# Rolls-Royce Non-Modification Service Bulletin 72-AK188: Rolls-Royce NMSB TRENT XWB 72-AK188 Rev 3

- Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2022-1244, the docket of AD 2023-04-14. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Rolls-Royce Non-Modification Service Bulletin 72-AK188](https://openairdocs.org/service-documents/rolls-royce/72-ak188.md)
- Title as filed: Rolls-Royce NMSB TRENT XWB 72-AK188 Rev 3
- Pages: 28
- PDF: https://openairdocs.org/files/sha256/ee/9d/ee9de3334845fb1593423bb71bc4ce0b8d1ebd304e56516c8d072124dbd07e85
- Page: https://openairdocs.org/service-documents/rolls-royce/72-ak188/file/ee9de3334845

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

This document transmits Revision 3 to Service Bulletin TRENTXWB-72-AK188
Document History
Service Bulletin Revision Status Supplement Revision Status
Initial Issue Aug.13/19
Revision 1 Sep.20/19
Revision 2 Dec.17/19
Bulletin Revision 3
Remove Incorporate Reason for change
All pages of the
Service Bulletin
Pages 1 to 23 of the
Service Bulletin
To update 1.C. Description,
2. Material Information and
3.B. Accomplishment
Instructions
All pages of
Appendix 1
Page 1 and 2 of
Appendix 1
To update 1.C. Description,
2. Material Information and
3.B. Accomplishment
Instructions
All pages of
Appendix 2
Page 1 of Appendix 2 To update 1.C. Description,
2. Material Information and
3.B. Accomplishment
Instructions
Printed in Great Britain
May. 9/22
TRENT XWB SERIES PROPULSION SYSTEMS NON-MODIFICATION SERVICE BULLETIN
ALERT TRENT XWB 72−AK188
Transmittal - Page 1 of 2
Date
ALERT

### Page 2

LIST OF EFFECTIVE PAGES
The effective pages to this Service Bulletin following incorporation of Revision
3 are as follows:
Page Revision Number Revision Date
Bulletin
R 1 3 May 9/22
R 2 3 May 9/22
R 3 3 May 9/22
R 4 3 May 9/22
R 5 3 May 9/22
R 6 3 May 9/22
R 7 3 May 9/22
R 8 3 May 9/22
R 9 3 May 9/22
R 10 3 May 9/22
R 11 3 May 9/22
R 12 3 May 9/22
R 13 3 May 9/22
R 14 3 May 9/22
R 15 3 May 9/22
R 16 3 May 9/22
R 17 3 May 9/22
R 18 3 May 9/22
R 19 3 May 9/22
R 20 3 May 9/22
R 21 3 May 9/22
R 22 3 May 9/22
R 23 3 May 9/22
Appendix 1
R 1 3 May 9/22
R 2 3 May 9/22
Appendix 2
R 1 3 May 9/22
Printed in Great Britain
TRENT XWB 72−AK188
Transmittal - Page 2

### Page 3

1. Planning Information
A. Effectivity
Airbus A350-900
All Trent XWB-75 Engines
All Trent XWB-79 Engines
All Trent XWB-79B Engines
All Trent XWB-84 Engines
B. Reason
(1) Problem
The purpose of the engine mount is to position the engine relative to the
aircraft pylon and to transfer all loads and rotational moments between
engine and aircraft pylon.
The front Engine Mount Support Structure (EMSS) comprises of the LP
Compressor Outlet Guide Vane (OGV) assembly and OGV Outer Mount Ring
Assembly (CSN 72354601150).
Revised analysis of these parts when the Front Mount Catcher Lug is
engaged in the failsafe condition has now been undertaken using more
advanced modelling techniques. This gives a more comprehensive
understanding of the loading and therefore stresses in the structure. This
analysis predicts that once the Front Engine Mount is in the failsafe
condition, the most highly stressed LP Compressor OGV (CSN 72354601500)
has a life that could be substantially lower than one shop visit.
This Non-Modification Service Bulletin (NMSB) introduces an inspection to
protect against the front engine mount entering the failsafe condition via
a failure of the OGV Outer Mount Ring Assembly outer rail lug fillet.
(2) Safety Intent
The safety intent of this Non-Modification Service Bulletin (NMSB) is to
confirm that the OGV Outer Mount Ring Assembly lug fillet area is not
cracked, to prevent any potential progression to failsafe operation when
the life of the EMSS is predicted to be low and failure of the EMSS could
occur.
ENGINE - RING, ASSY OGV OUTER MOUNT - FLUORESCENT PENETRANT INSPECTION OF THE MOUNT
RING OUTER RAIL LUG FILLETS - NON-MODIFICATION SERVICE BULLETIN - MOD.72-AK188
Printed in Great Britain
TRENT XWB 72−AK188
Page 1 of 23
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 4

