# Pratt & Whitney Alert Service Bulletin PW4G-100-A73-45

Copy: No revision named ("PW4G-100-A73-45"), 16 pages: PDF https://openairdocs.org/files/sha256/1b/a2/1ba25c1a27c9c68ddcec573b8676e8a71be864e3cbc30d16461679b43e3f3b0e; text https://openairdocs.org/service-documents/pratt-whitney/pw4g-100-a73-45/file/1ba25c1a27c9.md. Rights: © Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2018-0920; AD 2019-06-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Pratt & Whitney](https://openairdocs.org/service-documents/pratt-whitney.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: PW4G-100-A73-45
- Page: https://openairdocs.org/service-documents/pratt-whitney/pw4g-100-a73-45

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-06-07](https://openairdocs.org/ad/2019-06-07.md), effective May 2, 2019: No revision named
- [AD 2016-22-05](https://openairdocs.org/ad/2016-22-05.md), effective Dec 6, 2016: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/pratt-whitney/pw4g-100-a73-45/proposed.md).

## Text (16 pages)

Rights: © Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2018-0920; AD 2019-06-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
SER
VICE
BULLETIN
ENGINE
FUEL
AND
CONTROL
—
FUEL
NOZZLE
AND
SUPPOR
T
ASSEMBL
Y
—
ON-WING
INSPECTION
FOR
FUEL
LEAKS,
SOOT
AND
COKE
FORMA
TION,
AND
REPLACEMENT/REP
AIR
OF
SUSPECT
NOZZLES;
REPLACEMENT/REP
AIR
OF
FUEL
NOZZLES
A
T
OVERHAUL
M
O
D
E
L
A
P
P
L
I
C
A
T
I
O
N
PW4164,
PW4164-1D,
PW4168,
PW4168-1D,
PW4168A,
PW4168A-1D,
PW4170
B
U
L
L
E
T
I
N
I
S
S
U
E
S
E
Q
U
E
N
C
E
PW4G-100
Series
A73-45
A
T
A
N
U
M
B
E
R
73-1
1-00
U
T
C
/
P
&
W
P
R
O
P
R
I
E
T
A
R
Y
I
N
F
O
R
M
A
T
I
O
N
This
document
is
the
property
of
United
T
echnologies
Corporation
—
Pratt
&
Whitney
(UTC/P&W).
Y
ou
may
not
possess,
use,
copy
or
disclose
this
document
or
any
information
in
it,
for
any
purpose,
including
without
limitation
to
design,
manufacture,
or
repair
parts,
or
obtain
F
AA
or
other
government
approval
to
do
so,
without
UTC/P&W’
s
express
written
permission.
Neither
receipt
nor
possession
of
this
document
alone,
from
any
source,
constitutes
such
permission.
Possession,
use,
copying
or
disclosure
by
anyone
without
UTC/P&W’
s
express
written
permission
is
not
authorized
and
may
result
in
criminal
and/or
civil
liability
.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).
C
o
m
p
l
i
a
n
c
e
C
a
t
e
g
o
r
y
3,
4
P
&
W
D
i
s
t
r
i
b
u
t
i
o
n
C
o
d
e
2639
February
16/16
PW4G-100-A73-45
Page
1
of
16
Published
in
United
States
of
America

