# Leonardo Alert Service Bulletin 412-165: No revision named

- Rights: © Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0724, the docket of AD 2021-19-05. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Leonardo Alert Service Bulletin 412-165](https://openairdocs.org/service-documents/leonardo/sb-412-165.md)
- Title as filed: Leonardo Helicopters Emergency ASB No. 412-165
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/c7/fe/c7fe31e40a9e57100eb7c25384427a8d86732db02db88391a4b1eb77b58982e8
- Page: https://openairdocs.org/service-documents/leonardo/sb-412-165/file/c7fe31e40a9e

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Pa ge 1 of 13 
N°  412-165 
DA TE:  March 12, 2021 
REV. :  / - M arch 15, 2017 
TITLE 
ATA 25 – HOIST SUPPORT ASSY P/N 212-8800-02-1, INSPECTION OF 
REVISION LOG 
First Issue 
Leonardo S.p.A.
Via Giovanni Agusta, 520
21017 Cascina Costa di Samarate (VA) Italy
Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
EMERGENCY ALERT
SERVICE BULLETIN

### Page 2

S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 2 of 13 REVISION: / 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
All the AB412/AB412EP helicopters equipped with hoist support assy  
P/N 212-8800-02-1. 
All the hoist support assy P/N 212-8800-02-1 kept at stock. 
B. COMPLIANCE 
Before the next flight. 
C. CONCURRENT REQUIREMENTS 
N.A. 
D. REASON 
This Service Bulletin is issued in order to provide the necessary instruction on how to 
perform a Liquid Fluorescent Penetrant inspection of the hoist support assy P/N 212-
8800-02-1. 
E. DESCRIPTION 
A case of crack has been found on the hoist support assembly P/N 212-8800-02-1 
installed on a military helicopter. This condition, if not detected and corrected, could 
affect the structural integrity of the hoist support assembly. While the investigation in 
determining the root cause and the corrective action is ongoing, LHD decided, as a 
precautionary measure to issue this SB to introduce a one-off inspection with Liquid 
Fluorescent Penetrant inspection method on a specific area of the hoist support. The 
inspection does not require to remove the hoist support from the helicopter. 
F. APPROVAL 
The technical content of this Service Bulletin is approved under the authority of DOA nr. 
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before 
applying the Service Bulletin, applicable Aviation Authority approval must be checked 
within Leonardo Helicopters customer portal. EASA states mandatory compliance with 
inspections, modifications or technical directives and related time of compliance by 
means of relevant Airworthiness Directives. 
If an aircraft listed in the effectivity embodies a modification or repair not LHD certified 
and affecting the content of this Service Bulletin, it is responsibility of the 
Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on

### Page 3

S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 3 of 13 
the aircraft, for any adaptation necessary before incorporation of the present Service 
Bulletin. 
G. MANPOWER 
To comply with this Service Bulletin 2 (two) MMH are deemed necessary. 
MMH are based on hands-on time and can change with personnel and facilities 
available. 
H. WEIGHT AND BALANCE 
N.A. 
I. REFERENCES 
1) PUBLICATIONS 
AB412-MM Maintenance Manual 
BHT-ALL-SPM Standard Practices Manual 
2) ACRONYMS & ABBREVIATIONS 
AR As Required 
DOA Design Organization Approval 
EASA European Aviation Safety Agency 
LHD Leonardo Helicopters 
MM Maintenance Manual 
MMH Maintenance Man Hours 
P/N Part Number 
S/N Serial Number 
SB Service Bulletin 
3) ANNEX 
Annex A AB412/AB412EP hoist support localized penetrant inspection Type 1, 
Method C, Level 3, Form “d”. 
J. PUBLICATIONS AFFECTED 
N.A. 
K. SOFTWARE ACCOMPLISHMENT SUMMARY 
N.A.