C. Description
This NMSB instructs the repeat inspection of the OGV Outer Mount Ring Assembly
using a fluorescent penetrant technique (FPI).
Accomplishment of this NMSB 72-AK188R is to be recorded in accordance with local
Service Bulletin tracking system procedures and a completed copy of Appendix 1
(or similar form) returned to your Rolls-Royce Representative upon completion
of the inspection.
Revision 1 of this NMSB was issued to correct a cleaning procedure reference in
3.B In-Shop Accomplishment Instructions.
Revision 2 of this NMSB wasR issued to clarify the limits for redeposited
material/blackspots in 3.A. and 3.B. Accomplishment Instructions and to clarify
labelling of the fillets in Appendix 1.
Revision 3 of this NMSB is issued to increase the required inspection interval
to align with an engine refurbishment shop visit (Level 3 or 4 on the HP system
module) and remove the on-wing compliance.
R
R
R
D. Compliance
(1) On-Wing
Not applicableR
(2) In-Shop
ALERT
This Non-Modification Service Bulletin is subject to the incorporation
requirements of an EASA Airworthiness Directive.
R
R
Carry out the inspection in accordance with 3. Accomplishment Instructions
at every engine refurbishment shop visit (Level 3 or 4 on the HP system
module).
R
R
R
E. Approval
The technical content of this Non-Modification Service Bulletin was approved
under the authority of Design Organisation Approval EASA.21J.065 on Aug.12/19
and was re-approved Dec.17/19.
NMSB 72-AK188 was approved by Rolls-Royce on May. 5/22. The technical content
of this document is approved under the authority of the DOA ref. EASA.21J.065.
R
R
Printed in Great Britain
TRENT XWB 72−AK188
Page 2
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 5

F. Manpower
(1) On-wing
Not applicable.R
(2) In-shop
(a) Time to inspectR
2 hours (1 perso n * 2 hours) - EstimatedR
The Fluorescent Penetrant Inspection (FPI) defined in this NMSB shall
only be performed by personnel qualified to FPI level 2 or higher and
in possession of up-to-date eyesight record in accordance with
EN4179/NAS410 or alternative standards/guidelines accepted by the
applicable National Aviation Authority.
R
R
R
R
R
NOTE: The parts affected by this NMSB are accessible in-shop when
carrying out a Level 1 or above workscope.
R
R
G. Material Price and Availability
For Material price and availability contact your assigned Rolls-Royce
Representative.
H. Tooling Price and Availability
Part Description Quantity
Fan case access ladders RRT081482 (or equivalent) 1
Dark Non-Reflective cover
to darken the area for
inspection
No specific As necessary
Battery powered
Ultraviolet Light Source
capable of providing a
minimum UV radiation
intensity of 1200
microwatts per square
centimetre at the
inspection surface.
No specific 1
Printed in Great Britain
TRENT XWB 72−AK188
Page 3
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 6

Battery powered White
light source, capable of
providing a minimum of
1000 Lux at the inspection
surface
No specific 1
Temporary stand/tripod for
positioning inspection
lights
No specific 1
Calibrated light
radiometer, containing
both UV and visible sensor
No specific 1
I. References
(1) Overhaul Process Manual (TSD594J):
(a) TASK 70-00-00-100-101 - Overhaul Process 101 - Non-Aqueous Vapour and
Liquid Degreasing.
(b) TASK 70-00-00-200-210 - Overhaul Process 210 - Fluorescent Penetrant
Inspection.
Printed in Great Britain
TRENT XWB 72−AK188
Page 4
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 7

