# Piper Mandatory Service Bulletin 910: Revision A

- Rights: © Piper. Filed by the FAA in regulations.gov docket FAA-2014-1083; AD 2015-08-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Piper Mandatory Service Bulletin 910](https://openairdocs.org/service-documents/piper/sb-910.md)
- Title as filed: U.S. DOT/FAA - Piper Service Bulletin No. 910A
- Pages: 8
- PDF: https://openairdocs.org/files/sha256/f8/55/f855e1c8ca5ae0059c1eb19596ed2c781dce87127ff0b968718984680526f25c
- Page: https://openairdocs.org/service-documents/piper/sb-910/file/f855e1c8ca5a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

PIPER
Piper Aircraft Corporation
Vero Beach, Florida, U.S.A.
SERVICE  No.  910A
BULLETIN
************************
PIPER CONSIDERS
COMPLIANCE MANDATORY
********  *****
Date  October 1Q,  -1.989
(Service Bulletin No. 910A supersedes and voids Service Bulletin No. 910,
dated May 15, 1989 and the affected portions of Service Bulletin No. 5288,
dated March 10, 1978)
This Service Bulletin is divided in two Parts.  Check each Part for applicable
compliance time, purpose and instructions.
SUBJECT:  Wing Lift Strut Assembly
Inspection/Replacement
REASON FOR REVISION:  To revise models affected, serial numbers affected,
compliance time, purpose, instructions and to add
Part II.
APPROVAL:  The technical contents of this Service Bulletin have
been approved by the F.A.A.
PART I
MODELS AFFECTED:  SERIAL NUMBERS AFFECTED:
PA-18/18A Series Super Cub
NOTE: Includes All Serial
No. L-21A, L-21B, & L-18,
Seaplane, Agricultural, and
Military Versions
PA-19 Super Cub
18-1 through 18-8309025,
1809001 through 1809032,
1809034 through 1809040
19-1, 19-2 and 19-3
COMPLIANCE TIME:  Before next flight and each twelve (12) month period
thereafter.
NOTE:
If the inspection requirements of Service Bulletins No. 5288 or No. 910 have
been accomplished within the last twelve (12) months or if the wing lift struts
are new and were installed within the last twelve (12) months, inspection is
required no later than twelve (12) months after the last inspection or new lift
strut installation as the case may be. If the aircraft is new with original
lift struts installed, the repetitive inspection begins when the aircraft is
twelve (12) months old.
(OVER)
ATA: 5701

### Page 2 (OCR)

SERVICE BULLETIN NO. 910A  PAGE 2 OF 5
PURPOSE:  Piper Aircraft has determined that the five (5) year
repetitive inspection interval required in Service Bulletins No. 5288 and 910
may be inadequate for the timely detection of serious wing lift strut
corrosion. This corrosion, if allowed to progress, may lead to failure of the
wing lift strut, and the possibility of loss of wing structure integrity.
The compliance time for the corrosion inspection and treatment is reduced to an
interval not to exceed twelve (12) months from the last inspection or the first
use of new lift struts. Initially Piper deems it necessary to replace
existing wing lift strut with new sealed wing lift struts at a date not to
exceed twenty-four (24) months. (See Part II)
Part I of this Service Bulletin provides an inspection an corrosion impediment
procedure to detect and treat possible wing lift strut corrosion.
INSTRUCTIONS:
Remove wing lift struts  and accomplish the inspection per inspection
procedures on Sketch "A". Caution: All aircraft utilizing "cuffs" at the
wing lift strut roots (top and/or bottom) should take extra care in
inspection for external corrosion in the areas covered by the cuffs.
Inspect forks, clamps, fairleads and jury struts for condition and replace
as necessary.  All attaching hardware should be replaced.
After completion of the inspection procedure, but prior to the corrosion
impediment procedure of the wing lift struts, turn each wing litt strut
upside down and tap gently. This procedure is necessary to remove any
water, debris, or corrosion particles which may have accumulated. int
4. Lift strut tubes indicating presence of internal corrosion and which fail
the inspection procedure must be replaced with new wing lift struts called
for in PART II of this Service Bulletin. Note: Should corrosion be
apparent from the outside, (rust pin holes or large rust stains) strut must
be replaced even if strut passes the inspection procedure.
Treat (corrosion impediment) each wing lift strut per the instruction
procedure note on Sketch "A".  Treatment must coincide with each inspection
as outlined in the compliance time above.
6. Lift strut assemblies which have been factory treated with corrosion
preventive measures are identified by the installation of a cherry lock.
rivet installed at the upper (wing attachment) end.
Alternate preservative materials:  In addition to the "Val oil" and
"Lionoil" (preservatives), it is permissible to use the following alternate
preservatives - Paralketone, linseed oil or any alternate preservatives
that satisfy the requirements of Federal Specification TT-S-176D.
NOTE:
Upon successful completion of the inspection procedure and treatment,
reinstall lift struts on aircraft.
8.  Check aircraft rigging and adjust as necessary, use Piper Service Memo 19
(attachment A) as required to accomplish the proper rigging.
9. Make an appropriate logbook entry of compliance with this Service Bulletin.

