# Rolls-Royce Deutschland Service Bulletin RB 72-J941

Copy: No revision named ("RB_72-J941_0"), 49 pages: PDF https://openairdocs.org/files/sha256/5d/0e/5d0eb35f6ab4d6541be59316e76aee9bfdf77ce997ef2e1699c2da6ca701786a; text https://openairdocs.org/service-documents/rolls-royce-deutschland/rb72-j941/file/5d0eb35f6ab4.md. Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2020-0009, the docket of AD 2020-15-12. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Rolls-Royce Deutschland](https://openairdocs.org/service-documents/rolls-royce-deutschland.md)
- Type: Service bulletin (Service Bulletin)
- Number: RB 72-J941
- Page: https://openairdocs.org/service-documents/rolls-royce-deutschland/rb72-j941

## Text (49 pages)

Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2020-0009, the docket of AD 2020-15-12. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

This document transmits the Initial Issue of Service Bulletin TRENT1000-72-J941
and the Initial Issue of the Supplement
Bulletin Initial Issue
Remove Incorporate Reason for change
Pages 1 to 44 of the
Service Bulletin
Initial Issue
Supplement Initial Issue
Remove Incorporate Reason for change
Page 1 and 2 Initial Issue
Printed in Great Britain
Dec. 6/18
TRENT 1000 SERIES PROPULSION SYSTEMS SERVICE BULLETIN
TRENT 1000 72−J941
Transmittal - Page 1 of 3
Date

### Page 2

LIST OF EFFECTIVE PAGES
The effective pages to this Service Bulletin are as follows:
Page Revision Number Revision Date
Bulletin
1 Dec.6/18
2 Dec.6/18
3 Dec.6/18
4 Dec.6/18
5 Dec.6/18
6 Dec.6/18
7 Dec.6/18
8 Dec.6/18
9 Dec.6/18
10 Dec.6/18
11 Dec.6/18
12 Dec.6/18
13 Dec.6/18
14 Dec.6/18
15 Dec.6/18
16 Dec.6/18
17 Dec.6/18
18 Dec.6/18
19 Dec.6/18
20 Dec.6/18
21 Dec.6/18
22 Dec.6/18
23 Dec.6/18
24 Dec.6/18
25 Dec.6/18
26 Dec.6/18
27 Dec.6/18
28 Dec.6/18
29 Dec.6/18
30 Dec.6/18
31 Dec.6/18
32 Dec.6/18
33 Dec.6/18
34 Dec.6/18
35 Dec.6/18
36 Dec.6/18
37 Dec.6/18
38 Dec.6/18
39 Dec.6/18
40 Dec.6/18
41 Dec.6/18
42 Dec.6/18
43 Dec.6/18
44 Dec.6/18
Printed in Great Britain
TRENT 1000 72−J941
Transmittal - Page 2

### Page 3

Supplement
1 Dec.6/18
2 Dec.6/18
Printed in Great Britain
TRENT 1000 72−J941
Transmittal - Page 3

### Page 4

1. Planning Information
A. Effectivity
Boeing 787
TRENT1000-A2 All Engines.
TRENT1000-C2 All Engines.
TRENT1000-D2 All Engines.
TRENT1000-E2 All Engines.
TRENT1000-G2 All Engines.
TRENT1000-H2 All Engines.
TRENT1000-J2 All Engines.
TRENT1000-K2 All Engines.
TRENT1000-L2 All Engines.
TRENT1000, M32100604 M32 Modules
B. Concurrent Requirements
None.
C. Reason
(1) Problem
The current standards of IP compressor stage 1 and 2 rotor blades are
susceptible to premature deterioration due to cracking in the blade root.
In addition, the IP compressor stages 1 to 8 rotor shaft assembly is
susceptible to cracking of the stage 2 disc post.
ENGINE - IP COMPRESSOR BLADES - INTRODUCTION OF REVISED IP COMPRESSOR STAGE 1 AND 2
ROTOR BLADES FEATURING OPTIMISED MANUFACTURING AND GEOMETRY CHANGES WITH ASSOCIATED
CHANGES TO BUILD AND MACHINING INSTRUCTIONS - MOD.72-J941
Printed in Great Britain
TRENT 1000 72−J941
Page 1 of 44
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 5

Both problems are attributed to the LP compressor blade assembly
generating wakes that are felt at the front of the IP compressor as
pressure disturbances. During certain flight conditions the frequency of
the disturbances coincides with the natural frequencies of the blades,
causing high vibration leading to deterioration of the DFL (Dry Film
Lubricant) in the blade root. As the DFL wears, the increase in
co-efficient of friction, combined with the high vibration, causes high
steady and high alternating stresses in the blade root edge of bedding,
causing crack initiation and propagation.
In some instances, the IP Compressor stage 1 to 8 rotor shaft assembly
stage 2 disc post has cracked in preference to the stage 2 rotor blade.
(2) Evidence
The problems have been experienced on a number of in-service engines.
(3) Substantiation
The changes introduced by this Service Bulletin have been the subject of
satisfactory engineering evaluation, including stress and vibration
assessments and successful development engine testing.
(4) Objective
Incorporation of this Service Bulletin (Modification) is designed to
maintain reliability.
(5) Effect of Bulletin on:
(a) Operation
Not affected.
(b) Maintenance
Not affected.
(c) Overhaul
Affected (see 1.L. Other Publications Affected).
(d) Repair Schemes
Affected (Affected Repair Schemes will be revised to include the
Part(s) introduced by this Service Bulletin).
(e) Interchangeability
Affected (see 1.M. Interchangeability of Parts).
Printed in Great Britain
TRENT 1000 72−J941
Page 2
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 6

D. Description
(1) This Service Bulletin introduces revised IP compressor stage 1 and stage 2
rotor blades featuring manufacturing and geometry changes to the aerofoil
and root sections of the blade to change the resonant frequency and
minimise vibratory stresses.
The changes are:
(a) A revised IP compressor stage 1 rotor blade is introduced similar to
the existing item except for:
(i) The method of manufacture is changed from precision forged to
machined all over post oversize forging.
(ii) The blade aerofoil profile is revised with the introduction of
a leading edge cutback at the tip region.
(iii) The blade aerofoil features such as chord length, aerofoil
thickness, localised leading edge and trailing edge thickness
are revised.
(iv) The root profile has been revised to rebalance the root steady
stresses.
(v) The maximum blade weight limit, specified for individual
blades, is tightened during manufacture to control the maximum
allowable blade set weight specified for stage 1.
(vi) The natural frequency limit requirements are defined on the
manufacturing detail drawing.
(b) Revised IP compressor stage 1 strap assemblies are introduced to
accommodate the root geometry changes of IP compressor stage 1 rotor
blades.
(c) A Revised IP compressor stage 2 rotor blade is introduced similar to
the existing item except for:
(i) The method of manufacture is changed from precision forged to
machined all over post oversize forging.
(ii) The blade aerofoil features such as chord length, aerofoil
thickness, localised leading edge and trailing edge thickness
are revised.
(iii) The root profile has been revised to rebalance the root steady
stresses.
Printed in Great Britain
TRENT 1000 72−J941
Page 3
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 7

(iv) The maximum blade weight limit, specified for individual
blades, is tightened during manufacture to control the maximum
allowable blade set weight specified for stage 2.
(v) The natural frequency limit requirements are defined on the
manufacturing detail drawing.
(d) A revised IP compressor blades locking and sealing build instruction
is introduced to implement additional build verification checks.
(e) A revised IP compressor stages 1 to 8 blade tip machining instruction
is introduced to achieve the required cold build clearances of the
revised standard of stage 1 and 2 blades introduced by this Service
Bulletin.
(2) This Service Bulletin is in two parts as follows:
(a) Part 1
New production and in-service applications.
(b) Part 2
Reserved for possible future use.
E. Compliance
(1) ON-WING
Not applicable.
(2) IN-SHOP
RECOMMENDED
It is recommended that this Service Bulletin be accomplished on
engines/powerplants at M32 - IPC Module rework level of Module Check and
Repair or Module Refurbishment or Module Overhaul or Engine Refurbishment
or Engine Check and Repair.
F. Approval
The technical content of Modification 72-J941 was approved by a representative
of the European Aviation Safety Agency (EASA) on Dec. 5/18, EASA certificate
No. EASA.C.10067810.
This Service Bulletin has been reviewed by Boeing and the instructions herein
are certified with the applicable FAA regulations.
Printed in Great Britain
TRENT 1000 72−J941
Page 4
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 8

