# Leonardo Service Bulletin 169-162: Revision A

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0612, the docket of AD 2021-20-17. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Service Bulletin 169-162](https://openairdocs.org/service-documents/leonardo/sb-169-162.md)
- Title as filed: Leonardo Helicopters SB No. 169-162 Rev A
- Pages: 16
- PDF: https://openairdocs.org/files/sha256/26/4b/264bc0aeec73fc724a993f1fb2c57fafdc5c5c3510c578b2102a3c15418ba5f1
- Page: https://openairdocs.org/service-documents/leonardo/sb-169-162/file/264bc0aeec73

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

N° 169-162
DATE:  August 4, 2020 
REV. :  A - December 2, 2020 
Page 1 of 15 
TITLE 
ATA 64 - TAIL ROTOR IMPROVED DUPLEX BEARING INSTALLATION 
REVISION LOG 
Helicopters already compliant with previous issues of this Service Bulletin do not need any 
additional action. 
Revision A is issued in order to provide additional clarifications about required materials and 
components return procedures. 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
SERVICE BULLETIN

### Page 2

S.B. N°169-162 
 DATE: August 4, 2020 
Page 2 of 15 REVISION: A - December 2, 2020 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
Part I : All AW1 69 helicopters equipped with Tail Rotor Duplex Bearing 
P/N 4F6430V00551 
Part II : All AW1 69 helicopters already equipped with Tail Rotor Duplex Bearing 
P/N MM6430V00151. 
B. COMPLIANCE 
Part I:  
Within 400 flight hours or 4 months whichever occurs first from the issue of this Service 
Bulletin 
 
Part II:  
NOTES 
A non-cumulative tolerance of 10% may be  applied to 
the compliance time s specified below to allow 
synchronization of the required inspections with other 
required maintenance tasks for which a non-cumulative 
tolerance is already granted in the applicable 
Maintenance Manual. 
Within 400 FH accumulated by the Duplex Bearing PN MM6430V00151 installed on 
AW169 helicopter. 
C. CONCURRENT REQUIREMENTS 
Refer also to SB 169 -178 for additional operations needed upon any installation of 
improved Tail Rotor Duplex Bearing P/N MM6430V00151 
D. REASON 
This Service Bulletin is issued in order to provide the necessary instruction on how to 
perform the installation of the new Tail Rotor Duplex Bearing P/N MM6430V00151 in 
lieu of P/N 4F6430V00551. 
E. DESCRIPTION 
Leonardo Helicopters Division has developed this Service Bulletin in order to require the 
installation of the new Tail Rotor Duplex Bearing P/N MM6430V00151 in lieu of 
P/N 4F6430V00551 on AW169 helicopters.

### Page 3

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 3 of 15 
The new Tail Rotor Duplex Bearing features material change s for different internal 
components and general optimization of the internal micro geometry, aimed to reduce 
the heat generation. 
Part I of this Service Bulletin provides the necessary instructions on how to install the 
new Tail Rotor Duplex Bearing P/N MM6430V00151 in lieu of P/N 4F6430V00551. 
Part II  of this Service Bulletin requires any new Tail Rotor Duplex Bearing P/N 
MM6430V00151 to be replaced with a brand new unit everytime the component reaches 
a certain amount of FH.  
Duplex bearings (P/N 4F6430V00551 and P/N MM6430V00151) removed for scheduled 
replacement must be returned to LHD (no scrap on site is allowed). Customer/Operator 
are invited to contact their contact point in Leonardo Helicopters Material Services, in 
order to receive proper instructions.   
Duplex bearings (P/N 4F6430V00551 and P/N MM6430V00151) removed for 
unscheduled replacement due to findings must be returned to LHD  facility as well. 
Customer/Operator are invited to contact their contact point in LH Service Engineering 
(engineering.support.lhd@leonardocompany.com), in order to receive proper 
instructions. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, b efore 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. 
EASA states mandatory compliance with inspections, modifications or technical 
directives and related time of compliance by means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin.  
 