### Page 3 (OCR)

SERVICE BULLETIN NO. 910A  PAGE 3 OF 5
MODELS AFFECTED:
PA-18/18-A Series Super Cub
NOTE: Includes A11 Serial
No. L-21A, L-21B, & L-18,
Seaplane, Agricultural,
and Military Versions
PA-19 Super Cub
PART II
SERIAL NUMBERS AFFECTED:
18-1 through 18-8309025,
1809001 through 1809032,
1809034 through 1809040
19-1, 19-2 and 19-3
COMPLIANCE TIME:  To coincide with the next regularly scheduled
inspection event or at next replacement of the wing lift strut, but not to
exceed twenty-four (24) months from the initial inspection as called for in
Part I of this Service Bulletin.
PURPOSE:  Part II of this Service Bulletin announces the
availability of new sealed wing lift struts which, when installed, will relieve
inspection requirements of Part I of this Service Bulletin
INSTRUCTIONS:
1.  2.  Prepare, prime and paint new sealed wing lift struts to match aircraft  Remove old wing lift strut.
before assembly.
3. Inspect clamps, fairleads and jury struts for condition and replace as
necessary. All attaching hardware should be replaced.
4.  Install new Sealed Wing Lift Strut Assemblies, Piper Part Number 89497-02
(front) and Piper Part Number 89498-02 (rear) on each wing.
5. Install "No Step" Decal, Piper Part Number 80944-02, at the base of each
wing lift strut in the approximate location of the original "No Step"
decal.
6. Check aircraft rigging and adjust as necessary. Use Piper Service Memo 19
(attachment A) as required to accomplish the proper rigging.
7. Upon successful completion of Part II of this Service Bulletin, make an
appropriate logbook entry of compliance.
MATERIAL REQUIRED:  As required by inspection for Part I or as required by
Part II, two (2) each Front Wing Strut Assemblies, Piper Part Number 89497-02,
two (2) each Rear Wing Strut Assemblies, Piper Part Number 89498-02, and four
(4) each "No Step" Decal, Piper Part Number 80944-02.
AVAILABILITY OF PARTS:  Your Piper Field Service Facility.
EFFECTIVITY DATE:  This Service Bulletin is effective upon receipt.
(OVER)

### Page 4 (OCR)

SERVICE BULLETIN NO. 910A  PAGE 4 OF 5:
SUMMARY:  Any applicable factory participation will remain in
affect for a period of time not to exceed 180 days from the effective date of
this Service Bulletin..
- =
Special pricing is in effect for the Front Wing Lift Strut, Piper Part Number
89497-02 and for the Rear Wing Lift Strut, Piper Part Number 89498-02, for
twenty-four (24) months from the effective date of this Service Bulletin.
Please contact your Factory Piper Field Service Facility to make arrangments
for compliance with this Service Bulletin in accordance with the compliance
time indicated.
NOTE: If you are no longer in possession of this aircraft, please forward
this information to the present owner/operator and notify the
factory of address/ownership corrections. Changes should include
aircraft model, serial number, current owner's name and address.
Corrections/changes should be directed to:
Piper Aircraft Corporation
Attn: Customer Services
P.0. Box 1328
Vero Beach, Florida 32961-1328
...
.....

