# Pratt & Whitney Alert Service Bulletin PW4G-112-A72-330

Copy: Revision 2 ("U.S. DOT/FAA - PW4G-112-A72-330R2"), 62 pages: PDF https://openairdocs.org/files/sha256/53/e3/53e37ae23da548f0fafb90481227ac9e7bf39e368876ac9db0e68c373d5dd9c5; text https://openairdocs.org/service-documents/pratt-whitney/pw4g-112-a72-330/file/53e37ae23da5.md. Rights: © Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2013-0072; AD 2013-15-09, 2014-23-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Pratt & Whitney](https://openairdocs.org/service-documents/pratt-whitney.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: PW4G-112-A72-330
- Latest revision known: PW4G-112-A72-330, Revision 2, dated July 11, 2013 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/pratt-whitney/pw4g-112-a72-330

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2014-23-01](https://openairdocs.org/ad/2014-23-01.md), effective Dec 26, 2014: Revisions 1 and 2
- [AD 2013-15-09](https://openairdocs.org/ad/2013-15-09.md), effective Sep 17, 2013: Revisions 1 and 2

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/pratt-whitney/pw4g-112-a72-330/proposed.md).

## Text (62 pages)

Rights: © Pratt & Whitney. Filed by the FAA in regulations.gov docket FAA-2013-0072; AD 2013-15-09, 2014-23-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
SER
VICE
BULLETIN
REVISION
NOTICE
ENGINE
—
AIR
SEAL
ASSEMBL
Y
,
2ND
ST
AGE
HIGH
PRESSURE
TURBINE
(HPT)
—
INSPECTION
OF
THE
SEAL
FOR
CRACKS
T
urbojet
Engine
Service
Bulletin
No.
PW4G-1
12-A72-330
Revision
No.
2
dated
July
1
1,
2013
.
R
e
v
i
s
i
o
n
H
i
s
t
o
r
y
Original
Issue
December
3,
2012
Revision
1
dated
February
14,
2013
Revision
2
dated
July
1
1,
2013
R
e
a
s
o
n
f
o
r
t
h
e
R
e
v
i
s
i
o
n
T
o
replace
NDIP-1
137,
Revision
B
with
NDIP-1
137,
Revision
C
dated
June
19,
2013.
The
List
of
Required
T
ools
in
the
Necessary
T
ools
section
was
updated.
The
T
raining
and
Certification
for
the
inspection
personnel
is
found
in
NDIP-1
137.
The
same
information
was
removed
from
the
Accomplishment
Instructions
because
it
is
not
necessary
to
state
it
again.
The
Accomplishment
Instructions
step
“One
isolated
spike
of
greater
than
1.2
volts
after
a
2nd
EC
inspection
is
performed
would
be
considered
acceptable
to
continue
in
service
if
this
Service
Bulletin
inspection
is
performed
on
a
reduced
interval
of
600
cycles.”
was
changed
to
“One
isolated
spike
of
greater
than
1.2
volts
after
a
2nd
EC
inspection
is
performed
would
be
considered
acceptable
to
continue
in
service
if
this
Service
Bulletin
inspection
is
performed
on
a
reduced
interval
of
600
cycles.
During
that
next
600
cycle
interval
if
there
are
no
isolated
spikes
of
greater
than
1.2
volts
for
two
EC
inspections
the
engine
could
return
to
the
1200
cycle
inspection
interval.”
More
HPT
stage
2
air
seal
OD
cavity
surface
inspection
criteria
was
added
in
the
Accomplishment
Instructions.
E
f
f
e
c
t
o
f
R
e
v
i
s
i
o
n
o
n
P
r
i
o
r
C
o
m
p
l
i
a
n
c
e
None.
T
h
i
s
i
s
a
C
o
m
p
l
e
t
e
R
e
v
i
s
i
o
n
(
N
o
t
A
p
p
l
i
c
a
b
l
e
t
o
t
h
e
S
G
M
L
v
e
r
s
i
o
n
)
The
contents
are
in
accordance
with
the
list
of
ef
fective
pages.
All
pages
have
the
current
revision
number
.
T
echnical
changes
are
marked
with
black
bars.
N
o
n
-
D
e
s
t
r
u
c
t
i
v
e
I
n
s
p
e
c
t
i
o
n
P
r
o
c
e
d
u
r
e
s
NDIP-1
137,
Revision
C
dated
June
19,
2013
is
attached.
Please
discard
the
previously
issued
copy
.
M
O
D
E
L
A
P
P
L
I
C
A
T
I
O
N
PW4074,
PW4074D,
PW4077,
PW4077D,
PW4084D,
PW4090,
PW4090-3
B
U
L
L
E
T
I
N
I
S
S
U
E
S
E
Q
U
E
N
C
E
PW4G-1
12
Series
A72-330
P
&
W
D
i
s
t
r
i
b
u
t
i
o
n
C
o
d
e
2642
PW4G-1
12-A72-330
Page
1
of
2
Published
in
United
States
of
America
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 2

P
a
g
e
R
e
v
i
s
i
o
n
N
o
.
D
a
t
e
1
thru
32
2
July
1
1/13
A
copy
of
this
Revision
Notice
and
any
future
revision
notices
must
be
filed
as
a
permanent
record
with
your
copy
of
the
subject
bulletin.
PW4G-1
12-A72-330
Page
2
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 3

ALERT
SER
VICE
BULLETIN
ENGINE
—
AIR
SEAL
ASSEMBL
Y
,
2ND
ST
AGE
HIGH
PRESSURE
TURBINE
(HPT)
—
INSPECTION
OF
THE
SEAL
FOR
CRACKS
M
O
D
E
L
A
P
P
L
I
C
A
T
I
O
N
PW4074,
PW4074D,
PW4077,
PW4077D,
PW4084D,
PW4090,
PW4090-3
B
U
L
L
E
T
I
N
I
S
S
U
E
S
E
Q
U
E
N
C
E
PW4G-1
12
Series
A72-330
A
T
A
N
U
M
B
E
R
72-52-00
U
T
C
/
P
&
W
P
R
O
P
R
I
E
T
A
R
Y
I
N
F
O
R
M
A
T
I
O
N
This
document
is
the
property
of
United
T
echnologies
Corporation
—
Pratt
&
Whitney
(UTC/P&W).
Y
ou
may
not
possess,
use,
copy
or
disclose
this
document
or
any
information
in
it,
for
any
purpose,
including
without
limitation
to
design,
manufacture,
or
repair
parts,
or
obtain
F
AA
or
other
government
approval
to
do
so,
without
UTC/P&W’
s
express
written
permission.
Neither
receipt
nor
possession
of
this
document
alone,
from
any
source,
constitutes
such
permission.
Possession,
use,
copying
or
disclosure
by
anyone
without
UTC/P&W’
s
express
written
permission
is
not
authorized
and
may
result
in
criminal
and/or
civil
liability
.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).
C
o
m
p
l
i
a
n
c
e
C
a
t
e
g
o
r
y
3
P
&
W
D
i
s
t
r
i
b
u
t
i
o
n
C
o
d
e
2642
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
1
of
32
Published
in
United
States
of
America

### Page 4

S
u
m
m
a
r
y
The
function
of
this
Alert
Service
Bulletin
is
to
provide
a
Non-Destructive
Inspection
Procedure
(Reference
16,
NDIP-1
137)
for
an
Eddy
Current
Inspection
(ECI)
of
the
Air
Seal
Assembly
in
the
2nd
Stage
High
Pressure
T
urbine
(HPT),
PN
54L041.
This
inspection
is
to
find
cracks
in
the
forward
Outer
Diameter
(OD)
radii.
See
Reference
16,
NDIP-1
137,
Figure
1
for
the
inspection
area.
This
inspection
will
need
to
be
done
again
until
a
new
Service
Bulletin
is
released
that
supplies
a
new
design
air
seal.
P
l
a
n
n
i
n
g
I
n
f
o
r
m
a
t
i
o
n
E
f
f
e
c
t
i
v
i
t
y
D
a
t
a
E
n
g
i
n
e
M
o
d
e
l
s
A
p
p
l
i
c
a
b
l
e
PW4074,
PW4077
Engine
Serial
Nos.
—
All
engines
that
have
a
2nd
Stage
HPT
Air
Seal,
PN
54L041
installed
(Post
Reference
13,
Service
Bulletin
No.
PW4G-1
12-72-271).
PW4074D,
PW4077D,
PW4084D,
PW4090,
PW4090-3
Engine
Serial
Nos.
—
All
engines
that
have
a
2nd
Stage
HPT
Air
Seal,
PN
54L041
installed
(Post
Reference
13,
Service
Bulletin
No.
PW4G-1
12-72-271).
C
o
n
c
u
r
r
e
n
t
R
e
q
u
i
r
e
m
e
n
t
s
There
are
no
concurrent
requirements.
R
e
a
s
o
n
1.
Problem:
Cracks
are
starting,
and
increasing
in
size,
in
the
2nd
stage
HPT
Air
Seal,
PN
54L041,
at
the
forward
OD
area
of
the
part.
The
cracks
can
cause
an
engine
event.
2.
Cause:
An
investigation
has
determined
that
loading
on
the
forward
OD
flange
can
cause
cracks
on
the
OD
radius
of
the
HPT
2nd
stage
air
seal.
3.
Solution:
Do
an
Eddy
Current
Inspection
of
the
2nd
Stage
air
seal
to
find
cracks.
D
e
s
c
r
i
p
t
i
o
n
Inspect
the
2nd
Stage
HPT
Air
Seal,
PN
54L041,
to
find
cracks.
See
Figure
1.
C
o
m
p
l
i
a
n
c
e
Category
3
Do
this
Alert
Service
Bulletin
as
follows:
PN
54L041
Air
Seals
that
have
accumulated
less
than
or
equal
to
1,200
total
cycles
since
new
,
when
this
Alert
Service
Bulletin
is
released,
must
be
inspected
within
2,200
T
otal
Cycles
(TC)
since
new
.
Air
Seals
that
have
accumulated
more
than
1,200
total
cycles
since
new
,
when
this
Alert
Service
Bulletin
is
released,
must
be
inspected
within
1,000
cycles
of
Alert
Service
Bulletin
release.
Once
the
inspection
is
accomplished,
it
must
be
repeated
every
1,200
cycles
until
the
engine
is
removed.
This
information
is
also
shown
in
the
table
below
.
If
a
piece
part
air
seal
is
in
the
shop
after
the
of
release
of
this
Alert
Service
Bulletin,
and
is
inspected
using
Fluorescent
Penetrant
Inspection
(FPI)
per
the
requirements
in
Reference
4,
CIR
Manual,
and
shows
no
crack
indications,
the
part
will
require
an
Eddy
Current
Inspection
within
1,200
cycles
following
that
piece
part
FPI.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
2
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 5

A
i
r
S
e
a
l
I
n
s
p
e
c
t
i
o
n
I
n
t
e
r
v
a
l
s
Engine
Model
T
otal
Part
Cycles
Since
New
(TC)
Initial
Inspection
Threshold
Cycles
Subsequent
Inspection
Cycles
TC
≤
1200
2,200
1,200
TC
>
1200
1,000
1,200
PW4074,
PW4077,
PW4074D,
PW4077D,
PW4084D,
PW4090,
PW4090-3
TC
>
1200
and
Air
Seal
receives
in-shop
FPI
per
Reference
4,
CIR
Manual
1,200
1,200
C
A
U
T
I
O
N
:
CUMULA
TIVE
T
OT
AL
AIR
SEAL
CYCLES
MUST
NOT
EXCEED
REFERENCE
5
OR
6,
ENGINE
MANUAL,
CHAPTER
5
LIFE.
IF
THE
CHAPTER
5
LIFE
CYCLE
IS
EXCEEDED,
THE
P
AR
T
IS
NOT
AUTHORIZED
FOR
USE.
A
p
p
r
o
v
a
l
D
a
t
a
The
times
between
inspections
specified
in
Compliance
and
the
inspection
procedures
specified
in
the
Accomplishment
Instructions
agree
with
the
applicable
Federal
A
viation
Regulations
and
are
F
AA-Approved
for
the
engine
model(s)
given.
M
a
n
p
o
w
e
r
The
estimate
of
man-hours
of
labor
directly
necessary
to
do
the
intent
of
this
Alert
Service
Bulletin
are
as
follows:
1.
Open
the
cowl
doors
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1.0
2.
Remove
the
parts
to
gain
access
to
the
HPT
turbine
exhaust
case
manifold
port
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
0.5
3.
Do
Reference
16,
NDIP-1
137
Eddy
Current
Inspection
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2.0
4.
Install
the
parts
that
were
removed
for
access
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
0.5
5.
Close
the
cowl
doors
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1.0
6.
T
otal
Necessary
Man-hours
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5.0
W
e
i
g
h
t
D
a
t
a
No
Change.
E
l
e
c
t
r
i
c
a
l
L
o
a
d
D
a
t
a
Not
Applicable.
S
o
f
t
w
a
r
e
A
c
c
o
m
p
l
i
s
h
m
e
n
t
S
u
m
m
a
r
y
Not
Applicable.
R
e
f
e
r
e
n
c
e
s
1.
T
urbojet
Engine
Standard
Practices
Manual,
Part
No.
585005.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
3
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 6

