# Fairchild Service Bulletin 227-27-041

Copy: Revision 2 ("SB 227-27-041 R2 (12-4-14)"), 18 pages: PDF https://openairdocs.org/files/sha256/b0/61/b061991d4a26b87dad7ba5aef9177696b82a986f7bd16a8ee4b9cd9ef4d6f261; text https://openairdocs.org/service-documents/m7-aerospace/sb-227-27-041/file/b061991d4a26.md. Rights: © M7 Aerospace. Filed by the FAA in regulations.gov docket FAA-2015-2207, the docket of AD 2015-19-10. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Fairchild](https://openairdocs.org/service-documents/m7-aerospace.md)
- Type: Service bulletin (Service Bulletin)
- Number: 227-27-041
- Latest revision known: 227-27-041, Revision 2 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/m7-aerospace/sb-227-27-041

## Text (18 pages)

Rights: © M7 Aerospace. Filed by the FAA in regulations.gov docket FAA-2015-2207, the docket of AD 2015-19-10. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Issued: February 24, 1997
Revised: December 5, 2014
227-27-041 R2
Page 1 of 1
P.O. Box 790490 • San Antonio, Texas 78279–0490 • (210) 824–9421
SERVICE BULLETIN
Revision Transmittal Sheet
TO: HOLDERS OF SA227 SERIES SERVICE INFORMATION MANUALS
This is Revision 2 to SA227 Series Service Bulletin 227-27-041, CONTROL COLUMN ROLLER 
BEARING AND ELEVATOR ROD END BEARING INSPECTION / REPLACEMENT, Issued: 
December 11, 1996; Revised: December 5, 2014.
1. REASON
 This service bulletin has been completely re-written to address issues and differences 
between the earlier revision of the bulletin, AD 97-02-02, SA227 Illustrated Parts 
Catalog (IPC) Chapters 27-30-30 and 27-30-40, and the SA227 Maintenance Manual 
Chapter 05-10-00. All changes are denoted by revision bar in the left hand margin.
2. INSTRUCTIONS
A. This Service Bulletin has been completely reprinted.  Remove and discard all 
pages of prior issue and replace with this revision.
B. Place this revision transmittal sheet in front of the service bulletin.
C. Please insert the attached revised Service Bulletin Index pages.

### Page 2

P.O. Box 790490 • San Antonio, Texas 78279–0490 • (210) 824–9421

### Page 3

CHAPTER 27 – FLIGHT CONTROLS
SA227 SERIES INDEX
CHAPTER 27 INDEX
Page 5 of 6
NUMBER DATE TITLE AIRCRAFT EFFECTIVITY
27-039  05-15-96 Rework of UP/DOWN Elevator All SA227 Series Airplanes 
   Quadrant Stops and LH/RH      
   Rudder Bellcrank Stops
27-040   NOT ISSUED
27-041  12-11-96 Control Column Roller Bearing All SA227 Series Airplanes 
 (R) 02-24-97 and Elevator Rod End Bearing
 (R) 12-05-14 Inspection/Replacement
27-042  06-16-97 Control Column Pivot All SA227 Series Airplanes 
   Improvement
27-043  07-18-97 Flap position Indication / All SA227-AC, AT and BC 
    Control Circuit Modi ﬁ cation 
    Airplanes
27-044  11-18-98 Installation of Simmonds All SA227 Series Airplanes  
 (R) 12-03-98 Precision P/N DL5040M5 with Barber Colman, P/N 
   and/or DL5040M6 Pitch Trim 27-19008-001/-002 Pitch
   Actuator (PTA) Trim Actuator Installed
27-045  05-11-99 Installation of P/N DL5040M8, All SA227 Series Airplanes 
 (R) 12-27-99 Simmonds Precision Pitch Trim
 (R) 11-18-02 Actuator (PTA)
27-046  03-08-99 Installation of All SA227 Series Airplanes 
   P/N 27-19008-006/-007 with P/N 27-19008-001/-002/
   Barber-Colman Pitch Trim -004/-005 Barber-Colman PTA
   Actuator (PTA) installed.
27-047  12-05-00 Installation of Fairleads SA227-AT, S/N AT423-621,
   at F.S. 174.06 SA227-AC, S/N AC406, 415,
    416, 420-621
27-048  09-29-03 Life Limit for Rudder Gust  All SA227 Series Airplanes  
   Lock Assembly, Part Number
   27-70066-001, of 5000 Hours
27-049  04-02-04 Inspection of 26-72003  All SA227 Series Airplanes 
   Rudder Pedals for cracks
27-050  09-24-04 Modi ﬁ cation of Vertical   All SA227 Series Airplanes 
 (R)03-06-09 StabilizerAft Spar to
 (R)03-19-10 Facilitate Installation of
   P/N 27-19332 Rudder
   Trim Actuator
27-051  09-19-08 Gravel Guard Installation All SA227 Series Airplanes
Issued: July 8, 1981
Revised: December 5, 2014