### Page 5 (OCR)

SERVICE BULLETIN NO. 910A  PAGE 5 OF 5
0 00 8 0 0
VIEW OF MAULE FABRIC TESTER
Rivet NAS173884-4 (On Centerline Of "FACTORY TREATED" Strut)
-1.62 -  Sheet Metal Screw MS51861-44 (On Centerline Of "FIELD TREATED" Strut)
BOTTOM VIEW OF FRONT LIFT STRUT ASSEMBLY
Rivet NAS173884-4 (On Canterline OF "FACTORY TREATED" Strut)
• 1.62-  Sheet Metal Screw MS51861-44 (On Centerline Of "FIELD TREATED" Strut)
BOTTOM VIEW OF REAR LIET STRUT ASSEMBLY
INSPECTION PROCEDURE
1.  Securely tape a sheet of thin 1/4 inch graph paper to the lower 11 inches of the top and bottom surface on all wing lift
struts.
2  Using a Maule "FabricTester" and holding tool normal to strut contour, apply pressure at a scale reading of 80 in in
each of the grid blocks.
3.  Remove the paper and inspect the lift strut tubes. A perceptible dent will appear if internal corrosion is present. If any
dents are found, be certain the dent are in the metal by carefully removing the paint.
a  Lift strut tubes indicating the presence of any prectible dent in the metal must be replaced with a new lift
strut assembly before further flignt.
b.  If no dents appear in the metal, the lift strut may be considered airwothy.
NOTE
Further intemal corrosion may be impeded per the following procedure:
Remove lift strut from aircraft.
b.  Inject one quart of Valoil, Lionoil Multi-Purpose L-1, Linseed Oil, Paralketone
or any alternate preservative conforming to Federa Specification TT-S-176D,
into the bolt hole at the top of the strut.
C.  Plug the bolt holes and slosh oil until interior of strut is throughly coated.
d.  Drain oil from strut (through bolt holes) and install MS51861-44 sheet metal screw,
as shown, for future identification.
Reinstall strut to aircraft and nig.
4.  Record lift strut inspection in aircraft logbook.
SKETCH "A"

### Page 6

:·~-:=~-·· 
··-· '-::.. 
-· -·4 
·---i~ -· 
·' 
~ 
·---..... _...::--.-. """'.· ... 
-__.;.:....:,_-. 
.... \ :-....... .. . ... ....... ... 
-·'1+"'"~''"-""--"'.·~ .... .. . ... -•. -·;:. . ..:,;--, .. :: 
-.. .. . . .. 
-~-:-~-~--~ -··.,...., . :~-----_ ... ~.--
..., ....... ,.. ..... . 
~~ : '<1'..-_.1 -·>: 
·-··-.. - ... 
---------. -·---~ ... _ ... 
. ... ,.... ... · 
.-.J? . • ... i"-:-:~ . 
.. 
. ·

### Page 7 (OCR)

REFERENCE SERVICE BULLETIN 910A  ATTACHMENT "A"
SERVICE  MEMO
Service Memo No. 19
RIGGING PROCEDURE
Piper PA-18 and PA-19
RIGGING PROCEDURE: Raise the forward part of the airplane so that the wheels are just
clear of the ground and support it by props under the front landing sees frings. Raise the
tail to approximate level flight position and support it there.
LEVELING: Level the airplane as follows: Drop plumb bob from P. K, Screw in door frame
top chamel to intersect punch mark in enclosure door rear hinge.
DIHEDRAL ANGLE: To check dibedral angle at the front spar proceed as follows:
Stretch a string along the top of the wings above the front spar, from wing tip to wing tip,
and draw it tight.
Check the dimension vertically from the string to top of fuselage front spar wing hinge atting.
For correct dhedral this dimension should be 3 f 1/8 inches.
To check for equal dibedral in each wing proceed as follows:
Using the 30 inch level (without any spacer blocks) hold it spanwise against the bottom of the
wing under the from spar in the space between the jury struts and lift strut attachments.
Note the position of the bubble and do the same on the other wing. Re-adjust the front struts
until both wings show the same amount off level, being careful with each adjustment to set
the left strut out the same number of turns as the right one is set in, and vice versa.
WASH OUT: To adjust the wash out in the wings (dibedral of the rear spar) proceed as follows:
Set a 3/8 inch spacer block on top of the 30 inch level at one end. Working on the rib adjacent
to the outer end of the aileron, hold the level fore and aft along the bottom of the rib with the
spacer block at the rear and the front end of the location of the front spax. The correct wash
out will erdst when the bubble is centered. Adjust the rear struts in or out to obtain this
condition.
TAIL ASSEMBLY: With the airplane in level position the stabilizers should be leveled at their
rear spars. The hinge line should be straight from tip to tip.
Plumb the fin at the rudder hinges.
PIPER AIRCRAFT CORPORATION, LOCK HAVEN, PA.. U. S. A.

### Page 8 (OCR)

....
100 12 - A

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