G. Manpower
(1) On-wing
Not applicable.
(2) In-shop
Not affected.
NOTE : The parts affected by this Service Bulletin are accessible in-shop.
H. Material Price and Availability
Modification kit not required; parts supplied as single line items.
For prices and availability of future spares see supplement to this bulletin.
I. Tooling Price and Availability
Special tools are not required.
J. Weight and Balance
(1) Weight Change
Plus 1,63 kg (3.6 lb).
(2) Moment Arm
24 mm (0.9 in.) Forwards.
(3) Datum
Power Plant Station (PPS) 3000 mm (118.11 in.).
K. References
(1) Engine Manual, 72-32-30, Disassembly and Assembly.
(2) Cleaning, Inspection and Repair Manual, 72-32-31, Inspection.
L. Other Publications Affected
(1) For effect on Illustrated Parts Catalogue (IPC) refer to 2. Material
Information.
(2) Engine Manual, 72-32-30, Disassembly and Assembly.
(3) Cleaning, Inspection and Repair Manual, 72-32-32, Inspection.
Printed in Great Britain
TRENT 1000 72−J941
Page 5
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 9

M. Interchangeability of Parts
It is essential that parts are fitted as a Service Bulletin set.
Printed in Great Britain
TRENT 1000 72−J941
Page 6
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 10

2. Material Information
A. Parts required to accomplish this Service Bulletin:
All Engines and Modules
P a r t1o fS B
72-32-32
FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE OLD
PART
NO.
INSTR
DISP
01 250 KH89682 34 BLADE,STAGE 1-ROTOR-IP
COMPRESSOR
KH25729 (1)
01 275 KH85811 25 STRAP,ASSY STAGE 1-IP
COMPRESSOR
FW56769 (1)
01 285 KH85811 9AR STRAP,ASSY STAGE 1-IP
COMPRESSOR (NOMINAL)
FW56769 (1)(2)
01 295 KH85287 9AR STRAP,ASSY STAGE 1
BALANCE-BALANCED-IP
COMPRESSOR
FW56771 (1)(2)
02 250 KH87131 49 BLADE,STAGE 2-ROTOR-IP
COMPRESSOR
KH25730 (1)
B. Parts to be reworked:
None.
C. New production parts:
The following parts will be made available as future spares in addition to
those listed under A:
All Engines and Modules
P a r t1o fS B
72-32-32
FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE OLD
PART
NO.
INSTR
DISP
01 280 KH85812 25 STRAP,STAGE 1-IP COMPRESSOR FW56770 (3)
01 290 KH85812 9AR STRAP,STAGE 1-IP COMPRESSOR
(NOMINAL)
FW56770 (4)
01 300 KH85293 9AR STRAP, BALANCE STAGE
1-BALANCED-IP COMPRESSOR
FW56772 (5)
Printed in Great Britain
TRENT 1000 72−J941
Page 7
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 11

D. Instruction disposition codes:
(1) Not Interchangeable. The new part must not be replaced by the old part in
isolation, and the old part must not be replaced by the new part in
isolation.
(2) Select as required.
(3) Part of IP compressor stage 1 strap assembly at ATA chapter reference
72-32-32, fig/item 01275.
(4) Part of IP compressor stage 1 strap assembly at ATA chapter reference
72-32-32, fig/item 01285.
(5) Part of IP compressor stage 1 balance strap assembly at ATA chapter
reference 72-32-32, fig/item 01295.
Printed in Great Britain
TRENT 1000 72−J941
Page 8
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 12

3. Accomplishment Instructions
A. The revised IP compressor stage 1 blades and associated strap assemblies, the
revised stage 2 blades and the effect of the revised IP compressor assembly
instructions introduced by this Service Bulletin are interchangeable with the
existing parts only as a Service Bulletin set (see 1.M. Interchangeability of
Parts):
(1) Disassemble the existing IP compressor rotor assembly in accordance with
Part B of these Accomplishment Instructions.
(2) Inspect the IP compressor rotor shaft assembly in accordance with Part C
of these Accomplishment Instructions.
(3) Assemble the IP compressor rotor assembly in accordance with Part D of
these Accomplishment Instructions.
B. Disassemble the existing IP compressor rotor shaft assembly in accordance with
current overhaul procedures (Engine Manual, 72-32-30, Disassembly).
C. Inspect the IP compressor rotor shaft assembly (72-32-31, 01-450), in
accordance with current overhaul procedures (CIR, 72-32-31, Inspection).
D. Assemble the revised IP compressor rotor assembly in accordance with current
overhaul procedures (Engine Manual, 72-32-30, Assembly) except for the items
that follow:
(1) SUBTASK 72-32-30-440-183.
Find the installation sequence of the stage 1 thru 6 blades. Refer to
Fig.1:
(a) Weigh the 34 stage 1 blades (72-32-32, 01-250):
(i) Weigh each stage 1 blade and make a record of the individual
blade weight:
(1) Remove all stage 1 blades that weigh more than 461,8 g (16.29
oz) from the set and replace with blades lighter than 461,8 g
(16.29 oz).
(2) Make a record of the each replacement stage 1 blade weight.
(ii) Make a record of the total weight of the stage 1 blades:
(1) If the total weight of the stage 1 blades is more than
15699,5 g (553.78 oz), remove the heaviest blades from the
set.
Printed in Great Britain
TRENT 1000 72−J941
Page 9
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 13

(2) Replace the removed blades with lighter stage 1 blades until
the total weight of the stage 1 blade set is not more than
15699,5 g (533.78 oz).
(3) Make a record of each replacement stage 1 blade weight.
(4) Make a record of the new total weight of all the stage 1
blades.
(5) Make a record of each individual blade weight and the total
set blade weight on the Inspection build record or
equivalent.
(iii) Put the stage 1 blades on an applicable work surface in a
light-heavy-light installation sequence.
(iv) Find the installation sequence for the stage 1 blades:
(1) Use the UT1689 software.
(2) Put the stage 1 blades in the correct sequence for
installation as shown by the computer printout.
(3) Use OMat 261 temporary marker pencil/crayon (or OMat 262
temporary marker felt/fibre tip) to identify the positions 1
to 34 on the stage 1 blades. Make the mark on a surface of
the blade root that is not a contact surface.
(b) Weigh the 49 stage 2 blades (72-32-32, 02-250):
(i) Weigh each stage 2 blade and make a record of the individual
blade weight:
(1) Remove all stage 2 blades that weigh more than 140 g (4.94
oz) from the set and replace with blades lighter than 140 g
(4.94 oz).
(2) Make a record of each replacement stage 2 blade weight.
(ii) Make a record of the total weight of the stage 2 blades:
(1) If the total weight of the stage 2 blades is more than 6858 g
(241.91 oz), remove the heaviest blades from the set.
(2) Replace the removed blades with lighter stage 2 blades until
the total weight of the stage 2 blade set is not more than
6858 g (241.91 oz).
(3) Make a record of each replacement stage 2 blade weight.
Printed in Great Britain
TRENT 1000 72−J941
Page 10
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 14