### Page 4

S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 4 of 13 REVISION: / 
2. MATERIAL INFORMATION 
A. REQUIRED MATERIALS 
1) PARTS 
N.A. 
2) CONSUMABLES 
The following consumable materials, or equivalent, are necessary to accomplish this 
Service Bulletin: 
# SPEC./LHD CODE NUMBER DESCRIPTION Q.TY NOTE PART  
1 SAE-AMS-2644, Type I,  Method C, Level 3 Dye Penetrant AR (1)(2) - 
2 SAE-AMS-2644, Type I, Form “d” Developer AR (1)(2) - 
3 SAE-AMS-2644 Cl II Solvent AR (1)(2) - 
4 Commercial Small soft clean brush AR (1) - 
5 Commercial Clean, dry, lint-free cloth or  absorbent toweling AR (1) - 
6 Commercial Chemical paint remover AR (1) - 
7 Commercial Surface finishing paint AR (1) - 
3) LOGISTIC MATRIX 
N.A. 
NOTE 
(1) Local supply. 
(2) This material shall be certified in accordance with AMS2644, obtained from a 
supplier listed in QPL-AMS2644, supplied from the same manufacturer and in 
aerosol cans packaging. 
B. SPECIAL TOOLS 
The following special tools, or equivalent, are necessary to accomplish this Service 
Bulletin: 
# P/N DESCRIPTION Q.TY NOTE PART 
8 Commercial Dark curtain 1 (B1) - 
9 Commercial Magnifying lens 5x 1 (B1) - 
10 Commercial UV-A inspection lamp 1 (B1)(B2) - 
11 Commercial UV-A/White light meters 1 (B1) - 
12 Commercial Environmental thermometer 1 (B1) - 
Refer also to Annex A for the equipment/tools required for the liquid penetrant 
inspection.

### Page 5

S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 5 of 13 
SPECIAL TOOLS NOTE 
 Item to be procured as local supply. 
 This lamp should emit at least 1200 µW/cm² and no more than 20lux at 38cm from 
the front of the filter to the face of the sensor. 
C. INDUSTRY SUPPORT INFORMATION 
Owners/Operators who comply with the instructions of this Service Bulletin no later than 
the applicable date in the “Compliance” section will be eligible to receive REQUIRED 
MATERIALS on free of charge basis, except for Consumable Materials and Special 
Tools. 
NOTE 1: Customers who fail to comply with the instructions in this Service Bulletin 
before the compliance date are not eligible for the aforementioned special policy. 
Please Issue relevant MMIR form to your Warranty Administration Dpt accompanied by 
INSPECTION REPORT and PICTURE of the affected area. 
NOTE 2: The INSPECTION REPORT and PICTURE are mandatory; in case the MMIR 
is not accompanied by these documents, it will be rejected.

### Page 6

S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 6 of 13 REVISION: / 
3. ACCOMPLISHMENT INSTRUCTIONS 
GENERAL NOTE 
Place an identification tag on all components that are re-
usable, including the attaching hardware that has been 
removed to gain access to the modification area and 
adequately protect them until their later re-use. 
NOTE 
Hoist support assy P/N 212-8800-02-1 kept at stock 
must be inspected in accordance with step 2 before their 
installation on the helicopter. 
1. In accordance with AB412-MM, prepare the helicopt er on ground for a safe maintenance. 
Disconnect the battery, all electrical power sources and/or the external power supply. 
NOTE 
This inspection does not require removal of the hoist 
support from the helicopter. 
2. With reference to Figure 1 and 2, in accordance w ith Annex A, perform surface 
Fluorescent Penetrant Inspection of the hoist support assy P/N 212-8800-02-1 on the 
indicated area: 
2.1 if no evidence of or crack is found, proceed to step 3. 
2.2 if evidence of crack is found, inform Leonardo Helicopters at 
absereng.aw@leonardocompany.com providing detailed pictures of the crack. In 
accordance with AB412-MM, remove from service the damaged hoist support and 
replace it with a serviceable one. 
3. Return the helicopter to a ready to flight condition and record for compliance with this 
Service Bulletin on the helicopter logbook. 
4. Send the attached compliance form to the following mail box: 
 absereng.aw@leonardocompany.com 
As an alternative, gain access to My Communications section on Leonardo WebPortal and 
compile the “Service Bulletin Application Communication”. 
 