2.
PW4074,
PW4077
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A346.
3.
PW4074D,
PW4077D,
PW4084D,
PW4090,
PW4090-3,
PW4090D,
PW4098
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A742.
4.
PW4000
Series
1
12
Inch
PW4074,
PW4077,
PW4077D,
PW4084D,
PW4090,
PW4098
T
urbofan
Engines,
Engine
Cleaning,
Inspection
And
Repair
(CIR)
Manual,
Part
No.
51A750.
5.
PW4074,
PW4077
T
urbofan
Engines,
Engine
Manual,
Part
No.
51A345.
6.
PW4074D,
PW4077D,
PW4084D,
PW4090,
PW4090-3,
PW4090D,
PW4098
T
urbofan
Engines,
Engine
Manual,
Part
No.
51A751.
7.
Boeing
777
Aircraft
Maintenance
Manual
(AMM).
8.
Service
Bulletin
No.
PW4G-1
12-72-77;
Engine
—
Seal
Assembly
,
Second
Stage
HPT
Air
—
Replacement
Or
Modification
Of;
The
Air
Seal
Assembly
For
Improved
Durability
.
Issue
Sequence
72-77,
PW4G-1
12
Series.
9.
Alert
Service
Bulletin
No.
PW4G-1
12-A72-172;
Engine
—
Seal
Assembly
,
Air
,
2nd
Stage
High
Pressure
T
urbine
(HPT)
—
Borescope
Inspection
For
Cracks
And
Cycle
Limit
Reduction.
Issue
Sequence
72-172,
PW4G-1
12
Series.
10.
Alert
Service
Bulletin
No.
PW4G-1
12-A72-197;
Engine
—
Seal
Assembly
,
Air
,
2nd
Stage
High
Pressure
T
urbine
(HPT)
—
Borescope
Inspection
For
Cracks
And
Cycle
Limit
Reduction.
Issue
Sequence
72-197,
PW4G-1
12
Series.
1
1.
Alert
Service
Bulletin
No.
PW4G-1
12-A72-222;
Engine
—
Air
Seal
Assembly
,
2nd
Stage
High
Pressure
T
urbine
(HPT)
—
Borescope
Inspection
For
Cracks.
Issue
Sequence
72-222,
PW4G-1
12
Series.
12.
Alert
Service
Bulletin
No.
PW4G-1
12-A72-233;
Engine
—
Air
Seal
Assembly
,
2nd
Stage
High
Pressure
T
urbine
(HPT)
—
Inspection
For
Cracks
And
Cycle
Limit
Reduction.
Issue
Sequence
72-233,
PW4G-1
12
Series.
13.
Service
Bulletin
No.
PW4G-1
12-72-271;
Engine
—
Seal
Assembly
,
2nd
Stage
High
Pressure
T
urbine
(HPT)
Air—
Replace
The
Seal
Assembly
And
Related
Parts
For
Improved
Durability
.
Issue
Sequence
72-271,
PW4G-1
12
Series.
14.
Service
Bulletin
No.
PW4G-1
12-75-30;
Air
—
Metering
Orifice
Plate
And
Seal
Assemblies
—
Replacement
Of
With
Gaskets.
Issue
Sequence
72-30
PW4G-1
12
Series.
15.
Service
Bulletin
No.
PW4G-1
12-72-84;
Engine
—
T
urbine
V
ane
And
Blade
Modulated
Cooling
Air
System
—
Removal
Of,
T
o
Provide
A
W
eight
Saving.
Issue
Sequence
72-84
PW4G-1
12
Series.
16.
Non-Destructive
Inspection
Procedure,
NDIP-1
137,
PW4000-1
12”
2nd
Stage
HPT
Air
Seal
Forward
Outer
Diameter
Eddy
Current
Inspection
(On-Wing)
N
O
T
E
:
References
8.
through
15.
are
shown
to
help
find
configurations
in
relation
to
this
bulletin.
P
u
b
l
i
c
a
t
i
o
n
s
C
h
a
n
g
e
d
See
the
Material
Information
Part
Number
Instruction
—
Disposition
codes
for
cleaning,
inspection
and
repair
compatibility
between
the
new
and
old
part
number(s).
PW4074,
PW4077
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A346.
72-52-00,
Figure
1
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
4
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 7

75-25-00,
Figure
2,
8
and
9
PW4074D,
PW4077D,
PW4084D,
PW4090,
PW4090-3,
PW4090D,
PW4098
T
urbofan
Engines,
Illustrated
Parts
Catalog,
Part
No.
51A742.
72-52-00,
Figure
1
75-25-00,
Figure
2
and
9
I
n
t
e
r
c
h
a
n
g
e
a
b
i
l
i
t
y
Not
Applicable.
I
n
f
o
r
m
a
t
i
o
n
i
n
t
h
e
A
p
p
e
n
d
i
x
Alternate
Accomplishment
Instructions
(No)
Progression
Charts
(Y
es)
Added
Data
(Y
es)
Revision
to
T
able
of
Limits
(No)
Inspection
Procedures
(Y
es)
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
5
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 8

M
a
t
e
r
i
a
l
I
n
f
o
r
m
a
t
i
o
n
M
a
t
e
r
i
a
l
—
C
o
s
t
a
n
d
A
v
a
i
l
a
b
i
l
i
t
y
1.
The
estimated
price
of
new
material
to
do
this
Alert
Service
Bulletin
depends
on
which
parts
are
replaced.
2.
There
are
tool
kits,
number
PW
A
107958,
and
Machida
Engine
Rotator
Kit,
and
Machida
V
ideo
Scope
Kit,
to
do
this
Alert
Service
Bulletin.
Contact
your
Pratt
&
Whitney
T
ool
Support
Services
sales
manager
directly
,
or
by
e-mail
to
pwtools@pw
.utc.com
for
assistance
with
new
PW
A
tools,
kits,
calibrations,
and
repairs.
3.
Part
availability
information
is
provided
in
material
data
Instructions
—
Disposition.
I
n
d
u
s
t
r
y
S
u
p
p
o
r
t
P
r
o
g
r
a
m
Not
Applicable.
T
h
e
m
a
t
e
r
i
a
l
d
a
t
a
t
h
a
t
f
o
l
l
o
w
s
i
s
f
o
r
e
a
c
h
e
n
g
i
n
e
.
N
O
T
E
:
It
is
possible
to
use
the
Chapter/Section
and
Figure/Item
reference
number
shown
below
the
old
part
number
to
find
the
part
in
the
Illustrated
Parts
Catalog.
Because
there
are
many
dif
ferent
configurations
used,
it
is
frequently
necessary
to
show
more
than
one
group
of
parts.
When
this
occurs,
parts
that
are
interchangeable
are
shown
line-by-line
only
,
unless
this
is
shown
dif
ferently
.
C
A
U
T
I
O
N
:
THE
FOLLOWING
MA
TERIAL
DA
T
A
T
ABLE(S)
ARE
ORGANIZED
BY
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG.
ALL
P
AR
TS
IN
THE
T
ABLE(S)
MA
Y
OR
MA
Y
NOT
BE
APPLICABLE
T
O
ALL
THE
ENGINE
MODELS
SHOWN
IN
THE
T
ABLE
HEADING.
YOU
MUST
REFER
T
O
THE
APPROPRIA
TE
ILLUSTRA
TED
P
AR
TS
CA
T
ALOG
FOR
ENGINE
MODEL
APPLICABILITY
USING
THE
OLD
P
AR
T
NUMBER
(PN)
AND
CA
T
ALOG
SEQUENCE
NUMBER.
F
AILURE
T
O
INST
ALL
THE
P
AR
T(S)
IN
THE
CORRECT
ENGINE
MODEL
MA
Y
RESUL
T
IN
A
CONFIGURA
TION
THA
T
IS
NOT
F
AA
APPROVED.
T
h
e
m
a
t
e
r
i
a
l
d
a
t
a
t
h
a
t
f
o
l
l
o
w
s
i
s
f
o
r
e
a
c
h
e
n
g
i
n
e
.
F
o
r
P
W
4
0
7
4
,
P
W
4
0
7
7
E
n
g
i
n
e
s
:
New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
1
389,400.00
SEAL
ASSY
—
AIR,
HPT
,
2STG
54L041
(72-52-00-1-160
B)
(4)(C)(X)
AR
68.60
GASKET
OPTION
ST1
142-032
(75-25-00-9-80)
(75-25-00-9-150)
(C)(E)(O1)
AR
61.20
GASKET
OPTION
ST1
141-60
(75-25-00-9-130)
(C)(E1)(O2)
AR
196.30
GASKET
—
SPRING,
TURB
CLG
AIR
55T843
(A0946)
(75-25-00-8-40)
(C)(E1)
(V)
AR
74.60
BOL
T
MS9716-10
(75-25-00-9-140
B)
(C)(E2)
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
6
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 9

New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
AR
49.70
BOL
T
MS9716-05
(75-25-00-9-90)
(75-25-00-9-160)
(C)(E2)
AR
20.20
BOL
T
ST2601-10
(75-25-00-9-20
A)
(C)(E2)
AR
296.20
BOL
T
ST2601-16
(75-25-00-9-25
A)
(C)(E2)
AR
63.80
GASKET
OPTION
ST2422-039
(75-25-00-9-10)
(C)(E1)(O3)
AR
45.50
BOL
T
—
TCA
MS9715-08
(75-25-00-2-20)
(C)(E2)
1
317.80
GASKET
OPTION
ST1
141-03
(75-25-00-2-1)
(C)(E)(O4)
T
h
e
m
a
t
e
r
i
a
l
d
a
t
a
t
h
a
t
f
o
l
l
o
w
s
i
s
f
o
r
e
a
c
h
e
n
g
i
n
e
.
F
o
r
P
W
4
0
7
4
D
,
P
W
4
0
7
7
D
,
P
W
4
0
8
4
D
,
P
W
4
0
9
0
,
P
W
4
0
9
0
-
3
E
n
g
i
n
e
s
:
New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
1
389,400.00
SEAL
ASSY
—
AIR,
HPT
,
2STG
54L041
(72-52-00-1-160
B)
(4)(C)(X)
1
68.60
GASKET
OPTION
ST1
142-032
(75-25-00-9-146)
(C)(E)(O1)
AR
61.20
GASKET
OPTION
ST1
141-60
(75-25-00-9-130)
(C)(E)(O2)
AR
74.60
BOL
T
MS9716-10
(75-25-00-9-140
B)
(C)(E2)
AR
49.70
BOL
T
MS9716-05
(75-25-00-9-90)
(75-25-00-9-160)
(C)(E2)
AR
20.20
BOL
T
ST2601-10
(75-25-00-9-20
A)
(C)(E2)
AR
296.20
BOL
T
ST2601-16
(75-25-00-9-25
A)
(C)(E2)
AR
63.80
GASKET
OPTION
ST2422-039
(75-25-00-9-10)
(C)(E1)(O3)
AR
45.50
BOL
T
—
TCA
MS9715-08
(75-25-00-2-20)
(C)(E2)
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
7
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 10

New
PN
Qty
Estimate
of
Unit
Price
($)
Keyword
Old
PN
Instructions
—
Disposition
1
317.80
GASKET
OPTION
ST1
141-03
(75-25-00-2-1)
(C)(E)(O4)
2
434.80
GASKET
—
SPRING
50U285
(72-25-00-9-145)
(C)(E)
M
o
d
i
fi
c
a
t
i
o
n
a
n
d
S
p
a
r
e
s
I
n
f
o
r
m
a
t
i
o
n
Estimated
part
prices
are
provided
when
they
are
available
at
time
of
publication.
The
Estimate
of
Unit
Price
is
only
for
planning
purposes
and
does
not
constitute
a
firm
quotation.
An
asterisk
(*)
is
shown
where
part
pricing
information
was
unavailable.
In
either
case,
contact
Pratt
&
Whitney
Spares
Management
&
Logistics
for
firm
quotations.
Parts
Modification
Conditions
(4)
Do
an
inspection
as
specified
in
the
Accomplishment
Instructions.
Spare
Parts
A
vailability
(C)
The
old
part
will
continue
to
be
supplied.
(E)
The
old
part
is
an
expendable
item
that
is
necessary
to
do
this
bulletin.
(E1)
The
old
part
is
an
expendable
item
that
may
be
necessary
to
do
this
bulletin
depending
on
which
parts
are
removed
from
the
engine.
(E2)
The
old
part
is
a
bolt
that
can
break
when
it
is
removed
from
the
engine.
It
may
be
necessary
to
replace
it.
(O1)
Gasket
Option,
PN
ST1
142-032,
consists
of
a
gasket,
PN
ST1
1
12-032
(P14U51-0039-02
PerkinElmer
Inc.
part
number)
or
PN
ST1
122-032.
(O2)
Gasket
Option,
PN
ST1
141-60,
consists
of
a
gasket
PN
P13U51-0049-2
(PerkinElmer
Inc.
part
number)
or
PN
ST1
121-60.
(O3)
Gasket
Option,
PN
ST2422-039,
consists
of
a
gasket
PN
P14U5N0046-2
(PerkinElmer
Inc.
part
number)
and
ST2412-039.
(O4)
Gasket
Option,
PN
ST1
141-03,
consists
of
a
gasket
PN
ST1
1
1
1-03
(P13U51-0004-2
PerkinElmer
Inc.
part
number)
and
ST1
121-03.
(V)
This
is
the
PerkinElmer
Inc.
part
number
.
(X)
See
Reference
2
or
3,
Illustrated
Parts
Catalog
for
applicable
replacement
parts.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
8
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 11