(4) Make a record of the new total weight of all the stage 2
blades
(5) Make a record of each individual blade weight and the total
set blade weight on the Inspection build record or
equivalent.
(iii) Put the stage 2 blades on an applicable work surface in a
light-heavy-light installation sequence.
(iv) Find the installation sequence for the stage 2 blades:
(1) Use the UT1689 software.
(2) Put the stage 2 blades in the correct sequence for
installation as shown by the computer printout.
(3) Use OMat 261 temporary marker pencil/crayon (or OMat 262
temporary marker felt/fibre tip) to identify the positions 1
to 49 on the stage 2 blades. Make the mark on a surface of
the blade root that is not a contact surface.
(c) Continue with the SUBTASK 72-32-30-440-183.
(2) SUBTASK 72-32-30-440-184.
Install the stage 1 blades to the IP compressor rotor shaft. Refer to
Figs.2, 3 and 4:
(a) Install the 34 stage 1 blades (72-32-32, 01-250). Refer to Figs.2, 3
and 4:
(i) Set the 34 Stage 1 blades in the correct installation sequence.
(ii) Add the 25 new straps (72-32-32, 01-275) and the nine new
nominal straps (72-32-32, 01-285) also in the correct
installation sequence with the respective stage 1 blade.
(iii) Position the strap in the stage 1 blade root and measure the
gap between the strap and the blade slot (Dimension AM). Refer
to Fig.3. The dimension AM should not be greater than 1.00 mm
(0.039 in.). If a dimension AM greater than 1.00 mm (0.039 in.)
is found, check the combination of stage 1 blade and the strap.
(iv) Keep the strap with the respective stage 1 blade during
assembly.
(v) During the stage 1 blade installation and removal, it is
possible that damage to the Dry Film Lubricant (DFL) can occur
on the stage 1 blade at the location AL. Refer to Fig.3. Only
DFL damage at the location AL is acceptable.
Printed in Great Britain
TRENT 1000 72−J941
Page 11
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 15

(vi) Find the mark to show the No.1 dovetail slot of the stage 1
rotor disk. The mark is on the face of the outer diameter of
the rotor disk adjacent to the dovetail slot.
(vii) Apply a thin layer of OMat 1069 assembly fluid to the centre of
each stage 1 dovetail slot. Avoid application of OMat 1069
assembly fluid at the slot ends. Remove any excess OMat 1069
assembly fluid in accordance with current overhaul procedures
(TSD 595-J, 70-00-00, OP 102 Primary cleaning - Aqueous).
(viii) Before installation of the stage 1 blades, do a stage 1 blade
build verification:
(1) Make a record of the part number identified on the stage 1
blades (72-32-32, 01-250), the straps (72-32-32, 01-275) and
the nine nominal straps (72-32-32, 01-285), to be installed
by these Accomplishment Instructions, on the Inspection Build
Record or equivalent.
(2) Compare the part number recorded above against the part
number listed against the stage 1 blades (72-32-32, 01-250),
the straps (72-32-32, 01-275) and the nine nominal straps
(72-32-32, 01-285) identified in 2. Material Information of
this Service Bulletin, to make sure that they are the same.
(ix) Install the 34 stage 1 blades with their respective straps in
the correct sequential position. Use hand pressure only to
install the blades, no additional tooling to be used.
(x) Push all the straps (72-32-32, 01-275) and the nominal straps
(72-32-32, 01-285) rearwards until they are flush with the
front face of the disk, and protrude at the rear of the disk.
(xi) Use the HU44134 loading tool to install the retaining ring
(72-32-32, 01-200) into the groove in the stage 1 disk. Make
sure that the slots in the retaining ring align with both the
straps (72-32-32, 01-275) and the nominal straps (72-32-32,
01-285).
(xii) Push all of the straps (72-32-32, 01-275) and the nominal
straps (72-32-32, 01-285) forward until the rear tabs touch the
stage 1 disk, and that the front tab is not touching the disk
slot or the retaining ring. Do not bend the front tab of the
straps at this time.
Printed in Great Britain
TRENT 1000 72−J941
Page 12
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 16

(3) SUBTASK 72-32-30-440-185.
Install the stage 2 blades to the IP compressor rotor shaft. Refer to
Figs.5, 6 and 7:
(a) Before installation of the stage 2 blades, do a stage 2 blade build
verification:
(i) Make a record of the part number identified on the stage 2
blades (72-32-32, 02-250), installed by these Accomplishment
Instructions, on the Inspection Build Record or equivalent.
(ii) Compare the part number recorded above against the part number
listed against the stage 2 blades (72-32-32, 02-250) identified
in 2. Material Information of this Service Bulletin, to make
sure that they are the same.
(b) Install the 49 stage 2 blades (72-32-32, 02-250) in their identified
installation sequence positions on the stage 2 disk. Use hand pressure
only to install the blades, no additional tooling to be used. Refer to
Figs.5, 6 and 7.
(c) Install the stage 2 retaining ring (72-32-32, 02-200) in the groove:
(i) Carefully wind the retaining ring along the IP compressor rotor
shaft (72-32-31, 01-450) to the stage 2 disk.
(ii) Make sure that the Dimension AJ, does not exceed 700 mm (27.6
in.). Refer to Fig.5.
(d) Continue with the SUBTASK 72-32-30-440-185.
(4) SUBTASK 72-32-30-440-186.
Install the stage 3 blades to the IP compressor rotor shaft. Refer to
Figs.5, 6 and 7:
(a) Install the 58 stage 3 blades (72-32-32, 03-250) in their identified
installation sequence positions on the stage 3 disk. Use hand pressure
only to install the blades, no additional tooling to be used. Refer to
Figs.5, 6 and 7.
(b) Install the stage 3 retaining ring (72-32-32, 03-200) in the groove:
(i) Carefully wind the retaining ring along the IP compressor rotor
shaft (72-32-31, 01-450) to the stage 3 disk.
(ii) Make sure that the Dimension AJ, does not exceed 700 mm (27.6
in.). Refer to Fig.5.
(c) Continue with the SUBTASK 72-32-30-440-186.
Printed in Great Britain
TRENT 1000 72−J941
Page 13
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 17

(5) SUBTASK 72-32-30-440-187
Install the stage 4 blades to the IP compressor rotor shaft. Refer to
Figs.5, 6 and 7:
(a) Install the 53 stage 4 blades (72-32-32, 04-250) in their identified
installation sequence positions on the stage 3 disk. Use hand pressure
only to install the blades, no additional tooling to be used. Refer to
Figs.5, 6 and 7.
(b) Install the stage 4 retaining ring (72-32-32, 04-200) in the groove:
(i) Carefully wind the retaining ring along the IP compressor rotor
shaft (72-32-31, 01-450) to the stage 4 disk.
(ii) Make sure that the Dimension AJ, does not exceed 700 mm (27.6
in.). Refer to Fig.5.
(c) Continue with the SUBTASK 72-32-30-440-187.
(6) SUBTASK 72-32-30-440-188.
Install the stage 5 blades to the IP compressor rotor shaft:
(a) Install the 53 stage 5 blades (72-32-32, 05-250) in their identified
installation sequence positions on the stage 5 disk. Use hand pressure
only to install the blades, no additional tooling to be used. Refer to
Figs.5, 6 and 7.
(b) Install the stage 5 retaining ring (72-32-32, 05-200) in the groove:
(i) Carefully wind the retaining ring along the IP compressor rotor
shaft (72-32-31, 01-450) to the stage 5 disk.
(ii) Make sure that the Dimension AJ, does not exceed 700 mm (27.6
in.). Refer to Fig.5.
(c) Continue with the SUBTASK 72-32-30-440-188.
(7) SUBTASK 72-32-30-440-189.
Install the stage 6 blades to the IP compressor rotor shaft. Refer to
Figs.5, 6 and 7:
(a) Install the 60 stage 6 blades (72-32-32, 06-250) in their identified
installation sequence positions on the stage 6 disk. Use hand pressure
only to install the blades, no additional tooling to be used. Refer to
Figs.5, 6 and 7.
Printed in Great Britain
TRENT 1000 72−J941
Page 14
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 18