### Page 2

S
u
m
m
a
r
y
The
purpose
of
this
Service
Bulletin
is
to
provide
a
fleet
management
plan
to
address
PW4000-100
engine
fuel
system
leaks.
There
have
been
nine
(9)
occurrences
of
fuel
leaks
subsequent
to
release
of
Reference
9,
Alert
Service
Bulletin
PW4G-100-A73-44
and
all
occurrences
were
on
engines
installed
with
the
T
alon
IIB
combustion
chamber
configuration.
The
investigation
of
these
fuel
leaks
has
identified
that
the
leak
occurs
at
a
brazed
joint
interface
on
the
fuel
injector
support
(fuel
nozzle)
between
the
inlet
fitting
and
the
nozzle
support
pad.
Until
a
redesigned
fuel
nozzle
is
released,
the
fleet
management
plan
set
out
in
this
Service
Bulletin
includes
repetitive
inspections
on-wing
to
detect
leaks,
and
the
installations,
during
shop
visits,
of
either
new
or
repaired
fuel
nozzles
to
zero-time
the
brazed
joint.
N
O
T
E
:
In
Pratt
&
Whitney
Manuals
and
Service
Bulletins,
the
terms
“Fuel
Nozzles”,
“Fuel
Nozzle
Support
Assembly”,
and
“Fuel
Injectors”
are
used
interchangeably
.
P
l
a
n
n
i
n
g
I
n
f
o
r
m
a
t
i
o
n
E
f
f
e
c
t
i
v
i
t
y
D
a
t
a
E
n
g
i
n
e
M
o
d
e
l
s
A
p
p
l
i
c
a
b
l
e
PW4164,
PW4168,
PW4168A
Engine
Serial
Nos.
—
All
Engines
that
have
incorporated
Reference
5,
Service
Bulletin
PW4G-100-72-214,
or
Reference
6,
Service
Bulletin
PW4G-100-72-219
PW4168A
Engine
Serial
Nos.
—
All
Engines
that
incorporate
the
T
alon
IIA
Outer
Combustion
Chamber
Assembly
PN
51J100
with
Fuel
Nozzles
PN
51J345
having
Serial
Numbers
CGGUA19703
thru
CGGUA19718
or
Serial
Numbers
CGGUA22996
and
up
PW4168A-1D,
PW4170
Engine
Serial
Nos.
P735001
thru
P735190*
*
This
estimate
of
engine
serial
numbers
will
be
revised,
if
necessary
,
when
parts
are
installed
in
engines
at
Pratt
&
Whitney
.
This
Service
Bulletin
also
applies
to
engines
converted
to
the
PW4164-1D,
PW4168-1D,
PW4168A-1D,
PW4170
models
by
Reference
8,
Service
Bulletin
PW4G-100-72-220.
C
o
n
c
u
r
r
e
n
t
R
e
q
u
i
r
e
m
e
n
t
s
There
are
no
concurrent
requirements.
R
e
a
s
o
n
1.
Problem:
There
have
been
nine
(9)
occurrences
of
fuel
leaks
subsequent
to
release
of
Reference
9,
Alert
Service
Bulletin
PW4G-100-A73-44.
T
wo
(2)
of
these
fuel
leaks
resulted
in
a
fire
warning/In-Flight
Shutdown
(IFSD)
while
the
remaining
leaks
were
found
during
post
flight
troubleshooting
for
fuel
leaking
or
scheduled
visual
inspection.
All
nine
fuel
leak
occurrences
were
on
engines
installed
with
the
T
alon
IIB
combustion
chamber
configuration.
This
combustion
chamber
configuration
is
used
in
all
PW4000-100
engines
post
Reference
5,
Service
Bulletin
PW4G-100-72-214,
Reference
6,
Service
Bulletin
PW4G-100-72-219
and
Reference
8,
Service
Bulletin
PW4G-100-72-220,
and
production
PW4168A-1D
and
PW4170
engines.
2.
Cause:
The
Investigation
of
these
fuel
leaks
has
identified
that
the
leak
occurs
at
the
brazed
joint
interface
on
the
fuel
injector
support
(fuel
nozzle)
between
the
inlet
fitting
and
the
nozzle
support
pad.
Cracks
are
attributed
to
thermal
mechanical
fatigue
due
to
high
thermal
gradients
on
engines
equipped
with
the
T
alon
IIB
Combustor
.
February
16/16
PW4G-100-A73-45
Page
2
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
Subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 3

