# Piaggio Mandatory Service Bulletin 80-0455: No revision named

- Rights: © Piaggio. Filed by the FAA in regulations.gov docket FAA-2017-0648; AD 2017-20-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Piaggio Mandatory Service Bulletin 80-0455](https://openairdocs.org/service-documents/piaggio/sb-80-0455.md)
- Title as filed: SB-80-0455
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/17/53/175389df77320a8dae16f67c0c5234565f3fe9b7b20c18d85991514290699a05
- Page: https://openairdocs.org/service-documents/piaggio/sb-80-0455/file/175389df7732

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 1  of  12 
Mod. D007_ed_1 
The EASA states mandatory compliance with inspections, modifications or technical directives and 
related time compliance by means of relevant Airworthiness Directives. 
SERVICE BULLETIN  (MANDATORY)  N.: 80-0455  REV. 0   ATA CHAPTER:  27; 55 
MODIFICATION N.: N/A 
TITLE: P180 AVANTI/AVANTI II – FORWARD WING FLAP, AILERON, MAIN WING 
INBOARD FLAP AND ELEVATOR ASSEMBLIES: INSPECTION OF 
REVISION STATUS OF THE BULLETIN 
This Service Bulletin (SB) is at the original issue and consists of  12   pages. 
1. PLANNING INFORMATION 
A. EFFECTIVITY 
Piaggio Aero Industries (PAI) P180 Avanti, Manufacturer’s Serial Number (MSN): 1004 
thru 1104 .  
Piaggio Aero Industries (PAI) P180 Avanti II Manufacturer’s Serial Number (MSN): 1002 , 
1105 thru 1220 . 
According to PAI manufacturing do cumentation, flight control surfaces  serial numbers not 
affected by this Service Bullet in are listed in the following T able 1 and may be installed on 
aircraft above indicated (since delivery or after, as replacement parts). 
NOTE 1: operators replacing any flight control surface(s) shall verify that the replacing 
unit is compliant with the requirement of this Service Bulletin.

### Page 2

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 2  of  12 
Mod. D007_ed_1 
 
Table 1 – Flight control surfaces: not affected serial numbers. 
 
 P/N S/N 
LH FWD FLAP 80-131001-403 
1212 thru 1216 
1218 
1221 thru 1227 
1229 
RH FWD FLAP 80-131001-404 
1208 thru 1212 
1214 thru 1223 
LH INB. FLAP 80-652001-905 
1087 thru 1091 
1093 thru 1097 
1099 
1101 thru 1102 
1105 
1107 thru 1108 
RH INB. FLAP 80-652001-907 1089 thru 1103 
LH AILERON 80-302009-903 
1212 thru 1220 
1222 thru 1226 
1228 
RH AILERON 80-302010-903 1206 thru 1223 
LH ELEVATOR 80-403001-905 
1116 thru 1129 
1131 thru 1132 
RH ELEVATOR 80-403001-906 
1114 
1116 thru 1125 
1127 thru 1128 
1130 
 
B. CONCURRENT REQUIREMENTS 
N/A

### Page 3

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 3  of  12 
Mod. D007_ed_1 
 
C. REASON 
PAI performed a deep analysis of a substantial disbonding found between the RH elevator 
assembly upper/lower metal skin and the honeycomb core during a post -flight inspection.  
Investigation identified that a nonconformity in the  manufacturing process could be the root  
cause of the disbonding and that other flight control surfaces could be potentially involved. 
This condition, if not detected and corrected, could affect the structural stiffness of the part, 
and downgrade the surface aerodynamic performance. 
This MANDATORY SB provides instruc tions for repetitive inspections to verify the 
structural integrity of the affected assemblies and depending on findings outcome require the 
repair of the part(s) or the replacement of the affected flight control surface(s). 
Aviation Authority action is also expected. 
D. DESCRIPTION 
General 
This MANDATORY SB consists of the following: 
Part A: identification of flight control surfaces  serial numbers, according to aircraft’s 
logbook and check if the identified parts are included in the not-affected units list 
as per §1.A. Table 1 of this Service Bulletin.  
If one or more surface(s) is (are) not listed in §1.A. Table 1, proceed with Part B 
or C of this Service Bulletin for this(these) surface(s), otherwise no other actions 
are required. 
Part B: coin tapping test o n the affected assemblies (not replaced as per Part C  of this 
Service Bulletin): LH and RH forward wing flap, LH and RH aileron , LH and 
RH main wing inboard flap and/or LH and RH elevator. 
Findings review and report to PAI Product Support Dept.  Depending on findings 
and actions taken, repetitive inspections are required.  Repair instructions may be 
also applicable.  
Part C: depending on  actions taken in Part A or B, replacement instructions of the 
affected assembly. 
E. COMPLIANCE 
This MANDATORY Service Bulletin shall be accomplished as follows: 
Part A: within 50 flight hours (FH) from the issue date of this Service Bulletin. 
 Part A may be postponed to the next 200 FH inspection if the following 
condition is met: last coin tapping inspection (refer to NDTM Chap. 51-00-01) or

