# Pilatus Service Bulletin 34-010: Revision 1

- Rights: © Pilatus Aircraft Ltd. Filed by the FAA in regulations.gov docket FAA-2023-0926, the docket of AD 2023-12-04. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Pilatus Service Bulletin 34-010](https://openairdocs.org/service-documents/pilatus/sb-34-010.md)
- Title as filed: Pilatus PC-24 Service Bulletin 34-010 Rev 1
- Pages: 28
- PDF: https://openairdocs.org/files/sha256/d6/b7/d6b78b4f95fb5150e39a2c32454fd795e27004156af388f2c142705d5a33ce95
- Page: https://openairdocs.org/service-documents/pilatus/sb-34-010/file/d6b78b4f95fb

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Service Bulletin No: 34-010 Ref No: 178
Modification No: EC-21-0263, EC-22-0449 ATA Chapter: 34
SERVICE BULLETIN
PILATUS AIRCRAFT LTD, STANS, SWITZERLAND
Service Bulletin No: 34-010 Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 1 of 28
NAVIGATION - WEATHER RADAR SYSTEM
REDUNDANT WEATHER RADAR WIRING MODIFICATION
1. Planning information
A. Effectivity
PC-24 aircraft MSN 231 thru MSN 252, MSN 254 and MSN 255.
This modification was incorporated on MSN 253, and MSN 256 thru MSN 260 during production.
This modification will be incorporated on MSN 261 and subsequent during production.
B. Concurrent requirements
None.
C. Reason
(1) Problem
The nose wiring harness includes electrical provisions for two weather radar options 
(RDR-2100 and RDR-7000). All of the wires in this nose wiring harness should be installed 
together in a braided shielding sleeve.
On some aircraft, it has been identified that certain wires (principally those not used in the 
weather radar option selected) were not installed in the braided shielding sleeve, they 
were instead installed outside of the braided shielding sleeve. The missing shielding 
extends over a length of approximately 0.5 meters. At the unshielded end the wires are 
capped and stowed and the other ends are connected to the modules that follow:
•A G M 1
•A G M 2
• DGI01
•A H R S 2 .
A Lightning Strike event could therefore affect the functionalities related to the above 
modules.
(2) Solution
Disconnect and cap and stow the redundant wires that are installed outside of the braided 
shielding sleeve.

### Page 2

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 2 of 28
SERVICE BULLETIN
D. Description
This Service Bulletin gives the data and instructions necessary to:
(1) Part 1 - Do the modification to disconnect and cap and stow the redundant wires of the
RDR-2100 wiring harness.
NOTE: Part 1 of this Service Bulletin is only applicable to aircraft that have the 
RDR-7000 weather radar installed.
OR
(2) Part 2 - Do the modification to disconnect and cap and stow the redundant wires of the 
RDR-7000 wiring harness.
NOTE: Part 2 of this Service Bulletin is only applicable to aircraft that have the 
RDR-2100 weather radar installed.
Revision No.1 of this Service Bulletin is issued to include:
• Additional items in the modification kit
• Additional modification instructions  to include the two additional items:
• Dummy ferrules (P/N 971.19.26.111)
• Shrink hose (P/N 917.99.88.607).
For Operators that have accomplished this Service Bulletin at the initial issue, make sure that the 
dummy ferrules (P/N 971.19.26.111) and the shrink hose (P/N 917.99.88.607) are installed. 
Refer to the applicable Part of this Service Bulletin:
E. Compliance
Mandatory, no later than the next 12 month inspection.
F. Approval
The technical content of this document is approved under the authority of the DOA ref. 
EASA.21J.357.
Pilatus advises Operators/Owners to check with their designated Airworthiness Authority for any 
changes, local regulations or sanctions that may affect the embodiment of this Service Bulletin.
• Part 1 - Para. 3.B.(4)
OR -
• Part 2 - Para. 4.B.(6)

### Page 3

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 3 of 28
G. Copyright and legal statement
© Pilatus Aircraft Ltd. This document contains proprietary information that is protected by 
copyright. All rights are reserved. No part of this document may be copied, reproduced or 
translated to other languages without the prior written consent of Pilatus Aircraft Ltd.
In connection with the use of this document, Pilatus does not provide any express or implied 
warranties and expressly disclaims any warranty of merchantability or fitness for a particular 
purpose. This document contains trade secrets, confidential and/or proprietary information of 
Pilatus and technical data subject to export control laws and regulations, including the U.S. 
Export Administration Regulations (EAR). Disclosure or distribution of this document contrary to 
the EAR, and other laws and regulations, is strictly forbidden. The above restrictions may apply 
to data on all pages of this document.
H. Manpower
Accomplishment instructions - Part 1
Accomplishment instructions - Part 2
I. Weight and balance
(1) Weight Change:
+0.267 lb (+0,121 kg).
(2) Moment Change:
+11.572 lb*in (+0,133 kg*m).
Description Man-Hours
Preparation 0.25
Modification 2.00
Test 4.00
Requirements after job completion 0.50
TOTAL MAN-HOURS 6.75
Description Man-Hours
Preparation 0.25
Modification 2.50
Test 6.00
Requirements after job completion 0.50
TOTAL MAN-HOURS 9.25