G. MANPOWER 
To comply with this Service Bulletin the following MMH are deemed necessary: 
Part I: approximately ten (10) MMH 
Part II: approximately ten (10) MMH

### Page 4

S.B. N°169-162 
 DATE: August 4, 2020 
Page 4 of 15 REVISION: A - December 2, 2020 
MMH are based on hands -on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
DATA MODULE DESCRIPTION PART 
DM01 69-A-00-20-00-00A-120A-A Helicopter on ground for a 
safe maintenance. 
- 
DM02 69-A-64-31-04-00A-720A-A  Sliding control assy - Install 
procedure 
- 
DM03 69-A-64-31-03-00A-520A-A Spider plug - Remove 
procedure 
- 
DM04 69-A-64-31-03-00A-720A-A Spider plug - Install 
procedure 
- 
DM05 69-A-64-31-01-00A-520A-A Pitch link - Remove 
procedure 
- 
DM06 69-A-64-31-01-00A-720A-A Pitch link - Install 
procedure 
- 
DM07 69-A-64-31-02-00A-520A-A Scissors assy - Remove 
procedure 
- 
DM08 69-A-64-21-05-00A-520A-A Lightning conductor jumper 
- Remove procedure 
- 
DM09 69-A-64-31-05-00A-520A-B Duplex bearing - Remove 
procedure 
- 
DM10 69-A-64-31-05-00A-720A-B Duplex bearing - Install 
procedure 
- 
DM11 69-A-64-31-07-00A-520A-A Boot - Remove procedure - 
2) ACRONYMS 
AMDI Aircraft Material Data Information 
AMP Aircraft Maintenance Publication 
AR As Required 
CSRP Common Structural Repair Publication 
DM Data Module 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
IPD Illustrated Parts Data

### Page 5

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 5 of 15 
ITEP Illustrated Tool and Equipment Publication 
LHD Leonardo Helicopters Division 
MLG Main Landing Gear 
MMH Maintenance-Man-Hours 
3) ANNEX 
N.A. 
J. PUBLICATIONS AFFECTED 
AW169 Aircraft Maintenance Publication (AMP) 
AW169 Illustrated Part Data (IPD) 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 6

S.B. N°169-162 
 DATE: August 4, 2020 
Page 6 of 15 REVISION: A - December 2, 2020 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
PART I 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
1 6F6400P00411  REWORK, SPACER AND DUPLEX REPLACEMENT REF .  - 
2 MM6430A00151  Spacer 1 ..  - 
3 6F6430P00231  
REWORK, SLIDING 
CONTROL ASSEMBLY 
T/R 
REF ..  - 
4 MM6430V00151  Tail rotor duplex bearing 1 …  169-162L1 
5 6F6430A01352  Peeling shim 1 …  169-162L1 
6 LAMHALPATCH01R1  Protective layer REF .. (1)  
7 M06SHA094D01R1  Thermal strip REF .. (1)(2)  
8 MS24665-155  Pin 10 .  169-162L1 
9 MS24665-304  Pin 1 .  169-162L1 
10 MS24665-302  Pin 3 .  169-162L1 
11 A256A029  O-ring 1 .  169-162L1 
12 AW001CK07UV  Strap Tiedown 2 .  169-162L1 
PART II 
# P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 
13 MM6430V00151  Tail rotor duplex bearing 1 .  169-162L1 
14 6F6430A01352  Peeling shim 1 .  169-162L1 
15 LAMHALPATCH01R1  Protective layer REF . (1)  
16 M06SHA094D01R1  Thermal strip REF . (1)(2)  
17 MS24665-155  Pin 10 .  169-162L1 
18 MS24665-304  Pin 1 .  169-162L1 
19 MS24665-302  Pin 3 .  169-162L1 
20 A256A029  O-ring 1 .  169-162L1 
21 AW001CK07UV  Strap Tiedown 2 .  169-162L1 
Refer also to IPD for the consumable materials required to comply with the AMP DM 
referenced in the accomplishment instructions 
2) CONSUMABLES 
Refer also to AMDI for the consumable materials required to comply with the AMP 
DM referenced in the accomplishment instructions.