### Page 4

CHAPTER 27 INDEX
Page 6 of 6
CHAPTER 27 – FLIGHT CONTROLS
SA227 SERIES INDEX
NUMBER DATE TITLE AIRCRAFT EFFECTIVITY
Issued: July 8, 1981
Revised: September 04, 2014
27-052  04-28-09 Pilot's and Copilot's Control SA227 Series S/N 420 to 723
   Column Access Panels Mod
27-053  06-10-11 Inspection and Repair /  All SA227 Series Airplanes
 (R) 09-06-11 Replacement of Pitch Trim      
 (R) 10-14-11 Actuator Fuselage Fittings
27-054  06-06-13 Inspection and Lubrication of All SA227 Series Airplanes
 (R) 09-30-13 the Aileron Control Cable      
 (R) 10-23-13 Chain in the Pilot's and Co-      
   Pilot's Control Columns
27-055  09-04-14 Inspection/Replacement of the All SA227 Series Airplanes 
   Aileron Control System Rod      
   End Bearings
27-056  09-04-14 Inspection of the Aileron All SA227 Series Airplanes 
   Link Rod, Bellcrank, and      
   Aileron Hinge Bracket for      
   Damage
27-057  08-18-14 Inspection/Repair or Wiring All SA227 Series Airplanes 
   Harnesses in Vertical Stabilizer

### Page 5

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 1 of 12
SERVICE BULLETIN
SA227 SERIES
Flight Controls
Control Column Roller Bearing and Elevator Rod End Bearing Inspection / Bolt 
Replacement
1. PLANNING INFORMATION
A. Effectivity:
All SA227 Series Airplanes
B. Reason:
(1) To prevent possible fatigue failure of control column pivot bearing.  
(2) To prevent damage to elevator rod end bearing retainer/dust covers by ensuring 
appropriate hardware conﬁ guration for the attachment of the elevator rod assembly 
to the elevator walking beam and control column.
(3) To prevent possible fatigue failure of the elevator control rod to elevator walking 
beam attach bolt.
This service bulletin has been completely re-written to address issues and differences 
between the earlier revision of the bulletin, AD 97-02-02, SA227 Illustrated Parts Catalog 
(IPC) Chapters 27-30-30 and 27-30-40, and the SA227 Maintenance Manual Chapter 
05-10-00. All changes are denoted by revision bar in the left hand margin.
C. Description:
This service bulletin addresses three separate issues that are identi ﬁ ed herein as 
1.C.(1): Control Column Pivot, 1.C.(2): Elevator Rod End, and 1.C.(3): Elevator Rod 
Assembly Attachment Hardware. See Table 1 for compliance requirements.
(1) Control Column Pivot (see Figure 1)
To prevent fatigue cracking of the control column pivot bearing, three possible 
actions are required:
(a) Inspect security of control column roller pivot con ﬁ guration by application of 
torque to the pivot bearing and ensuring no movement occurs as de ﬁ ned in 
this service bulletin, or;
(b) Replace the control column pivot bearings and associated hardware with new 
or newly deﬁ ned parts and ensure the security of control column pivot by ap-
plication of torque to the pivot bearing and ensuring no movement occurs as 
deﬁ ned in this service bulletin, or;
(c) Incorporate the revised control column pivot con ﬁ guration deﬁ ned in Service 
Bulletin 227-27-042.