### Page 4

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 4 of 28
SERVICE BULLETIN
J. Electrical load change data
Not changed.
K. Software
Not changed.
L. References
Aircraft Maintenance Manual (AMM):
M. Publications affected
Wiring Diagram Manual (WDM).
N. Interchangeability of parts
Not applicable.
PC24-A-A00-50-0000-00A-070A-A PC24-A-A06-40-0000-00A-040A-A
PC24-A-E20-10-0003-00A-913A-A PC24-A-E20-10-0004-00A-913A-A
PC24-A-E20-20-0001-00A-040A-A PC24-A-E24-00-0000-00A-913A-A
PC24-A-E24-97-0002-00A-320A-A PC24-A-E24-97-0007-00A-320A-A
PC24-A-E42-10-0001-02A-520A-A PC24-A-E42-10-0001-02A-720A-A.

### Page 5

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 5 of 28
2. Material information
Operators that require additional information and/or Service Bulletin material can 
contact their authorized Pilatus Service Center, or Pilatus Customer Support on 
www.pilatus-aircraft.com  contact us.
NOTE: Part numbers given in this Service Bulletin are correct at the time of 
approval. Pilatus Aircraft Ltd reserves the right to change the part numbers 
as necessary. Part numbers of items delivered with a kit are correct when
the kit is dispatched. This could lead to differences between those part 
numbers quoted in a Service Bulletin and a kit if parts are superseded. 
Operators are requested to check the Illustrated Parts Data (IPD) for 
delivered parts that differ from those listed in the Service Bulletin materials 
kit list.
Operators are requested to advise Pilatus Aircraft Ltd of the Manufacturers Serial 
Number (MSN), the flying hours and landings of aircraft that are allocated for this 
Service Bulletin.
A. Material - Price and availability
B. Warranty
Credit will be issued for parts and labour for all affected aircraft on approval of a warranty claim, 
provided the work is accomplished by an authorized Service Center within the compliance time 
given in Section 1.E on Page 2 of this Service Bulletin.
C. Material necessary for each aircraft
(1) Material to order from Pilatus
Modification kit number 500.50.24.042
Modification kit number Price Availability
500.50.24.042 Contact as abo ve Approximately 2 weeks
New part No. Description Old part No. Qty Disp.
code
Fig Item
917.99.88.601 Shrink Hose, Black 3/64 - 0,50
M
N- -
917.99.88.604 Shrink Hose, Black 1/8 - 0,16
M
N- -
917.99.88.605 Shrink Hose, Black 3/16 0,04
M
N- -
971.19.38.605 Heat-shrinkable, ES Cap
No. 1
-1 0 N - -
917.99.88.607 Shrink Ho se, Black, 3/8 - 0,02
M
N- -
Disposition Codes: D - Discard / N - New / R - Return to Pilatus / E - Exchange part

### Page 6

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 6 of 28
SERVICE BULLETIN
NOTE: The quantity of some items in this modification kit will include spares depending on the 
accomplishment of Part 1 or Part 2 of this Service Bulletin.
D. Operator supplied materials
NOTE: To identify the materials used in this procedure, look in the Consumable materials list. 
Refer to AMM PC24-A-A00-50-0000-00A-070A-A.
E. Material necessary for each spare
Not applicable.
F. Re-identified parts
Not applicable.
971.19.26.111 Ferrule, Blank, Dummy - 1 N - -
971.32.51.210 Band, clamp, ST, 6 mm
(PB1021)
-3 N - -
971.75.16.829 Contact, Socket, Crimp, 
AWG22-26
(A096-1P3, A096-2P2, 
A096-6P2, A096-7P3, 
A096-7P4)
-1 3 N - -
971.75.17.911 Contact, Pin, #22
(PB1012, PB1021)
-1 3 N - -
971.75.18.921 Plug, Seal, Size 22
(Filler Pin)
(PB1012, PB1021)
-1 3 N - -
Material No. Description Qty Remarks
P09-005 Cable tie
(MS3367-5-9, PA66)
AR P/N 971.32.51.105
P09-008 Cable tie
(MS3367-4-9, PA66)
AR P/N 971.32.51.104
P09-014 Cable tie
(MS3397-1-9, PA66)
AR P/N 971.32.51.101
P09-064 Tape (Silic one, Red) AR P/N 917.40.60.311
New part No. Description Old part No. Qty Disp.
code
Fig Item
Disposition Codes: D - Discard / N - New / R - Return to Pilatus / E - Exchange part