V
endor
Services
or
Special
Components/Materials
V
e
n
d
o
r
S
e
r
v
i
c
e
s
o
r
S
p
e
c
i
a
l
C
o
m
p
o
n
e
n
t
s
/
M
a
t
e
r
i
a
l
s
P&W
Designation
V
endor
Designation
Name
V
endor
Name
&
Address
55T843
A0946
GASKET
—
SPRING,
TURB
CLG
AIR
ST2402-039
P14U5N0046-2
GASKET
ST1
1
12-032
P14U51-0039-02
GASKET
ST1
1
1
1-60
P13U51-0049-02
GASKET
ST1
1
1
1-03
P13U51-0004-2
GASKET
PERKINELMER
INC.
1
1642
OLD
BAL
TIMORE
PIKE
BEL
TSVILLE,
MD
20705-1210
USA
V
endor
Manufacturer
’
s
Code:
15284
See
Illustrated
Parts
Catalog
V
endor
Manufacturer
’
s
Code
List
N
O
T
E
:
EXCEPT
FOR
WORK
OR
SUPPLIES
T
O
BE
PERFORMED
OR
FURNISHED
BY
PRA
TT
&
WHITNEY
,
IT
IS
UNDERST
OOD
THA
T
PRA
TT
&
WHITNEY
DOES
NOT
ENDORSE
THE
WORK
PERFORMED
BY
THE
COMP
ANY
OR
COMP
ANIES
NAMED
HEREIN
OR
ANY
OTHER
COMP
ANY
AND
DOES
NOT
ACCEPT
RESPONSIBILITY
T
O
ANY
DEGREE
FOR
THE
SELECTION
OF
SUCH
COMP
ANY
OR
COMP
ANIES
FOR
THE
PERFORMANCE
OF
ANY
WORK
OR
PROCUREMENT
OF
SUPPLIES.
M
a
t
e
r
i
a
l
D
a
t
a
f
o
r
E
a
c
h
S
p
a
r
e
E
n
g
i
n
e
The
material
for
each
spare
engine
is
as
stated
in
the
preceding
material
information
section.
R
e
i
d
e
n
t
i
fi
e
d
P
a
r
t
s
Not
Applicable.
N
e
c
e
s
s
a
r
y
T
o
o
l
s
The
following
tools
are
required
to
accomplish
this
Alert
Service
Bulletin.
Contact
your
Pratt
&
Whitney
Customer
Representative
for
information
regarding
acquiring
these
tools.
L
i
s
t
o
f
R
e
q
u
i
r
e
d
T
o
o
l
s
KIT
NUMBER
NOMENCLA
TURE
UNITS
PER
ENGINE
PW
A
107958*
EDDY
CURRENT
INSPECTION
Kit
1
N/A*
MACHIDA
ENGINE
ROT
A
T
OR
Kit
Model
MA-TT
-70
with
Adapters
1
N/A*
MACHIDA
VIDEO
SCOPE
Kit
Model
VSC-2-86
with
Monitor
1
*
Detail
tool
listing
is
found
in
NDIP-1
137
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
9
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 12

O
t
h
e
r
M
a
t
e
r
i
a
l
I
n
f
o
r
m
a
t
i
o
n
D
a
t
a
Not
Applicable.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
10
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 13

A
c
c
o
m
p
l
i
s
h
m
e
n
t
I
n
s
t
r
u
c
t
i
o
n
s
F
O
R
P
W
4
0
7
4
,
P
W
4
0
7
7
E
N
G
I
N
E
S
I
N
S
T
A
L
L
E
D
O
N
A
I
R
C
R
A
F
T
1.
Open
the
cowl
doors
to
gain
access
to
the
T
urbine
V
ane
Cooling
Air
(TVCA)
Ducts.
See
Reference
7,
Boeing
777
Aircraft
Maintenance
Manual
(AMM)
Chapter/Section
71-1
1-04.
Allow
engine
to
cool.
2.
It
is
permitted
to
use
the
optional
TVCA
duct
entry
port
location
for
Eddy
Current
(EC)
inspection
access.
Remove
the
Upper
Right
TVCA
Duct
(AP01
or
AP1
14)
as
specified
in
Reference
7,
Boeing
AMM
T
ask
75-25-05-000-818
or
the
lower
left
TVCA
Duct
(AP02)
as
specified
in
Reference
7,
Boeing
AMM
T
ask
75-25-05-000-819
based
on
accessibility
.
The
AP01
or
AP1
14
TVCA
Duct
is
located
at
the
two
o’clock
position
(See
Figures
2
through
5)
and
the
AP02
air
duct
is
located
at
the
four
o’clock
position
(See
Figure
6).
The
Upper
Right
TVCA
is
one
of
three
configurations:
N
O
T
E
:
Removal
of
the
bolts
from
the
TVCA
Duct
access
ports
when
the
engine
is
hot
without
lubrication
can
cause
the
bolts
to
break.
Apply
penetration
oil
to
the
TCA
Duct
Bolts
prior
to
removal
per
Reference
7,
Boeing
777
AMM,
Chapter/Section
70-00-00,
SPOP
427.
See
Chapter/Section
70-00-00,
T
ask
70-00-00-910-808-N00
for
repair
of
broken
bolts
(SPOP
416).
A.
Configuration
1
—
Engines
with
the
Modulated
TVCA
System
Pre
Reference
15,
SB
PW4G-1
12-72-84.
This
system
has
a
TVCA
valve
located
between
the
(AP01)
duct
and
the
(AP05)
elbow
.
With
this
configuration,
you
must
use
O-ring
gaskets
at
all
four
HPT
case
boss
locations,
(AP01),
(AP02),
(AP03),
and
(AP04).
See
Figure
2
and
4.
B.
Configuration
2
—
Engines
without
the
Modulated
TVCA
System
(Post
Reference
15,
SB
PW4G-1
12-72-84,
Method
2).
This
system
has
a
optional
duct
(AP1
15)
in
place
of
the
TVCA
valve.
The
duct
(AP1
15)
is
located
between
the
(AP01)
duct
and
the
(AP05)
elbow
.
With
this
configuration,
you
must
use
O-ring
gaskets
at
the
two
HPT
case
bosses,
(AP02)
and
(AP04).
The
(AP01)
and
(AP03)
locations
use
metering
orifice
plate
and
seal
assemblies
(Engines
Pre
Reference
14,
SB
PW4G-1
12-75-30).
The
(AP01)
and
(AP03)
locations
use
O-ring
gaskets
at
the
two
HPT
case
bosses
(Engines
Post
Reference
14,
SB
PW4G-1
12-75-30).
See
Figure
3
and
4.
C.
Configuration
3
—
Engines
manufactured
without
the
Modulated
TVCA
system
or
Engines
Post
Reference
15,
SB
PW4G-1
12-72-84,
Method
1.
This
system
has
a
duct
AP1
14
in
place
of
the
TVCA
valve,
the
AP01
duct,
and
the
AP05
elbow
.
With
this
configuration,
you
must
use
O-ring
gaskets
at
the
two
HPT
case
bosses,
(AP02)
and
(AP04).
The
(AP1
14)
and
(AP03)
locations
use
metering
orifice
plate
and
seal
assemblies
(Engines
Pre
Reference
14,
SB
PW4G-1
12-75-30).
The
(AP01)
and
(AP03)
locations
use
O-ring
gaskets
at
the
two
HPT
case
bosses
(Engines
Post
Reference
14,
SB
PW4G-1
12-75-30).
See
Figure
5.
3.
It
is
permitted
to
use
the
optional
entry
port
location
for
HPT
stage
2
air
seal
temperature
measurements.
Measure
the
HPT
stage
2
air
seal
temperature
through
the
EC
inspection
port
(previous
step)
with
the
use
of
a
borescope
to
verify
the
thermocouple
position
is
on
the
HPT
Stage
2
air
seal
outside
diameter
or
remove
the
TCA
Probe
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
75-25-07-000-801.
See
Figure
7.
See
Reference
16.,
NDIP-1
137,
Section
3.
N
O
T
E
:
Removal
of
the
nuts
from
the
TCA
probe
port
studs
when
the
engine
is
hot
without
lubrication
can
result
in
stud
breakage.
Apply
penetration
oil
to
the
TCA
Duct
studs
prior
to
removal
per
Reference
7,
Boeing
777
AMM,
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
1
1
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 14

Chapter/Section
70-00-00,
SPOP
427.
See
Chapter/Section
70-00-00,
T
ask
70-00-00-910-808-N00
for
repair
of
broken
bolts
(SPOP
416).
4.
Remove
the
main
gearbox
crank
pad
cover
as
specified
in
Reference
7,
Boeing
777
AMM
Subtask
72-00-00-980-807.
5.
Remove
the
starter
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
80-1
1-01-000-801.
6.
Install
the
N2
rotor
turning
equipment
as
specified
in
Reference
7,
Boeing
777
Aircraft
Maintenance
Manual,
Chapter/Section
72-00-00.
A.
Install
the
rotator
drive
unit
to
the
starter
pad
on
the
main
gearbox.
B.
Follow
the
instructions
provided
by
the
manufacturer
for
the
assembly
of
the
rotator
kit.
C.
Use
the
instruction
manual
provided
by
the
manufacturer
to
operate
the
rotator
.
7.
Do
Reference
16,
Non-Destructive
Inspection
Procedure
NDIP-1
137.
NDIP-1
137
is
attached
in
the
Appendix.
See
Figure
9,
Sheets
1
and
2.
A.
Provide
the
inspection
result
(Appendix
2
of
the
NDIP)
to
the
Pratt
&
Whitney
local
representative
who
will
forward
the
results
to
the
responsible
customer
technical
service
contact.
B.
If
the
mock
up
probe
tip
or
EC
probe
tip
liberates
into
the
engine,
every
ef
fort
should
be
used
to
remove
the
liberated
material
from
the
engine.
If
the
mock
probe
tip
or
EC
probe
tip
is
not
accessible,
it
is
acceptable
to
continue
in
service.
C.
If
the
grind
blend
tip
liberates,
every
ef
fort
should
be
used
to
remove
the
liberated
material
from
the
engine.
If
the
grind
tip
is
not
accessible
it
is
acceptable
to
continue
in
service
if
a
visual
borescope
of
the
HPT
stage
2
air
seal
OD
cavity
using
the
criteria
below
is
performed
on
reduced
inspection
interval
not
to
exceed
60
cycles.
If
the
inspection
is
found
acceptable,
at
this
interval
(60
cycles)
the
inspection
interval
can
be
increased
not
to
exceed
180
cycles.
If
the
inspection
is
found
acceptable
at
this
interval
(180
cycles)
the
inspection
interval
can
be
increased
not
to
exceed
360
cycles.
At
this
360
cycle
interval
this
service
bulletin
EC
NDIP
1
137
Inspection
should
be
performed.
If
the
inspections
are
found
acceptable
at
this
inspection
interval,
then
the
HPT
stage
2
air
seal
OD
cavity
and
EC
inspections
should
continue
on
a
repetitive
600
cycle
interval.
HPT
stage
2
air
seal
OD
cavity
inspection
criteria
as
follows.
See
Figure
9,
Sheet
3
for
the
specified
surfaces.
Surface
damage
on
the
forward
barrel
fillet
shown
is
not
permitted,
remove
engine
in
5
cycles.
Missing
material
on
the
rear
1st
stage
side
plate
surface
1
or
the
forward
air
seal
knife
edge
surface
2
is
not
permitted,
remove
engine.
Missing
coating
of
>
25%
on
the
forward
air
seal
knife
edge
surface
2
is
not
permitted,
remove
engine
in
5
cycles.
Nicks
and
dents
greater
than
0.010
inch
(0.254
mm)
depth
in
surface
4
and
5
is
not
permitted,
remove
engine
in
5
cycles.
Imbedded
grind
tip
or
dents
in
the
forward
T2V
inner
air
seal
honeycomb
surface
3
is
not
permitted,
remove
engine
in
5
cycles.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
12
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 15

8.
If
HPT
Stage
2
Air
Seal
indications
are
found
greater
than
or
equal
to
1.2
volts
peak
amplitude
remove
engine
within
five
Flight
Cycles
(FC)
(Reference
16,
NDIP-1
137
Step
6.1)
A.
One
isolated
spike
of
greater
than
1.2
volts
after
a
2nd
EC
inspection
is
performed
would
be
considered
acceptable
to
continue
in
service
if
this
Service
Bulletin
inspection
is
performed
on
a
reduced
interval
of
600
cycles.
During
that
next
600
cycle
interval
if
there
are
no
isolated
spikes
of
greater
than
1.2
volts
for
two
EC
inspections
the
engine
could
return
to
the
1200
cycle
inspection
interval.
9.
If
indications
are
within
Reference
16,
NDIP-1
137
criteria
the
HPT
Stage
2
Air
Seal
should
continue
in
service
and
be
inspected
on
the
repetitive
inspection
interval
listed
in
this
Alert
Service
Bulletin.
10.
Remove
the
rotator
adapter
from
the
gearbox
crank
pad
location.
1
1.
Install
the
gearbox
crank
pad
cover
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
72-00-00-840-805.
12.
Remove
the
N2
rotor
turning
equipment
from
the
starter
pad
on
the
main
gearbox.
13.
Install
the
starter
as
specified
in
Reference
7,
Boeing
777
AMM
Subtask
80-1
1-01-400-801.
14.
If
removed,
install
the
Upper
Right
TVCA
Duct
(AP01
or
AP1
14)
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-05-400-818.
The
AP02
air
duct
is
located
at
the
two
o’clock.
See
Reference
14,
Service
Bulletin
PW4G-1
12-75-30
to
ensure
a
gasket
is
installed
at
the
HPT
port
in
place
of
a
metering
orifice
&
seal
assembly
.
See
Figures
2
through
5.
15.
If
access
to
an
optional
HPT
stage
2
vane
cluster
access
was
used,
install
the
lower
left
TVCA
Duct
(AP02)
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-05-400-819.
This
air
duct
is
located
at
the
four
o’clock
position.
See
Figure
6.
16.
If
removed,
install
TCA
Probe
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-07-400-801.
See
Figure
7.
17.
Close
the
cowl
doors
as
specified
in
Reference
7,
Boeing
777
AMM,
Chapter/Section
71-1
1-04.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
13
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 16