(b) Install the stage 6 retaining ring (72-32-32, 06-200) in the groove:
(i) Carefully wind the retaining ring along the IP compressor rotor
shaft (72-32-31, 01-450) to the stage 6 disk.
(ii) Make sure that the Dimension AJ, does not exceed 700 mm (27.6
in.). Refer to Fig.5.
(c) Continue with the SUBTASK 72-32-30-440-189.
(8) SUBTASK 72-32-30-440-191.
Find the correct selection of stage 7 blades. Refer to Figs.10, 11 and 13:
(a) The total number of stage 7 blades used is 58, as follows:
(i) 38 stage 7 blades (72-32-32, 07-250).
(ii) Two stage 7 LH locking blades (72-32-32, 07-350).
(iii) Two stage 7 RH locking blades (72-32-32, 07-450).
(iv) A selection of 16 blades from the 16 stage 7 nominal blades
(72-32-32, 07-550) and the 16 stage 7 undersize blades
(72-32-32, 07-600).
(b) Install the 58 blades to check the stage 7 build clearance dimension:
NOTE : The circumferential position of the set of 58 blades is not
important during this check of the stage 7 build clearance
dimension.
(i) Reject and replace any stage 7 blade that is not easy to
install, with a blade of the same type.
(ii) Assemble the drift:
(1) Install the RRT028110 drift in the HU37519 drift.
(2) Tighten the screw (part of the HU37519 drift) to attach the
RRT028110 drift.
(iii) Install the 38 stage 7 blades (72-32-32, 07-250):
(1) Install one of the stage 7 blades through the blade loading
slot in the stage 7 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
stage 7 blade around the disk.
Printed in Great Britain
TRENT 1000 72−J941
Page 15
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 19

(3) Do the two steps above again to install each of the remaining
37 stage 7 blades.
(iv) Install the 16 stage 7 blades selected from the stage 7 nominal
blades (72-32-32, 07-550) and the stage 7 undersize blades
(72-32-32, 07-600):
(1) Install one of the nominal/undersize stage 7 blades through
the blade loading slot in the stage 7 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
nominal/undersize stage 7 blade around the disk.
(3) Do the two steps above again to install each of the remaining
15 nominal/undersize stage 7 blades.
(v) Install the two stage 7 LH locking blades (72-32-32, 07-350)
and the two stage 7 RH locking blades (72-32-32, 07-450):
(1) Install one of the locking stage 7 blades through the blade
loading slot in the stage 7 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
locking stage 7 blade around the disk.
(3) Do the two steps above again to install each of the remaining
3 locking stage 7 blades.
(vi) Measure the stage 7 build clearance dimension:
(1) Push the stage 7 blades around the blade slot to make the
platforms touch. This will make a build clearance between two
blade platforms.
(2) Use applicable feeler gauges to measure the build clearance
dimension. The feeler gauges must go between the two blade
platforms for their full axial length and their full radial
height. Be careful not to cause damage to either the disk or
to the blades while measuring the build clearance dimension.
(3) Make a record of the build clearance dimension. The stage 7
build clearance dimension must be between 0,05 and 0,45 mm
(0.002 and 0.018 in.).
(vii) If necessary, correct the stage 7 build clearance dimension:
(1) Calculate the number of stage 7 nominal/undersize blades that
must be replaced to correct the stage 7 build clearance
dimension.
Printed in Great Britain
TRENT 1000 72−J941
Page 16
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 20

(2) Make a selection of the necessary number of stage 7
nominal/undersize blades (from the set) needed to correct the
build clearance dimension. Refer to the stage 7 blade
quantities given in step 3.D.(8)(a) above.
(3) Remove the necessary number of nominal/undersize blades from
the stage 7 disk.
(4) Do the steps 3.D.(8)(a) and (b) again to install the
nominal/undersize blades.
(5) Do step 3.D.(8)(b)(vi) again to measure the stage 7 build
clearance dimension.
(viii) When the stage 7 build clearance dimension is correct, measure
all the individual stage 7 blade weights and measure the total
stage 7 blade set weight:
(1) Weigh each of the stage 7 blades and make a record of the
blade weights.
(2) Remove all the stage 7 blades that weigh more than 42,9 g
(1.51 oz) from the set and replace with a lighter blade of
the same type.
(3) Make a record of the weight of the each of the replacement
blade(s).
(4) Make a record of the total weight of the stage 7 set.
(5) If the total weight is more than 2422,0 g (5.34 lb) remove
the heaviest blades from the set.
(6) Replace each of the heaviest stage 7 blades with lighter
blades of the same type until the total weight of the stage 7
set is not more than 2422,0 g (5.34 lb).
(7) Make sure that the final set of stage 7 blades used are of
the type and quantity as established in step 3.D.(8)(a)
above.
(8) Do step 3.D.(8)(b)(vi) again to measure the stage 7 build
clearance dimension.
(ix) Remove the stage 7 blades from the disk and put them on an
applicable work surface.
(x) Make a record of each individual stage 7 blade weight and the
total set weight, on the Inspection Build Record or equivalent.
Printed in Great Britain
TRENT 1000 72−J941
Page 17
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 21

(9) SUBTASK 72-32-30-440-192
Install the stage 7 blades. Refer to Figs.8, 9, 10 and 11:
(a) Put the stage 7 blades on an applicable work surface in a
light-heavy-light installation sequence.
(b) Find the installation sequence for the 58 stage 7 blades:
(i) Use the UT1689 software to find the installation sequence to be
used on the stage 7 blades.
(ii) Put the stage 7 blades in the correct sequence for the
installation as shown by the computer printout.
(iii) Make sure that the undersize blades are not adjacent to each
other.
(iv) Make sure that the undersize blades are equally spaced around
the disk.
(v) Make sure that each LH locking blade is adjacent to a RH
locking blade.
(vi) Make a record of the number and the position of both the
nominal and the undersize blades.
(vii) Use OMat 261 temporary marker pencil/crayon (or OMat 262
temporary marker felt/fibre tip) to identify the positions on
the stage 7 blades 1 to 58. Make the mark for each blade
position on the airfoil surface.
NOTE : The number one blade position is the blade axially on line
with the number one dovetail on the stage one disk.
(c) Install the stage 7 blades (72-32-32, 07-250), (72-32-32, 07-350),
(72-32-32, 07-450), (72-32-32, 07-550), (72-32-32, 07-600) and the
stage 7 screw and nut (72-32-32, 07-275) into the blade loading slot:
(i) Install the 58 stage 7 blades and the two stage 7 screws and
nuts (72-32-32, 07-275) into the disk through the blade loading
slot:
(1) Install the 58 stage 7 blades in the correct sequence through
the blade loading slot. Use hand pressure only to install the
blades, no additional tooling to be used.
(2) Use the HU37519 drift (with the RRT028110 drift) to move all
the blades around the disk. Push against the screw and nut to
move the blades around the disk.
Printed in Great Britain
TRENT 1000 72−J941
Page 18
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 22

(ii) Make sure that the two stage 7 screw and nut (72-32-32, 07-275)
are in their correct positions.
(iii) Torque the two stage 7 screw and nut (72-32-32, 07-275) to
between 1,692 and 1,802 Nm (14.9754 and 15.9490 lbfin).
(d) Use the HU35059-1 adapter to measure and record (final check) the
dimension Y for each screw and nut (72-32-32, 07-275). Dimension Y
must not be more than 0,10 mm (0.004 in.) larger or smaller than the
dimension Y recorded in the existing SUBTASK 72-32-30-440-190.
(e) If dimension Y is not in the limits, do the steps that follow:
(i) Loosen the screw(s) of the stage 7 screw and nut (72-32-32,
07-275) where dimension Y is not in limits.
(ii) Remove sufficient stage 7 blades to get access to the stage 7
screw and nut where dimension Y is not in limits.
(iii) Remove and discard the stage 7 screw and nut that is not in
limits.
(iv) Replace the stage 7 screw and nut with a serviceable stage 7
screw and nut. Refer to the existing SUBTASK 72-32-30-440-190.
(v) Install the stage 7 blades removed in step 3.D.(9)(e)(ii)
above. Make sure the blades installation order is the same as
the order that the blades were removed.
(vi) Do step 3.D.(9)(c)(iii) again.
(vii) Do step 3.D.(9)(d) and (e) again as applicable.
(10) SUBTASK 72-32-30-440-223.
Find the correct selection of stage 8 blades. Refer to Figs. 10, 12 and
13:
(a) The total number of stage 8 blades used is 53, as follows:
(i) 34 stage 8 blades (72-32-32, 08-250).
(ii) Two stage 8 LH locking blades (72-32-32, 08-350).
(iii) Two stage 8 RH locking blades (72-32-32, 08-450).
(iv) A selection of 15 blades from the 15 stage 8 nominal blades
(72-32-32, 08-550) and the 15 stage 8 undersize blades
(72-32-32, 08-600).
Printed in Great Britain
TRENT 1000 72−J941
Page 19
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 23