### Page 7

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 7 of 28
G. Tools and equipment
NOTE: Refer also to the referenced AMM procedures as applicable.
Tools and equipment Recommended
Pilatus part
Tool kit, electrician Local supply
Insert and extract tool (as applicable) Local supply
Heat gun Local supply
Hand banding tool (Tie-dex A40199)
OR
Banding tool DBS-2100 (M81306/1A)
P/N 990.00.02.031
Local supply

### Page 8

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 8 of 28
SERVICE BULLETIN
3. Accomplishment instructions - Part 1
Only for Aircraft with the RDR-7000 Weather Radar system installed.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ELECTRICAL SYSTEM OR A SYSTEM 
THAT USES THE ELECTRICAL POWER. MAKE SURE THAT IT IS SAFE BEFORE YOU 
APPLY ELECTRICAL POWER TO THE AIRCRAFT OR ENERGIZE THE AIRCRAFT 
ELECTRICAL SYSTEMS. THE ELECTRICAL POWER CAN CAUSE INJURY TO OR 
KILL PERSONNEL AND CAUSE DAMAGE TO EQUIPMENT.
A. Preparation
(1) Obey the safe maintenance practices as necessary. Refer to AMM PC24-A-E20-10-0003-
00A-913A-A.
(2) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A-
A.
(3) Put a ‘ DO NOT CONNECT ELECTRICAL POWER’ sign on the:
• Overhead control panel
• External power connection.
(4) Open/Remove the access panels/fairings in  Table 1. Refer to AMM PC24-A-A06-40-0000-
00A-040A-A.
Table 1: Access panels/fairings
(5) Remove the Modular Avionics Unit (MAU) 1 cover. Refer to AMM PC24-A-E42-10-0001-
02A-520A-A.
Panel number Panel name
212AL Nose door, LH
212AR Nose door, RH

### Page 9

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 9 of 28
B. Modification
NOTE: When you cap and stow wires/shields, unless otherwise stated, use shrink hose P/N 
917.99.88.601 to isolate the wires, shrink Hose P/N 917.99.88.604 to isolate the 
shields, heat shrinkable caps (P/N 971.19.38.605) to cap all of the wires/shields 
together.
NOTE: When you attach cables/wires in the aircraft, use tape (Silicone red, fiberglass) 
(Material No. P09-064) and the applicable cable ties (Material No. P09-005/P09-008/
P09-014), as necessary.
(1) Disconnect the electrical  connectors listed below:
• Electrical connector PB1021 from the electrical receptacle JB1021
• Electrical connector A096-2P2 from AGM 1 on the MAU 1
• Electrical connector A096-6P2 from DGIO 1 on the MAU 1
• Electrical connector A096-7P4 from DGIO 1 on the MAU 1.
(2) Disconnect/Open the backshell on each of  the electrical connectors listed above.
(3) Use the applicable insert/extract tool and disconnect the wires from the electrical 
connector PB1021. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 1 thru 4):
(a) Disconnect the blue wire of cable SM 4B22 from terminal 17 of the electrical 
connector PB1021.
(b) Disconnect the trace wire of cable SM4B22 from terminal 18 of the electrical 
connector PB1021.
(c) Disconnect the shield wire of cable SM4B22 from terminal 19 of the electrical 
connector PB1021.
(d) Install a new contact (P/N 971.75.17.9 11) and a seal plug (filler pin) (P/N 
971.75.18.921) in each of the terminals where you disconnected the wires.
(e) Remove (and discard) the band clamp and disconnect the cable shield of cable 
SM4B22 from the backshell of the electrical connector PB1021.
(f) Use a new band clamp (P/N 971.32.51.210) and connect all of the remaining cable 
shield(s)/shield wire(s)) to the backshell of the electrical connector PB1021.
(g) Connect the backshell to the electrical connector PB1021.
(h) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector PB1021.
(4) Use the applicable insert/extract tool and disconnect the wires from the electrical 
connector A096-2P2. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 5 thru 8):
(a) Disconnect the blue wire of cable SM4C 22 from terminal 19 of the electrical 
connector A096-2P2.
(b) Disconnect the wire SM4G22 from terminal 20 of the electrical connector A096-2P2.