F
O
R
P
W
4
0
7
4
D
,
P
W
4
0
7
7
D
,
P
W
4
0
8
4
D
,
P
W
4
0
9
0
,
P
W
4
0
9
0
-
3
E
N
G
I
N
E
S
I
N
S
T
A
L
L
E
D
O
N
A
I
R
C
R
A
F
T
1.
Open
the
cowl
doors
to
gain
access
to
the
T
urbine
V
ane
Cooling
Air
(TVCA)
Ducts.
See
Reference
7,
Boeing
777
Aircraft
Maintenance
Manual
(AMM)
Chapter/Section
71-1
1-04.
Allow
engine
to
cool.
2.
It
is
permitted
to
use
the
optional
TVCA
duct
entry
port
location
for
Eddy
Current
(EC)
inspection
access.
Remove
the
TVCA
Elbow
(AP83)
as
specified
in
Reference
7,
Boeing
AMM
T
ask
75-25-05-000-824
or
the
upper
right
TVCA
Duct
AP1
14)
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-05-000-823.
The
AP83
elbow
is
attached
to
the
AP02
air
duct
and
is
located
at
the
four
o’clock
location.
See
Figure
8.
N
O
T
E
:
Removal
of
the
bolts
from
the
TVCA
Duct
access
ports
when
the
engine
is
hot
without
lubrication
can
cause
the
bolts
to
break.
Apply
penetration
oil
to
the
TCA
Duct
Bolts
prior
to
removal
per
Reference
7,
Boeing
777
AMM,
Chapter/Section
70-00-00,
SPOP
427.
See
Chapter/Section
70-00-00,
T
ask
70-00-00-910-808-N00
for
repair
of
broken
bolts
(SPOP
416).
3.
It
is
permitted
to
use
the
optional
entry
port
location
for
HTP
stage
2
air
seal
temperature
measurements.
Measure
the
HPT
stage
2
air
seal
temperature
through
the
EC
inspection
port
(previous
step)
with
the
use
of
a
borescope
to
verify
the
thermocouple
position
is
on
the
HPT
stage
2
air
seal
OD
or
remove
the
TCA
Probe
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
75-25-07-000-801.
See
Figure
7.
See
reference
16.,
NDIP
1
137.
N
O
T
E
:
Removal
of
the
nuts
from
the
TCA
probe
port
studs
when
the
engine
is
hot
without
lubrication
can
result
in
stud
breakage.
Apply
penetration
oil
to
the
TCA
Duct
studs
prior
to
removal
per
Reference
7,
Boeing
777
AMM,
Chapter/Section
70-00-00,
SPOP
427.
See
Chapter/Section
70-00-00,
T
ask
70-00-00-910-808-N00
for
repair
of
broken
bolts
(SPOP
416).
4.
Remove
the
main
gearbox
crank
pad
cover
as
specified
in
Reference
7,
Boeing
777
AMM
Subtask
72-00-00-980-807.
5.
Remove
the
starter
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
80-1
1-01-000-801.
6.
Install
the
N2
rotor
turning
equipment
as
specified
in
Reference
7,
Boeing
777
Aircraft
Maintenance
Manual,
Chapter/Section
72-00-00.
A.
Install
the
rotator
drive
unit
to
the
starter
pad
on
the
main
gearbox.
B.
Follow
the
instructions
provided
by
the
manufacturer
for
the
assembly
of
the
rotator
kit.
C.
Use
the
instruction
manual
provided
by
the
manufacturer
to
operate
the
rotator
.
7.
Do
Reference
16,
Non-Destructive
Inspection
Procedure
NDIP-1
137.
NDIP-1
137
is
attached
in
the
Appendix.
See
Figure
9,
Sheets
1
and
2.
A.
Provide
the
inspection
result
(Appendix
2
of
the
NDIP)
to
the
Pratt
&
Whitney
local
representative
who
will
forward
the
results
to
the
responsible
customer
technical
service
contact.
B.
If
the
mock
up
probe
tip
or
EC
probe
tip
liberates
into
the
engine,
every
ef
fort
should
be
used
to
remove
the
liberated
material
from
the
engine.
If
the
mock
probe
tip
or
EC
probe
tip
is
not
accessible,
it
is
acceptable
to
continue
in
service.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
14
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 17

C.
If
the
grind
blend
tip
liberates,
every
ef
fort
should
be
used
to
remove
the
liberated
material
from
the
engine.
If
the
grind
tip
is
not
accessible
it
is
acceptable
to
continue
in
service
if
a
visual
borescope
of
the
HPT
stage
2
air
seal
OD
cavity
using
the
criteria
below
is
performed
on
reduced
inspection
interval
not
to
exceed
60
cycles.
If
the
inspection
is
found
acceptable,
at
this
interval
(60
cycles)
the
inspection
interval
can
be
increased
not
to
exceed
180
cycles.
If
the
inspection
is
found
acceptable
at
this
interval
(180
cycles)
the
inspection
interval
can
be
increased
not
to
exceed
360
cycles.
At
this
360
cycle
interval
this
service
bulletin
EC
NDIP
1
137
Inspection
should
be
performed.
If
the
inspections
are
found
acceptable
at
this
inspection
interval,
then
the
HPT
stage
2
air
seal
OD
cavity
and
EC
inspections
should
continue
on
a
repetitive
600
cycle
interval.
HPT
stage
2
air
seal
OD
cavity
inspection
criteria
as
follows.
See
Figure
9,
Sheet
3
for
the
specified
surfaces.
Surface
damage
on
the
forward
barrel
fillet
shown
is
not
permitted,
remove
engine
in
5
cycles.
Missing
material
on
the
rear
1st
stage
side
plate
surface
1
or
the
forward
air
seal
knife
edge
surface
2
is
not
permitted,
remove
engine.
Missing
coating
of
>
25%
on
the
forward
air
seal
knife
edge
surface
2
is
not
permitted,
remove
engine
in
5
cycles.
Nicks
and
dents
greater
than
0.010
inch
(0.254
mm)
depth
in
surface
4
and
5
is
not
permitted,
remove
engine
in
5
cycles.
Imbedded
grind
tip
or
dents
in
the
forward
T2V
inner
air
seal
honeycomb
surface
3
is
not
permitted,
remove
engine
in
5
cycles.
8.
If
HPT
Stage
2
Air
Seal
indications
are
found
greater
than
or
equal
to
1.2
volts
peak
amplitude
remove
engine
within
five
Flight
Cycles
(FC)
(Reference
16,
NDIP-1
137
Step
6.1)
A.
One
isolated
spike
of
greater
than
1.2
volts
after
a
2nd
EC
inspection
is
performed
would
be
considered
acceptable
to
continue
in
service
if
this
Service
Bulletin
inspection
is
performed
on
a
reduced
interval
of
600
cycles.
During
that
next
600
cycle
interval
if
there
are
no
isolated
spikes
of
greater
than
1.2
volts
for
two
EC
inspections
the
engine
could
return
to
the
1200
cycle
inspection
interval.
9.
If
indications
are
within
Reference
16,
NDIP-1
137
criteria
the
HPT
Stage
2
Air
Seal
should
continue
in
service
and
be
inspected
on
the
repetitive
inspection
interval
listed
in
this
Alert
Service
Bulletin.
10.
Remove
the
rotator
adapter
from
the
gearbox
crank
pad
location.
1
1.
Install
the
gearbox
crank
pad
cover
as
specified
in
Reference
7,
Boeing
777
AMM
T
ask
72-00-00-840-805.
12.
Remove
the
N2
rotor
turning
equipment
from
the
starter
pad
on
the
main
gearbox.
13.
Install
the
starter
as
specified
in
Reference
7,
Boeing
777
AMM
Subtask
80-1
1-01-400-801.
14.
If
removed,
install
the
TVCA
elbow
(AP83)
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-05-400-824.
The
AP83
elbow
is
attached
to
the
AP02
air
duct
and
is
located
at
the
four
o’clock
position.
See
Figure
8.
N
O
T
E
:
Reference
13,
Service
Bulletin
PW4G-1
12-72-271
replaces
the
metering
orifice
and
seal
assembly
with
a
gasket.
15.
If
access
to
an
optional
High
Pressure
T
urbine
(HPT)
2nd
stage
vane
cluster
was
used,
install
the
upper
right
TVCA
Duct
(AP1
14).
The
air
duct
is
located
at
the
two
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
15
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 18

o’clock
position.
Install
the
duct
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-05-400-823.
See
Figure
5.
16.
If
removed,
install
TCA
Probe
as
specified
in
Reference
7,
Boeing
777
AMM,
T
ask
75-25-07-400-801.
See
Figure
7.
17.
Close
the
cowl
doors
as
specified
in
Reference
7,
Boeing
777
AMM,
Chapter/Section
71-1
1-04.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
16
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 19 (OCR)

Pratt & Whitney
A United Technologies Company
54L041
2ND STAGE AIR SEAL
DO THE INSPECTION IN
THE ACCOMPLISHMENT
INSTRUCTIONS
B524368
LOCATION OF THE PW4074, PW4077, PW4074D, PW4077D, PW4084D, PW4090,
AND PW4090-3 2ND STAGE HPT AIR SEAL ASSEMBLY
72-52-00
FIGURE 1
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 17
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 20 (OCR)

Pratt & Whitney
A United Technologies Company
MS9716-05
BOLT
REFERENCE
ST1142-032
GASKET OPTION
REFERENCE
AP01 TUBE
REFERENCE
AP05 ELBOW
REFERENCE
. ST2422-039
SEE FIGURE 4  GASKET OPTION
REFERENCE
B524716
ENGINES WITH THE MODULATED TVCA SYSTEM (PRE REFERENCE 15, SB PW4G-112-72-84)
75-25-00
FIGURE 2
December 3/12  PW4G-112-A72-330
REVISION NO. 2 - July 11/13  Page 18
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 21 (OCR)

Pratt & Whitney
A United Technologies Company
MS9716-05
BOLT
REFERENCE
ST1142-032
GASKET OPTION
REFERENCE
AP01 TUBE
REFERENCE
AP05 ELBOW
REFERENCE
SEE FIGURE 4
ST2422-039
GASKET OPTION
REFERENCE
B524717
ENGINES WITHOUT THE MODULATED TVCA SYSTEM (POST REFERENCE
15, SB PW4G-112-72-84, METHOD 2)
75-25-00
FIGURE 3
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 19
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 22 (OCR)

Pratt & Whitney
A United Technologies Company
55T843
551308  LOOP CLAMP  SPRING GASKET  REFERENCE
REFERENCE
TVCA VALVE
REFERENCE
AP115 TUBE
REFERENCE
55T308
LOOP CLAMP
REFERENCE
55T843
SPRING GASKET
REFERENCE
B524739
TURBINE VANE COOLING AIR VALVE AND AP115 TUBE ASSEMBLY
75-25-00
FIGURE 4
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 20
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 23 (OCR)

Pratt & Whitney
A United Technologies Company
ST2601-16
BOLT
REFERENCE
ST2601-10
BOLT
REFERENCE
AP114 TUBE -
REFERENCE
ST2422-039
GASKET OPTION
REFERENCE
B524718
ENGINES ORIGINALLY MANUFACTURED WITHOUT THE MODULATED TVCA SYSTEM
OR ENGINES POST REFERENCE 15, SB PW4G-112-72-84, METHOD 1
FIGURE 5
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 21
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 24 (OCR)

Pratt & Whitney
A United Technologies Company
ST1141-60
TURBINE VANE  GASKET OPTION
COOLING AIR  REFERENCE
(TVCA) DUCT (AP02)  TVCA
SHUTOFF
VALVE
REFERENCE
ST 1142-032
GASKET OPTION
REFERENCE
MS9716-05
FUEL HOSE
BOLT
REFERENCE  BRACKET
REFERENCE
QTY (4)
REFERENCE
MS9716-10
BOLT
REFERENCE
QTY (6)
REFERENCE
BOLT QTY (2)
REFERENCE
FWD
BRACKET
REFERENCE
CLAMP
REFERENCE
B524369
LOCATION OF THE TVCA DUCT (AP02) FOR THE PW4074 AND PW4077 ENGINES
75-25-00
FIGURE 6
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 22
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 25 (OCR)

Pratt & Whitney
A United Technologies Company
TCA PROBE
REFERENCE
ST 1141-03
MS9715-08
GASKET OPTION
REFERENCE  BOLT  REFERENCE
B524719
LOCATION OF THE TURBINE COOLING AIR (TCA) PROBE
75-25-00
FIGURE 7
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 23
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 26 (OCR)

Pratt & Whitney
A United Technologies Company
PLATE
AND
ST1142-032  SEAL
GASKET OPTION  (REF)
REFERENCE
TVBC AIR
BOLT QTY (4)  SHUTOFF VALVE
REFERENCE  REFERENCE
TVCA
ELBOW
HPT CASE  (AP83)
REFERENCE
50U285
SPRING GASKET
CHECK VALVE
REFERENCE
BRACKET  50U285
REFERENCE  SPRING
GASKET
TVCA DUCT (AP02)
REFERENCE
CLAMP
REFERENCE  COUPLING
REFERENCE
EWD
BOLT QTY (2)
REFERENCE
B524370  VIEW B
LOCATION OF THE TVCA DUCT (AP02) FOR THE PW4074D, PW4077D,
PW4084D, PW4090, AND PW4090-3 ENGINES
75-25-00
FIGURE 8
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 24
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 27 (OCR)