  
Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione 

### Page 7

Figure 1 
S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 7 of 13

### Page 8

Figure 2 
 S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 8 of 13 REVISION: /

### Page 9

ANNEX A 
S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 9 of 13 
ANNEX A 
AB412/AB412EP HOIST SUPPORT LOCALIZED PENETRANT 
INSPECTION TYPE 1, METHOD C, LEVEL 3, FORM “d”

### Page 10

ANNEX A 
 S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 10 of 13 REVISION: / 
1 PURPOSE AND APPLICABILITY 
This procedure details the requirements for the Liquid Penetrant Inspection (PT) on the 
hoist support assy P/N 212-8800-02-1. The specific Penetrant system to be used is Type 
I, Method C, Sensitivity Level 3, form “d”. Purpose of this inspection is the detection of 
any possible crack located on a specific surface of hoist support. 
2 REFERENCES 
The following documents in their last revision are considered part of this procedure: 
ASTM E1417  Standard Practice for Liquid Penetrant Testing; 
ASTM E3022 Standard Practice for Measurement of Emission Characteristics and 
Requirements for LED UV-A Lamps Used in Fluorescent Penetrant 
and Magnetic Particle Testing; 
EN4179/NAS410 Qualification and approval of personnel for non-destructive testing; 
QPL AMS2644 Qualified Product List of Inspection Materials, Penetrant; 
SAE AMS2644 Inspection Materials, Penetrant. 
3 EQUIPMENT AND MATERIALS 
The following materials, equipment and tools are requested. 
3.1 MATERIALS 
WARNING 
SOLVENT CLEANERS AND DEVELOPER CARRIER 
FLUIDS ARE DANGEROUS. OBSERVE ALL 
RELEVANT SAFETY PRECAUTIONS TO PREVENT 
THE RISK OF INJURY, FIRE OR EXPLOSION. 
a. Dye Penetrant SAE-AMS-2644 TY I, Method C, Level 3 (*); 
b. Developer SAE-AMS-2644 Form “d” (*);  
c. Solvent SAE-AMS-2644 Class 2 (*).  
(*) All the materials shall be certified in accordance with AMS2644, obtained from a 
supplier listed in QPL-AMS2644, supplied from the same manufacturer and in 
aerosol cans packaging. 
3.2 EQUIPMENT/TOOLS 
a. Dark curtain;  
b. Luxmeter for checking the illuminance (20 lux maximum on the part during the 
inspection and the 100 lux maximum for excess penetrant removal phase);

### Page 11

ANNEX A 
S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 11 of 13 
c. Radiometer for checking the minimum 1,200 W/cm2 on the part during the 
inspection; 
d. UV-A lamp suitable for achieving an irradiance of at least 1,200 W/cm2 on the 
area of inspection at 38 cm from the lamp; in case of use of a LED UV-A lamp, 
it shall be certified in accordance with ASTM E3022; 
e. White light lamp suitable for achieving an illuminance of at least 1,000 lux on the 
inspection surface when needed for further analysis; 
f. Small soft clean dry brush to apply penetrant;  
g. Clean, dry, lint-free cloth or absorbent toweling; 
h. A magnification lens (max 5x); 
i. An environmental thermometer.  
4 PERSONNEL 
Personnel performing the inspection of this procedure and appointed for the interpretation 
and evaluation of the indications shall be qualified as a minimum Level 2 in the PT Method 
and for the Technique “Type 1, Method C” in accordance with the requirements of 
EN4179/NAS410. The personnel shall also be familiar with the purpose of this procedure. 
5 PART PREPARATION 
Due to the presence of paint on the inspection area, the paint must be removed with a 
suitable chemical paint remover after masking the area to be inspected. To facilitate the 
removal of the paint after the action of the paint remover, a soft plastic brush (toothbrush) 
can be used. Class 2 solvent must be used for the final cleaning of the inspection area 
before proceeding with the steps identified in paragraph 6. The operation shall be repeated 
as many times as necessary in order to remove any surface contamination. Any abrasion 
tool is forbidden. 
The accuracy of the cleaning on the entire inspection surface shall be verified under white 
light at 1,000 lux minimum and with the use of the mirror and the lens as necessary. 
6 ISPECTION 
If not otherwise specified below, the inspection process shall be in compliance with the 
requirements of ASTM E1417. 
6.1 TEMPERATURE CONTROL 
The inspection can only be carried out when the temperature of the room, part, and 
materials is in the range of 10-45°C (50-113 °F). Make sure that the parts and 
materials stayed inside the environment in which the inspection is performed for a 
time enough to ensure thermal equilibrium.