### Page 10

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 10 of 28
SERVICE BULLETIN
(c) Disconnect the wire SM4H22 from terminal  21 of the electrical connector A096-2P2.
(d) Disconnect the cable shield of cable SM4C 22 from the backshell of the electrical 
connector A096-2P2.
(e) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you 
disconnected the wires.
(f) Install a dummy ferrule (P/N 971.19.26.111)  in the empty hole in the backshell of the 
electrical connector A096-2P2.
(g) Close the backshe ll of the electrical connector A096-2P2.
(h) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector A096-2P2.
1 Use shrink hose (P/N 917.99.88.607) on the ferrule and solder shield.
(5) Use the applicable insert/extract tool an d disconnect the wires from the electrical 
connector A096-6P2. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 9 thru 11):
(a) Disconnect the red wire of cable SM6A24 from terminal 22 of the electrical 
connector A096-6P2.
(b) Disconnect the blue wire of cable SM6A24  from terminal 23 of the electrical 
connector A096-6P2.
(c) Disconnect the cable shield of cable SM6A 24 from the backshell of the electrical 
connector A096-6P2.
(d) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you 
disconnected the wires.
(e) Close the backshe ll of the electrical connector A096-6P2.
(f) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connectorA096-6P2.
(6) Use the applicable insert/extract tool an d disconnect the wires from the electrical 
connector A096-7P4. Refer to Figure 1, and Figure 2 - Hook-Up Chart 1 (Line 12 thru 14):
(a) Disconnect the red wire of cable SM7A24 from terminal 22 of the electrical 
connector A096-7P4.
(b) Disconnect the blue wire of cable SM7A24  from terminal 23 of the electrical 
connector A096-7P4.
(c) Disconnect the cable shield of cable SM7A 24 from the backshell of the electrical 
connector A096-7P4.
(d) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you 
disconnected the wires.
(e) Close the backshe ll of the electrical connector A096-7P4.

### Page 11

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 11 of 28
(f) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector A096-7P4.
(7) Connect the electrical connectors listed below:
• Electrical connector PB1021 to the electrical receptacle JB1021
• Electrical connector A096-2P2 to AGM 1 on the MAU 1
• Electrical connector A096-6P2 to DGIO 1 on the MAU 1
• Electrical connector A096-7P4 to DGIO 1 on the MAU 1.
• Torque the jack screws of the electrical connectors A096-2P2 / A096-6P2 / 
A096-7P4 to between 40 and 44 in-lb (4,5 and 5,0 Nm) plus the rundown 
torque. Refer to AMM PC24-A-E20-20-0001-00A-040A-A.
C. Test
(1) Remove the ‘ DO NOT CONNECT ELECTRICAL POWER’ sign from the:
• Overhead control panel
• External power connection.
(2) Do the Connection PB/JB1021 - Operation test. Refer to AMM PC24-A-E24-97-0007-00A-
320A-A.

### Page 12

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 12 of 28
SERVICE BULLETIN
D. Requirements after job completion
(1) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A-
A.
(2) Install the MAU 1 cover. Refer to AMM PC24-A-E42-10-0001-02A-720A-A.
(3) Remove all the equipment, tools and materials from the work area. Make sure that the 
work area is clean.
(4) Close/Install the access panels/fairings in Table 2. Refer to AMM PC24-A-A06-40-0000-
00A-040A-A.
Table 2: Access panels/fairings
(5) Do the Closeup practices. Refer to AMM PC24-A-E20-10-0004-00A-913A-A.
E. Documentation
(1) Make an entry in the Aircraft Logbook to record  the incorporation of Part 1 of this Service 
Bulletin.
(2) Make sure that the Aircraft Logbook shows any new Pilatus Part Number(s) and/or Serial 
Number(s), as applicable.
(3) Inform CAMP of the incorporation of Part 1 of this Service Bulletin and any new Pilatus 
Part Number(s) and/or Serial Number(s), as applicable. Send the completed feedback 
sheet to: fax@campsystems.com
Panel number Panel name
212AL Nose door, LH
212AR Nose door, RH

### Page 13

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 13 of 28
4. Accomplishment inst ructions - Part 2
Only for Aircraft with the RDR-2100 Weather Radar system installed.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ELECTRICAL SYSTEM OR A SYSTEM 
THAT USES THE ELECTRICAL POWER. MAKE SURE THAT IT IS SAFE BEFORE YOU 
APPLY ELECTRICAL POWER TO THE AIRCRAFT OR ENERGIZE THE AIRCRAFT 
ELECTRICAL SYSTEMS. THE ELECTRICAL POWER CAN CAUSE INJURY TO OR 
KILL PERSONNEL AND CAUSE DAMAGE TO EQUIPMENT.
A. Preparation
(1) Obey the safe maintenance practices as necessary. Refer to AMM PC24-A-E20-10-0003-
00A-913A-A.
(2) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A-
A.
(3) Put a ‘ DO NOT CONNECT ELECTRICAL POWER’ sign on the:
• Overhead control panel
• External power connection.
(4) Open/Remove the access panels/fairings in Table 3. Refer to AMM PC24-A-A06-40-0000-
00A-040A-A.
Table 3: Access panels/fairings
(5) Remove the Modular Avionics Unit (MAU) 1 cover. Refer to AMM PC24-A-E42-10-0001-
02A-520A-A.
Panel number Panel name
212AL Nose door, LH
212AR Nose door, RH