Pratt & Whitney
A United Technologies Company
2ND STAGE HPT AIR SEAL
VIEW A
HPT 2ND STAGE
BLADE (REF)
HPT 2ND STAGE
VANE (REF)
FLEXIBLE
FWD  ECI PROBE
TCA PORT
SECTION A-A
B524371
INSPECTION OF THE 2ND STAGE HPT AIR SEAL
FIGURE 9, SHEET 1
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 25
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 28 (OCR)

Pratt & Whitney
A United Technologies Company
2ND STAGE HPT AIR SEAL
ECI PROBE ACCESS
THROUGH T2V
TRANSFER TUBE
FLEXIBLE
ECI PROBE
VIEW A
B524372
INSPECTION OF THE 2ND STAGE HPT AIR SEAL
FIGURE 9, SHEET 2
December 3/12  PW4G-112-A72-330
REVISION NO. 2 - July 11/13  Page 26
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 29 (OCR)

Pratt & Whitney
A United Technologies Company
OD FORWARD
BARREL FILLET
VIEW A
REGIONS TO CHECK FOR SURFACE DAMAGE DURING BORESCOPE INSPECTION
B525101
INSPECTION OF THE 2ND STAGE HPT AIR SEAL
FIGURE 9, SHEET 3
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 27
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 30

A
p
p
e
n
d
i
x
P
a
r
t
s
P
r
o
g
r
e
s
s
i
o
n
T
o
S
h
o
w
t
h
e
C
h
a
n
g
e
d
P
a
r
t
i
n
R
e
l
a
t
i
o
n
t
o
O
t
h
e
r
P
a
r
t
s
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
28
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 31 (OCR)

Pratt & Whitney
A United Technologies Company
(1) 17)
50L926
.2A1158
.50L855
ORIGINAL
(1) 50L926 INCLUDES DETAIL 2ND STAGE HPT SEAL
(2) (7)  METERING PLUG, PN 2A1158 AND 2ND STAGE
50L976  HPT AIR SEAL DAMPER, PN 50L855.
.50L965
.50L964  (2) 50L976 INCLUDES DETAIL 2ND STAGE HPT SEAL
SB 72-77  METERING PLUG, PN 50L965 AND 2ND STAGE
HPT AIR SEAL DAMPER, PN 50L964.
(3) YOU CAN DO ASB 72-197 TO POST-SB 72-77
(2) (7)  2ND STAGE HPT AIR SEAL ASSEMBLIES.
50L976
.50L965  (4) ASB 72-222 HAS BEEN SUPERSEDED BY
.50L964  ASB 72-233.
ASB 72-172
(5) YOU CAN DO ASB 72-233 TO POST-ASB 72-197,
POST-ASB 72-172, AND POST-SB 72-77
2ND STAGE HPT AIR SEAL ASSEMBLIES.
(2) (3) (7)
50L976  (6) _ 54L041 INCLUDES DETAIL 2ND STAGE HPT SEAL
.50L965  .50L964  HPT SEAL PLAIN PLUG, PN 55L007.  METERING PLUG, PN 55L008 AND 2ND STAGE
ASB 72-197
(7) YOU CAN REPLACE THIS 2ND STAGE HPT
(2) (4) (7)  AIR SEAL ASSEMBLY WITH 54L041.
50L976
.50L965
.50L964
ASB 72-222
(2) (5)
50L976
.50L965
50L964
ASB 72-233
(6)
54L041
.55L008
.55L007
SB 72-271
54L041
.55L008
.55L007
SB A72-330
B524366
PROGRESSION OF THE PW4074 AND PW4077 2ND STAGE HPT AIR SEAL ASSEMBLY
CHART A
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 29
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 32 (OCR)

Pratt & Whitney
A United Technologies Company
(1)
50L960
.50L965
.50L964
ORIGINAL
(1) (2)
50L960
.50L965
.50L964
ASB 72-222
(1)
50L960
.50L965
.50L964
ASB 72-233
(3)
54L041
55L008
.55L007
SB 72-271
54L041
.55L008
.55L007
SB A72-330
(1) 50L960 INCLUDES DETAIL 2ND STAGE HPT SEAL METERING PLUG, PN 50L965 AND 2ND STAGE
HPT AIR SEAL DAMPER, PN 50L964.
(2) ASB 72-222 HAS BEEN SUPERSEDED BY ASB 72-233.
(3) 54L041 INCLUDES DETAIL 2ND STAGE HPT SEAL METERING PLUG, PN 55L008 AND 2ND STAGE
HPT SEAL PLAIN PLUG, PN 55L007.
B524367
PROGRESSION OF THE PW4074D, PW4077D, PW4084D, PW4090, PW4090-3
2ND STAGE HPT AIR SEAL ASSEMBLY
CHART B
December 3/12  PW4G-112-A72-330
• REVISION NO. 2 - July 11/13  Page 30
UTC/P&W PROPRIETARY INFORMATION
Subject to the restrictions on the cover or first page.
Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3).

### Page 33

A
d
d
e
d
D
a
t
a
I
n
t
e
r
n
a
l
R
e
f
e
r
e
n
c
e
I
n
f
o
r
m
a
t
i
o
n
Revision
No.
Reference
Document
Origination
Original
EA1
1KCB91
BE/JEJ
1
EA1
1KCB91
BE/JEJ
2
EA1
1KCB91
BE/MJS
Number
values
shown
in
parentheses
adjacent
to
U.S.
values
are
International
System
of
units
(SI)
equivalents.
T
o
calculate
part
life,
include
the
hours
and/or
cycles
since
the
part
was
made.
Use
the
total
hours
or
cycles
to
calculate
life
limits
that
are
the
result
of
part
modification,
a
part
used
in
an
engine
with
dif
ferent
thrust,
or
for
some
other
reason.
I
n
s
p
e
c
t
i
o
n
P
r
o
c
e
d
u
r
e
s
N
O
T
E
:
EXCEPT
FOR
WORK
OR
SUPPLIES
T
O
BE
PERFORMED
OR
FURNISHED
BY
PRA
TT
&
WHITNEY
,
IT
IS
UNDERST
OOD
THA
T
PRA
TT
&
WHITNEY
DOES
NOT
ENDORSE
THE
WORK
PERFORMED
BY
THE
COMP
ANY
OR
COMP
ANIES
NAMED
HEREIN
OR
ANY
OTHER
COMP
ANY
AND
DOES
NOT
ACCEPT
RESPONSIBILITY
T
O
ANY
DEGREE
FOR
THE
SELECTION
OF
SUCH
COMP
ANY
OR
COMP
ANIES
FOR
THE
PERFORMANCE
OF
ANY
WORK
OR
PROCUREMENT
OF
SUPPLIES.
Reference
16,
Non-Destructive
Inspection
Procedure,
NDIP-1
137,
PW4000-1
12”
2nd
Stage
HPT
Air
Seal
Forward
Outer
Diameter
Eddy
Current
Inspection
(On-Wing),
follows.
l
December
3/12
PW4G-1
12-A72-330
REVISION
NO.
2
-
July
1
1/13
Page
31
UTC/P&W
PROPRIET
AR
Y
INFORMA
TION
Subject
to
the
restrictions
on
the
cover
or
first
page.
Not
subject
to
the
EAR
per
15
C.F
.R.
Chapter
1,
Part
734.3(b)(3).

### Page 34

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
1 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
Applies to Models: PW4074, PW4074D, PW4077, PW4077D, PW4084D, PW4090 and PW4090-3 
 
P/N 54L041/54L043 
 
NDIP 1137 Rev. C 
 
 
WARNING 
THIS DOCUMENT MAY CONTAIN INFORMATION SUBJECT TO THE INTERNATIONAL TRAFFIC IN ARMS REGULATION (ITAR) OR THE EXPORT ADMINISTRATION 
REGULATION (EAR) OF 1979. THIS INFORMATION MAY NOT BE EXPORTED, RELEASED, OR DISCLOSED TO FOREIGN NATIONALS OUTSIDE THE UNITED 
STATES WITHOUT FIRST COMPLYING WITH THE EXPORT LICEN SE REQUIREMENTS OF THE INTERNATIONAL TRAFFIC IN ARMS REGULATION (ITAR) AND/OR 
THE EXPORT ADMINISTRATION REGULATION (EAR). A VIOLATION OF THE ITAR OR EAR MAY BE SUBJECT TO A PENALTY OF UP TO 10 YEARS 
IMPRISONMENT AND A FINE OF $1,000,000 UNDER 22 U.S.C 2778  OR SECTION 2410 OF THE EXPORT ADMINISTRATION ACT OF 1979. INCLUDE THIS NOTICE 
WITH ANY REPRODUCED PORTION OF THIS DOCUMENT.  
 
RESTRICTION 
PAGES OF THIS DOCUMENT MARKED WITH THE NOTICES SET FORTH BELOW CONTAIN CONTRACTOR COMPETITION SENSITIVE DATA AND/OR PRATT & 
WHITNEY PROPRIETARY DATA WHICH IS SUBMITTED IN CONFIDENCE. NO DISCLOSURE OR USE OF THIS INFORMATION IS PERMISSIBLE WITHOUT PR IOR 
WRITTEN CONSENT OF UNITED TECHNOLOGIES CORPORATION EXCEPT FOR OFFICIAL PURPOSES WITHIN THE U.S. GOVERNMENT.  
 
DOCUMENT PROPERTY RIGHTS NOTICE 
THIS DOCUMENT IS THE PROPERTY OF UNITED TECHNOLOGIES CORPORATION (UTC).  YOU MAY NOT POSSESS, USE, COPY OR DISCLOSE THIS 
DOCUMENT OR ANY INFORMATION IN IT, FOR ANY PURPOSE, INCLUDING WITHOUT LIMITATION TO DESIGN, MANUFACTURE OR REPAIR P ARTS, OR OBTAIN 
FAA OR OTHER GOVERNMENT APPROVAL TO DO SO, WITHOUT UTC’S EXPRESS WRITTEN PERMISSION.  NEITHER RECEIPT NOR POSSESSION OF THIS 
DOCUMENT ALONE, FROM ANY SOURCE, CONSTITUTES SUCH PERMISSION.  POSSESSION, USE, COPYRIGHT OR DISCLOSURE BY ANYONE W ITHOUT UTC’S 
EXPRESS WRITTEN PERMISSION IS NOT AUTHORIZED AND MAY RESULT IN CRIMINAL AND OR CIVIL LIABILITY.  
 
NOTICES 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
Approved By: Jonathan Sullivan, PL 3 
 
Date: June 19, 2013

### Page 35

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
2 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
0.0 General 
The objective of this procedure is to perform an eddy current (EC) inspection of the forward outer 
diameter radii of the HPT 1-2 Seal for possible indications.  Since the part cannot be directly accessed 
(located inboard of the gas path) this is accomplished using a borescope and hand held remote wand 
eddy current probes.  The probes enter the engine through a TCA manifold port on the HPT case, then 
through the 2nd stage vane transfer tube to then contact the seal in the desired area.  The proper probe 
placement on the part surface is monitored via a 2.0 mm flexible borescope which is inserted through an 
adjacent 2nd vane transfer tube.  The high pressure rotor is then rotatated via an engine rotator to effect 
scanning of the part.  Figure 1 shows the cross section of the 1-2 seal, related parts and the zones of 
inspection. 
 
