru 5, remove all external panels, internal panels and internal liners as required to gain 
access to the area affected by the installation and perform visual inspection of the C/As 
and of the Torque Tube C3 and the strip installation adjustment as described in the 
following procedure: 
3.1 With reference to Figure 2 and Figure 3, perform a visual inspection of the C/As 
fixed to strips P/N 3P5315A10531 and 3P5315A12931 according to the following 
steps:  
3.1.1 Check for chafing and/or damage of the cable harness.  
3.1.2 In case of any finding, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) in order to receive further 
instruction. 
3.2 With reference to Figure 2, perform a visual inspection of the Torque Tube C3 
P/N 3E6711A00433. Make sure that there is no damage on the tube.  
If damage is found, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) in order to receive further instruction. 
3.3 With reference to Figure 4 and to Figure 6 thru 9 perform strip installation 
adjustment as described in the following procedure: 
3.3.1 With reference to Figure 4, remove C/A from supports  
AW001CL504B-N6 installed on strips P/N 3P5315A10531 and/or 
P/N 3P5315A12931. 
3.3.2 With reference to Figure 6 remove strips P/N 3P5315A10531 and/or 
3P5315A12931 and put them on a workbench. Retain the fixing 
hardware for later use.

### Page 9

S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: /  Page 9 of 23 
3.3.3 With reference to Figure 7, remove n° 3 supports AW001CL504B-N6 
from P/N 3P5315A10531 and/or P/N 3P5315A12931. 
NOTE 
Perform Steps 3.3.4 ONLY in case of damage of 
the strip P/N 3P5315A10531 and/or 
P/N 3P5315A12931 and if replacement is 
needed. Otherwise, go to step 3.3.5. 
3.3.4 With reference to Figure 7, assemble strips P/ N 3P5315A10531 and/or 
3P5315A12931 with reference to the following procedure: 
3.3.4.1 With reference to Figure 8, manufacture strips 
P/N 3P5315A10551 and/or 3P5315A12951 using Aluminium 
Sheet AL-ALY 2024. 
3.3.4.2 In accordance to CSRP DM CSRP-A-51-21-06-00A-644A-D apply 
Chromate Conversion Treatment. 
3.3.4.3 With reference to Figure 8 and in accordance with CSRP DM 
CSRP-A-51-21-02-02A-257A-D apply a layer of primer on strips 
P/N 3P5315A10551 and/or 3P5315A12951. 
3.3.4.4 With reference to Figure 7 install n°2 nut plates P/N MS21075L3N 
by means of n°4 rivet P/N NAS1097AD3-3 or  
P/N MS20426AD3-3 (as applicable) on strips P/N 3P5315A10551 
and/or 3P5315A12951. 
3.3.4.5 With Reference to Figure 7, install n° 3 new supports 
AW001CL504B-N6 by means of n° 3 rivets NAS1720H5L2A on 
strips P/N 3P5315A10551 and/or 3P5315A12951. Make sure they 
are oriented opposite with respect to nut plates MS21075L3N. 
3.3.4.6 With reference to Figure 7, countermark the obtained components 
as P/N 3P5315A10531 and/or 3P5315A12931. 
NOTE 
Perform Step 3.3.5 ONLY in case Steps 3.3.4 
was not performed. 
3.3.5 With Reference to Figure 7, install n° 3 suppo rts P/N AW001CL504B-N6 
by means of n° 3 rivets NAS1720H5L2A on bracket P/N 3P5315A10531 
and/or 3P5315A12931. Make sure they are oriented opposite with 
respect to nut plates MS21075L3N. 
3.3.6 With reference to Figure 9, fix C/As on strips P/N 3P5315A10531 and/or 
3P5315A12931 by means of tie wraps.