### Page 14

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 14 of 28
SERVICE BULLETIN
B. Modification
NOTE: When you cap and stow wires/shields, use shrink hose P/N 917.99.88.601 to isolate 
the wires, shrink Hose P/N 917.99.88.603 to isolate the shields, heat shrinkable caps 
(P/N 971.19.38.605) to cap all of the wires/shields together.
NOTE: When you attach cables/wires in the aircraft, use tape (Silicone red, fiberglass) 
(Material No. P09-064) and the applicable cable ties (Material No. P09-005/P09-008/
P09-014), as necessary.
(1) Disconnect the electrical connectors listed below:
• Electrical connector PB1021 from the electrical receptacle JB1021
• Electrical connector PB1012 from the electrical receptacle JB1012
• Electrical connector A096-7P3 from DGIO 1 on the MAU 1
• Electrical connector A096-1P3 from AGM 1 on the MAU 1.
(2) Disconnect/Open the backshell on each of the electrical connectors listed above.
(3) Use the applicable insert/extract tool an d disconnect the wires from the electrical 
connector PB1021. Refer to Figure 3, and Figure 4 - Hook-Up Chart 2 (Line 1 thru 11):
(a) Disconnect the red wire of cable SM28B 24 from terminal 41 of the electrical 
connector PB1021.
(b) Disconnect the blue wire of cable SM28B2 4 from terminal 42 of the electrical 
connector PB1021.
(c) Remove (and discard) the band clamp and disconnect the cable shield of cable 
SM28B24 from the backshell of the electrical connector PB1021.
(d) Disconnect the red wire of cable SM29B 24 from terminal 124 of the electrical 
connector PB1021.
(e) Disconnect the red/black wire of cable SM29 B24 from terminal 125 of the electrical 
connector PB1021.
(f) Disconnect the blue wire of cable SM29B2 4 from terminal 126 of the electrical 
connector PB1021.
(g) Disconnect the blue/black wire of cable SM 29B24 from terminal 127 of the electrical 
connector PB1021.
(h) Remove the cable shield of cable SM29B2 4 from the backshell of the electrical 
connector PB1021.
(i) Disconnect the red wire of cable SM30A 24 from terminal 120 of the electrical 
connector PB1021.
(j) Disconnect the blue wire of cable SM30A2 4 from terminal 121 of the electrical 
connector PB1021.
(k) Remove the cable shield of cable SM30A2 4 from the backshell of the electrical 
connector PB1021.

### Page 15

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 15 of 28
(l) Install a new contact (P/N 971.75.17.9 11) and a seal plug (filler pin) (P/N 
971.75.18.921) in each of the terminals where you disconnected the wires.
(m) Use a new band clamp (P/N 971.32.51.210) and connect all of the remaining cable 
shield(s)/shield wire(s)) to the backshell of the electrical connector PB1021.
(n) Connect the backshell to the electrical connector PB1021.
(o) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector PB1021.
NOTE: For cable SM29B24, use shrink Hose P/N 917.99.88.605 to isolate the 
shield. Do not use shrink hose P/N 917.99.88.604.
(4) Use the applicable insert/extract tool and disconnect the wires from the electrical 
connector PB1012. Refer to Figure 3, and Figure 4 - Hook-Up Chart 2 (Line 12 thru 14):
(a) Disconnect the red wire of cable SM32A2 4 from terminal 100 of the electrical 
connector PB1012.
(b) Disconnect the blue wire of cable SM32 A24 from terminal 101 of the electrical 
connector PB1012.
(c) Remove (and discard) the band clamp and disconnect the cable shield of cable 
SM32A24 from the backshell of the electrical connector PB1012.
(d) Install a new contact (P/N 971.75.17.9 11) and a seal plug (filler pin) (P/N 
971.75.18.921) in each of the terminals where you disconnected the wires.
(e) Use a new band clamp (P/N 971.32.51.210) and connect all of the remaining cable 
shield(s)/shield wire(s)) to the backshell of the electrical connector PB1012.
(f) Connect the backshell to the electrical connector PB1012.
(g) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector PB1012.
(5) Use the applicable insert/extract tool and disconnect the wires from the electrical 
connector A096-7P3. Refer to Figure 3, and Figure 4 - Hook-Up Chart 2 (Line 15 thru 17):
(a) Disconnect the red wire of cable SM35A24 from terminal 45 of the electrical 
connector A096-7P3.
(b) Disconnect the blue wire of cable SM35 A24 from terminal 46 of the electrical 
connector A096-7P3.
(c) Disconnect the cable shield of cable SM35A24 from the backshell of the electrical 
connector A096-7P3.
(d) Install a blind contact (P/N 971.75.16.829) in each of the terminals where you 
disconnected the wires.
(e) Close the backshell of the electrical connector A096-7P3.
(f) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector A096-7P3.