 
FIGURE 1 
 
0.0 Training and Certification 
Formal instruction in eddy current testing:  
0.1.1. Inspection personnel shall be certified to ASNT Level II, NAS 410 Level II, ATA Spec 105 Level II 
or equivalent qualification in eddy current method.  
Required for this procedure: 
0.1.2. Approximately two days of instruction and familiarization with test equipment, probes and this 
inspection technique.  
0.1.3. Inspector shall demonstrate Probability of Detection (POD) flaw capability on the POD (EDM 
notched) test part.  The 90% probability of detection, 95% confidence level maximum allowable 
flaw size shall be 0.012” notch depth.  
1-2 Seal 
OD Inspection 
Zone 
2nd Vane Assy. 
Transfer 
tube exit 
Honeycomb 
Aft Fwd 
Transfer 
tube elbow

### Page 36

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
3 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
0.1.4. Inspector recertification is required if more than 4 months elapse without having performed an 
engine inspection or completed training/refresher training.  Recertification will require an 
approximately one day refresher course given by a Pratt & Whitney approved instructor.  
1.0 Equipment Required 
1.1. Inspection Kit, PWA107958 consisting of the following: 
1.1.1. EC Probe, PWA 107921**  (US-2823, red stripe on handle), Figure 2 
1.1.2. EC Mock-Up (dummy) Probe, 71993 (green stripe on handle) 
1.1.3. Cleaning Probe, 71992, (white stripe on handle) 
1.1.4. Cleaning Brush,  P/N CB-2010, Figure 11, 12 
1.1.5. Cleaning Brush cable clamp, P/N 74096 
1.1.6. EC Probe Cable,  US–94032 
1.1.7. Calibration Standard, PWA107922**, Figure 5 
1.1.8. Probe Tip Holder, 71984, Figure 4 
1.1.9 Eddy Current Instrument, UniWest  US-454, Figure 3, with accessory compact flash memory card 
1.1.10 60 cc Syringe & plastic tube* 
1.1.11 Fluke 16 Multi-meter and flexible thermocouple (or equivalent) 
1.1.12 Probe to HPT Case Holder, 71987, Figure 19 
1.1.13 Extension cord* 
1.1.14 Power Strip*  
1.1.15 Flashlight*  
1.1.16 Clip Board*  
1.1.17 Misc. hand tools (allen wrench set, needlenose pliers,  wire stripper/cutters, screw driver, duct 
tape, electrical tape, tie wraps) (*) 
1.1.18 Machida blend tool kit, BT-4000PW, consisting of: 
power supply, foot pedal control, motor handle, blending guide tube, grinding bits, collet, 
misc. tools in pouch, tool holder 
1.1.19 Custom case for items 1.1.1 through 1.1.18. 
 *  - Common tools/items can use an equivalent substitute 
 ** - PWA tools can be replaced by latest revision letter tool 
1.2 Additional Equipment Required: 
1.2.1 Machida Video Scope, consisting of Model 7-6060, integrated processor/light unit and VSC-2-
86, 2.0 mm diameter, flexible videoscope.  The 7-6060 includes AC power cable, video cable, 2 
GB SD storage card, reference card, users manual and roll around case, see Figure 24. 
Equivalent borescope/videoscope may be used (note: maximum borescope diameter that will fit 
through 2nd Vane transfer tube is 2.5 mm).   
1.2.2 Machida Engine Rotator Kit, MA-TT-70 includes: drive motor, 12” offset drive adapter,  DR-00 
drive adapter,  TT-70-A controller, AC power cable, unit to motor cable, allen wrenches, spare 10-
32 screws, user manual, roll around case, see Figure 25.  Also in case are AD-03 adapter plate 
and DR-03 drive adapter.  An equivalent rotator may be used but must be adaptable to engine 
starter location and capable of turning engine at constant one rpm (within 5%).

### Page 37

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
4 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
2.0 EC Calibration 
2.1. Connect the PWA107921 probe to the probe cable and US-454 EC instrument (see Kit 1.1.1, 1.1.6, Figure 
2). .  
2.2. Power on the US-454 EC instrument and allow it to warm up for a period of 5 minutes, or as specified in the 
instrument user manual (see Kit 1.1.9, Figure 3). 
 
FIGURE 2 
PWA107921 Eddy Current Probe 
 
NOTE: Once set, the detailed instrument settings can be loaded into the unit’s memory via 
the “Save Settings” function. This will help the operators reset the unit to the desired 
values. All parameters shall be verified before proceeding with the calibration.  
 
NOTE: To ensure all parameters are properly set, the inspector can recall the instrument 
default settings by selecting “ENTER SETUP” then selecting “LOAD DEFAULTS” and 
pressing enter. If this is done, each and every parameter identified below must be manually 
entered.   
 
 
FIGURE 3 
Eddy Current instrument (UniWest US-454)

### Page 38

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
5 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
2.3. Set up US-454 EC instrument to the following initial settings: 
2.3.1. FREQ 1:  3 MHz  
2.3.2. F1 GAIN: 66 dB 
2.3.3. F1 ROT: 90 degrees (initial phase angle)  
2.3.4. DRIVE: HIGH (probe drive) 
2.3.5. LP FLT: 50 Hz (low pass filter) 
2.3.6. HP FLT: 2 Hz. (High pass filter) 
2.3.7. CHART: ON 
2.3.8. EC DISP (Screen Mode): I-PLANE (Impedance plane) 
Settings below are under ‘Enter Setup’ sub-menu 
2.3.9. Sample Rate: 504 samples/sec 
2.3.10. O-scope sweep rate: 1 sec/div 
2.3.11. O-scope trigger source: free run 
2.3.12. Report Files: BMP + TXT 
2.3.13. Circular Buffer: No 
2.3.14. Rundown Battery Monitor: Off (white letters on red background), then ‘cancel’. 
2.4. Install probe tip in probe tip holder (71984) as shown in Figure 4.  The back of the probe tip (with white line) 
should be flat against the cavity in the probe holder.  Tighten the thumb screw sufficiently to hold the probe 
tip firmly but do not over tighten (see Kit 1.1.8, Figure 4). 
 
   
FIGURE 4 
Probe in probe tip holder for calibration  
 
 
2.5. Place the probe/tip holder on the PWA107922 gauge standard and line it up approximately ¼ inch from the 
left end (as marked) while facing the front of the standard (Figure 5). Push “null” while holding the probe in 
contact with the OD radius of the calibration standard (see Kit 1.1.8, Figure 5). 
2.6 Scan the probe to the right at a constant speed of approximately 1.4 inches per second towards the EDM 
calibration notch ‘A’, making sure to keep the probe tip holder in square contact with the standard. Observe 
the indication in the impedance plane display and adjust  the rotation (phase angle) to vertical as shown in 
Figure 6.  The cable end of the probe should not be held; it should be allowed to slide smo othly 
along the bench/table.  This will help avoid signal noise.

### Page 39

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
6 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
 
FIGURE 5 
PWA107922 calibration standard consists of actual section of seal with EDM notch 
 
2.7 Once phase angle is set, rotate knob to “EC Display”, push “Enter” and change to “O -Scope”.  Then briefly 
push the “Display|on/off” button to switch to horizontal sweep oscilloscope display, as in Figure 7.   
2.8 Rotate the knob so that “Save Report” is highlighted on the instrument screen (do not push enter  yet).   
2.9 With the probe holder lined up to left as in 2.5, push the “Erase” button and then start to scan the probe 
steadily to the right side and past the EDM notch A.  Press “Enter”, and then press “Enter” again to access 
report file naming function. Enter a convenient single character for a file name and this push “Enter”. 
2.10 Rotate the knob to “Recall Report” and press “Enter”. Use scroll knob to highlight the file name just saved 
and press “Enter” to display the scan.  Scan speed can be estimated as follows:  since the horizontal sweep 
rate of the instrument is set to 1 second/division, the scan, at constant speed, should take between 5 and 6 
seconds to scan reach the notch signal (from the start of the scan), see Figure 7.   
NOTE: It is important to scan at the proper speed (and especially not too fast).  Scanning too fast 
can result in significantly lower amplitude for the notch leading to excessively high gain levels.  
Calibration gain should not exceed 72 dB; if it does, re-check scan speed. 
 
2.11 If scan speed is acceptable, observe the notch signal peak to peak amplitude (count screen divisions, each 
division is divided into 5 subdivisions or 0.2 divisions each dot).  If necessary, adjust gain and repeat 2.8 -  
2.11 to produce an EC signal equal in amplitude to the set up card to within +/- 0.4 divisions. See Figure 7  
for typical trace over the gage standard.  Note the slight increase in noise once the probe starts moving; this 
is where time of scan starts. 
 
OD Radius 
forward flange 
Scan start 
position

### Page 40 (OCR)

NDIP 1137
Technique Sheet for PW4000-112" HPT 1-2 Seal NDI (On-wing application)
-1 3,00 MHz  F1 Y: 0.5 V/DI
€ 0.5 W/DIV
0.5 W/DIV
Tộ:10
FRED  3.00 MHz CAIN  70.4 dB ROT  114 Deg LP FLT  50 HZ SIANDARD MODE
FIGURE 6
Phase angle set to vertical on calibration notch.
F1=3,00M F2=0FF F1G=67,3 F1R=86 LPF=50 HPF=2 SampRate=10850(11067)
Y :0.5 V/DIV
amplitude
(peak to peak)
notch signal
scan start
[ò÷05
between 5
and 6 seconds
0:00
FREQ 1 3.00 MHz F1 CAIN 67.3 dB F1 ROT 86 Deg LP FLT  50 Hz DISP IP + CH
FIGURE 7
O-Scope display of EDM notch signal on calibration standard.
2.12  Fill in the required information on a fresh Eddy Current Inspection Data Sheet (Appendix 1), noting the
calibration notch 'A' response amplitude, the phase angle, the calibration gain, and the inspection (total)
gain settings. Also note the seal temperature, part number, serial number and engine cycles/hours (if
available) on the inspection sheet..
2.13  Rotate knob to "EC Display", push "Enter" and change back to "I-Plane" display prior to collecting engine
data. This step is required to ensure phase angle data is collected during inspection.
P&W PROPRIETARY INFORMATION  ECCN 9E991- EXPORT CONTROLLED

### Page 41

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
8 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
2.14 Add 12 dB of gain to the calibration gain prior to the inspection.   
2.15 The Calibration should be re-performed if the inspection has been interrupted for more than 30 minutes 
or instrument loses power (shuts off) before inspection and post-inspection calibration are completed. 
Remove probe tip holder, 71984, before using probe in engine. 
 
3 Engine Access Precautions and Procedure 
WARNING:  Follow site protocols concerning clothing and procedures for entering engine nacelle as well as rules 
on making electrical connections.  Refer to AMM 78-31-00 for tasks and safety precautions related 
to the engine thrust reverser system. 
 
NOTE: Local management may contact the local P&W Representative to arrange for an on-site protocols 
briefing of special engine access rules. 
 
3.1 Engine must be cool or ambient.  If necessary, forced air cooling or heating may be performed (also see 3.3)  
Gain entry to the inspection area by having the nacelle fully open.  Optimal access to inspection location is 
via HPT case TCA manifold port located at approximately 4:00 on the case (viewed aft looking forward) on all 
affected PW4000 engine models (see title page).  HPT case ports at 2:00 and 10:00 are optional choices for 
access if 4:00 port cannot be used (see Accomplishment section in the Service Bulletin). 
 
3.2.1 Locate a suitable ladder or scaffold to allow one person comfortable access to the TCA port 
location(s) being utilized.  Borescope and EC instrument should be positioned so probe and 
borescope  can  comfortably reach the HPT case port. 
3.3 The 1-2 Seal temperature is measured via flexible thermocouple (see Kit 1.1.11) through the 2nd Vane 
transfer tube (same location as utilized for EC inspection (see Figure 10). The borescope must be used to 
visually verify that thermocouple tip is touching the 1-2 seal.   An optional alternative to the 2nd Vane transfer 
tube is the TCA temperature probe location (adjacent to 10:00 TCA manifold port, see Figure 8).  The TCA 
temperature probe is removed and then the flexible thermocouple is inserted (it should go in for approximately 
9 inches before the tip reaches the seal, visual confirmation is not required).  Allow reading to stabilize and 
record temperature on inspection sheet (Appendix 1).  
NOTE:  Metal temperature must be no greater than 110 F (44 C) before inspection can take place 
or damage to EC probe may result. 
 
FIGURE 8 
Alternate location for taking seal temperature 
 
 
3.4 Entry of Inspectors and Equipment into Engine for Inspection

### Page 42

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
9 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
3.4.1 Set up the Engine Rotator control unit by connecting power cable, motor cable and controller 
(see Kit 1.2.2, Figure 25). 
3.4.2 Remove the engine air starter (at approximately 5:30, aft looking forward) per the 
accomplishment section of Service Bulletin. 
3.4.2.1 Set up the Engine Rotator and connect drive mechanism to the starter adapter plate per 
the accomplishment section of service bulletin.  Also install the rotator gearbox adapter 
as shown in Figure 9.  The adapter is only used to keep track of part rotation (see 4.1.2). 
NOTE:  Verify that the engine rotor is smoothly turning the seal in CW direction when aft looking 
forward (the OD surface of seal moving away from you on the borescope monitor).  Line 
up the index marks on the rotator gearbox adapter (by turning rotor as needed), Figure 
9.  The woodruff key slot should be positioned at 12:00 for convenience in keeping track 
of rotations.  The slot will rotate ¾ of a revolution for one complete rotation of the 
N2 rotor.  Speed control on engine rotator should be adjusted so that 3/4 
revolution of key slot is completed in approximately 1 minute (plus or minus 5 
seconds).  Rotate the engine slowly for 2 revolutions of the woodruff key and look for 
any debris or deposits on the seal inspection area that might cause problems with probe 
contact.  If the inspector observes any unusual condition or debris, borescope 
photographs can be taken and forwarded to Pratt & Whitney representative for 
consultation.  See Quick Reference card in kit for instructions on how to take borescope 
photos (see Kit 1.2.1, Figure 24). 
 
 
FIGURE 9 
 
 
3.5 Power up the borescope and carefully insert the borescope into the 2nd Vane transfer tube entrance 
exposed near the lower edge of case port (prior to Figures 10 & 11 which show EC probe inserted at this 
location).  Look for any debris, damage or edge obstruction in tube or at tube exit that might obstruct 
passage of the EC probe wand.  Carefully push the borescope tip past the transfer tube exit until the white 
tape on borescope wand is approximately even with tube entrance.  Articulate the stalk as necessary to 
view the 1-2 Seal.   
 