Investigation
also
identified
that
the
cracking
may
be
aggravated
by
a
laser
tack
weld
that
holds
the
nozzle
fitting
in
place
during
the
braze
process.
This
process
change
was
introduced
to
fuel
nozzle
PN
51J345
in
December
2008.
3.
Solution:
There
are
two
parts
to
the
fleet
management
plan:
Part
A:
Perform
a
repetitive
visual
inspection
at
each
“A”
check
for
leaks.
Part
B:
During
shop
visits,
remove
the
fuel
nozzles
and
either
replace
with
new
nozzles
or
replace
with
fuel
nozzles
that
have
the
brazed
joint
zero-timed
in
accordance
with
Reference
10,
CMM
73-1
1-16
(PN
52A420)
Repair-08.
N
O
T
E
:
A
redesigned
fuel
nozzle
is
in
process.
D
e
s
c
r
i
p
t
i
o
n
Part
A
—
Inspect
the
fuel
nozzles
for
fuel
leaks,
and
soot
or
coke
formation.
Replace
leaking
fuel
nozzle(s)
with
new
or
zero
(0)
time
fuel
nozzles
repaired
per
Reference
10,
CMM
Repair-08.
Part
B
—
In
shop
replace
(24)
fuel
nozzles
with
new
or
zero
(0)
time
fuel
nozzles
repaired
per
Reference
10,
CMM
Repair-08.
C
o
m
p
l
i
a
n
c
e
Category
3
(Part
A)
Do
by
the
next
“A”
check
and
at
every
subsequent
“A”
check.
Category
4
(Part
B)
Do
when
the
engine
or
module
first
goes
to
a
maintenance
base
which
can
do
these
procedures
regardless
of
the
scheduled
maintenance
action
or
the
reason
for
engine
removal.
A
p
p
r
o
v
a
l
D
a
t
a
The
times
between
inspections
specified
in
Compliance
and
the
inspection
procedures
specified
in
the
Accomplishment
Instructions
agree
with
the
applicable
Federal
A
viation
Regulations
and
are
F
AA-Approved
for
the
engine
model(s)
given.
The
aircraft
TC
holder
has
been
informed
of
this
change.
M
a
n
p
o
w
e
r
The
estimate
of
man-hours
of
labor
directly
necessary
to
do
the
intent
of
this
Service
Bulletin
are
as
follows:
P
a
r
t
A
(
O
n
-
W
i
n
g
)
1.
Open
and
close
cowl
doors
...............................................................
.................
1.0
2.
Inspect
(24)
locations
for
leaks
...............................................................
...........
1.2
3.
T
otal
Necessary
Man-hours
...............................................................
................
2.2
N
O
T
E
:
Additional
man-hours
will
be
required
if
fuel
nozzles
need
to
be
replaced.
February
16/16
PW4G-100-A73-45
Page
3
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R
Chapter
1,
Part
734.3(b)(3).

### Page 4

P
a
r
t
B
(
I
n
-
S
h
o
p
)
1.
Necessary
to
remove,
replace,
and
leak
check
the
(24)
fuel
nozzles
..............
48.0
2.
T
otal
Necessary
Man-hours
...............................................................
..............
48.0
N
O
T
E
:
Man-hours
are
for
engines
that
do
not
have
fuel
nozzle
replacement
in
the
work
scope.
W
e
i
g
h
t
D
a
t
a
No
Change.
E
l
e
c
t
r
i
c
a
l
L
o
a
d
D
a
t
a
Not
Applicable.
S
o
f
t
w
a
r
e
A
c
c
o
m
p
l
i
s
h
m
e
n
t
S
u
m
m
a
r
y
Not
Applicable.
R
e
f
e
r
e
n
c
e
s
1.
T
urbojet
Engine
Standard
Practices
Manual,
Part
No.
585005.
2.
PW4164,
PW4168,
PW4168A,
PW4170
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A343.
3.
PW4164,
PW4164-1D,
PW4164C,
PW4164C-1D,
PW4164C/B,
PW4164C/B-1D,
PW4168,
PW4168-1D,
PW4168A,
PW4168A-1D,
PW4170
T
urbofan
Engines,
Engine
Manual,
Part
No.
51A342.
4.
Airbus
A330
Aircraft
Maintenance
Manual.
5.
Service
Bulletin
No.
PW4G-100-72-214;
Engine
—
Chamber
Assemblies,
Inner
And
Outer
Combustion
—
Introduction
Of
The
T
alon
IIB
T
o
Reduce
Combustor
Exit
T
emperature
At
The
Outer
Diameter
.
Issue
Sequence
72-214,
PW4G-100
Series.
6.
Service
Bulletin
No.
PW4G-100-72-219;
Engine
—
Modification
Of,
T
o
Incorporate
The
Advantage70™
Performance
And
Durability
Upgrade
Kit
T
o
Improve
Engine
Reliability
And
Reduce
Thrust
Specific
Fuel
Consumption.
Issue
Sequence
72-219,
PW4G-100
Series.
7.
Service
Bulletin
No.
PW4G-100-73-34;
Engine
Fuel
And
Control
—
Nozzle
And
Support
Assembly
,
Fuel
—
Replace
With
A
New
More
Durable
Fuel
Nozzle
And
Support
Assembly
.
Issue
Sequence
73-34,
PW4G-100
Series.
8.
Service
Bulletin
No.
PW4G-100-72-220;
Engine
—
Conversion
Of
A
PW4164,
PW4168,
Or
PW4168A
Engine
T
o
A
PW4164-1D,
PW4168-1D,
PW4168A-1D,
Or
PW4170
Engine.
Issue
Sequence
72-220,
PW4G-100
Series.
9.
Service
Bulletin
No.
PW4G-100-A73-44;
Engine
Fuel
and
Control
—
Fuel
Nozzle
T
o
Fuel
Nozzle
Supply
Manifold
Interface
—
Inspection
For
Fuel
Leaks,
Soot
And
Coke
Formation,
And
Incorporation
Of
An
Increased
T
ube
Coupling
Nut
(B-Nut)
T
orque;
Issue
Sequence
A73-44,
PW4G-100
Series.
10.
PW4000
Engine
Component
Maintenance
Manual
(CMM)
73-1
1-16,
PN
52A420,
Fuel
Injector
and
Support
Assembly
.
N
O
T
E
:
Reference
8
is
shown
to
help
find
non-production
configurations
that
may
incorporate
this
bulletin.
N
O
T
E
:
References
5
thru
7
and
9
are
shown
to
help
find
configurations
in
relation
to
this
bulletin.
February
16/16
PW4G-100-A73-45
Page
4
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
Subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 5