### Page 4

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 4  of  12 
Mod. D007_ed_1 
last ultrasonic inspection (refer to. NDTM Chap. 51 -00-03) was performed , 
without any defect found,  on the LH and RH forward wing flap, LH and RH 
aileron , LH and RH main wing inboard flap and LH and RH elevator during the 
previous 200 FH from the issue date of this Service Bulletin. 
NOTE: it is not necessary to perform the following Part B for the flight contro ls 
surfaces replaced according to Part C of this Service Bulletin. 
Part B: following aircraft logbook check result as per Part A , perform initial inspection 
within 50 flight hours (FH) from the issue date of this Service Bulletin or at the 
next 200  FH inspection since the last coin tapping inspection (ref er to NDTM 
Chap. 51-00-01) executed on the LH and RH forward wing flap, LH and RH 
aileron , LH and RH main wing inboard flap, LH and RH elevator, whichever 
occurs later. 
[a] After initial inspection, in case of no damage found (local delamination), 
repeat the check after 200 FH. 
[b] After 200 FH (as per [a]), in case of no damage found, repeat t he check after 
200 FH. 
[c] After 400 FH (since initial inspection), in case of no damage found, proceed 
with coin tapping test every 600 FH in accordance with AMM. 
In case of damage found (local delamination) during inspection as per [a] or [b], 
proceed as follows: 
 in case of damage within the acceptable limits, repair must be performed in 
accordance with the Structural Repair Manual (SRM) report no. 180 -
MAN-0250-01106; 
 in case of damage exceeding the acceptable limits , contact PAI for 
technical evaluation and further actions. 
A repaired surface shall be inspected again after 50 FH since repair  and proceed 
as follows: 
[d] in case of no damage found, repeat the check after 200 FH; 
[e] in case of no damage found during inspection [d], proceed with coin tapping 
test every 600 FH in accordance with AMM. 
In case of damage found during inspection [d], contact immediately P AI for 
further actions. 
In case of damage found during inspection scheduled every 600 FH  (as per [e]), 
proceed as follows :

### Page 5

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 5  of  12 
Mod. D007_ed_1 
 in case of damage within the acceptable limits, repair must be performed in 
accordance with the Structural Repair Manual (SRM ) report no. 180 -
MAN-0250-01106: for repetitive inspection refer to [e]; 
 in case of damage exceeding the acceptable limits, contact immediately 
PAI. 
Part C: following inspection findings and actions taken  in accordance with Part B of this 
Service Bulletin and after contacting PAI P180 Customer Support to arrange the 
repair or replacement according to PAI Prod. Support Engineering evaluation. 
NOTE 2: the adoption of the 600 FH coin tapping interval on all the flight control 
surfaces, in consequence of a “no damage found” condition as per Part B 
of this Service Bulletin, is considered a terminating action of this SB. 
NOTE 3: should a new defect be found during a  coin tapping test carried out at 50 
FH or 200 FH after a repair, the replacement of the affected part 
combined with a “no damage found” condition on the other surfaces, and 
verified during all the previous coin tapping tests up to the 200 FH test, is 
considered a terminating action of this Service Bulletin. 
In compliance with this Service Bulletin, please complete the attached Confirmation Slip 
and sent it back to Piaggio Aero Industries S.p.A. – Product Support Department. 
F. APPROVAL 
The technical content o f this Service Bulletin has  been approved under the Authority of 
DOA No EASA.21J.220. 
G. MANPOWER 
This MANDATORY Service Bulletin may be accomplished in approximately: 
Part A: 0.5  man-hour (MH). 
Part B: 0.5  man-hour (MH) (each surface). 
Part C: 4  man-hours (MH) for FWD wing flap replacement (single unit); 
7  man-hours (MH) aileron replacement (single unit); 
4  man-hours (MH) MW inboard flap replacement (single unit); 
8  man-hours (MH) for elevator replacement (single unit). 
Additional 10 MH (maximum) ma y be required for post -installation flight 
control surface adjustment/test. 
NOTE: estimated man-hours provided above are not considering the drying/curing time required when a 
flight control surface repair is necessary and they do not include preparation a nd the time 
required to return the aircraft to a flyable status.