 
Woodruff key slot 12:00 11:00 
6:00

### Page 43

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
10 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
    
FIGURE 10 
 
 
FIGURE 11 
 
3.6 Carefully remove the borescope stalk from this 2nd Vane tube and re-insert it in the transfer tube 
adjacent to (and  above)  the full view tube.  It is slightly behind the HPT case outer wall but the 
borescope can easily be maneuvered to gain access.  See Figure 10,11. 
3.7 Prior to insertion of an actual eddy current probe, the ‘Mock-Up’ Probe, 71933, should be inserted to test 
transfer tube clearance (see Kit 1.1.2).   
3.8 Carefully insert the Mock-Up probe tip in the 2nd Vane transfer tube (fully visible tube entrance 
toward the lower edge of the port that was previously checked for debris in 3.5).  The white line on 
the tip should be facing down (towards the convex side of transfer tube entrance, see Figure 11).  
Some resistance will be felt as the probe is pushed past the transfer tube elbow and tube exit (more 
resistance than borescope stalk).  Be careful not to buckle the yellow tube; use two fingers to 
support it while pushing it through.  Do not use excessive force; it may help to rotate the probe 
handle a bit from side to side to help ingress and using fingers to support the yellow stalk as in 
HPT Case Port 
at 4:00 (AP02) 
position, aft 
looking forward 
2nd Vane transfer 
tube entry location 
for borescope 
(partially hidden 
under case) 
black mark for 
insertion depth 
transfer tube 
entrance for 
EC probe 
convex side of opening

### Page 44

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
11 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
Figure 12.  Insert probe until the edge of black marking on the probe stalk is even with the transfer 
tube entrance (Figures 10,11).  
 
3.9 Observe the probe tip by moving the borescope stalk as needed.  The probe tip should be positioned in 
the groove as described in Figures 13 and 14.  When tip is in correct position, rotate engine for two full 
rotations of the gearbox adapter key slot.  Observe the probe wand/tip on the borescope screen and 
look for any signs of probe movement as the seal rotates.  The probe should not show any noticeable 
movement which could cause lift-off and false calls.  If such movement is present remove probe and 
investigate OD groove with borescope to try and determine if any surface debris  is present that might 
cause the problem.  If probe movement cannot be remedied, make a note of this on the inspection data 
sheet.  After the first 3 – 5 seconds, the engine should rotate smoothly and consistently.  If this cannot 
be achieved, make note if it on the inspection sheet. 
NOTE:  Be mindful that if the borescope wand is touching the seal the entire display may appear to 
move (not just the probe).  If the vane honeycomb appears to be moving at same time as probe, this 
is the reason.  If this occurs the it may help to reposition the borescope and check again. 
 
 
FIGURE 12

### Page 45

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
12 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
FIGURE 13 
 
 
 
FIGURE 14 
Cross section showing proper side to side placement of probe tip 
 
Remove the mock-up probe by gently pulling the handle away from the HPT case but still aligned with 
the transfer tube (avoid excessive bending of probe wand).  Some resistance will be felt as the probe tip 
negotiates the transfer tube elbow.  If the probe feels to be stuck, try to get a view with the borescope of 
the problem.  If necessary, push probe back in to inspection position and  push plunger end to extend 
vane honeycomb 
Intersection of groove 
and cylindrical surface 
right side of probe tip 
0.020” (0.51 mm) 
Seal OD surface 
inspection zone 
Fwd 
Aft 
knife edge seal 
Probe tip radius sits  
evenly in groove

### Page 46

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
13 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
the coil, (see Figure 16) and rotate tip to an alternate position and then let tip retract (let off plunger).  
Try and extract probe again while preventing plunger spring from compressing (do not let tip self-
extend).  Once probe is extracted, re-inspect tube with borescope to determine cause of problem.  DO 
NOT USE EXCESSIVE FORCE TO REMOVE PROBE OR TIP MAY PULL OFF AND DROP IN 
ENGINE.  Carefully inspect the transfer tube exit for signs of excess casting flash (lip) or excessively 
rough casting surface in elbow that may impede probe tip movement.  Also look for signs of transfer 
tube neck down at joint between tube and elbow (see Figure 15).  If any of these conditions  are 
observed, it will be necessary to de-burr/blend  this area using the procedure in Appendix 2.  After 
blending, try mock-up probe again and verify it can be inserted and extracted without issue.  Fill in 
Yes/No at bottom of inspection data sheet (Appendix 1) next to “Blending Required”. 
NOTE: If EC probe tip or Mock Up probe tip liberates from probe stalk during withdrawal from 
engine or if a grinding tip (during transfer tube blending) separates from flexible shaft and  
cannot be recovered from inside engine, see Service Bulletin for disposition. 
 
FIGURE 15 
 
 
    
FIGURE 16 
 
 
Borescope view showing example of transfer 
tube/elbow joint with restricted area, preventing 
probe tip from passing through. 
extended probe tip

### Page 47

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
14 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
3.10 Seal cleaning procedure 
 
Note:   Water is the primary solution to be used for seal cleaning but in some cases it may be 
necessary to use a stronger solvent.  Isopropyl Alcohol and Acetone are permissible if water will not 
remove adhered debris on seal.  It is recommended that no more than 120 cc of either solvent be 
introduced into engine.  Either solvent should only be used when seal temperature is at or below 
110°F (44°C).  The syringe and plastic tube are resistant to these chemicals. 
 
3.10.1 Fill the 60 cc syringe with clean water (see Kit 1.1.10).  Insert the plastic tube end through 
the vane transfer tube and position it so the black mark on the tube is even with the transfer 
tube entrance. 
Note:  When seal metal temperature has dropped to 200°F (93°C), it is permissible to initiate 
cleaning of seal with water.  It is not recommended to use alcohol or acetone until 
temperature has dropped to 110 F (44 C).   
3.10.2 While rotating the engine, spray water into the seal area by slowly pushing the syringe 
plunger.  Try to push uniformly such that the entire seal OD is wet in the inspection zone 
(avoid spraying directly on borescope tip).  If necessary, spray another 60 cc of water to 
ensure the whole inspection zone is wet.  Use the borescope to view the nozzle tip to ensure 
that water is spraying onto the OD groove feature (inspection zone). 
3.10.3 Remove syringe/plastic tube and wait 10 minutes. 
3.10.4 Insert the brush/cable into the Cleaning Probe, 71992 (see Kit 1.1.4, 1.1.3), and secure the 
cable end to the cable clamp on the probe handle (tighten white knob) see Figure 17 (also 
see Kit 1.1.5). 
3.10.5 Insert the Cleaning Probe with brush and position the brush so it is in contact and centered 
in the OD groove on the seal, see Figure 18.  Use borescope to view brush position. 
NOTE: Use a dark colored permanent marker  to blacken approximately the last inch (25 mm) of the 
probe stalk (Figure 17).  This will help reduce light reflection from the probe and prevent the 
borescope from auto-dimming.  It may also help to change from ‘auto’ to ‘max’ (8) on the 
borescope light control and to change ‘gain’ to ‘on’. 
3.10.6 Rotate the engine for  3 key slot  revolutions while observing the brush through the 
borescope to verify it stays in contact with the part.  Remove cleaning probe/brush when 
complete. 
 
 
   
FIGURE 17 
Cleaning Brush 
 
Use dark permanent 
marker to color end of 
probe stalk to reduce 
light reflection 
(approximately 1 inch). 
brush cable 
cable clamp

### Page 48

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
15 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
FIGURE 18 
Cleaning Brush in position (borescope view) 
 
3.10.7 Remove brush from Cleaning Probe and then re-insert the probe handle/wand, 71992, 
(without the brush) and position the end of the yellow tube so it sits in the center of the OD 
groove. 
3.10.8 Apply shop air to the cleaning probe handle to force air through the tube.  Rotate the engine 
for  3 key slot revolutions while blowing compressed air through the tube.  This will help 
remove any loose debris in the inspection zone. 
 
   4.0  Inspection 
 
4.1 On the PWA107921 Eddy Current probe, align the probe tip with the black dot on the (yellow) 
probe wand, see Figure 16.  The tip can be rotated by pushing in probe plunger and rotating, 
but be careful to rotate no more than 180 degrees in either direction or coil signal wires may 
twist inside handle and break (resulting in a dead probe).  Carefully insert the calibrated Eddy 
Current probe tip into the transfer tube with the white line on the probe tip facing the convex 
side of the tube (facing down in Figure 10).  Failure to do so may result in probe tip getting 
stuck in tube!  Some resistance will be felt as the probe is pushed  past the transfer tube 
elbow and elbow exit (more resistance than borescope stalk).  Be careful not to buckle the 
yellow tube; use fingers to support it while pushing it through (Figure 12).  Do not use excessive 
force; it may help to rotate the probe handle a bit from side to side to help ingress.   Once fully 
inserted, it is also permissible to push in plunger end of handle to extend probe tip to help 
positioning tip (it is spring loaded, also see Figure 16).  Insert probe until the black marking on 
the probe stalk is even with the transfer tube entrance (Figure 11). 
  
4.2 Articulate the borescope as necessary to view the probe tip.  Adjust probe tip position, if 
necessary, to ensure the tip is in full contact and is properly centered in the OD radius .  
This step is critical to a good inspection.  When viewed with vane honeycomb on right side 
of borescope monitor screen, the right edge of the probe tip should be close to the intersection

### Page 49

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
16 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
of the OD groove with the flat area (aft side of groove) as shown in Figure 13.  Figure 14 shows 
a scale drawing of the seal cross section and how the probe tip should fit in the OD groove.    
NOTE:  Be careful that the borescope tip does not get under the probe stalk and push the probe up 
off the part surface.   
NOTE: Use a dark colored permanent marker to blacken approximately the last inch (25 mm) of the probe 
stalk (Figure 17).  This will help reduce light reflection from the probe and prevent the borescope 
from auto-dimming.  It may also help to change from ‘auto’ to ‘max’ (8) on the borescope light 
control and to change ‘gain’ to ‘on’. 
4.3 Null the probe by pressing the ‘Null’ button on US-454 EC instrument.  Double check that 12 dB of 
gain was added to the calibration gain.  Also check that Strip Chart and Impedance Plane are being 
displayed on US-454 display. 
 
4.4 Observe signal trace on eddy current instrument screen.  If it appears unusually flat (i.e. no baseline 
noise), double check to make sure tip is in proper contact with the OD radius and probe cable 
connections are correct and working.  If proper probe tip contact cannot be achieved, try a different 
probe from the kit. 
4.5 Once the probe is satisfactorily positioned, install the Probe to Case Holder, 71987 ( see Kit 1.1.12, 
Figure 19).  This device keeps the probe steady and prevents signal noise due to movement of probe 
handle.   
 
 NOTE:  Prior to starting inspection scan, pull the borescope back away from probe tip by 
approximately 1.5 – 2.0 inches (40 – 50 mm) to avoid borescope tip bumping into probe 
during engine rotation (which can cause false call signals) 
 
NOTE: the inspector should not hold the probe handle during the inspection scan.

### Page 50

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
17 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
FIGURE 19 
 
4.6 Rotate engine clockwise (aft looking forward) with the Engine Rotator, as required to align key 
slot at the 11:00 location on gearbox adapter (Figure 9).   
 
 
4.7 Prepare the US-454 eddy current instrument for recording the engine scan data by displaying the 
selection menu on the right side if the screen (push enter button once if menu is not displayed).  
Scroll as necessary to find ‘Save Data’ on the menu (Figure 20) and leave it highlighted (do not 
hit enter).  Turn on the engine rotator and when key slot reaches the 12:00 position, push the 
‘Erase’ button on the US-454 to start scan data collection (see Figure 3).  The erase button clears 
the instrument buffer so that all data collected will be from this point in time.   
 
Note:  the engine should be up to one rpm scan speed before the data collection begins. 
 
4.8 The inspector shall monitor the instrument screen for signals exceeding the rejection threshold 
criteria.  When the key slot has completed 360 degrees (reaches 12:00 again), push ‘Enter’ 
button on US-454 Eddy Current Instrument (it is critical to make sure the scan overlaps the 
start position to ensure no portion of seal is missed).  This will stop data collection.   Push 
‘Enter’ once more and the instrument will then be ready for naming of the scan data file as shown 
in Figure 20.  The scan data file must be named (with engine serial number and dash number for 
scan 1, 2 , etc.) and saved on the instrument (see 4.9).   
Probe to Case holder sits in 
lower half of boss.  Hand 
tighten red thumb screw, 
then close and tighten 
probe handle clamps.

### Page 51

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
18 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
        Note: file name is limited to 8 characters 
 
 
FIGURE 20 
 
4.9 Rotate the scroll knob to select the first letter/number in the file name.  Then use the F2 key to 
move the cursor to next location.  Rotate scroll knob until next desired digit is shown, push F2 
key, etc.  The F1 key can be used to back space in case of error.  Once the file name is 
completed, push “Enter” enter and the file name should appear highlighted.   
 
4.10 All data must be reviewed by inspector.  This is done by choosing ‘Recall Data’ from the screen 
menu and then selecting the file from the list of saved files (using scroll knob).  The data review 
screen will appear as shown in Figure 21.  The electronic strip chart of Y signal component for 
entire scan is on the left while a zoomed up portion of this signal between the green cursor lines 
is  on the right.  The operator shall set the controls for the zoomed portion by hitting ‘Enter’ and 
then adjusting ‘Frame Length’ to minimum value, ‘Scroll Step’ to 15%, ‘Chart Display’ to Y and 
sensitivity to 0.5 v/div, see Figure 22.  After setting these parameters push the ‘cancel’ button.  
The inspector may use other sensitivity settings as convenient during data analysis (data does 
not change, only voltage scale on instrument changes). 
 