(b) Install the 53 blades to check the stage 8 build clearance dimension:
NOTE : The circumferential position of the set of 53 blades is not
important during this check of the stage 8 build clearance
dimension.
(i) Reject and replace any stage 8 blade that is not easy to
install, with a blade of the same type.
(ii) Assemble the drift:
(1) Install the RRT028110 drift in the HU37519 drift.
(2) Tighten the screw (part of the HU37519 drift) to attach the
RRT028110 drift.
(iii) Install the 34 stage 8 blades (72-32-32, 08-250):
(1) Install one of the stage 8 blades through the blade loading
slot in the stage 8 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
stage 8 blade around the disk.
(3) Do the two steps above again to install each of the remaining
34 stage 8 blades.
(iv) Install the 15 stage 8 blades selected from the stage 8 nominal
blades (72-32-32, 08-550) and the stage 8 undersize blades
(72-32-32, 08-600):
(1) Install one of the nominal/undersize stage 8 blades through
the blade loading slot in the stage 8 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
nominal/undersize stage 8 blade around the disk.
(3) Do the two steps above again to install each of the remaining
15 nominal/undersize stage 8 blades.
(v) Install the two stage 8 LH locking blades (72-32-32, 08-350)
and the two stage 8 RH locking blades (72-32-32, 08-450):
(1) Install one of the locking stage 8 blades through the blade
loading slot in the stage 8 disk.
(2) Use the HU37519 drift (with the RRT028110 drift) to move the
locking stage 8 blade around the disk.
(3) Do the two steps above again to install each of the remaining
3 locking stage 8 blades.
Printed in Great Britain
TRENT 1000 72−J941
Page 20
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 24

(vi) Measure the stage 8 build clearance dimension:
(1) Push the stage 8 blades around the blade slot to make the
platforms touch. This will make a build clearance between two
blade platforms.
(2) Use applicable feeler gauges to measure the build clearance
dimension. The feeler gauges must go between the two blade
platforms for their full axial length and their full radial
height. Be careful not to cause damage to either the disk or
to the blades while measuring the build clearance dimension.
(3) Make a record of the build clearance dimension. The stage 8
build clearance dimension must be between 0,05 and 0,45 mm
(0.002 and 0.018 in.).
(vii) If necessary, correct the stage 8 build clearance dimension:
(1) Calculate the number of stage 8 nominal/undersize blades that
must be replaced to correct the stage 8 build clearance
dimension.
(2) Make a selection of the necessary number of stage 8
nominal/undersize blades (from the set) needed to correct the
build clearance dimension. Refer to the stage 8 blade
quantities given in step 3.D.(10)(a) above.
(3) Remove the necessary number of nominal/undersize blades from
the stage 8 disk.
(4) Do the steps 3.D.(10)(a) and (b) again to install the
nominal/undersize blades.
(5) Do the step 3.D.(10)(b)(vi) again to measure the stage 8
build clearance dimension.
(viii) When the stage 8 build clearance dimension is correct, measure
all the individual stage 8 blade weights and measure the total
stage 8 blade set weight:
(1) Weigh each of the stage 8 blades and make a record of the
blade weights.
(2) Remove all the stage 8 blades that weigh more than 44,7 g
(1.58 oz) from the set and replace with a lighter blade of
the same type.
(3) Make a record of the weight of the each of the replacement
blade(s).
(4) Make a record of the total weight of the stage 8 set.
Printed in Great Britain
TRENT 1000 72−J941
Page 21
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 25

(5) If the total weight is more than 2310,2 g (5.09 lb) remove
the heaviest blades from the set.
(6) Replace each of the heaviest stage 8 blades with lighter
blades of the same type until the total weight of the stage 8
set is not more than 2310,2 g (5.09 lb).
(7) Make sure that the final set of stage 8 blades used are of
the type and quantity as established in step 3.D.(10)(a)
above.
(8) Do step 3.D.(10)(b)(vi) again to measure the stage 8 build
clearance dimension.
(ix) Remove the stage 8 blades from the disk and put them on an
applicable work surface.
(x) Make a record of each individual stage 8 blade weight and the
total set weight, on the Inspection Build Record or equivalent.
(11) SUBTASK 72-32-30-440-193
Install the stage 8 blades. Refer to Figs.8, 9, 10 and 12:
(a) Put the stage 8 blades on an applicable work surface in a
light-heavy-light installation sequence.
(b) Find the installation sequence for the 53 stage 8 blades:
(i) Use the UT1689 software to find the installation sequence to be
used on the stage 8 blades.
(ii) Put the stage 8 blades in the correct sequence for the
installation as shown by the computer printout.
(iii) Make sure that the undersize blades are not adjacent to each
other.
(iv) Make sure that the undersize blades are equally spaced around
the disk.
(v) Make sure that each LH locking blade is adjacent to a RH
locking blade.
(vi) Make a record of the number and the position of both the
nominal and the undersize blades.
Printed in Great Britain
TRENT 1000 72−J941
Page 22
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 26

(vii) Use OMat 261 temporary marker pencil/crayon (or OMat 262
temporary marker felt/fibre tip) to identify the positions on
the stage 8 blades 1 to 53. Make the mark for each blade
position on the airfoil surface.
NOTE : The number one blade position is the blade axially on line
with the number one dovetail on the stage one disk.
(c) Install the stage 8 blades (72-32-32, 08-250), (72-32-32, 08-350),
(72-32-32, 08-450), (72-32-32, 08-550), (72-32-32, 08-600) and the
stage 8 screw and nut (72-32-32, 08-275) into the blade loading slot:
(i) Install the 53 stage 8 blades and the two stage 8 screw and nut
(72-32-32, 08-275) into the disk through the blade loading
slot:
(1) Install the 53 stage 8 blades in the correct sequence through
the blade loading slot. Use hand pressure only to install the
blades, no additional tooling to be used.
(2) Use the HU37519 drift (with the RRT028110 drift) to move all
the blades around the disk. Push against the screw and nut to
move the blades around the disk.
(ii) Make sure that the two stage 8 screw and nut (72-32-32, 08-275)
are in their correct positions.
(iii) Torque the two stage 8 screw and nut (72-32-32, 08-275) to
between 1,692 and 1,802 Nm (14.9754 and 15.9490 lbfin).
(d) Use the HU35059-1 adapter to measure and record (final check) the
dimension Y for each screw and nut (72-32-32, 08-275). Dimension Y
must not be more than 0,10 mm (0.004 in.) larger or smaller than the
dimension Y recorded in the existing SUBTASK 72-32-30-44-190.
(e) If dimension Y is not in the limits, do the steps that follow:
(i) Loosen the screw(s) of the stage 8 screw and nut (72-32-32,
08-275) where dimension Y is not in limits.
(ii) Remove sufficient stage 8 blades to get access to the stage 8
screw and nut where dimension Y is not in limits.
(iii) Remove and discard the stage 8 screw and nut that is not in
limits.
(iv) Replace the stage 8 screw and nut with a serviceable stage 8
screw and nut. Refer to the existing SUBTASK 72-30-440-190.
Printed in Great Britain
TRENT 1000 72−J941
Page 23
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 27