### Page 7

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 7 of 15 
3) LOGISTIC MATRIX 
In order to apply this Service Bulletin, the following Logistic P/N can be ordered in 
accordance with the applicable notes: 
 
LOGISTIC P/N Q.TY (PER HELO) NOTE PART 
169-162L1 1 (3) 1,2 
MM6430A00151 1 - 1 
LAMHALPATCH01R1 REF (1) 1,2 
M06SHA094D01R1 REF (1) 1,2 
NOTES 
(1) Item required in Q.ty within Part III of SB 169-178, to be applied concurrently with current 
SB. Only Q.ty 1 of this item is necessary for the application of both current SB and SB 
169-178. Item shall be separately ordered in Q.ty within SB 169-178, as it is not included 
in logistic P/N 169-162L1. 
(2) Identification on label M06SHAL094D01R1 is printed on the thermal strip. 
(3) Logistic P/N is firstly required upon accomplishment of Part I. It shall be made newly 
available for Part II embodiment in accordance with the relevant compliance. 
B. SPECIAL TOOLS 
# P/N DESCRIPTION Q.TY NOTE PART 
22 6F6430G00131 Tool, T/R pitch control link adjust 1 (1) / 
23 8G6420G01832 T/R spider & slider, remove/installation tool kit 1 (1) / 
24 6F6430G04031 TR duplex bearing  removal-installation tool kit 1 (1) / 
 
Refer also to ITEP for the special tools required to comply with the AMP DM referenced 
in the accomplishment instructions. 
 
(1) If the present tool is not already owned in Customer’s stock, please contact Leonardo 
Helicopters order administration point of contact to request the tool supply on loan. As 
soon as the present Service Bulletin is implemented the tool supplied on loan shall be 
promptly returned to Leonardo Helicopters. 
C. INDUSTRY SUPPORT INFORMATION 
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance” section will be eligible to receive necessary 
replacements on free of cha rge basis, except for Consumable Materials and Special 
Tools.  
NOTE: Customers who fail to comply with the instructions in this Service Bulletin before 
the compliance date are not eligible for the aforementioned special policy.

### Page 8

S.B. N°169-162 
 DATE: August 4, 2020 
Page 8 of 15 REVISION: A - December 2, 2020 
Please Issue relevant MMIR form to your Warranty Administration Dpt.  
NOTE: WRM will include RETURN MATERIAL AUTHORIZATION (RMA) number; the 
unit removed from the aircraft has to be returned to LHD as per instructions defined into 
LHD Information Letter GEN-15-047 and GEN-19-075. 
NOTE: Duplex bearings (P/N 4F6430V00551 and P/N MM6430V00151) removed for 
scheduled or unscheduled replacement must be returned to LHD (no scrap on site is 
allowed).  
For scheduled replacement, Customer/Operator are invited to contact their contact point 
in Leonardo Helicopters Material Services, in order to receive proper instructions. For 
unscheduled replacement, Customer/Operator are invited to contact their contact point 
in LH Service Engineering ( engineering.support.lhd@leonardocompany.com), in order 
to receive proper instructions.  
NOTE: please provide P/N, S/N and FH of the TR Duplex Bearing P/N MM6430V00151 
to be removed from the helicopter at next application of Part II of the current SB.

### Page 9

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 9 of 15 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTES 
a) Place an identification tag on all components that 
are re-usable, including the attaching hardware that 
has been removed to gain access to the modification 
area and adequately protect them until their later re-
use. 
b) Exposed thread surface and nut must be protected  
using a layer of tectyl according to MIL -C-16173 
grade I. 
c) All lengths are in mm. 
PART I 
1. In accordance with DM 69-A-00-20-00-00A-120A-A, prepare the helicopter on ground for 
a safe maintenance. Disconnect the battery, all electri cal power sources and/or the 
external power supply. 
2. In accordance with AMP DM 69-A-64-31-03-00A-520A-A, remove the spider plug. 
3. In accordance with applicable steps of AMP DM 69-A-64-31-01-00A-520A-A, temporarily 
detach the upper attachment of all the pitch links from the TR. 
4. In accordance with applicable steps of AMP DM 69-A-64-31-02-00A-520A-A, disconnect 
the upper half scissors from the spider. 
5. In accordance with applicable steps of AMP DM 69-A-64-31-07-00A-520A-A, disconnect 
and lower the boot from the spider. 
6. In accordance with AMP DM 69-A-64-21-05-00A-520A-A, d isconnect the TR lightning 
conductor jumper. 
CAUTION 
Pay attention to prevent rod rotation, when screwing / 
un-screwing the castellated nut, holding the rod square 
end. 
NOTE 
Before removal of the TR duplex bearing, take note of 
its installation orientation  marking “OUT” on the 
outboard visible face. After removal mark “IN” on the 
inboard opposite face of the TR duplex bearing. Use an 
indelible pen. 
7. In accordance with AMP DM 69-A-64-31-05-00A-520A-B, remove Tail Rotor Duplex