### Page 6

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 6  of  12 
Mod. D007_ed_1 
H. TECHNICAL INFORMATION 
For questions concerning the technical content of this Service Bulletin, please contact: 
Piaggio Aero Industries – P180 Customer Support 
Via Pionieri e Aviatori d’Italia, snc - 16154 Genoa, Italy 
Fax No. :  (+ 39)  010 099 8400 
E-mail:   technicalsupport@piaggioaerospace.it 
I. MATERIAL – COST AND AVAILABILITY 
For pricing, availability and scheduling, please contact: 
- for customers and operators in Europe, Asia and RoW  
e-mail:    spareparts@piaggioaerospace.it 
telephone:  (+39)  335 810 59 20 
- for customers and operators in the Americas 
e-mail:    spares@piaggioamerica.com 
telephone :  (+1)  561 253 0104 
fax:     (+1)  561 683 5513 
J. TOOLING – COST AND AVAILABILITY 
N/A 
K. WEIGHT AND BALANCE  
N/A 
L. ELECTRICAL LOAD DATA  
N/A 
M. REFERENCES 
 
Document Title Document Number Chapter/Section 
Airplane Maintenance Manual (AMM) 
9066  (Avanti) 
180-MAN-0200-01105  (Avanti II) 
12-00-00 
20-00-00 
27-10-00 
27-30-00 
27-50-00

### Page 7

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 7  of  12 
Mod. D007_ed_1 
Illustrated Parts Catalog (IPC) 
9065  (Avanti) 
180-MAN-0100-01103  (Avanti II) 
55-20-00 
57-51-00 
57-52-00 
57-61-00 
57-62-00 
Structural Repair Manual (SRM) 180-MAN-0250-01106 51-70-90 
Non-Destructive Test Manual (NDTM) 180-MAN-0300-01107 51-00-01 51-00-03 
PAI Service Letter (SL) 
“Warranty Claim & Failure Report procedure” 
80-0097  latest revision - 
 
 
 
N. PUBLICATIONS AFFECTED 
Document Title Document Number Chapter/Section 
Chapter 05 - Time Limits and 
Scheduled Maintenance 
(Avanti) 
180-MAN-0200-03832  Rev. C2 TR-213  to  05-20-00 
Chapter 05 - Time Limits and 
Scheduled Maintenance 
(Avanti II) 
180-MAN-0200-01491  Rev. D2 TR-240  to  05-20-00 
Structural Repair Manual (SRM) 180-MAN-0250-01106  Rev. B0 TR-013  to  51-70-90

### Page 8

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 8  of  12 
Mod. D007_ed_1 
2. ACCOMPLISHMENT INSTRUCTIONS 
NOTE 4: prepare the aircraft for maintenance in accordance with AMM Chap. 12-00-00. 
NOTE 5: refer to AMM Chap. 20 -00-00 for airframe  standard practices airframe, taking 
care to the health and safety precautions. 
Part A 
(1) In the aircraft’s logbook, verify if the serial numbers of the LH and RH forward wing flap, 
LH and RH aileron , LH and RH main wing inboard flap and LH and RH elevator are 
included in Table 1 (refer to Planning Information, §1.A of this Service Bulletin). 
(2) If any of the serial number installed is not listed in Table 1, proceed with Part B or C of this 
Service Bulletin for this(these) surface(s) , otherwise proceed with the next step as no other 
actions are required. 
(3)  Complete the Part “A” of  the attached Confirmation Slip and send it back to Piaggio Aero 
Industries S.p.A. – Product Support Department. 
(4) Make an opportune entry in the airplane logbook to show compliance with P art “A” of 
this Service Bulletin. 
Part B  
(5) Ascertain that the following Temporary Revisions are included in the manuals as follows: 
 Temporary Revision no.213 to the Avanti Airplane Maintenance Manual Chapter 
05 (Report no. 180-MAN-0200-03832, Rev. C2), Chapter 05-20-00. 
 Temporary Revision no.240 to the Avanti II Airplane Maintenance Manual 
Chapter 05 (Report no. 180-MAN-0200-01491, Rev. D2), Chapter 05-20-00. 
 Temporary Revisions no.013 to the Structural Repair Manual (Report no. 180 -
MAN-0250-01106, Rev. B0), Chapter 51-70-90. 
 