(v) Install the stage 8 blades removed in step 3.D.(11)(e)(ii)
above. Make sure the blades installation order is the same as
the order that the blades were removed.
(vi) Do step 3.D.(11)(c)(iii) again.
(vii) Do step 3.D.(11)(d) and (e) again as applicable.
(f) Disassemble the drift:
(i) Loosen the screw (part of the HU37519 drift) to release the
RRT028110 drift.
(ii) Remove the RRT028110 drift from the HU37519 drift.
(12) SUBTASK 72-32-30-440-202
Initially balance the IP compressor rotor shaft assembly. Refer to Fig.14:
(a) If the unbalance is more than 10000 gmm (13.887 ozin) in plane FC or
6000 gmm (8.332 ozin) in plane RC do as follows:
(i) Change the position of the stage 1 and the stage 6 blades to
correct the unbalance
(ii) For any stage 1 blade moved, keep the strap removed with the
blade to maintain the measured blade and strap gap
relationship.
(iii) Install the relocated blade and associated strap in accordance
with the revised SUBTASK 72-32-30-440-184 above in these
Accomplishment Instructions.
(iv) Use the blade weight data recorded in the revised SUBTASK
72-32-30-440-183 above in these Accomplishment Instructions.
(13) SUBTASK 72-32-30-440-204
Lock the stage 1 blades:
(a) Replace the existing Fig. 72-32-30-990-238-001 with Fig.2 of this
Service Bulletin.
(b) Continue with the SUBTASK 72-32-30-440-204.
(14) SUBTASK 72-32-30-440-207
Measure the tip radius of the blades:
(a) Replace the existing Fig. 72-32-30-990-249-001 with Fig.15 of this
Service Bulletin.
Printed in Great Britain
TRENT 1000 72−J941
Page 24
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 28

(b) Replace the existing Fig. 72-32-30-990-249-002 with Fig.16 of this
Service Bulletin.
(c) Continue with the SUBTASK 72-32-30-440-207.
(15) SUBTASK 72-32-30-440-208-001
Grind the blade tips. Refer to the revised SUBTASK 72-32-30-440-207, step
3.D.(14), above:
(a) Replace the existing Fig. 72-32-30-990-249-001 with Fig.15 of this
Service Bulletin.
(b) Replace the existing Fig. 72-32-30-990-249-002 with Fig.16 of this
Service Bulletin.
(c) Deburr the blades, The sharp edges of the airfoil are to be retained
as far as possible.
(d) Continue with the SUBTASK 72-32-30-440-208-001.
(16) SUBTASK 72-32-30-440-208-002
Grind the blade tips. Refer to the revised SUBTASK 72-32-30-440-207, step
3.D.(14), above:
(a) Replace the existing Fig. 72-32-30-990-249-001 with Fig.15 of this
Service Bulletin.
(b) Replace the existing Fig. 72-32-30-990-249-002 with Fig.16 of this
Service Bulletin.
(c) Deburr the blades, The sharp edges of the airfoil are to be retained
as far as possible.
(d) Continue with the SUBTASK 72-32-30-440-208-002.
(17) SUBTASK 72-32-30-440-282
Clean the blades after grinding:
(a) Install the blades to the IP rotor shaft in their correct positions:
(i) Install the stage 1 blades in accordance with the revised
SUBTASK 72-32-30-440-184, step 3.D.(2), above in these
Accomplishment Instructions.
(ii) Install the stage 2 blades in accordance with the revised
SUBTASK 72-32-30-440-185, step 3.D.(3), above in these
Accomplishment Instructions.
Printed in Great Britain
TRENT 1000 72−J941
Page 25
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 29

(iii) Install the stage 3 blades in accordance with the revised
SUBTASK 72-32-30-440-186, step 3.D.(4), above in these
Accomplishment Instructions.
(iv) Install the stage 4 blades in accordance with the revised
SUBTASK 72-32-30-440-187, step 3.D.(5), above in these
Accomplishment Instructions.
(v) Install the stage 5 blades in accordance with the revised
SUBTASK 72-32-30-440-188, step 3.D.(6), above in these
Accomplishment Instructions.
(vi) Install the stage 6 blades in accordance with the revised
SUBTASK 72-32-30-440-189, step 3.D.(7), above in these
Accomplishment Instructions.
(vii) Install the stage 7 blades in accordance with the revised
SUBTASK 72-32-30-440-192, step 3.D.(9), above in these
Accomplishment Instructions.
(viii) Install the stage 8 blades in accordance with the revised
SUBTASK 72-32-30-440-193, step 3.D.(11), above in these
Accomplishment Instructions.
(b) Continue with the SUBTASK 72-32-30-440-282.
(18) SUBTASK 72-32-30-440-217
Final balance the IP compressor rotor assembly:
(a) Replace the existing Fig. 72-32-30-990-238-001 with Fig.2 of this
Service Bulletin.
(b) If the unbalance at plane FC is more than the limit, remove and
discard the applicable straps (72-32-32, 01-275) and straps (nominal)
(72-32-32, 01-285) and install the new strap (balance) (72-32-32,
01-295) in accordance with the revised SUBTASK 72-32-30-440-184, Part
3.D.(2) above in these Accomplishment Instructions.
(i) Make a record of the part number identified on the required
balance straps (72-32-32, 01-295), to be installed above by
these Accomplishment Instructions, on the Inspection Build
Record or equivalent.
(ii) Compare the part number recorded above against the part number
listed against the balance straps (72-32-32, 01-295) identified
in 2. Material Information of this Service Bulletin, to make
sure that they are the same.
(iii) If necessary, remove the material from the strap (balance) to
get the correct unbalance correction.
Printed in Great Britain
TRENT 1000 72−J941
Page 26
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 30

(iv) Remove the burrs and the sharp edges from the strap (balance).
(v) Push the strap (balance) forward until the rear tab touches the
stage 1 disk.
(vi) Do the steps 3.D.(18)(b)(ii), (iii) and (iv) above again until
all the necessary straps (balance) are installed
(vii) Lock the stage 1 blades with the straps (balance) (72-32-32,
01-295) installed. Refer to the revised SUBTASK
72-32-30-440-204, Part 3.D.(13), above in these Accomplishment
Instructions.
(c) If a new stage 6 balance plate is to be installed, install the stage 6
blade in accordance with the revised SUBTASK 72-32-30-440-189 above in
these Accomplishment Instructions.
(d) Continue with the SUBTASK 72-32-30-440-217.
(19) SUBTASK 72-32-30-440-218
Do a check of the final balance of the IP compressor rotor assembly:
(a) If the unbalance at plane FC is more than the limit, remove and
discard the applicable straps (72-32-32, 01-275) and straps (nominal)
(72-32-32, 01-285) and install the new strap (balance) (72-32-32,
01-295) in accordance with the revised SUBTASK 72-32-30-440-184, Part
3.D.(2) above in these Accomplishment Instructions.
(i) Make a record of the part number identified on the required
balance straps (72-32-32, 01-295), to be installed above by
these Accomplishment Instructions, on the Inspection Build
Record or equivalent.
(ii) Compare the part number recorded above against the part number
listed against the balance straps (72-32-32, 01-295) identified
in 2. Material Information of this Service Bulletin, to make
sure that they are the same.
(iii) If necessary, remove the material from the strap (balance) to
get the correct unbalance correction.
(iv) Remove the burrs and the sharp edges from the strap (balance).
(v) Push the strap (balance) forward until the rear tab touches the
stage 1 disk.
(vi) Do the steps 3.D.(19)(b)(ii), (iii) and (iv) above until all
the necessary straps (balance) are installed
Printed in Great Britain
TRENT 1000 72−J941
Page 27
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 31