### Page 10

S.B. N°169-162 
 DATE: August 4, 2020 
Page 10 of 15 REVISION: A - December 2, 2020 
Bearing P/N 4F6430V00551. 
8. Return the Tail Rotor Duplex Bearing P/N 4F6430V00551 removed within step 7 to 
Leonardo Helicopters Customer Support within 2 days. Please refer to your usual contact 
point in Leonardo Helicopters Material Services, in order to arrange the return of replaced 
items in LHD facility. 
CAUTION 
Duplex Bearing must be installed  with a co ntrolled 
orientation. 
9. In accordance with AMP DM 69-A-64-31-05-00A-720A-B, install Tail Rotor Duplex Bearing 
P/N MM6430V00151, keeping the outer race outside marking prop erly readable while 
letting down in the slider/spider seat. Refer to Figure 1. 
10. With reference to Figure 2, mark Retromod P/N 6F6430P00231  on the Sliding Control 
assembly P/N 6F6430A01232 by method of vibro-etching. 
11. In accordance with the instructions reported on Part III of SB 169-178, install new Thermal 
Strip and Adhesive Protective Layer on Spacer P/N MM6430A00151.  
CAUTION 
Pay attention to prevent rod rotation, when screwing / 
un-screwing the castellated nut, holding the rod square 
end.  
NOTES 
In case during the installation of control rod nut, after 
several attempts with different nuts, the minimum 
required breakaway torque (as required by AMP DM 69-
A-64-31-04-00A-720A-A) is not reached, please contact 
the Produc t Support Engineering 
(engineering.support.lhd@leonardocompany.com) to 
receive dedicated instructions. 
12. In accordance with AMP DM 69-A-64-31-04-00A-720A-A, install new S pacer 
P/N MM6430A00151 and reinstall Sliding Control Assy on the helicopter. 
13. Restore the slippage marking on the castellated nut from the hinge bracket element to the 
rod. 
14. In accordance with AMP DM 69-A-64-31-01-00A-720A-A, restore the correct installation 
of TR pitch links.

### Page 11

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 11 of 15 
NOTE 
When performing the following step allow the sealant to 
cure for at least 2 hours before the next flight. 
15. In accordance with AMP DM 69-A-64-31-03-00A-720A-A, install the spider plug. 
16. Return the helicopter to flight configuration and record for compliance with Part I of this 
Service Bulletin on the helicopter logbook. 
17. Send the attached compliance form to the following mail box: 
engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.