### Page 10

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 10 of 23 REVISION: / 
3.3.7 With Reference to Figure 6, reinstall strips P/N 3P5315A10531 and/or 
3P5315A12931. 
4. In case of findings, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) to report about the results of the inspections 
requested. 
5. In accordance with the applicable steps of AMP DM 39-A-24-91-01-00A-720A-A and with 
reference to Figure 1 thru Figure 5, close the circuit breaker panel assy. 
6. Return the helicopter to flight configuration and record for compliance with Part I of this 
Service Bulletin on the helicopter logbook. 
7. Send the attached compliance form to the following mail box:     
   engineering.support.lhd@leonardo.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 11

S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: /  Page 11 of 23 
PART II 
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on 
ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or 
the external power supply. 
2. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 5, 
Figure 10 and Figure 11, remove all external panels, internal panels and internal liners as 
required to gain access to the area affected by the installation and perform the diode A77 
harness installation inspection in the area between STA 3400 and 3900 as described in 
the following procedure:  
2.1 With reference to Figure 5, Figure 10 and Figure 11, perform a visual inspection of 
the C/As installation next to the Diode A77 P/N 3G2430V00352 according to the 
following steps: 
2.1.1 With reference to Figure 10, check for chafing or damage on the cable 
harness in the area showed.  
2.1.2 In case of any finding, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) in order to receive further 
instruction. 
2.1.3 With reference to Figure 10 and Figure 11, ensure that clearance of at 
least 10.0 mm exists in the area inside the red circle shown in Figure 11, 
between the cable harness and Diode A77 P/N 3G2430V00352.  
NOTE 
In case of any doubt and/or need to support,  
contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) in order to 
receive further instruction. 
2.1.4 If necessary, in accordance with Figure 10 and  Figure 11, re-route the 
cable harnesses (using if needed also lacing cord to fix the cables with 
each other) in order to respect the clearance of at least 10.0 mm from 
the diode or any other surrounding structure or component. 
2.2 With reference to Figure 10 and 11, perform a visual inspection of the Diode A77. 
Make sure that no damage is present on the component. 
2.3 In case of any finding, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) in order to receive further instruction. 
3. In case of findings, contact Product Support Engineering 
(engineering.support.lhd@leonardo.com) to report about the results of the inspections 
requested.

### Page 12

S.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 12 of 23 REVISION: / 
4. Return the helicopter to flight configuration and record for compliance with Part II of this 
Service Bulletin on the helicopter logbook. 
5. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardo.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.ruzione sezione

### Page 13

Figure 1 
S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: / Page 13 of 23 
  
3P5315A10531 STRIP ASSY
(REF)
OVERHEAD PANEL (REF) STRUCTURES AND SYSTEMS ARE PARTIALLY 
OMITTED FOR BETTER CLARITY PURPOSE SB139-731-001-01
VIEW B
A
STRUCTURES AND SYSTEMS ARE PARTIALLY 
OMITTED FOR BETTER CLARITY PURPOSE
VIEW A
STA
3.120
REF
STA
3.900
REF
A77 DIODE (REF)
3P5315A12931 STRIP ASSY
(REF)
LH
UP
FWD
OVERHEAD PANEL (REF)
CB
D

### Page 14

Figure 2 / 
 S
.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 14 of 23 REVISION: / 
 
  
SB139-731-002-01
STRUCTURES AND SYSTEMS ARE PARTIALLY 
OMITTED FOR BETTER CLARITY PURPOSE
VIEW C

### Page 15 (OCR)

* LEONARDO  HELICOPTERS
Strip P/N 3P5315A10531
or 3P5315A12931
03128 06/10/2022
UP
REGISTRA
VAI A
VIEW WITH BORESCOPE
Figure 3
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: /  Page 15 of 23

### Page 16

Figure 4 / 
 S
.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 16 of 23 REVISION: /

### Page 17

Figure 5 
S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: / Page 17 of 23 
  