P
u
b
l
i
c
a
t
i
o
n
s
C
h
a
n
g
e
d
PW4164,
PW4168,
PW4168A,
PW4170
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A343
73-1
1-00,
Figure
5
I
n
t
e
r
c
h
a
n
g
e
a
b
i
l
i
t
y
Not
Applicable.
I
n
f
o
r
m
a
t
i
o
n
i
n
t
h
e
A
p
p
e
n
d
i
x
Alternate
Accomplishment
Instructions
(No)
Progression
Charts
(No)
Added
Data
(Y
es)
Revision
to
T
able
of
Limits
(No)
Inspection
Procedures
(No)
February
16/16
PW4G-100-A73-45
Page
5
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R
Chapter
1,
Part
734.3(b)(3).

### Page 6

M
a
t
e
r
i
a
l
I
n
f
o
r
m
a
t
i
o
n
M
a
t
e
r
i
a
l
—
C
o
s
t
a
n
d
A
v
a
i
l
a
b
i
l
i
t
y
1.
There
is
no
new
material
cost
to
do
this
Service
Bulletin
if
new
fuel
nozzles
are
not
required.
2.
There
is
no
kit
provided
to
do
this
Service
Bulletin.
3.
Part
availability
information
is
provided
in
material
data
Instructions
—
Disposition.
I
n
d
u
s
t
r
y
S
u
p
p
o
r
t
P
r
o
g
r
a
m
Not
Applicable.
T
h
e
m
a
t
e
r
i
a
l
d
a
t
a
t
h
a
t
f
o
l
l
o
w
s
i
s
f
o
r
e
a
c
h
e
n
g
i
n
e
.
N
O
T
E
:
It
is
possible
to
use
the
Chapter/Section
and
Figure/Item
reference
number
shown
below
the
old
part
number
to
find
the
part
in
the
Illustrated
Parts
Catalog.
Because
there
are
many
dif
ferent
configurations
used,
it
is
frequently
necessary
to
show
more
than
one
group
of
parts.
When
this
occurs,
parts
that
are
interchangeable
are
shown
line-by-line
only
,
unless
this
is
shown
dif
ferently
.
C
A
U
T
I
O
N
:
THE
FOLLOWING
MA
TERIAL
DA
T
A
T
ABLE(S)
ARE
ORGANIZED
BY
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG.
ALL
P
AR
TS
IN
THE
T
ABLE(S)
MA
Y
OR
MA
Y
NOT
BE
APPLICABLE
T
O
ALL
THE
ENGINE
MODELS
SHOWN
IN
THE
T
ABLE
HEADING.
YOU
MUST
REFER
T
O
THE
APPROPRIA
TE
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG
FOR
ENGINE
MODEL
APPLICABILITY
USING
THE
OLD
P
AR
T
NUMBER
(PN)
AND
CA
T
ALOG
SEQUENCE
NUMBER.
F
AILURE
T
O
INST
ALL
THE
P
AR
T(S)
IN
THE
CORRECT
ENGINE
MODEL
MA
Y
RESUL
T
IN
A
CONFIGURA
TION
THA
T
IS
NOT
F
AA
APPROVED.
T
h
e
m
a
t
e
r
i
a
l
d
a
t
a
t
h
a
t
f
o
l
l
o
w
s
i
s
f
o
r
e
a
c
h
e
n
g
i
n
e
.
F
o
r
P
W
4
1
6
4
,
P
W
4
1
6
4
-
1
D
,
P
W
4
1
6
8
,
P
W
4
1
6
8
-
1
D
,
P
W
4
1
6
8
A
,
P
W
4
1
6
8
A
-
1
D
,
P
W
4
1
7
0
E
n
g
i
n
e
s
:
New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
24
INJECT
OR
AND
SUPPOR
T
ASSEMBL
Y
—
FUEL
51J1
16
(73-1
1-00-5-10
D)
(3)(4)(N)
OR
24
15,780.00
NOZZLE
AND
SUPPOR
T
ASSEMBL
Y
—
FUEL
51J345
(73-1
1-00-5-10
E)
(3)(4)(C)
M
o
d
i
fi
c
a
t
i
o
n
a
n
d
S
p
a
r
e
s
I
n
f
o
r
m
a
t
i
o
n
Estimated
part
prices
are
provided
when
they
are
available
at
time
of
publication.
The
Estimate
of
Unit
Price
is
only
for
planning
purposes
and
does
not
constitute
a
firm
quotation.
An
asterisk
(*)
is
shown
where
part
pricing
information
was
unavailable.
In
either
case,
contact
Pratt
&
Whitney
Spares
Management
&
Logistics
for
firm
quotations.
Parts
Modification
Conditions
February
16/16
PW4G-100-A73-45
Page
6
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
Subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 7