### Page 12

ANNEX A 
 S.B. N°412-165 EMERGENCY ALERT 
 DATE: March 12, 2021 
Page 12 of 13 REVISION: / 
6.2 PENETRANT APPLICATION 
NOTE 
Do not spray the liquid penetrant directly on the 
inspection area. 
The penetrant shall be applied on the inspection are a by means of the soft bristled 
brush and verified under UV-A light. Penetrant Dwell Time shall be a minimum of 30 
minutes and no more than 60 minutes. 
6.3 PENETRANT REMOVAL 
Solvent-removable penetrant is removed by first wiping the excess penetrant with a 
clean, lint-free, dry cloth or absorbent toweling. The remainder of the surface 
penetrant is then removed with Class 2 solvent-dampened lint-free cloth or towel; 
the use of cloths or paper soaked with the solvent or the spraying of solvent directly 
on to the part is prohibited. 
The complete removal of the excess of penetrant shall be verified under UV-A lamp 
at 100 W/cm2 minimum and no more than 100 lux on the area of inspection. 
6.4 DEVELOPER APPLICATION 
CAUTION 
In case of any developer dripping, the part shall be 
carefully cleaned and the whole process repeated from 
“Part Preparation”. 
In case of exceeding 60 minutes, the part shall be 
carefully cleaned and the whole process repeated from 
“Part Preparation”. 
The developer shall be applied to the part when the solvent is completely 
evaporated; the application shall be done directly from the aerosol can, which 
requires agitating regularly to keep the developer suspended in the carrier vehicle. 
The correct application shall result in a thin and uniform film and the color of the part 
should be just visible through the developer. 
The developer dwell time shall be 10 minutes minimum and shall not exceed 1 hour. 
6.5 OBSERVATION REQUIREMENTS 
The part shall be covered with the darkening curtain with the UV-A lamp turned on; 
the following conditions shall be verified on the inspection surface: 
a) An irradiance of at least 1,200 W/cm2,

### Page 13

ANNEX A 
S.B. N°412-165 EMERGENCY ALERT 
DATE: March 12, 2021 
REVISION: / Page 13 of 13 
b) An illuminance maximum of 20 lux. 
During the observation of the part, the operator shall not wear photochromic or dark 
glasses and shall ensure there are no sources of fluorescence in the inspection area 
(e.g. white paper and/or cloths). The operator shall stay in the booth a minimum of 
one minute for dark adaptation before carrying out the inspection. 
The part shall be observed very carefully on its entire surface. 
Any fluorescent indication shall be identified for interpretation and evaluation. 
6.6 INTERPRETATION AND EVALUATION 
Parts resulting not affected by any indication will remain in service. 
Vice versa any indication of fluorescence shall be interpreted by lightly wiping with 
a cloth or paper, dampened with Class 2 solvent. This shall be done for a maximum 
of 2 wipes; then the developer application on the area affected by the suspected 
discontinuity shall be done under the same conditions of paragraph 6.5. 
Any indication, confirmed by the wipe-off, will be also checked under 1,000 lux 
minimum of white light and lens for confirmation of any visible crack that will result 
in the removal of the part from service. 
Any indication not confirmed by the wipe-off shall be considered false and the part 
will remain in service. 
6.7 POST INSPECTION CLEANING 
Parts evaluated for remaining in service shall be cleaned from any inspection 
residues by means of the soft plastic brush and the Class 2 solvent and the operation 
shall be repeated as many times as necessary in order to remove any surface 
contamination. In this case, the solvent should be sprayed directly onto the part and 
into the central hole of the hub for complete fluorescence removal to be verified 
under UV-A lamp. 
Restore the surface finish as required, in accordance with BHT-ALL-SPM.

### Page 14

Remarks:
Information: 
SERVICE BULLETIN COMPLIANCE   FORM Date:
Number:
Revision:
Please send to the following address: 
Telephone:
Fax:
 B.T. Compliance Date:
 Customer Name and Address:
 Helicopter Model S/N Total Number Total Hours T.S.O.
LEONARDO S.p.A.
CUSTOMER SUPPORT & SERVICES - ITALY
PRODUCT SUPPORT ENGINEERING & LICENSES DEPT. 
Via  Giovanni Agusta, 520
21017  Cascina  Costa di Samarate (VA) - ITALY 
Tel.: +39 0331 225036  Fax: +39 0331 225988
We request your cooperation in filling this form,  in order to keep out statistical data relevant to aircraft configuration up-to-date. The form should be filled in all
its parts and sent to the above address or you can communicate the application also via Technical Bulletin Application Communication Section placed in 
Leonardo AW Customer Portal - MyCommunications Area. We thank you beforehand for the information given.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