4.11 Use the scroll knob to move the green cursor lines through the scan and record positive or 
negative indications equal to or above 1.2 volts peak amplitude.  Be sure and record data 
file name on data sheet.  In addition, if only a single (1) peak/event exceeds 1.2 volts after 
the re-inspection the seal is not rejectable (see 4.12 and Figure 23). However, if this 
situation occurs, the seal will need re-inspection at a reduced interval per the Service 
Bulletin. Depending on the spacing between indications, frame length may need to be raised or 
lowered to ensure the entire signal in question (and no more) is within the green frame lines.  
Note: if more than 6 signals are above reject threshold, record only the 6 of highest amplitude and 
note “numerous rejectable indications” on the inspection data sheet (Appendix 1).    
 
 
cursor control for  
moving to next letter 
(or backspace) 
file naming

### Page 52 (OCR)

NDIP 1137
Technique Sheet for PW4000-112" HPT 1-2 Seal NDI (On-wing application)
Data Recall: "22240_1_,dat", 135.99kB, 504 samples/sec  Storage Free: 243,37MB
FREQ:3.00M CAIN:78.7/0B  ROT:90 Deg  YSENS:0.5 V/DI  90
Y: 1.502 Vpp  -Y: -0.979 V  +Y: 0.523 V
-1:00,2  0:46,3
Green lines (cursor)
define portion of  information  phase
scan to be zoomed
on right
270
Largest Positive and Negative
Peak Amplitude within
zoomed area of signal
possible
indications
0:00.0  -0:45,4
FRAME AT  FRAME LENGTH  SCROLL STEP  DISP TOGGLE  DISP CH + IP
FIGURE 21
m:ss.t
FRAME AT  0:00.0
FRAME LENCTH  8:020
SCROLL STEP  20
AUTU FIND  NONE
CHART DISPLAY
X SENS  1.2 U/DIV
Y SENS  = X
AUTO CLEAR  OFF
PRINT SCREEN
SAVE REPORT
# s
MEASURE VIDEO
SCROLL STEP  ID ISP  TOCCLE  | DISP I-PLANE
FIGURE 22
19
P&W PROPRIETARY INFORMATION  ECCN 9E991- EXPORT CONTROLLED

### Page 53 (OCR)

NDIP 1137
Technique Sheet for PW4000-112" HPT 1-2 Seal NDI (On-wing application)
Data Recall Mode: Point 0 of 60084. X:24 Y:65519
FRE4:3.0BM GRIN:Y9.2 dB  ROT: 117 Deg YSENS:1 V/DIV
Y: 9.661 Vpp  -Y: -5.393 V  4.268 V
—6:40„6-  1¢14,7
Although both
positive and
negative peaks are
above threshold,
Single 'event' above  this example shows
reject threshold  a single event and
counts as a single
peak above reject
0:00.0  1:02,8
App: 1.5  DSP: 2.4  FPGA: 2.0  Driver: 1.0  STANDARD MODE
Data Recall Mode: Point Q of 60084, X:24 Y:65519
FREQ:3.00M  GAIN:79.2 dB  ROT: 117 Deg  YSENS: 1 V/DIV
Y: 18.733 Vpp  -Y:-10.489 V  +Y :  8.245 V
6¢40,6-  1:55,4
It is uncertain if these
peaks result from a
single or double
indication since they
are clearly separated
in time. As such, they
Example showing two  would be considered
separate peaks above  as two peaks above
reject threshold  reject threshold
0:01.0]  1:37,2
App: 1.5  DSP: 2.4  FPGA: 2.0  Driver: 1.0 STANDARD MODE
FIGURE 23
If rejectable indications are found, the inspection should be repeated one time (repeat
sections 2 and 4). If the data appears to have other anomalies, rectify problem and re-
inspect. EC probe can be removed from the 2nd Vane after all data are reviewed. If debris
is suspect as cause of rejection it is permissible to repeat cleaning procedure, 3.11.
NOTE: If rejectable indications (equal to or greater than plus or minus 1.2 volts peak
amplitude) are observed, repeat inspection (a spare probe may be used) per sections 2
and 4. If 2 scan is acceptable (see single peak exception in 4.11), the seal is
acceptable. Both scans must be recorded. If debris on seal surface is suspect, repeat
cleaning procedure before re-scan.
4.13  At end of work shift, all scan files on the EC instrument compact flash storage card must be
backed up to an external storage device (i.e. laptop computer). This is done by shutting off
20
P&W PROPRIETARY INFORMATION ECCN 9991- EXPORT CONTROLLED

### Page 54

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
21 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
EC instrument, removing the card and, using a suitable card reader, copy the data files f or 
each engine to a folder name with engine serial number.   
 
5.1 Post-inspection probe calibration check. 
5.1.1 Reinstall probe shoe, 71984, on probe tip, bring gain down 12 dB (to original calibration gain) and 
check probe calibration on notch A.  It should read within 15 % of original calibration amplitude.  If 
these criteria cannot be met, re-inspect OD radius per section 4.0. 
5.1.2 The final determination of all reportable indications is based on the accept / reject criteria in 
section 6.0. 
6.0    Analysis and Reporting of Inspection Data 
6.1 Indications equal to or greater than 1.2 volts peak amplitude (positive or negative) are 
rejectable and should be recorded on Inspection Data Sheet  (Appendix 1).  
7.0 Reporting / Disposition  
7.1 Provide inspection results (Appendix 1 data sheets) to the local Pratt & Whitney Field 
Representative (electronic or hard copies). 
7.2 Electronic copies of the eddy current data files (as saved on the compact flash storage card) 
and a copy of the corresponding data sheet (Appendix 1) should be given/transferred to the 
local Pratt & Whitney Field Representative who will then forward these documents to Pratt & 
Whitney Materials & Process Engineering, Non-Destructive Evaluation group. 
 
 
 
FIGURE 24 
Borescope Kit

### Page 55

NDIP 1137 
Technique Sheet for PW4000-112” HPT 1-2 Seal NDI (On-wing application) 
 
22 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
 
 
 
 
 
 
FIGURE 25 
Engine Rotator Kit

### Page 56

APPENDIX 1                                              NDIP 1137 
PW4000-112” HPT 1-2 Seal On-Wing EC Inspection ECI of OD Forward Radius 
Engine Models: PW4074, PW4074D, PW4077, PW4077D, PW4084D, PW4090, PW4090-3 
 
Probe P/N ______________   Probe S/N __________________     Seal Temp.:__________    Date: _______________ 
 
Seal P/N ____________ Seal S/N ____________  Engine Cycles/Hrs ___________ Seal Cycles/Hrs  ____________              
 
Aircraft Number _______________ Engine S/N  ______________  Engine Position ______  Inspector: ___________ 
 
 
Calibration Gain:________ @ notch ‘A’ amplitude per cal card,  Gauge Standard S/N: _________ , Phase Angle: ________ 
 
Total Gain: _______ (+12 dB), set Y sensitivity to 0.5 v/div,   US-454 Data File Name: _________________________     
 
 
Indication # Time (in scan) Peak Amplitude + or - (volts) Comments 
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
Vane Blending Required ______ (yes/no)

### Page 57

NDIP 1137 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
     24 
 
APPENDIX 2 
Special Blending Procedure (Rev08) 
PW4000-112” 2nd Stage HPT Vane Transfer Tube Air Passage Tube 
Engine Models: PW4074, PW4074D, PW4077, PW4077D, PW4084D, PW4090, PW4090-3 
Subject:  
This blend procedure is used to provide clearance for the eddy current probe by removing material from the 
T2V transfer tube air passage. This tube allows access for eddy current inspection and if it is distorted or if 
cast portion has an excessively rough surface or has a lip of excess cast flash material at the transfer tube exit, 
the eddy current probe may not be able to pass through.  
1. Equipment:  
2.0 mm Machida Video Borescope (see Kit 1.2.1, Figure 24) 
Machida blend tool kit, BT-4000PW (see Kit 1.1.18, Figure A) 
 
 
FIGURE A 
 
 Machida Blend Tool

### Page 58

NDIP 1137 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
     25 
 
 
2. Inspection Preparation:  
2.1. Insert the 2 mm borescope into the HPT 2nd stage vane transfer tube entrance port and inspect the 
passage for distortion,/bulging material (Figure B ) or for excessive casting flash (Figure C). 
 
 
FIGURE B 
Distorted bulging material is below the arrows (above) 
 
 
FIGURE C  
 
Lip of flashing material is between the arrows (above) 
2.2. If distortion or bulging or rough casting surface is visual ( Figure B , C ) remove the bore scope, 
assemble the blend equipment per section 3.0 and follow the blend procedure per section 4.0 for the 
T2V air tube passage distortion/bulging 
Note: a small amount of distortion is enough to impede the ECI probe 
2.3. If no distortion, bulging or rough casting surface is present inside the T2V transfer tube air passage, and 
then push the scope thru the tube until the inner passage or exit opening is visible. Verify and/or Inspect

### Page 59

NDIP 1137 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
     26 
 
exit opening for evidence of a lip of casting flash material at the “U” shaped portion (left side) of the 
opening (Figure C). If flash lip is evident, assemble the blend equipment per section 3.0 and follow the 
blend procedure per section 5.0 for excess casting flash. 
Note a small amount of flashing is enough to impede the ECI probe 
Note: Some vanes have excess flash material only at the bottom of the “U” shaped opening that 
must be removed, while others may have additional excess material on the sides of the “U” that 
must also be removed 
3. Assembly of Blend Equiptment 
3.1. Assemble the blend equipment. See Fig. A. and refer to instruction manual. Make sure control box power 
switch is in the off position, the direction of rotation switch is in the forward position, and speed adjustment is in the 
min position. Attach the foot pedal, put switch in foot position, move 110/220 voltage selector switch to the 
applicable supply voltage, and connect the handle power cord to the control box. NOTE: Always use the foot 
pedal. Unlock the collet on the handle by rotating the collet release ring. Insert the blend  tool drive cable thru the 
Teflon tube and attach to handle by inserting the drive cable end of cone-shaped blend tool (red color on shaft) 
into the collar, leaving a gap of approximately 1/8” (3 mm) between Teflon tube end and blend tip. Lock the collet 
by rotating the collet release ring. Finger tighten the hose clamp that secures the Teflon tube to handle. Turn the 
power switch to the on position, and depress foot pedal to test the rotation of blend tool. 
4. Blend Procedure for distorted/bulged T2V transfer tube air passage 
4.1. If there is distorted, bulging material, or a rough casting surface to be blended, partially insert the blend 
tool first into the vane transfer tube opening, and then insert the bore scope slightly behind the blend tool. 
Push the borescope and blend tool together thru the opening, viewing the blend tool ahead of the 
borescope on the borescope monitor. Position the cone shaped blend tip slightly in front of the bulged, 
distorted material or rough casting surface. Keep a safe distance between the borescope and blend tool 
tip.  See Figure  D. 
 
 
FIGURE D  
 
Blending tip in correct position while blending bulging material

### Page 60

NDIP 1137 
P&W PROPRIETARY INFORMATION       ECCN 9E991- EXPORT CONTROLLED 
     27 
 
 
4.2. Always blend at a slow speed. Always start with the smallest diameter blend tip and gradually change to 
a larger diameter tip as needed to remove additional material. The shaft of the blend tool may fail if 
the blend tip gets jammed.  Use only the forward motor direction. Blend tool shaft failure may result 
from using reverse motor directions. 
NOTE: Use caution not to jam blend tip in bulge area of vane transfer tube. If the blend tip liberates, 
every effort should be used to remove the liberated material.  If the liberated material is not 
recoverable  see the Service Bulletin accomplishment section for continue in service direction. 
 
 
4.3. Turn motor switch to on position. With blend tip slightly before bulge location, press foot pedal and 
gently move cone blend tool in and out slightly to remove excess bulging material. It is possible the 
transfer tube wall becomes slightly compromised with open holes on both sides of bulged area. This is 
considered acceptable ( if there is more significant  distress is the result of grinding , provide 
borescope photo to PW for evaluation). 
4.4. Move power switch to off position on control box, .Remove blend tool and bore scope from vane. Insert 
mock up eddy current probe to see if it passes thr ough vane inner passage. 
 
4.5. If additional excess material is present, or  the mock up probe cannot not pass through, the spherical 
blend tool (green color on shaft) can be used to remove more excess material. 
 
4.6. Repeat the above steps as necessary to allow access for the eddy current probe. 
 
 
4.7. When blending is completed, move power switch to off position on control box. Remove all equipment from 
vane. 
5.  Blend Procedure for T2V Excess Casting Flash @ air passage exit to air seal 
5.1. Borescope and blend tool are placed into the same T2V transfer tube, but you must insert them and 
remove them in a certain order or damage may result to the borescope. Insert the borescope first,  
and remove the borescope last. If you need to alter from this order, use caution not to damage the 
bore scope with the blend tool. 
5.2. Insert the 2 mm borescope into the aft side of the vane transfer tube opening and push scope thru the tube 
until the exit opening is visible. Inspect exit opening for evidence of a lip of flashing material at the “U” 
shaped portion of the opening to the inspector’s left. Continue inserting the bore scope thru and past 
the opening towards the inner air seal. 
5.3. Insert the cone shaped blend tool into the forward side of the vane transfer tube opening and gently push 
blend tool thru the vane tube. Some resistance may be experienced as it goes thru the tightly curved 
portion near ID of vane. Gently push and twist as necessary while inserting until marked portion of blend 
tool’s Teflon tube is lined up with entrance of the transfer tube opening. The blending tool tip is now in 
approximately the correct blending location at the I.D. of the T2V transfer tube exit. 
5.4. Gently pull bore scope back to view blend tool tip at the air passage exit (see Figures E and F). Twist and 
position bore scope to get a good view of blending area. Keep a safe distance between the borescope 
and blend tool. Reposition blend tip as nec essary to grind away edge of excess flash material. See 
Fig. E.

The text continues at https://openairdocs.org/service-documents/pratt-whitney/pw4g-112-a72-330/file/53e37ae23da5.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