2. Material Information
A. Consumables, materials and expendables
Name Quantity Remarks
AMS2644 Type 1, Method D,
Level 2 (1D2) compliant
aerosol penetrant
(Fluorescent, Post
Emulsified, Medium
Sensitivity)
As necessary OMat 650
AMS2644 Type 1, Method D,
Level 4 (1D4) compliant
aerosol penetrant
(Fluorescent, Post
Emulsified, Ultra-high
Sensitivity)
As necessary OMat 652
AMS2644 Type 1, Method A,
Level 3 (1A3) compliant
aerosol penetrant
(Fluorescent, water
washable, High
Sensitivity)
As necessary OMat 632
AMS2644 Form D -
Non-Aqueous Wet Developer
- Aerosol As necessary OMat 617
Acetone based solvent
degreaser As necessary OMat 150
Solvent penetrant removerR As necessaryR OMat 616R
Penetrant 1D2 test panel
(TAM Panel) As necessary OMat 677
Penetrant 1D4 test panel
(TAM Panel) As necessary OMat 677
Penetrant 1A3 test panel
(TAM Panel) As necessary OMat 677
Absorbent Cloths, Lint
Free As necessary OMat 2-101
Printed in Great Britain
TRENT XWB 72−AK188
Page 5
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 8

Scotch-brite As necessary OMat 582
Scotch-brite As necessary OMat 583
Sponge type cotton buds As necessary No specific
Disposable plastic nitrile
gloves As necessary No specific
Waterproof, Silicon
Carbide As necessary OMat 5/36
Waterproof, Silicon
Carbide As necessary OMat 5/32
Emery, Polishing Paper As necessary OMat 5/60
Emery, Polishing Paper As necessary OMat 5/54
Printed in Great Britain
TRENT XWB 72−AK188
Page 6
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 9

3. Accomplishment Instructions
A. On-wing
Not applicable.R
B. In-shop
WARNING: BE CAREFUL WHEN YOU DO THIS PROCEDURE. OBEY THE EQUIPMENT MANUFACTURER'S
HEALTH AND SAFETY INSTRUCTIONS AND YOUR LOCAL REGULATIONS. INJURY CAN
OCCUR IF YOU DO NOT OBEY THESE INSTRUCTIONS.
WARNING: DO NOT OPERATE AN ULTRAVIOLET SOURCE IF IT DOES NOT HAVE A FILTER OR THE
FILTER DOES NOT HAVE THE CORRECT FIT OR THE FILTER HAS A CRACK.
ULTRAVIOLET RADIATION THAT IS NOT FILTERED CAN CAUSE INJURY TO YOUR EYES
AND SKIN.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL
MANUFACTURER INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: THE FLUORESCENT PENETRANT SHOULD BE ONLY APPLIED ON THE INSPECTION
SURFACE. DO NOT LET THE FLUORESCENT PENETRANT GO INTO ANY LOCATION OTHER
THAN THE INSPECTION SURFACE. IF THE FLUORESCENT PENETRANT GOES INTO ANY
LOCATION OTHER THAN THE INSPECTION SURFACE, STOP THE PROCEDURE AND
CONTACT ROLLS-ROYCE FOR FURTHER INSTRUCTIONS.
CAUTION: THE USE OF HAND HELD AIR AND ELECTRICAL POWER TOOLS IS NOT PERMITTED.
CAUTION: MAKE SURE THAT ONLY PERSONS WHO ARE APPROVED BY THE APPLICABLE AUTHORITY
DO THESE PROCEDURES. PERSONS WHO ARE NOT APPROVED CAN POSSIBLY GET AN
INCORRECT RESULT, WHICH CAN SUBSEQUENTLY CAUSE COMPONENT FAILURE.
CAUTION: USE ONLY THE CONSUMABLE MATERIALS GIVEN IN THIS TASK. IF YOU DO NOT OBEY
THIS INSTRUCTION, YOU CAN GET AN UNSATISFACTORY RESULT.
CAUTION: DO NOT LET THE FLUORESCENT PENETRANT REMOVER STAY ON THE SURFACE FOR
MORE THAN THE SPECIFIED TIME. IF THE REMOVER STAYS ON THE SURFACE FOR
MORE THAN THE SPECIFIED TIME, YOU CAN GET AN INCORRECT RESULT. THIS CAN
SUBSEQUENTLY CAUSE COMPONENT FAILURE.
CAUTION: DO NOT USE A TEST PANEL TAM (PSM-5) THAT WAS USED WITH A FLUORESCENT
PENETRANT WITH A DIFFERENT OMAT NUMBER. IF YOU DO, YOU CAN GET AN
INCORRECT RESULT AND THIS CAN SUBSEQUENTLY CAUSE COMPONENT FAILURE
(1) For the following Fluorescent Penetrant Inspection (FPI), use OMat 652
Penetrant where Penetrant is referred to and use OMat 677 Penetrant 1D4
test panel (TAM panel) where an OMat 677 Penetrant test panel is referred
to unless otherwise instructed.
Printed in Great Britain
TRENT XWB 72−AK188
Page 7
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 10