NOTE 6: Temporary Revisions will be incorporated into the related manual s at the 
next regular revision. 
(6) Put a warning not e in the flight compartment to tell people not to move  primary and 
secondary flight controls. 
(7) In accordance with ND TM Chap. 51 -00-01, perform a n accurate  coin tapping test on the 
following assemblies (FIGURE 1), making sure to carefully inspect both upper and lower skin 
of the flight control surface and check the entire bonding area:

### Page 9

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 9  of  12 
Mod. D007_ed_1 
 LH and RH forward wing flap ; 
 LH and RH aileron; 
 LH and RH main wing inboard flap; 
 LH and RH elevator. 
(8) In case of no damage/defect found, proceed with repetitive inspections in accordance with 
§1.E. COMPLIANCE of this Service Bulletin. 
(9) If a defect is found and is not within the acceptable l imits in accordance with NTDM Chap. 
51-00-01 Table 3  Class A, contact PAI Product Support Department  (refer to §1.H. ) for 
additional/following actions. 
Fill out a Failure Report (refer to PAI SL no. 80 -0097 latest revision) with all the relevant 
information about the damage such as but not limited to location, dimension, width and 
report to PAI Product Support Department prior to proceed (refer to §1.H.). 
(10) If a defect is found and is within the acceptable limits in accordance with NTDM Chap. 51 -
00-01 Table 3 ClassA, the affected control surface may be temporary repaired in accordance 
with SRM Chap. 51-70-90. 
Fill out a Failure Report (refer to PAI SL no. 80 -0097 latest revision) with all the relevant 
information about the damage such as but not limited to loc ation, dimension, width  and 
report to PAI Product Support Department (refer to §1.H.). 
A repaired surface shall be inspected in accordance with §1.E. COMPLIANCE of this 
Service Bulletin. 
Note that the repair is not a terminating action for repetitive inspe ction in accordance with 
the compliance (refer to §1.E.) of this Service Bulletin. 
(11) Complete the Part “B” of  the attached Confirmation Slip and send it back to Piaggio Aero 
Industries S.p.A. – Product Support Department. 
(12) Make an opportune entry in the airp lane logbook to show compliance with Part “ B” of 
this Service Bulletin.

### Page 10

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 10  of  12 
Mod. D007_ed_1 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE  1  -  FLIGHT CONTROL SURFACES TO BE TESTED. 
 
 
Part C 
(13) Following accomplishment of Part A or Part B of this Service Bulletin, if any flight  control 
surfaces replacement is required, proceed as follows: 
(13a) forward wing flap(s) in accordance with AMM Chap. 27-50-00; 
(13b) aileron(s) in accordance with AMM Chap. 27-10-00; 
(13c) main wing inboard flap(s) in accordance with AMM Chap. 27-50-00; 
(13d) elevator(s) in accordance with AMM Chap. 27-30-00. 
(14) Complete the Part “C” of  the attached Confirmation Slip and send it back to Piaggio Aero 
Industries S.p.A. – Product Support Department 
(15) Make an opportune entry in the airplane logbook to show compli ance with Part “C” of 
this Service Bulletin. 
ELEVATOR(S) 
FWD WING FLAP(S) 
AILERON(S) 
MAIN WING INBOARD FLAP(S)

### Page 11

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 11  of  12 
Mod. D007_ed_1 
3. MATERIAL INFORMATION 
A. LIST OF MODIFICATION KIT COMPONENTS 
Depending on findings as per Part A and/or B of this Service Bulletin, the following material 
may be required as spare part(s). 
For additional information about surfaces spare P/N refer to the relevant IPC chapter(s). 
 