### Page 6

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 2 of 12
(2) Elevator Rod Ends (see Figure 2)
To ensure the integrity of the elevator control system rod, the following action is 
required.
(a) Inspect elevator control rod end(s) for excessive wear or possible damage to 
bearing retainer/dust covers. Replace rod ends if damaged.
(3) Elevator Rod Assembly Attachment Hardware (see Figure 2)
To ensure the integrity of the elevator control system rod attachment bolt, the  
following actions are required:
(a) Inspect elevator control rod assembly attachment hardware con ﬁ guration to 
ensure the speciﬁ c hardware and hardware arrangement is as deﬁ ned by this 
service bulletin, and;
(b) Replace elevator rod assembly to elevator walking beam attachment bolt and 
washer with new parts as required by this service bulletin. 
D. Compliance:
Mandatory. Actions in accordance with Table 1 requirements.

### Page 7

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 3 of 12
SERVICE BULLETIN
SA227 SERIES
Condition Initial Action Repetitive Action
Control Column Pivot Bearing 
has been torque checked, or 
replaced per SB 227-27-041 (any 
revision) within the last 10,000 
hours TIS.
Accomplish the following:
In aircraft records, within 200 hours TIS after 
the effective date of this SB, indicate date of 
last torque check, and either:   
(1) Replace control column pivot bearing per 
Step 2.B. within 10,000 hours TIS <2> or 
within the next 1,000 hours TIS from the date 
of bulletin, whichever occurs later.
or
-------------------------------------------------------------
(2) Incorporate SB 227-27-042 per Step 2.C. 
<3><4>, within 10,000 hours TIS <2> or 
within the next 1,000 hours TIS from the date 
of bulletin, whichever occurs later. <7>
Accomplish the corresponding repetitive action:
(1) Replace control column pivot bearing per Step 
2.B. every 10,000 hours TIS <2>.
or
--------------------------------------------------------------------
(2) No repetitive action.  <3><4>
Control Column Pivot Bearing 
has not been torque checked, or 
replaced, within the last 10,000 
hours TIS per SB 227-27-041 
(any revision).
Accomplish one of the following:
(1) Torque check pivot bearing per Step 2.A. 
within 200 hours TIS after the effective date 
of this SB, and replace control column pivot 
bearing per Step 2.B. within the next 1,000 
hours TIS from the date of bulletin <6>
or
-------------------------------------------------------------
(2) Torque check pivot bearing per Step 2.A. 
within 200 hours TIS after the effective date 
of this SB, and incorporate SB 227-27-042 
per Step 2.C. <3><4>, within the next 1,000 
hours TIS from the date of bulletin <6><7>
Accomplish the corresponding repetitive action:
(1) Replace control column pivot bearing per Step 
2.B. every 10,000 hours TIS <2>.
or
--------------------------------------------------------------------
(2) No repetitive action.  <3><4>
Control column pivot conﬁ gu-
ration has been revised per 
SB 227-27-042.
In aircraft records, indicate completion of 
Step 2.C. of this Service Bulletin.  <3>
No repetitive action.
Elevator rod attachment 
hardware and its conﬁ gura-
tion complies with SB 227-
27-041 (any revision), at the 
date of this SB.
(There has been no conﬁ gu-
ration changes since original 
compliance with the SB)
In aircraft records, indicate current date as 
compliance with SB 227-27-041, and replace 
the elevator rod to walking beam attachment 
bolt per Step 2.D. within 10,000 hours TIS 
<2> or within 1,000 hours from the date of 
this SB, whichever occurs later.
Replace elevator rod bolt per Step 2.D. every 
10,000 hours TIS <2>.
Elevator rod attachment 
hardware and its conﬁ gura-
tion does NOT comply with 
SB 227-27-041 (any revi-
sion).
Within next 200 hours TIS from the effective 
date of this SB, comply with Step 2.D.
Replace elevator rod bolt per Step 2.D. every 
10,000 hours TIS <2>.
TABLE 1
COMPLIANCE REQUIREMENTS <1>