(2) Prepare the Ring, Assy OGV Outer Mount outer rail fillets (72-35-46,
01-150), see Figures 1 to 5 for inspection area, for Fluorescent Penetrant
Inspection in accordance with the following steps.
(a) Clean the inspection areas prior to FPI in accordance with the
following steps, refer to TSD594J OP 101 Section 9. (Subtask
70-00-00-110-101-A03).
WARNING: IT IS THE RESPONSIBILITY OF THE OPERATOR TO OBTAIN AND
OBSERVE THE MANUFACTURER'S MATERIAL SAFETY DATA SHEETS FOR
CONSUMABLE MATERIALS. THIS WILL CONTAIN INFORMATION SUCH AS,
HAZARDOUS INGREDIENTS, PHYSICAL/CHEMICAL CHARACTERISTICS,
FIRE, EXPLOSION, REACTIVITY, HEALTH HAZARD DATA, PRECAUTIONS
FOR SAFE HANDLING, USE, CONTROL MEASURES, ENVIRONMENTAL
EFFECTS. IT IS ALSO THE OPERATOR'S RESPONSIBILITY TO TAKE
LOCAL REGULATIONS INTO CONSIDERATION.
CAUTION: TO MAINTAIN THE CLEANLINESS OF THE WIPING SOLVENT, YOU MUST
POUR THE SOLVENT ONTO THE WIPING CLOTH. THE CLOTH MUST NOT
BE DIPPED INTO THE SOLVENT CONTAINER. IF YOU DO NOT OBEY
THIS INSTRUCTION, YOU CAN CAUSE CONTAMINATION OF THE SOLVENT
IN THE CONTAINER.
NOTE: The inspection surface must be clean, dry and free from soils,
oil, grease, paint, coatings, corrosion products, scale,
smeared metal, welding flux, chemical residues or any other
material that could prevent penetrant from entering a
discontinuity and affect the process performance or produce
unacceptable background.
(i) Apply OMat 150 Acetone based solvent degreaser to a clean OMat
2-101 Absorbent cloth, lint free.
(ii) Clean the inspection surfaces as shown in Figures 2-5 with a
clean and moist OMat 2-101 Absorbent cloth, lint free.
(iii) Ensure that all contaminants have been removed. If necessary
repeat the swabbing using fresh lint free cloth and solvent
until the area is clean and free of soil and grease.
(iv) Allow 10 minutes for the area to be completely dry prior to
penetrant application.
NOTE: You can use a clean lint free cloth to remove the unwanted
solvent.
(v) Safely discard the used materials.
Printed in Great Britain
TRENT XWB 72−AK188
Page 8
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 11

(3) Visually examine the 4-off outer rail lug fillets on the Ring, Assy OGV
Outer Mount in accordance with the following limits, refer to Figures 1-5.
DamageR LimitR ActionR
CorrosionR
R
No permitted limitR
R
Reject the OGV outer
mount ring assembly
R
R
R
DentsR One dent not more than
4.5 mm (0.177 in.) in
diameter
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001.
Dress diameter to depth
aspect ratio 10:1
R
R
R
R
R
Two or more dents not
more than 4.5 mm (0.177
in.) in diameter and
minimum distance
between dents is more
than 10.0 mm (0.394
in.)
R
R
R
R
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001.
Dress diameter to depth
aspect ratio 10:1
R
R
R
R
R
More than above
permitted limits
R
R
R
Reject the OGV outer
mount ring assembly
R
R
R
Nicks/scratchesR One nick/scratch not
more than 0.6 mm (0.024
in.) in depth and not
more than 9.0 mm (0.354
in.) in length
R
R
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001.
Dress length and width
to depth aspect ratio
10:1
R
R
R
R
R
R
Two or more
nicks/scratches and not
more than 0.6 mm (0.024
in.) in depth and not
more than 9.0 mm (0.354
in.) in length, minimum
distance between
nicks/scratches is more
than 10.0 mm (0.394
in.)
R
R
R
R
R
R
R
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001.
Dress length and width
to depth aspect ratio
10:1
R
R
R
R
R
R
More than above
permitted limits
R
R
R
Reject the OGV outer
mount ring assembly
R
R
R
Printed in Great Britain
TRENT XWB 72−AK188
Page 9
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 12