(vii) Lock the stage 1 blades with the straps (balance) (72-32-32,
01-295) installed. Refer to the revised SUBTASK
72-32-30-440-204, Part 3.D.(13), above in these Accomplishment
Instructions.
(b) If a new stage 6 balance plate is to be installed, install the stage 6
blade in accordance with the revised SUBTASK 72-32-30-440-189 above.
(c) If it is necessary to repeat the final balance of the IP compressor
rotor assembly, refer to the revised SUBTASK 72-32-30-440-217 above.
(d) Continue with the SUBTASK 72-32-30-440-218.
E. A record of accomplishment is required.
The Service Bulletin number and relevant Service Bulletin part shall be recorded
in the relevant log book when the Service Bulletin part is fitted in its
entirety.
Printed in Great Britain
TRENT 1000 72−J941
Page 28
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 32

Typical blade installation sequence
Fig.1
Printed in Great Britain
TRENT 1000 72−J941
Page 29
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 33

dej0031092
NOTE:
All Chapter−Section−Subject and Fig−Item references
are quoted for the Engine IPC
FRONT TAB
PAD
STRAP (Balance)
72−32−32
01−295
(As necessary
maximum 9 off) PAD
REAR TAB
FRONT TAB
PAD
STRAP
72−32−32
01−275
(25 off)
STRAP
(Nominal)
72−32−32
01−285
(As necessary
maximum 9 off)
PAD
REAR TAB
STAGE 1
BLADE
72−32−32
01−250
(34 off)
RETAINING
RING
72−32−32
01−200
TAB
(Bent)
TAB
(Straight)
FRONT TAB
STRAP
(34 off)
STAGE 1 DISK
REAR TAB
Part of IP compressor rotor shaft 72−32−31 01−450
MAX 7.20mm
(0.283 in)
BOTH SIDES
REMOVE MATERIAL FROM SHADED AREAS
AS NECESSARY FOR BALANCE CORRECTION
SHARP EDGES MUST BE REMOVED
A
A
Install the stage 1 blades
Fig.2
Printed in Great Britain
TRENT 1000 72−J941
Page 30
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 34

dej0031093
NOTE:
All Chapter−Section−Subject and Fig−Item references
are quoted for the Engine IPC
A−A
DIMENSION AM
AL AL
IP COMPRESSOR
STAGE 1 ROTOR BLADE
72−32−32
01−250
NOTE:
’AL’ is the only location of acceptable dry film
lubricant damage during assembly
IP COMPRESSOR
STAGE 1 STRAP ASSEMBLY
72−32−32
01−275
01−285
(Nominal)
Measure the Dimension AM and the location of Dry Film Lubricant area AL
Fig.3
Printed in Great Britain
TRENT 1000 72−J941
Page 31
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 35

dej0027457Part of IP compressor rotor shaft 72−32−31 01−450
BLADE
72−32−32 
01−250 
(34 off)
RETAINING
RING
72−32−32
01−200
HU44134
LOADING
TOOL
STRAP
(34 off)
STAGE 1 DISK
Install the stage 1 blades
Fig.4
Printed in Great Britain
TRENT 1000 72−J941
Page 32
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 36

dej0031094
RRT027187
GAUGE
HOLE
BLIND
HOLE
RETAINING
RING
A
A
A
Part of retaining ring
RETAINING
RING
A
A−A
B
B
RETAINING
RING
DIMENSION AJ
Install the stage 2 thru 6 blades
Fig.5
Printed in Great Britain
TRENT 1000 72−J941
Page 33
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 37

dej0019657
STAGE 3
RETAINING
RING
72−32−32
03−200
STAGE 2
RETAINING
RING
72−32−32
02−200
STAGE 4
RETAINING
RING
72−32−32
04−200
STAGE 5
RETAINING
RING
72−32−32
05−200
STAGE 6
RETAINING
RING
72−32−32
06−200
RRT026942
INSERTION
TOOL
Install the stage 2 thru 6 blades
Fig.6
Printed in Great Britain
TRENT 1000 72−J941
Page 34
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 38

dej0019658
 
STAGE 2
72−32−32
02−250
(49 off)
STAGE 3
72−32−32
03−250
(58 off)
STAGE 4
72−32−32
04−250
(53 off)
STAGE 5
72−32−32
05−250
(53 off)
STAGE 6
72−32−32
06−250
(60 off)
IP COMPRESSOR
ROTOR SHAFT
72−32−31
01−450
RETAINING RING
STAGE 2
72−32−32
02−200
STAGE 3
72−32−32
03−200
STAGE 4
72−32−32
04−200
STAGE 5
72−32−32
05−200
STAGE 6
72−32−32
06−200
RRT026943
EXTRACTOR
TYPICAL STAGE 2 THRU STAGE 6
Part of RRT026943 extractor
PIN
ROTOR BLADE
Install the stage 2 thru 6 blades
Fig.7
Printed in Great Britain
TRENT 1000 72−J941
Page 35
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 39

dej0023095
DIMENSION Y
SURFACE 1
STAGE 7 DISK
STAGE 7
SCREW
AND NUT
72−32−32
07−275
(2 off)
NUT
SCREW
IP COMPRESSOR
ROTOR SHAFT
72−32−31
01−450 SECTION THROUGH STAGE 7 DISK RIM
SHOWING THE SCREW AND NUT
Part of IP compressor rotor shaft 72−32−31 01−450
Part of stage 7 screw and nut 72−32−32 07−275
Part of stage 8 screw and nut 72−32−32 08−275
SURFACE 2
STAGE 8 DISK
SECTION THROUGH STAGE 8 DISK RIM
SHOWING THE SCREW AND NUT
IP COMPRESSOR
ROTOR SHAFT
72−32−31
01−450
SCREW
STAGE 8
SCREW
AND NUT
72−32−32
08−275
(2 off)
NUT
DIMENSION Y
Install the stage 7 and stage 8 lock screws and nuts
Fig.8
Printed in Great Britain
TRENT 1000 72−J941
Page 36
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 40

dej9008218
HU35059−1
ADAPTER
LOCATION BLOCK
SCREW
AND NUT
CALIPER
 BLADE
IP COMPRESSOR
ROTOR SHAFT
72−32−31
01−450
TYPICAL OF STAGE 7
AND STAGE 8
Part of HU35059−1 adapter
Install the stage 7 and stage 8 lock screws and nuts
Fig.9
Printed in Great Britain
TRENT 1000 72−J941
Page 37
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 41

dej9008219
A A
SCREW
HU37519
DRIFT
HU37519
DRIFT
RRT028110
DRIFT
STAGE 7
SCREW
AND NUT
72−32−32
07−275
(2 off)
STAGE 8
72−32−32
08−275
(2 off)
Part of HU37519 drift
A−A
Install the stage 7 and stage 8 blades
Fig.10
Printed in Great Britain
TRENT 1000 72−J941
Page 38
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 42

dej0022086
STAGE 7
RH LOCKING
BLADE
72−32−32
07−450
STAGE 7
LH LOCKING
BLADE
72−32−32
07−350
STAGE 7
LH LOCKING
BLADE
72−32−32
07−350
STAGE 7
BLADES
72−32−32
07−250
STAGE 7
RH LOCKING
BLADE
72−32−32
07−450
SCREW
AND NUT
INSTALLATION
POSITION
SCREW
AND NUT
INSTALLATION
POSITION
BLADE
LOADING SLOT
VIEW WHEN YOU LOOK FORWARD
STAGE 7
BLADES
72−32−32
07−250
(36 off)
STAGE 7 (Nominal)
BLADES
72−32−32
07−550
(As necessary maximum 16 off)
OR
STAGE 7 (Undersize)
BLADES
72−32−32
07−600
(As necessary maximum 16 off)The total number of stage 7 blades necessary is 58
NOTE:
Part of IP compressor rotor shaft 72−32−31 01−450
Installation position of the stage 7 blades
Fig.11
Printed in Great Britain
TRENT 1000 72−J941
Page 39
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 43