### Page 8

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 4 of 12
NOTES:
<1> Compliance with this Service Bulletin requires complying with Step 2.D. AND  
 with either Step 2.A. or 2.B. or 2.C.
<2>  From time of last replacement
<3>  Incorporation of SB 227-27-042 complies with Supplemental Inspection   
 Document (SID) Supplemental Inspection No. 27-31-01 and eliminates the  
 control column pivot bearing time replacement requirement. (Replace pivot  
 bearing every 10,000 hours TIS)  
<4>  The column pivot con ﬁ guration must be revised per SB 227-27-042 prior to  
 35,000 hours airplane total TIS or within the next 1,000 hours TIS from the  
 effective date of this Service Bulletin, whichever occurs later. 
  5  TIS - Time in Service (Flight Hours)
<6> Performing a replacement bearing initial action within 200 Hours TIS after the  
 effective date of this SB has the bene ﬁ t of eliminating the need for the initial  
 torque check and allows for an additional 10,000 hours TIS prior to the need  
 for repetitive action.  
 <7> There is an additional requirement to comply with SB 227-27-042 per the   
  Supplemental Inspection Document (SID). Therefore, if SB 227-27-042 is not  
  complied with here, compliance with 227-27-042 will be required per the      
  Supplemental Inspection Document (SID). 
TABLE 1 NOTES <1>

### Page 9

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 5 of 12
SERVICE BULLETIN
SA227 SERIES
E. Approval:
This Service Bulletin is approved by the FAA Airplane Certiﬁ cation Ofﬁ ce (ACO), ASW-
150.
F. Manpower:
M7 Aerospace estimates the following manhours to accomplish the different aspects 
of this service bulletin. The estimate is for direct labor only accomplished by an expe-
rienced crew. Adjust the estimate with operator task hour data as necessary.
(1) Control Column Pivot, pivot bearing torque check (Step 2.A.) - 2 hours 
(2) Control Column Pivot, pivot bearing replacement (Step 2.B.) - 8 hours
(3) Control Column Pivot, new pivot design (Step 2.C.) - 20 hours
(4) Elevator Rod Ends and Attach Bolt (Step 2.D.) - 4 hours
G. Material-Cost and Availability:
(1) Cost:
Because of pricing ﬂ uctuations, individual cost estimates should be obtained from 
your normal material procurement outlet. Additional material cost information may 
be contained in the Index or the Letter of Transmittal.
(2) Availability:
Parts are available.
H. Tooling-Price and Availability:
No special tooling required.
I. Weight and Balance:
Negligible
NOTE: It is recommended the aircraft operating weight be re-established after incor-
porating 20 service bulletins classiﬁ ed as having negligible impact on aircraft 
weight and balance. This recommendation is derived from data provided in 
FAA Advisory Circular 120-27.
J. Reference:
M7 Aerospace Drawing 26-71004 (latest FAA Approved revision)
M7 Aerospace Drawing 26-21352 (latest FAA Approved revision)
NOTE: References are for manufacturers’ use only.