Part/Number 
Specification Supplier Q.ty Type Designation 
SB 80-0455 Rev.0 Piaggio Aero Ind. - Kit Kit Service Bulletin 
1 80-131001-403 Piaggio Aero Ind. 1 Assy LH FWD flap* 
2 80-131001-404 Piaggio Aero Ind. 1 Assy RH FWD flap* 
3 80-302009-803 Piaggio Aero Ind. 1 Assy LH aileron ** 
4 80-302010-801 Piaggio Aero Ind. 1 Assy RH aileron ** 
5 80-652001-805 Piaggio Aero Ind. 1 Assy LH MW inboard flap *** 
6 80-652001-807 Piaggio Aero Ind. 1 Assy RH MW inboard flap *** 
7 80-403004-801 Piaggio Aero Ind. 1 Assy LH elevator **** 
8 80-403004-802 Piaggio Aero Ind. 1 Assy RH elevator **** 
 
*  IPC Chap. 57-52-00. 
**  IPC Chap. 57-61-00 and Chap. 57-62-00. 
*** IPC Chap. 57-51-00. 
**** IPC Chap. 55-20-00.

### Page 12

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
Original Issue: January 13th, 2017 
 
Service Bulletin: 80-0455 
Rev. N. 0  Date:   Page: 12  of  12 
Mod. D007_ed_1 
B. LIST OF MATERIALS – OPERATOR SUPPLIED 
Additional material may be required depending on the task(s) accomplished: refer to AMM 
and/or SRM relevant procedures. 
C. LIST OF TOOLS 
Specific too l(s) may be required depending on the task(s) accomplished: refer to AMM 
and/or SRM relevant procedures. 
D. DISPOSAL OF REMOVED PART 
Return the removed part (s) to Piaggio Aero Ind. – Product Support Dept. (refer to § 1.H.),  
including a completed copy of the attached Confirmation Slip. 
E. WARRANTY CREDIT PROGRAM 
N/A 
 
 
 
4. WARNING - PROPRIETARY RIGHTS 
This bulletin contains proprietary information of Piaggio Aero Industries S.p.A. (PAI), 
which PAI provides in confidence and solely for the purposes of supporting PAI products 
and providing applicable information regarding the proper u se, maintenance, inspection, 
repair, servicing and parts application of PAI products. Neither this bulletin nor any 
information in it may be disclosed to others, or used for any other purpose, including, 
without limitation, to design, create, develop, repr oduce, manufacture or derive any design, 
part, product, material, process, modification, configuration change or repair, or obtain any 
government approval to do so. This material is the exclusive property of Piaggio Aero 
Industries S.p.A. and therefore shall not be reproduced, used or disclosed to others except as 
authorized by contract with Piaggio Aero Industries S.p.A. or without the written permission 
of Piaggio Aero Industries S.p.A..

### Page 13

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
 
  
 
  
      
 
CONFIRMATION SLIP   (PAGE 1 OF 2) 
 
Service Bulletin Accomplishment SB-80-0455  Rev.0 
A/C  S/N: 
 
 
A/C Flight Hours: 
 
 
A/C LGDS: 
 
 
A/C Registration: 
 
 
  
PART A Date: 
Check for affected surface(s): 
            P/N       S/N      AFFECTED (Y/N) 
LH FW FLAP:      ______________    _________      ________ 
RH FW FLAP:      ______________    _________      ________ 
LH AILERON:      ______________    _________      ________ 
RH AILERON:      ______________    _________      ________ 
LH MW INBOARD FLAP:  ______________    _________      ________ 
RH MW INBOARD FLAP:  ______________    _________      ________ 
LH ELEVATOR:     ______________    _________      ________ 
RH ELEVATOR:     ______________    __________     ________ 
 
Accomplished by: Signature:

### Page 14

PIAGGIO AERO INDUSTRIES S.p.A. 
    Via Pionieri e Aviatori d’Italia snc - 16154 Genoa, Italy 
      Product Support Department 
 
  
 
  
      
 
CONFIRMATION SLIP   (PAGE 2 OF 2) 
 
PART B Date: 
Inspection findings (when applicable) 
 
 
LH FW FLAP:      ________________________________________________________ 
RH FW FLAP:      ________________________________________________________ 
LH AILERON:      ________________________________________________________ 
RH AILERON:      ________________________________________________________ 
LH MW INBOARD FLAP:  ________________________________________________________ 
RH MW INBOARD FLAP:  ________________________________________________________ 
LH ELEVATOR:     ________________________________________________________ 
RH ELEVATOR:     ________________________________________________________ 
Accomplished by: Signature: 
 
PART C Date: 
PART(S) REPLACED: 
Accomplished by: Signature:

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