(3)
Replace
as
required
based
on
results
of
the
inspection
in
the
Accomplishment
Instructions.
(4)
Do
an
inspection
as
specified
in
the
Accomplishment
Instructions.
Spare
Parts
A
vailability
(C)
The
old
part
will
continue
to
be
supplied.
(N)
The
old
part
is
not
available.
V
endor
Services
or
Special
Components/Materials
Not
Applicable.
M
a
t
e
r
i
a
l
D
a
t
a
f
o
r
E
a
c
h
S
p
a
r
e
E
n
g
i
n
e
The
material
for
each
spare
engine
is
as
stated
in
the
preceding
material
information
section.
R
e
i
d
e
n
t
i
fi
e
d
P
a
r
t
s
Not
Applicable.
N
e
c
e
s
s
a
r
y
T
o
o
l
s
S
u
p
p
o
r
t
E
q
u
i
p
m
e
n
t
a
v
a
i
l
a
b
l
e
b
e
f
o
r
e
T
ool
No.
Name
Manufacturer
V
arious
Flexible
Borescope
V
arious
O
t
h
e
r
M
a
t
e
r
i
a
l
I
n
f
o
r
m
a
t
i
o
n
D
a
t
a
Not
Applicable.
February
16/16
PW4G-100-A73-45
Page
7
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R
Chapter
1,
Part
734.3(b)(3).