Fretting/gallingR One area of
fretting/galling not
more than 0.6 mm (0.024
in.) in depth and area
not more than 6.5 mm
(0.256 in.) in width by
6.5 mm (0.256 in.) in
length
R
R
R
R
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001
R
R
Two or more areas of
fretting/galling not
more than 0.6 mm (0.024
in.) in depth and area
not more than 6.5 mm
(0.256 in.) in width by
6.5 mm (0.256 in.) in
length, minimum
distance between
fretting/galling is
more than 10.0 mm
(0.394 in.)
R
R
R
R
R
R
R
R
R
R
R
R
R
Repair, FRS3253 SPM
TASK 70-42-11-300-001
R
R
R
More than above
permitted limits
R
R
R
Reject the OGV outer
mount ring assembly
R
R
R
Table.1 Damage acceptance limitsR
(4) The local penetrant processing for this component must be performed in
accordance with the following steps, refer to TSD 594J OP210 (TASK
70-00-00-200-210) - Fluorescent Penetrant Inspection.
(a) Cover the region of the engine with a dark non-reflective cover in
order to reduce the white light levels.
(b) Prepare the portable Ultraviolet (UV) light source:
(i) Examine the portable UV light source to make sure that it is
serviceable, then set the lamp to the ON position.
(ii) Let the lamp become warm for approximately 10 minutes so that
it is in a stabilized condition.
NOTE: For LED UV lamps the stabilising time is declared by the
manufacturer and it may not be necessary to wait 10 minutes
R
R
Printed in Great Britain
TRENT XWB 72−AK188
Page 10
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 13

(iii) Do a check of the light intensity:
NOTE: It may be necessary to mount UV light source in a fixed
position for certain parts of the process e.g. removing
penetrant whilst viewing with mirror under UV illumination.
(1) Hold the lamp at a distance of 0.38 m (15 in.) above the lamp
monitor.
(2) Make sure that there is a minimum light intensity of 1200
microwatts per square centimetre.
(c) Prepare the OMat 677 Penetrant test panel (TAM Panel) for the
inspection:
NOTE: A known defective test panel that has been approved by the NDT
Level 3 certification holder may be used as an alternative to a
TAM Panel.
R
R
R
(i) Remove the OMat 677 Penetrant test panel (TAM Panel) from the
storage container of approved solvent.
(ii) Dry the OMat 677 Penetrant test panel with an OMat 2-101
Absorbent cloth, lint free or a paper-tissue.
(iii) If the OMat 677 Penetrant test panel (TAM Panel) has been used
before, visually examine it below the portable UV light source.
Make sure that there are no penetrant indications remaining. If
remaining penetrant indications are found, do the following
steps:
(1) Remove the penetrant processing materials from the inspection
surface by wiping with a clean OMat 2-101 Absorbent cloth,
lint free moistened with OMat 150 Acetone based solvent
degreaser.
(2) Clean the Penetrant test panel (TAM Panel) with clean water
to remove the OMat 617 Non-Aqueous Wet Developer.
(3) Dry the Penetrant test panel (TAM Panel) with a clean OMat
2-101 Absorbent cloth, lint free or a paper-tissue.
(4) Soak the Penetrant test panel (TAM Panel) in one of the
approved non-aqueous liquid degreasers for a minimum time of
15 minutes, refer to Overhaul Process Manual (TSD594J) TASK
70-00-00-100-101.
(5) Visually examine the Penetrant test panel (TAM Panel) below
the portable UV light source for penetrant indications. If
penetrant indications are found, repeat Steps (4) (c) (iii) 1
-5 .
Printed in Great Britain
TRENT XWB 72−AK188
Page 11
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 14