### Page 10

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 6 of 12
K. Other Publications Affected:
SA227 Series Illustrated Parts Catalog (IPC) 
SA227 Series Maintenance Manual (MM)
ST-UN-M001, SA227 Airframe Airworthiness Limitations Manual
2. ACCOMPLISHMENT INSTRUCTIONS
Compliance with this Service Bulletin requires complying with Steps 2.D. and with either 
Step 2.A. or 2.B. or 2.C. Refer to Table 1.
A. Control Column Pivot Bearing Inspection
(1) Remove cockpit furnishings and ﬂ oorboards as required to gain access to Pilot's 
and Copilot's control column roller bearings and elevator control rod end(s) as 
indicated in the SA227 Maintenance Manual, Chapter 25.
(2) Layout and enlarge Pilot's and Copilot's cutout as shown in FIGURE 1.  Deburr 
and surface ﬁ nish bare metal with alodine and epoxy polyamide primer in accor-
dance with SA226/227 Structural Repair Manual (SRM), Chapter 51-32-02.
(3) Using a calibrated torque wrench, apply 60.0 inch/pounds (+5.0 / -0.0 in-lbs) 
torque to the MS21044N4 nut securing the Pilot's and Copilot's control column 
roller bearings to the 26-21352-001 or -005 doubler assemblies. No movement 
is allowed.
(4) If nut movement occurs, remove and replace components and hardware per Step 
2.B. or 2.C., otherwise proceed to Step 2.D.
B. Control Column Pivot Bearing Replacement
(1) Remove cockpit furnishings and ﬂ oorboards as required to gain access to Pilot's 
and Copilot's control column roller bearings and elevator control rod end(s) as 
indicated in the SA227 Maintenance Manual, Chapter 25.
(2) Layout and enlarge Pilots and Copilots cutout as shown in FIGURE 1.  Deburr and 
surface ﬁ nish bare metal with alodine and epoxy polyamide primer in accordance 
with SA226/227 SRM, Chapter 51-32-02.
(3) Remove the CF-5/8-S bearings, MS21044N4 nuts and associated washers and 
the 26-21352-001 or -005 doubler assemblies and associated hardware indicated 
in Figure 1.

### Page 11

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 7 of 12
SERVICE BULLETIN
SA227 SERIES
CAUTION: PAY PARTICULAR ATTENTION TO SA227 MAINTENANCE MANUAL 
CHAPTER 27-30-10 WITH REGARDS TO BLOCKING WHEN 
DISCONNECTING/WORKING WITH ELEVATOR CONTROL CABLES 
DUE TO SPRING TENSION ON CABLES.
(4) Destroy or permanently mark the removed CF-5/8-S bearings to ensure no future 
use of the bearings.
(5) Install new CF-5/8-S bearings (or acceptable alternates listed in Step 3) with 
MS21042L4 nuts and associated washers per Figure 1 using a calibrated torque 
wrench to apply 70.0 in-lbs (+5.0 / -0.0 in-lbs) torque to the nut and bearing. Install 
26-21352-007 doubler assemblies or 26-21352-007P doublers per Figure 1.
NOTE: The 26-21352-001 doubler assembly is attached to the airplane structure 
using MS21042L3 nuts, AN3-5A bolts, and AN960-10L washers. The 
26-21352-005 doubler assemblies incorporate MS21073L3 nutplates in 
place of the MS21042L3 nuts. P/N 26-21352-007P doubler is available 
with only the roller bearing stud hole drilled and may be used to replace 
either the -001 or -005 doubler assemblies, but requires match drilling of 
the 26-21352-007P doubler to the airframe or removed doubler for the 
AN3-5A attach bolt hole locations (4 places). MS21073L3 nutplates may 
be installed or MS21042L3 nuts and AN960-10L washers may be used.
(6) Proceed to Step 2.D.
 C. Control Column Pivot Alternate Design
This step offers an alternate method of compliance to Steps 2.A. and 2.B.
(1) Comply with the latest FAA approved revision of Service Bulletin 227-27-042.
(2) Proceed to Step 2.D.
NOTE: Compliance with Step 2.C. removes the pivot bearing 10,000 hour replace-
ment requirement outlined in Table 1 for Steps 2.A. and 2.B.
D. Elevator Control Rod
(1) Remove the elevator control rod attached to the elevator walking beam and con-
trol column as shown in Figure 2 and as described in the SA227 MM, Chapter 
27-30-10.
CAUTION: PAY PARTICULAR ATTENTION TO SA227 MAINTENANCE MANUAL 
CHAPTER 27-30-10 WITH REGARDS TO BLOCKING WHEN 
DISCONNECTING/WORKING WITH ELEVATOR CONTROL CABLES 
DUE TO SPRING TENSION ON CABLES.