### Page 8

A
c
c
o
m
p
l
i
s
h
m
e
n
t
I
n
s
t
r
u
c
t
i
o
n
s
T
h
e
r
e
a
r
e
t
w
o
p
a
r
t
s
t
o
t
h
i
s
S
e
r
v
i
c
e
B
u
l
l
e
t
i
n
;
P
a
r
t
A
(
F
o
r
E
n
g
i
n
e
s
O
n
-
W
i
n
g
)
a
n
d
P
a
r
t
B
(
F
o
r
E
n
g
i
n
e
s
I
n
-
S
h
o
p
)
This
Service
Bulletin
applies
to
all
engines
incorporating
the
T
alon
IIB
combustion
chamber
configuration.
This
combustion
chamber
configuration
is
used
in
all
PW4000-100
engines
post
Reference
5,
Service
Bulletin
PW4G-100-72-214,
Reference
6,
Service
Bulletin
PW4G-100-72-219
and
Reference
8,
Service
Bulletin
PW4G-100-72-220,
and
production
PW4168A-1D
and
PW4170
engines.
For
these
engines,
all
(24)
fuel
nozzles
will
be
inspected
per
Part
A
and
replaced
per
Part
B.
This
Service
Bulletin
applies
to
all
PW4168A
Engines
that
incorporate
the
T
alon
IIA
Outer
Combustion
Chamber
Assembly
PN
51J100
and
have
installed
Fuel
Nozzle
PN
51J345
having
Serial
Numbers
CGGUA19703
thru
CGGUA19718
or
SN
CGGUA22996
and
up.
For
these
engines,
only
fuel
nozzles
having
the
listed
serial
numbers
will
be
inspected
per
Part
A
and
replaced
per
Part
B.
P
a
r
t
A
(
F
o
r
E
n
g
i
n
e
s
O
n
-
W
i
n
g
)
—
D
o
a
r
e
p
e
t
i
t
i
v
e
i
n
s
p
e
c
t
i
o
n
o
f
t
h
e
f
u
e
l
n
o
z
z
l
e
s
.
R
e
m
o
v
e
a
n
d
r
e
p
l
a
c
e
a
n
y
f
u
e
l
n
o
z
z
l
e
f
o
u
n
d
w
i
t
h
e
v
i
d
e
n
c
e
o
f
l
e
a
k
a
g
e
,
s
o
o
t
,
o
r
c
o
k
e
f
o
r
m
a
t
i
o
n
1.
Open
the
thrust
reverser
doors
as
specified
in
Reference
4,
Airbus
A330
Aircraft
Maintenance
Manual
(AMM).
2.
Allow
the
engine
to
cool
down
to
a
working
temperature.
3.
V
isually
inspect
the
(24)
fuel
nozzles
for
fuel
leaks
and
soot
or
coke
formation.
Use
a
flexible
borescope
to
view
locations
that
are
located
in
back
of
other
hardware.
See
Figures
1
thru
4.
4.
If
there
are
signs
of
fuel
leakage,
or
there
is
soot
or
coke
formation
at
any
location,
do
the
following
steps:
A.
Remove
the
ef
fected
fuel
nozzle
per
Reference
4,
AMM,
Chapter/Section
73-1
1-15,
Removal-01.
B.
Per
Reference
4,
Airbus
A330
Aircraft
Maintenance
Manual,
Chapter/Section
73-1
1-15,
Installation-01,
install
either
new
or
zero
(0)
cycles
since
Reference
10,
CMM
73-1
1-16,
Repair-08
repaired
replacement
fuel
nozzles(s),
PN
51J345.
N
O
T
E
:
Replacement
fuel
nozzles
must
be
new
or
have
zero
(0)
cycles
accumulated
since
Reference
10,
CMM
73-1
1-16,
Repair-08
was
accomplished.
5.
If
fuel
nozzle(s)
were
replaced,
do
the
following:
A.
Install
all
hardware/components
that
were
removed
to
gain
access
to
the
fuel
nozzle(s).
B.
Service
any
system
disturbed
components
(Hydraulic
Pump,
IDG,
and
Starter)
as
necessary
.
C.
Perform
post-requisite
checks/tests
as
specified
in
Reference
4,
Airbus
A330
Aircraft
Maintenance
Manual.
6.
Close
the
thrust
reverser
doors
as
specified
in
Reference
4,
Airbus
A330
Aircraft
Maintenance
Manual.
February
16/16
PW4G-100-A73-45
Page
8
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
Subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 9

P
a
r
t
B
(
F
o
r
E
n
g
i
n
e
s
I
n
-
S
h
o
p
)
—
R
e
m
o
v
e
a
n
d
r
e
p
l
a
c
e
(
2
4
)
f
u
e
l
n
o
z
z
l
e
s
1.
Remove
necessary
hardware/components
to
gain
access
to
all
(24)
fuel
nozzles
as
specified
in
Reference
3,
Engine
Manual.
A.
Remove
all
(24)
fuel
nozzles
per
Reference
3,
Engine
Manual,
Chapter/Section
71-00-73,
Removal-15
or
Chapter/Section
72-41-00,
Disassembly-02.
B.
Per
Reference
3,
Engine
Manual,
Chapter/Section
71-00-73,
Installation-15
or
Chapter/Section
72-41-00,
Assembly-01,
install
either
new
or
zero
(0)
cycles
since
Reference
10,
CMM
73-1
1-16,
Repair-08
repaired
replacement
fuel
nozzles,
PN
51J345.
N
O
T
E
:
Replacement
fuel
nozzles
must
be
new
or
have
zero
(0)
cycles
accumulated
since
Reference
10,
CMM
73-1
1-16,
Repair-08
was
accomplished.
2.
Install
all
hardware/components
that
were
removed
to
gain
access
to
the
fuel
nozzles
as
specified
in
Reference
(3),
Engine
Manual.
3.
Perform
post-requisite
checks/tests
as
specified
in
Reference
3,
Engine
Manual.
February
16/16
PW4G-100-A73-45
Page
9
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R
Chapter
1,
Part
734.3(b)(3).