### Page 16

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 16 of 28
SERVICE BULLETIN
(6) Use the applicable insert/extract tool an d disconnect the wires from the electrical 
connector A096-1P3. Refer to Figure 3, and Figure 4 - Hook-Up Chart 2 (Line 18 thru 22):
(a) Disconnect the red wire of cable SM37A 24 from terminal 20 of the electrical 
connector A096-1P3.
(b) Disconnect the red/black wire of cable SM37 A24 from terminal 61 of the electrical 
connector A096-1P3.
(c) Disconnect the blue wire of cable SM37A2 4 from terminal 62 of the electrical 
connector A096-1P3.
(d) Disconnect the blue/black wir e of cable SM37A24 from terminal 19 of the electrical 
connector A096-1P3.
(e) Disconnect the cable shield of cable SM 37A24 from the backshell of the electrical 
connector A096-1P3.
(f) Install a blind contact (P/N 971.75.16. 829) in each of the terminals where you 
disconnected the wires.
(g) Install a dummy ferrule (P/N 971.19.26.111)  in the empty hole in the backshell of the 
electrical connector A096-1P3.
(h) Close the backshe ll of the electrical connector A096-1P3.
(i) Cap the wires that you disconnected and stow them on the wiring harness near the 
electrical connector A096-1P3.
1 Use shrink Hose P/N 917.99.88.605 to isolate the shield. Do not use shrink 
hose P/N 917.99.88.604.
2 Use shrink hose (P/N 917.99.88.607) on the ferrule and solder shield.
(7) Connect the electrical connectors listed below:
• Electrical connector PB1021 from the electrical receptacle JB1021
• Electrical connector PB1012 from the electrical receptacle JB1012
• Electrical connector A096-7P3 from DGIO 1 on the MAU 1
• Electrical connector A096-1P3 from AGM 1 on the MAU 1.
• Torque the jack screws of the electric al connectors A096-7P3 / A096-1P3 to 
between 40 and 44 in-lb (4,5 and 5,0 Nm) plus the rundown torque. Refer to 
AMM PC24-A-E20-20-0001-00A-040A-A.

### Page 17

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 17 of 28
C. Test
(1) Remove the ‘ DO NOT CONNECT ELECTRICAL POWER’ sign from the:
• Overhead control panel
• External power connection.
(2) Do the Connection PB/JB1012 - Operation test. Refer to AMM PC24-A-E24-97- 0002-
00A-320A-A.
(3) Do the Connection PB/JB1021 - Operation test. Refer to AMM PC24-A-E24-97-0007-00A-
320A-A.
D. Requirements after job completion
(1) De-energize the aircraft electrical system. Refer to AMM PC24-A-E24-00-0000-00A-913A-
A.
(2) Install the MAU 1 cover. Refer to AMM PC24-A-E42-10-0001-02A-720A-A.
(3) Remove all the equipment, tools and material s from the work area. Make sure that the 
work area is clean.
(4) Close/Install the access panels/fairings in  Table 4. Refer to AMM PC24-A-A06-40-0000-
00A-040A-A.
Table 4: Access panels/fairings
(5) Do the Closeup practices. Refer to AMM PC24-A-E20-10-0004-00A-913A-A.
E. Documentation
(1) Make an entry in the Aircraft Logbook to record  the incorporation of Part 2 of this Service 
Bulletin.
(2) Make sure that the Aircraft Logbook shows any new Pilatus Part Number(s) and/or Serial 
Number(s), as applicable.
(3) Inform CAMP of the incorporation of Part 2 of this Service Bulletin and any new Pilatus 
Part Number(s) and/or Serial Number(s), as applicable. Send the completed feedback 
sheet to: fax@campsystems.com
Panel number Panel name
212AL Nose door, LH
212AR Nose door, RH

### Page 18

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 18 of 28
SERVICE BULLETIN
Part 1 - Wiring Diagram 34-49-20 - Weather Radar (RDR-2100) (Pre Service Bulletin)
Figure 1 (Sheet 1 of 2)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	
	
	

		

	
	
	


	

	 
		

			

					

 !	!
	
  
  
  
  
 !!	
		


 
	"
	


 
	
	
		
	
		
		
		
		

		!		

#$#
%$#
%


%


	

"
&

%

$
$#
%


%$#&

 
%$#$

 
#%#
$
'"


 !
!
 !
!
 !	!
#%#
%$

	



%!!
%!!
%!!
%!!
 !
!
 !
!
 	!

%#


%#
"
%#

%#



%#
 # %#(
%#
 # %#("
%#
 # %#(
)
)
)
)
)
)
)
)
 
 

& 

 
$ 
 
 






	



 
 
 












Carrasco SergioCarrasco Sergio
Zundritsch Peter
Fuchs Tobias

### Page 19

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 19 of 28
Part 1 - Wiring Diagram 34-49-20 - Weather Radar (RDR-2100) (Post Service Bulletin)
Figure 1 (Sheet 2 of 2)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	
	
	

		

	
	
	

			

		
	


	



 !""###
					

 ""#$##	$
	
 $$	#
		

"

	%
	
!

 

!


 


 
	
	
		
	
		
		
		
		

		$		

!&!


	

%
'
 

&




&

&



&'!