### Page 12

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 8 of 12
(2) Inspect rod end bearing retainer/dust covers for evidence of creasing or other 
damage as shown in Figure 2. If any creasing or other damage is found , remove 
and replace rod end(s).
(3) Check elevator control rod ends for excessive wear. Grasp the control rod ﬁ rmly 
in one hand and with the other hand attempt to move the inner ring radially back 
and forth in the bearing face. Any perceptible radial play between the inner ring 
and the race indicates excessive wear and the bearing shall be replaced.
(4) If the elevator control rod is disassembled to replace one or both of the rod end 
bearings, the control rod must be reassembled with: (a) length adjusted to meet 
elevator control system rigging and travel requirements of SA227 MM, Chapter 
27-00-00, (b) Both witness holes in control rod covered by installed bearings, (c) 
each bearing installed 90° (+/- 3°) to each other and, (d) control rod jam nuts with 
40 in-lbs (+/- 5 in-lbs) torque.
CAUTION: DO NOT ATTEMPT TO TIGHTEN THE CONTROL ROD ASSEMBLY JAM 
NUTS WHILE CONTROL ROD IS INSTALLED SINCE THIS WILL CAUSE 
CREASING OF ROD END BEARING RETAINER/DUST COVER.
NOTE: To prevent creasing, the rod end retainer/dust covers, the control rod 
length should be adjusted with the jam nuts tightened ﬁ nger tight and the 
elevator control system travel checked in accordance with SA227 MM, 
Chapter 27-00-00. Remove the control rod assembly and tighten jam nuts 
by holding the rod ends with a wrench on the ﬂ at of the bearing housing 
while torquing the jam nut to 40 in-lbs (+/- 5 in-lbs). Ensure that control 
rod criteria of Step 2.D.(4) is met.
(5) Reinstall elevator control rod. Use hardware and hardware arrangement  as shown 
in FIGURE 2. Replace bolt (P/N NAS6604D31 or previously replaced NAS6604D34  
(with more than 10,000 hours TIS) with a new bolt (P/N NAS6604D34) and install 
a new washer (P/N AN970-4).
NOTE: Use AN960-416 and/or AN960-416L washer(s), shown on either side of 
rod end bearings, as required for clamp up. Ensure that the AN310-4 nut 
does not ride on the shank of the NAS6604D34 bolt.
(6) Adjust elevator and aileron cable tensions and perform elevator and aileron control 
system travel/adjustment as described in SA227 MM, Chapter 27-00-00.
(7) Replace all cockpit furnishings and ﬂ oorboards removed to accomplish this          
inspection/replacement.
E. Complete aircraft records according to 14 CFR 43.9.