### Page 10 (OCR)

Pratt & Whitney
A United Technologies Company
ST 1141-40
GASKET OPTION (REF)
MS9715-14
BOLT QTY (3) PER
NOZZLE (REF)
51J345
FUEL NOZZLE AND SUPPORT
ASSEMBLY QTY (24) (REF)
.....
B526219
LOCATION OF THE FUEL NOZZLE AND SUPPORT ASSEMBLY
73-11-00
FIGURE 1
February 16/16  PW4G-100-A73-45
Page 10
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not Subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 11 (OCR)

Pratt & Whitney
A United Technologies Company
FUEL NOZZLE
SUPPLY MANIFOLD
(TYPICAL 8 LOCATIONS)
REFERENCE
FOCUSED AREA OF INSPECTION
BRAZE JOINT
FUEL NOZZLE LOCATION
FOCUSED AREA OF INSPECTION  (TYPICAL 24 LOCATIONS)
BRAZE JOINT
FOCUSED AREA OF INSPECTION
BRAZE JOINT
FUEL SUPPLY TUBE •
(TYPICAL 8 LOCATIONS)
REFERENCE
B526214
FUEL NOZZLE LOCATION FOCUSED INSPECTION AREA
FIGURE 2
February 16/16  PW4G-100-A73-45
Page 11
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R Chapter 1, Part 734.3(b)(3).

### Page 12 (OCR)

Pratt & Whitney
A United Technologies Company
FOCUSED AREA OF INSPECTION SHOWING COKE
FORMATION AT FUEL NOZZLE BRAZE JOINT
B526215
PHOTOS OF SOOT/COKE FORMATION AT FUEL NOZZLE BRAZE JOINT
EXAMPLES OF ON-WING FINDINGS
FIGURE 3, SHEET 1
February 16/16  PW4G-100-A73-45
Page 12
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not Subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 13 (OCR)

Pratt & Whitney
A United Technologies Company
FOCUSED AREA OF INSPECTION SHOWING COKE
FORMATION AT FUEL NOZZLE BRAZE JOINT
B526216
PHOTOS OF SOOT/COKE FORMATION AT FUEL NOZZLE BRAZE JOINT
EXAMPLES OF ON-WING FINDINGS
FIGURE 3, SHEET 2
February 16/16  PW4G-100-A73-45
Page 13
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R Chapter 1, Part 734.3(b)(3).

### Page 14 (OCR)

Pratt & Whitney
A United Technologies Company
FOCUSED AREA OF INSPECTION SHOWING COKE
FORMATION AT FUEL NOZZLE BRAZE JOINT
B526217
PHOTOS OF SOOT/COKE FORMATION AT FUEL NOZZLE BRAZE JOINT
EXAMPLES OF ON-WING FINDINGS
FIGURE 3, SHEET 3
February 16/16  PW4G-100-A73-45
Page 14
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not Subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 15 (OCR)

Pratt & Whitney
A United Technologies Company
FOCUSED AREA OF INSPECTION SHOWING COKE
FORMATION AT FUEL NOZZLE BRAZE JOINT
B526218
PHOTO OF SOOT/COKE FORMATION AT FUEL NOZZLE BRAZE JOINT
EXAMPLE OF REMOVED FUEL NOZZLE
FIGURE 4
February 16/16  PW4G-100-A73-45
Page 15
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R Chapter 1, Part 734.3(b)(3).

### Page 16

A
p
p
e
n
d
i
x
A
d
d
e
d
D
a
t
a
I
n
t
e
r
n
a
l
R
e
f
e
r
e
n
c
e
I
n
f
o
r
m
a
t
i
o
n
Revision
No.
Reference
Document
Origination
Original
EA16KC163
RDG/JEJ
Number
values
shown
in
parentheses
adjacent
to
U.S.
values
are
International
System
of
units
(SI)
equivalents.
February
16/16
PW4G-100-A73-45
Page
16
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
Subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