&&




(
(
!
&
)%
#
#
!$
$
!$
$
!$	#$
(
(
(





%
(
(
(






!!
&

	
#

#
!$$
!$$
!$$
!$$
!$
$
!$
$
!	#$



%


(
(
(
(
(
(
(
(
(
 

#'!

 
#&! 
 
#! 
#!
 
#! 

#!	

#!

#!

#!


#!

#!
 
#! 


#!

 



#!

Carrasco Sergio
Zundritsch Peter
Fuchs Tobias

### Page 20

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 20 of 28
SERVICE BULLETIN
Part 1 - Hook-Up Chart 1
Figure 2
 
 
 
  
 
Note 1: Cap and stow the wire. 
Line 
End 1 
Color Cable/Wire No. 
End 2 Remarks 
Ident. No. Terminal No. Contact P/N Contact P/N Terminal No. Ident. No.   
1 TB0911-12 H - BL SM4B22 - 17 PB1021 Disconnect End 2 (See Note 1) 
2 TB0911-12 J - TR SM4B22 - 18 PB1021 Disconnect End 2 (See Note 1) 
3 TB0911-12 K - Shield Wire SM4B22 - 19 PB1021 Disconnect End 2 (See Note 1) 
4 TB0911-12 L - Cable Shield SM4B22 - Backshell PB1021 Disconnect End 2 (See Note 1) 
5 TB0911-12 R - BL SM4C22 - 19 A096-2P2 Disconnect End 2 (See Note 1) 
6 TB0911-12 S - TR SM4C22/ SM4G22 - 20 A096-2P2 Disconnect End 2 (See Note 1) 
7 TB0911-12 T - TR SM4C22/ SM4H22 - 21 A096-2P2 Disconnect End 2 (See Note 1) 
8 TB0911-12 U - Cable Shield SM4C22 - Backshell A096-2P2 Disconnect End 2 (See Note 1) 
9 - - - RD SM6A24 - 22 A096-6P2 Disconnect End 2 (See Note 1) 
10 - - - BL SM6A24 - 23 A096-6P2 Disconnect End 2 (See Note 1) 
11 - - - Cable Shield SM6A24 - Backshell A096-6P2 Disconnect End 2 (See Note 1) 
12 - - - RD SM7A24 - 22 A096-7P4 Disconnect End 2 (See Note 1) 
13 - - - BL SM7A24 - 23 A096-7P4 Disconnect End 2 (See Note 1) 
14 - - - Cable Shield SM7A24 - Backshell A096-7P4 Disconnect End 2 (See Note 1)

### Page 21

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 21 of 28
Part 2 - Wiring Diagram 34-49-90 - Weather Radar (RDR-7000) (Pre Service Bulletin)
Figure 3 (Sheet 1 of 4)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	
	




		

						
			




	 !
"



	#

#

$


#
#
#
%

&








# !" '
# !" '
!# " 
	# 	
#
	#"!
	#"!
# " %
	
		
	
	


(
	# 
	# 

(
 &

 # !" '
 &
 # !" '
 &
 # !" '
" !
	
" !

" !

" !

" !

)
)
)
)
)
)
)
)
)
)
)
)
)
)  !	# 

!	# 
 "# 

"#

* "# *
*
"#
*
* !	# *
*
!	#
*
 !	# 

!	#

 !	#  !	# 
 +#  +# 
*
"	#
*
 "	# 

"	#

*
"	# *
 +	#  +	#
 !#

!#
Carrasco Sergio
Kenney Alan James
Fuchs Tobias

### Page 22

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 22 of 28
SERVICE BULLETIN
Part 2 - Wiring Diagram 34-49-90 - Weather Radar (RDR-7000) (Pre Service Bulletin)
Figure 3 (Sheet 2 of 4)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	

	




	




	

	


	

	





 	

 
 ! "#



 
$
%
&
'
&($
(
&($
(
 
 )
 
 )


 

$
%$
%  *

&

&
%  *
+
+
+
+
+
+
+
+
+
+
 
 ) $ 
 ' ,
$
 ' ,
  $  ' , $ ' ,

$

 $   $  
$
$!
   $
Carrasco Sergio
Kenney Alan James
Fuchs Tobias

### Page 23

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 23 of 28
Part 2 - Wiring Diagram 34-49-90 - Weather Radar (RDR-7000) (Post Service Bulletin)
Figure 3 (Sheet 3 of 4)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	
	
	

		

	
	
	

		
	





	



	

				




			
 !" #$
 !" #$
 !" #$




# !
"
#
#







	





%





&
#
'


! " 
 


"!
"!
 " &
#



	(

			 

			 
	(
 '

 '

 '

" !

" !

" !

" !
	
" !

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
*

!
*
* 
! * 
!  
!

 
! 


! 
 
" 
*

"
*


"

* 
" *
 
!  
! 
 
+  
+ 


"

 
" 
*

"
*
*

" *
 
+  
+
 
!