3P5315A12931 STRIP ASSY
(REF)
SB139-731-003-01
STRUCTURES AND SYSTEMS ARE PARTIALLY 
OMITTED FOR BETTER CLARITY PURPOSE
VIEW D
FWD
LHRH
STA 3120
A4T7 TERMINAL LUG
CABLE B1B22
A4T3 TERMINAL LUG
CABLE B1B8
A4T8 TERMINAL LUG
CABLE B1B3
A4T6 TERMINAL LUG
CABLE B1B6
B1B21
B1B23
B1B3
B1B7
B1B8
B1B11
B1B6
BL 0,0
B1A10
B1A3
B1A4
B1A8B1A17
B1A19
A3T12 TERMINAL LUG
CABLE B1A4
A3T3 TERMINAL LUG
CABLE B1A3
A3T4 TERMINAL LUG
CABLE B1A8
A3T6 TERMINAL LUG
CABLE B1A10
BL-800
BL-550
BL 800
BL 550
STA 3900
A4T4 TERMINAL LUG
CABLE B1B7
A4T12 TERMINAL LUG
CABLE B1B11
STA 3900
A77 DIODE (REF)
3P5315A10531 STIRP ASSY
(REF)
 
     
Part I
Part II

### Page 18

Figure 6 / 
 S
.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 18 of 23 REVISION: /

### Page 19

Figure 7 
S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: / Page 19 of 23 
  SB139-731-004-01
Ø5.15÷5.28
(TYP 2 PLACES)
MS21075L3        NUTPLATE  (2 OFF)
NAS1097AD3-3  RIVET          (4 OFF)
Ø4.26÷4.39     TYP N˚3 PLACES
AW001CL504B-N6 SUPPORT ELECTRICAL CABLE (3 OFF)
NAS1720H5L2A   RIVET          (3 OFF)
ACCORDING TO NTA670A
3P5315A12951 STRIP
3P5315A12931 STRIP ASSY
3P5315A10531 STRIP ASSY
(TYP 2 PLACES)
3P5315A10551 STRIP
Ø4.26÷4.39     TYP N˚3 PLACES
AW001CL504B-N6 SUPPORT ELECTRICAL CABLE (3 OFF)
NAS1720H5L2A   RIVET          (3 OFF)
ACCORDING TO NTA670A
MS21075L3 NUT
MS20426AD3-3 RIVET
Ø5.00
(TYP 2 PLACES)

### Page 20

Figure 8 / 
 S
.B. N°139-731 EMERGENCY ALERT 
 DATE: October 11, 2022 
Page 20 of 23 REVISION: / 
  SB139-731-005-01
6.0
TYP
104.7
N˚2 EQUAL SPACE
56.5
45˚
TYP
12.8
TYP
98.4 33.3
TYP
5.0R
TYP
12.0
TYP
8.0
TYP
38.7
12.013.3
TYP
165.0
PILOT HOLE Ø2.5
PILOT HOLE Ø2.5
PILOT HOLE Ø2.5
113.00
24.00
11.00
19.00
5.00RTYP.
112.70 12.00
137.00
92.00
68.50
45.00
45˚
TYP.
19.00
12.00
9 .00
6.00
MATERIAL AL-ALY 2024 T3
AMS-QQ-A-250/5, TH 0.81
3P5315A10551 STRIP
MATERIAL AL-ALY 2024 T3
AMS-QQ-A-250/5, TH 0.81
3P5315A12951 STRIP
N˚5 PILOT HOLES Ø2.50

### Page 21

Figure 9 
S.B. N°139-731 EMERGENCY ALERT 
DATE: October 11, 2022 
REVISION: / Page 21 of 23

### Page 22 (OCR)

_ LEONARDO
HELICOPTERS
Diode A77
Figure 10
Page 22 of 23  REVISION: /

### Page 23 (OCR)

K LEONARDO
HELICOPTERS
DIODE A77
Figure 11
S.B. N°139-731 EMERGENCY ALERT
DATE: October 11, 2022
REVISION: /  Page 23 of 23

### Page 24

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