### Page 13

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 9 of 12
SERVICE BULLETIN
SA227 SERIES
F. Complete and return service bulletin Compliance Form to M7 Aerospace Technical 
Support Department. Email: MetroTech@M7Aerospace.com. Fax: 210-820-8626.
3. MATERIAL LISTING
Replacement or alternate parts approved via M7 Aerospace drawings are acceptable 
substitutes for use in accomplishing this bulletin.
The following materials are required to accomplish the instructions outlined in this service 
bulletin. SB227-27-041 Kit A or B can be ordered and will contain all materials listed except 
common stock items which may be obtained locally or ordered separately.
KIT A - INSPECTION ONLY
NEW P/N QTY. KEYWORD OLD P/N DISPOSITION
AN310-4 * 2 Nut MS21083N4, Scrap
    MS20365-428
AN970-4 * 1 Washer N/A N/A
AN960-416 * A/R Washer N/A N/A
 (NAS1149C0463R is acceptable alternate washer)    
AN960-416L * A/R Washer N/A N/A
 (NAS1149C0432R is acceptable alternate washer)
MS24665-132 * 2 Cotter Pin N/A N/A
NAS6604D34 * 1 Bolt NAS6604D31 Scrap
NAS6604D12 * 1 Bolt AN4-( ) Scrap
 Or Alternate
   AN4-12
227-27-041-PL-A 1 Packing List N/A N/A
* Indicates materials are common stock items which will not be included in the kit.  
These parts may be obtained locally or ordered separately.
KIT B - INSPECTION AND REPLACEMENT
NEW P/N QTY. KEYWORD OLD P/N DISPOSITION
227-27-041 Kit A  1 Inspection Kit N/A N/A 
26-21352-007P 2 Doubler 26-21352-001 Scrap
     or -005
AN3-5A * 8 Bolt N/A N/A
AN960-10L * 8-16 Washer N/A N/A
 (NAS1149F0332P is acceptable alternate washer)
Continued Next Page

### Page 14

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 10 of 12
KIT B - INSPECTION AND REPLACEMENT (Continued)
NEW P/N QTY. KEYWORD OLD P/N DISPOSITION
AN960C416 * A/R Washer N/A N/A
 (NAS1149C0463R is acceptable alternate washer)    
AN960C416L * A/R Washer N/A N/A
 (NAS1149C0432R is acceptable alternate washer)    
CF-5/8-S   2 Roller Bearing CF-5/8-S Scrap
(CRS-10-1) § 2 Roller Bearing CF-5/8-S Scrap
(MS21440-102) § 2 Roller Bearing CF-5/8-S Scrap
MS21042L4 * 2 Nut MS21044N4 Scrap
MS21073L3 * 8 Nutplate MS21042L3 Scrap
MS20426AD3 * 16 Rivet N/A N/A 
REP4M6   2 Rod End (RH thread) REP4M6 Scrap
(MS21151-8)
REP4ML6 1 Rod End (LH Thread) REP4ML6 Scrap
(MS21151-9)
227-27-041-PL-B 1 Packing List N/A N/A
* Indicates materials are common stock items which will not be included in the kit.  
These parts may be obtained locally or ordered separately.
§ Indicates acceptable substitute for Roller Bearing P/N CF-5/8-S.

### Page 15

Issued: December 11, 1996
Revised: December 5, 2014
227-27-041 R2
Page 11 of 12
SERVICE BULLETIN
SA227 SERIES
FIGURE 1
CONTROL COLUMN ROLLER BEARING
INSPECTION / REPLACEMENT INSTRUCTIONS
6B270601
COPILOTS CONTROL COLUMN
INSPECTION INSTRUCTIONS:
APPLY 60.0 INCH/POUNDS (+ 5.0 / - 0.0 IN-LBS)
OF TORQUE AT MS21044N4 NUT.
IF NUT/ROLLER BEARING MOVES
PRIOR TO REACHING 60.0 INCH/POUNDS
OF TORQUE, REMOVE AND REPLACE
CF-5/8-S ROLLER BEARING,
26-21352-001/-005 DOUBLER ASSEMBLY
AND REPLACE MS21044N4 NUT WITH
MS21042L4 NUT.
26-21352-001 OR 26-21352-005
DOUBLER ASSEMBLY
(1 EACH, 2 PLACES)
FOR 26-21352-007P DOUBLER MATCH
DRILL FOR AN3-5A BOLT HOLES,
DRILL 0.097 TO 0.102 INCH DIAMETER,
2 PLACES EACH MS21073L3 NUTPLATE,
COUNTERSINK FAR SIDE,
100º x 0.175 TO 0.183 INCH DIAMETER,
INSTALL USING MS20426AD3
RIVETS.
A
DETAIL A
(PILOTS SIDE TYPICAL)
FWD
CF-5/8-S ROLLER BEARING
(1 EACH, 2 PLACES)
REINSTALL AN960C416
AND/OR AN960C416L WASHERS
USED AS SHIMS
AN3-5A BOLT
AN960-10L WASHER
MS21042L3 NUT
(FOR 26-21352-001 DOUBLER
ASSEMBLY)
(4 EACH, 2 PLACES)
 OR
AN3-5A BOLT
AN960-10L WASHER
(FOR 26-21352-005
DOUBLER ASSEMBLY)
(4 EACH, 2 PLACES)
MS21044N4 NUT (1 EACH, 2 PLACES)
AN960-416  AND/OR AN960-416L WASHERS
AS REQUIRED TO PROVIDE CLAMP UP OF
BEARING TO DOUBLER.  TORQUE NUT TO
70.0 INCH POUNDS  (+ 5.0 / - 0.0 IN-LBS).
ENLARGE CUTOUT BY 1.0 INCH, EACH END.
TRIM ANGLE FLANGE TO MATCH CUTOUT.
DEBURR AND SURFACE FINISH BARE METAL
USING EPOXY POLYAMIDE PRIMER.
1.0
INCH1.0INCH
IF FOUND LOOSE
REPLACE WITH
MS21042L4 NUT