dej0022087
STAGE 8
RH LOCKING
BLADE
72−32−32
08−450
STAGE 8
LH LOCKING
BLADE
72−32−32
08−350
STAGE 8
LH LOCKING
BLADE
72−32−32
08−350
STAGE 8
BLADES
72−32−32
08−250
STAGE 8
RH LOCKING
BLADE
72−32−32
08−450
SCREW
AND NUT
INSTALLATION
POSITION
SCREW
AND NUT
INSTALLATION
POSITION
BLADE
LOADING SLOT
VIEW WHEN YOU LOOK FORWARD
STAGE 8
BLADES
72−32−32
08−250
(32 off)
STAGE 8 (Nominal)
BLADES
72−32−32
08−550
(As necessary maximum 15 off)
OR
STAGE 8 (Undersize)
BLADES
72−32−32
08−600
(As necessary maximum 15 off)
The total number of stage 8 blades necessary is 53
NOTE:
Part of IP compressor rotor shaft 72−32−31 01−450
Installation position of the stage 8 blades
Fig.12
Printed in Great Britain
TRENT 1000 72−J941
Page 40
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 44

dej9007613
BUILD CLEARANCE DIMENSIONROTOR BLADES PUSHEDTOGETHER TO MAKE THE
BUILD CLEARANCE DIMENSION
Measure the build clearance dimension
Fig.13
Printed in Great Britain
TRENT 1000 72−J941
Page 41
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 45

dej9008220
A
HOIST
SAFETY CATCH
LIFT EYE
TOP
ROLLER
RRT026842
DUMMY
SHAFT
BOTTOM
ROLLER
BOTTOM
HALF
NUMBER 2
PEDESTAL
NUT
(2 off per tool)
NUT
(4 off)
BOLT AND
WASHER
(16 off)
HU37078
MOUNTING FOOT
(2 off)
HU37028
COVER
HU37077
MOUNTING FOOT
(2 off)
NUT
(2 off per tool)
NUMBER 1
PEDESTAL
HU41705
BOLT
(6 off)
MACHINE
DRIVE
HU43801
HOUSING
SWING ARM
HAND KNOB
RRT025901
MANDREL
PLANE RC
TOP HALF
SLING HOOK
PLANE FC
HU33852
SLING
(2 off)
Part of HU37078 mounting foot
Part of HU37077 mounting foot
Part of HU37028 cover
Part of HU43801 housing
Part of dynamic balancing machine
Part of HU33852 sling
Balance the IP compressor rotor assembly
Fig.14
Printed in Great Britain
TRENT 1000 72−J941
Page 42
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 46

dej0031095
NOTE:
All Chapter−Section−Subject and Fig−Item references
are quoted for the Engine IPC
A STAGE 1−2SEAL FINS
STAGE 2−3
SEAL FINS
STAGE 1
SEAL FINS
DIMENSION AB
DIMENSION AC
STAGE 7
IP COMPRESSOR
ROTOR SHAFT
72−32−31
01−450
STAGE 4−5
SEAL FINS
STAGE 5−6
SEAL FINS
STAGE 7−8
SEAL FINS
STAGE 8
SEAL FINS
Part of IP compressor rotor shaft 72−32−31 01−450
STAGE 6−7
SEAL FINS
P4
P6
P5
P7
P19P20
P21
P1
P2
P3
ANGLE AE
RADIUS
AD
STAGE 2
STAGE 3
P8
P9
STAGE 3−4
SEAL FINS
P10
P11
STAGE 4
P12
P13
P14
STAGE 5
P15
P16
P17
STAGE 6
P18 STAGE 8
P22
P23P24
B
0.14 mm (0.006 in) A B
STAGE 1 ONLY
0.12 mm (0.005 in) A B
BLADE TIP PROFILE
TYPICAL ALL STAGES
MAX 5 BLADES
C
C
C
Grind the blade tips
Fig.15
Printed in Great Britain
TRENT 1000 72−J941
Page 43
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 47

dej0031096
RAD ADSTAGE DIM AB DIM AC
−591.73 mm (23.296 in)
1 573.13 mm (22.564 in) − 507.29 mm (19.972 in)
502.43 mm (19.781 in)−558.90 mm (22.004 in)
2
3
447.96 mm (17.636 in)
434.77 mm (17.117 in)
426.30 mm (16.783 in)
451.36 mm (17.770 in)
449.82 mm (17.709 in)
−
− 473.30 mm (18.634 in)
470.36 mm (18.518 in)
468.47 mm (18.444 in)
513.65 mm (20.222 in)
−
−
ANGLE AE
18.871
12.583
9.923
POSITION
448.28 mm (17.649 in)
−
−
P1
P2
P3
P4
P5
P6
P7
P8
P9
332.41 mm (13.087 in)
323.60 mm (12.740 in)
314.84 mm (12.395 in)
−233.33 mm (9.186 in)
4 226.50 mm (8.917 in) − 437.38 mm (17.220 in)
436.56 mm (17.187 in)−219.59 mm (8.645 in)
5
6
148.34 mm (5.840 in)
140.07 mm (5.515 in)
130.47 mm (5.136 in)
422.92 mm (16.650 in)
422.37 mm (16.629 in)
−
− 429.81 mm (16.922 in)
429.01 mm (16.890 in)
428.09 mm (16.854 in)
438.19 mm (17.252 in)
−
−
6.780
5.494
4.795
421.82 mm (16.607 in)
−
−
P10
P11
P12
P13
P14
P15
P16
P17
P18
65.25 mm (2.569 in)
58.70 mm (2.311 in)
52.11 mm (2.051 in)
7
8
−
−
−
405.53 mm (15.966 in)
404.46 mm (15.924 in)
21.40 mm (0.843 in)
15.12 mm (0.595 in) 415.44 mm (16.356 in)
414.75 mm (16.329 in)
414.06 mm (16.302 in)27.68 mm (1.090 in)
88.11 mm (3.469 in)
6.247
8.975
403.40 mm (15.882 in)
94.93 mm (3.737 in)
101.64 mm (4.002 in)
P19
P20
P21
P22
P23
P24
−
−
−
Grind the blade tips
Fig.16
Printed in Great Britain
TRENT 1000 72−J941
Page 44
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 48

SUPPLEMENT - PRICES AND AVAILABILITY
This is a technical document not a quotation; any prices and delivery given are in
good faith without engagement.
Alternative parts can be supplied instead of parts listed. See Material Information
disposition instructions.
1. Modification Kit
Modification kit is not required. Parts supplied as single line items.
2. Parts required to accomplish this Service Bulletin:
Part No. Qty
Unit Price
US Dollars
KH85287 9 AR Price will be supplied on request
KH85811 9 AR Price will be supplied on request
KH85811 25 Price will be supplied on request
KH89682 34 Price will be supplied on request
KH87131 49 Price will be supplied on request
3. New Production Parts:
Part No. Qty
Unit Price
US Dollars
KH85293 9 AR Price will be supplied on request
KH85812 9 AR Price will be supplied on request
KH85812 25 Price will be supplied on request
NOTE : It is recommended that any consumable items(s) required to support the
Accomplishment of this Service Bulletin, be ordered at the same time as
the parts above.
ENGINE - IP COMPRESSOR BLADES - INTRODUCTION OF REVISED IP COMPRESSOR STAGE 1 AND 2
ROTOR BLADES FEATURING OPTIMISED MANUFACTURING AND GEOMETRY CHANGES WITH ASSOCIATED
CHANGES TO BUILD AND MACHINING INSTRUCTIONS - MOD.72-J941
Printed in Great Britain
TRENT 1000 72−J941
Supplement Page 1 of 2
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

### Page 49

4. Tools
None.
Printed in Great Britain
TRENT 1000 72−J941
Supplement Page 2
Dec. 6/18
Dec. 6/18
TRENT 1000 SERIES
SERVICE BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.