!
Carrasco Sergio
Zundritsch Peter
Fuchs Tobias

### Page 24

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 24 of 28
SERVICE BULLETIN
Part 2 - Wiring Diagram 34-49-90 - Weather Radar (RDR-7000) (Post Service Bulletin)
Figure 3 (Sheet 4 of 4)
	
					
	
	
						
		
	

 
!"#		$$!
	%
	
	

 
!" 	!	
 	

	




	







	

	

 
	

	





 	

!
!" # $



!
%
&
'
(
')%
)
')%
)
!

!



!

%
&%
&!!*

'

'
&!!*
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
!

 % 
!(!,
%
!(!,
 
! !
(!, (!,
! %  ! %  
%
%"
! !%
Carrasco Sergio
Zundritsch Peter
Fuchs Tobias

### Page 25

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 25 of 28
Part 2 - Hook-Up Chart 2
Figure 4 (Sheet 1 of 2)
 
 
 
 
  
 
 Note 1: Cap and stow the wire. 
Line 
End 1 
Color Cable/Wire No. 
End 2 Remarks 
Ident. No. Terminal No. Contact P/N Contact P/N Terminal No. Ident. No.   
1 - - - RD SM28B24 - 41 PB1021 Disconnect End 2 (See Note 1) 
2 - - - BL SM28B24 - 42 PB1021 Disconnect End 2 (See Note 1) 
3 - - - Cable Shield SM28B24 - Backshell PB1021 Disconnect End 2 (See Note 1) 
4 - - - RD SM29B24 - 124 PB1021 Disconnect End 2 (See Note 1) 
5 - - - RD/BK SM29B24 - 125 PB1021 Disconnect End 2 (See Note 1) 
6 - - - BL SM29B24 - 126 PB1021 Disconnect End 2 (See Note 1) 
7 - - - BL/BK SM29B24 - 127 PB1021 Disconnect End 2 (See Note 1) 
8 - - - Cable Shield SM29B24 - Backshell PB1021 Disconnect End 2 (See Note 1) 
9 - - - RD SM30A24 - 120 PB1021 Disconnect End 2 (See Note 1) 
10 - - - BL SM30A24 - 121 PB1021 Disconnect End 2 (See Note 1) 
11 - - - Cable Shield SM30A24 - Backshell PB1021 Disconnect End 2 (See Note 1) 
12 - - - RD SM32A24 - 100 PB1012 Disconnect End 2 (See Note 1) 
13 - - - BL SM32A24 - 101 PB1012 Disconnect End 2 (See Note 1) 
14 - - - Cable Shield SM32A24 - Backshell PB1012 Disconnect End 2 (See Note 1)

### Page 26

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 26 of 28
SERVICE BULLETIN
Part 2 - Hook-Up Chart 2
Figure 4 (Sheet 2 of 2)
 
 
 
 
 
 
 
 
 
 Note 1: Cap and stow the wire. 
Line 
End 1 
Color Cable/Wire No. 
End 2 Remarks 
Ident. No. Terminal No. Contact P/N Contact P/N Terminal No. Ident. No.   
15 - - - RD SM35A24 - 45 A096-7P3 Disconnect End 2 (See Note 1) 
16 - - - BL SM35A24 - 46 A096-7P3 Disconnect End 2 (See Note 1) 
17 - - - Cable Shield SM35A24 - Backshell A096-7P3 Disconnect End 2 (See Note 1) 
18 - - - RD SM37A24 - 20 A096-1P3 Disconnect End 2 (See Note 1) 
19 - - - RD/BK SM37A24 - 61 A096-1P3 Disconnect End 2 (See Note 1) 
20 - - - BL SM37A24 - 62 A096-1P3 Disconnect End 2 (See Note 1) 
21 - - - BL/BK SM37A24 - 19 A096-1P3 Disconnect End 2 (See Note 1) 
22 - - - Cable Shield SM37A24 - Backshell A096-1P3 Disconnect End 2 (See Note 1)

### Page 27

SERVICE BULLETIN
Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 27 of 28
Feedback Sheet for the Accomplishment of SB 34-010
The purpose of this feedback sheet is to provide CAMP
with the current information on each individual PC-24 aircraft.
Please complete the grey cells as appropriate using black ink and block letters.
Print out and send the completed feedback sheet to: fax@campsystems.com
SB Accomplishment Information
Feedback Sheet
Aircraft MSN Aircraft Registration Total Airframe Hours
Owner Total Landings
Operator
Service Center
We have embodied/accomplished this SB Fully Partially
Part 1 Part 2
The undersigned confirms the accomplishment of this Service Bulletin
Date of accomplishment Name Signature
Comments (procedure, kit quality, suggested improvements etc.)

### Page 28

Service Bulletin No: 34-010  Date: Sep 22/22
Rev. No.1  Date: Nov 29/22 Page 28 of 28
SERVICE BULLETIN
INTENTIONALLY BLANK

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.