### Page 16

Issued: December 11, 1996
Revised: December 5, 2014
SERVICE BULLETIN
SA227 SERIES
227-27-041 R2
Page 12 of 12
FIGURE 2
ELEVATOR CONTROL ROD, ROD END BEARING
INSPECTION / REPLACEMENT INSTRUCTIONS
6B270602
F.S. 116
F.S. 107
F.S. 98
CONTROL
COLUMN
CONTROL COLUMN
A
A
ELEVATOR CONTROL
WALKING BEAM
ELEVATOR CONTROL
WALKING BEAM
CL
SECTION A-A
(LOOKING INBOARD)
NAS6604D34 BOLT
AN960-416 WASHER
AN960-416 WASHER
AN310-4 NUT
MS24665-132 PIN
AN970-4 WASHER
MS21151-8 ROD END
(RH THREAD)
AND 
(EITHER END)
MS21151-9 ROD END
(LH THREAD)
FWD
F
W
D
AN960-416LWASHER
AN960-416 WASHER
AN960-416L WASHER
AN310-4 NUT
NORMAL ROD END
CREASED ROD END
REMOVE & REPLACE
RETAINER / DUST COVER
BEARING
CREASED (FRONT SIDE)
CREASED (BACK SIDE)
NAS6604D12 BOLT
(BOLT HEAD INBOARD)
HARDWARE ARRANGEMENT
SHOWN ABOVE IS CRITICAL TO
OBTAIN CORRECT CLAMP UP
MS24665-132 PIN
HARDWARE ARRANGEMENT
SHOWN BELOW IS CRITICAL TO
OBTAIN CORRECT CLAMP UP
ELEVATOR CONTROL ROD
AN960-416 AND/OR
AN960-416L WASHER(S)
(AS REQUIRED FOR CLAMP UP)

### Page 17

SA227 SERIES 
SERVICE BULLETIN COMPLIANCE FORM
227-27-041 R2
TO: OPERATOR OR SERVICE FACILITY ACCOMPLISHING BULLETIN
Please complete this compliance form, and mail according to the instructions on the 
reverse side.
Thank you for returning this form.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Aircraft Model Aircraft Serial Number 
Bulletin Issue Date  Revision Date 
Aircraft Registration Number   
Operator/Owner   
Time on Aircraft   
Date Accomplished   
Comments

### Page 18

FAIRCHILD AIRCRAFT 
 P. O. BOX 790490
 SAN ANTONIO, TEXAS 78279–0490
(Staple)
 ATTN: Technical Support Department
Fold  Here to Mail
Fold  Here to Mail
Place
Stamp
Here

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