### Page 12

S.B. N°169-162 
 DATE: August 4, 2020 
Page 12 of 15 REVISION: A - December 2, 2020 
PART II 
1. In accordance with AMP DM 69-A-00-20-00-00A-120A-A prepare the helicopter on ground 
for a sa fe maintenance. Disconnect the battery, all electrical power sources and/or the 
external power supply. 
2. In accordance with AMP DM 69-A-64-31-03-00A-520A-A, remove the spider plug. 
3. In accordance with applicable steps of AMP DM 69-A-64-31-01-00A-520A-A, temporarily 
detach the upper attachment of all the pitch links from the TR. 
4. In accordance with applicable steps of AMP DM 69 -A-64-31-02-00A-520A-A, disconnect 
the upper half scissors from the spider. 
5. In accordance with applicable steps of AMP DM 69 -A-64-31-07-00A-520A-A, disconnect 
and lower the boot from the spider. 
6. In accordance with AMP DM 69 -A-64-21-05-00A-520A-A, disconnect the TR lightning 
conductor jumper. 
CAUTION 
Pay attention to prevent rod rotation, when screwing / 
un-screwing the castellated nut, holding the rod square 
end. 
NOTE 
Before removal of the TR duplex bearing, take note of 
its installation orientation marking “OUT” on the 
outboard visible face. After removal mark “IN” on the 
inboard opposite face of the TR duplex bearing. Use an 
indelible pen. 
7. In accordance with AMP DM 69-A-64-31-05-00A-520A-B, remove Tail Rotor Duplex 
Bearing P/N MM6430V00151 installed on helicopter.  Record on the applicable logcard 
that the component was removed as required by Part II of SB 169-162. 
8. Return the removed Tail Rotor Duplex Bearing P/N MM6430V00151 to Leonardo 
Helicopters Customer Support within 2 days, also shipping all the documentation relevant 
to the component, such as logcard and SB compliance forms . Please refer to your usual 
contact point in Leonardo Helicopters Material Services, in order to arrange the return of 
replaced items in LHD facility. 
CAUTION 
Duplex Bearing must be installed  with a controlled 
orientation. 
9. In accordance with AMP DM 69-A-64-31-05-00A-720A-B, install Tail Rotor Duplex Bearing 
P/N MM6430V00151, keeping the outer race outside marking properly readable while

### Page 13

S.B. N°169-162 
DATE: August 4, 2020 
REVISION: A - December 2, 2020 Page 13 of 15 
letting down in the slider/spider seat. Refer to Figure 1. 
NOTE 
Spacer P/N MM6430A00151  already installed on 
helicopter can be kept in service, provided that no 
damage or wear is present on the component. 
10. In accordance with the instructions reported on Part III of SB 169 -178, replace Thermal 
Strip and Adhesive Protective Layer currently installed on Spacer P/N MM6430A00151.  
CAUTION 
Pay attention to prevent rod rotation, when screwing / 
un-screwing the castellated nut, holding the rod square 
end.  
NOTE 
In case during the installation of control rod nut, after 
several attempts with different n uts, the minimum 
required breakaway torque (as required by AMP DM 69-
A-64-31-04-00A-720A-A) is not reached, please contact 
the Product Support Engineering 
(engineering.support.lhd@leonardocompany.com) to 
receive dedicated instructions. 
11. In accordance with AMP DM 69-A-64-31-04-00A-720A-A, restore Sliding Control Assy 
installation on the helicopter. 
12. Restore the slippage marking on the castellated nut from hinge bracket element to the rod. 
13. In accordance with AMP DM 69-A-64-31-01-00A-720A-A, restore the correct installation 
of TR pitch links. 
NOTE 
When performing the following step allow the sealant to 
cure for at least 2 hours before the next flight. 
14. In accordance with AMP DM 69-A-64-31-03-00A-720A-A, install the spider plug 
15. Return the helicopter to flight configuration and record for compliance with Part II of this 
Service Bulletin on the helicopter logbook and on the logcard of the Duplex Bearing  
removed as per step 7. 
16. Send the attached compliance form to the following mail box: 
 engineering.support.lhd@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”.n cancellare mai qalibro

### Page 14 (OCR)

A LEONARDO  HELICOPTERS
8F6430A01232 SLIDING CONTROL ASSEMBLY
MM6430V00151 TAIL ROTOR DUPLEX BEARING
8F 8420401132  MM6430V00151
Figure 1
S.B. N°169-162
DATE: August 4, 2020
Page 14 of 15  REVISION: A - December 2, 2020

### Page 15 (OCR)

* LEONARDO  HELICOPTERS
6F6430A01232 SLIDING CONTROL ASSEMBLY
MARK RETROMOD P/N 6F6430P00231
6F6430P00231
Figure 2
S.B. N°169-162
DATE: August 4, 2020
REVISION: A - December 2, 2020  Page 15 of 15

### Page 16

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