(d) Apply Penetrant to the inspection areas, refer to Figures 2-5, by
brush or sponge applicator. The penetrant may be dispensed from an
aerosol into a suitable container for brush or sponge application.
Penetrant must comply with manufacturer's shelf life and any unused
penetrant must go to waste.
(e) If an aerosol penetrant is not available, it is permissible to use
Penetrant taken from an approved penetrant processing line and fully
traceable with batch numbers as an alternative. The penetrant must be
taken from the processing line on the day of inspection, stored in a
clean container and discarded after the inspection has been completed.
(f) Ensure that the inspection area is fully covered with penetrant with
the aid of a UV light source. Use of an inspection mirror is required
to check coverage where direct line of sight is not available to the
inspector.
(g) Apply Penetrant to the OMat 677 Penetrant test panel (TAM Panel).
(h) Leave the penetrant in contact with the components for 20 minutes.
CAUTION: THE PENETRANT CONTACT TIME MUST NOT EXCEED 1 HOUR. IF IT EXCEEDS
1 HOUR, THEN PENETRANT MUST BE RE-APPLIED AND A FURTHER 5 MINUTES
CONTACT TIME IS ALLOWED.
(5) After the 20 minutes contact time, remove the excess penetrant from the
inspection surface and the OMat 677 Penetrant test panel (TAM Panel) by
wiping thoroughly with a clean and dry OMat 2-101 Absorbent cloth, lint
free.
CAUTION: DO NOT LET THE FLUORESCENT PENETRANT REMOVER STAY ON THE SURFACE
FOR MORE THAN THE SPECIFIED TIME. IF THE REMOVER STAYS ON THE
SURFACE FOR MORE THAN THE SPECIFIED TIME, YOU CAN GET AN
INCORRECT RESULT. THIS CAN SUBSEQUENTLY CAUSE COMPONENT FAILURE.
CAUTION: USE THE MINIMUM APPLICATION NECESSARY TO ACHIEVE ACCEPTABLE
BACKGROUND FLUORESCENCE AND ENSURE THAT ACETONE IS NOT ALLOWED
TO FLOW ON THE INSPECTION SURFACE.
(6) Whilst illuminating with UV light, wipe off the penetrant from the
inspection surface with a clean OMat 2-101 Absorbent cloth, lint free
moistened with OMat 150 Acetone based solvent degreaser. A twice folded (4
layer) lint free cloth is considered to be optimum to achieve this.
(7) Use of inspection mirror to check removal is required where direct line of
sight is not available to the inspector.
(8) Use OMat 2-101 Absorbent cloth, lint free moistened with OMat 150 Acetone
based solvent degreaser or OMat 616 solvent penetrant removerR to clean the
OMat 677 Penetrant test panel (TAM Panel).
Printed in Great Britain
TRENT XWB 72−AK188
Page 12
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 15

(9) Ensure that all traces of the OMat 150 Acetone based solvent degreaser and
(where used on TAM panel only) OMat 616 solvent penetrant remover
R
R have
been completely removed by evaporation.
(10) If necessary, repeat the steps (6) to (9) to remove the excess penetrant
from inspection surface and Penetrant test panel (TAM panel). This step
should not be carried out more than 2 times. If the background still
remains after 2 penetrant removal steps (wipes), the part should be
re-cleaned from the start before undergoing repeat FPI technique (repeat
from Step (2) onwards).
(11) Apply a light, even coating of OMat 617 Non-Aqueous Wet Developer from a
sealed aerosol can to the inspection area and OMat 677 Penetrant test
panel (TAM Panel).
(12) Allow 10 minutes contact time for the developer.
(13) Inspect the inspection surface and Penetrant test panel (TAM Panel) in
accordance with the following steps, refer to TSD594J OP210 (TASK
70-00-00-200-210) - Fluorescent Penetrant Inspection.
(a) Ensure there are no white light sources or fluorescent items
(including clothing) within the inspection area or the inspector's
field of vision.
(b) Do not wear darkened or light sensitive glasses.
(c) Allow 1 minute for eye adaptation to the darkened area.
(d) Illuminate the OMat 677 Penetrant test panel (TAM Panel) with UV light
at an intensity of no less than 1200 microwatts per square centimetre
in the darkened area.
(e) Inspect the OMat 677 Penetrant test panel (TAM Panel) and check that
the largest indications are visible and match the control photograph
for that individual panel.
(f) Illuminate the inspection surface with UV light at an intensity of no
less than 1200 microwatts per square centimetre in the darkened area.
(g) Examine the Penetrant test panel (TAM Panel) under UV light-source for
crack indications. Make sure that there is the correct number of known
indications for the OMat 677 Penetrant test panel used as follows:
(i) If OMat 652 Penetrant was applied, look for five indications in
view, refer to TSD 594J OP210 (TASK 70-00-00-200-210) -
Fluorescent Penetrant Inspection.
(ii) If OMat 650 Penetrant was applied, look for three indications
in view, refer to TSD 594J OP210 (TASK 70-00-00-200-210) -
Fluorescent Penetrant Inspection.
Printed in Great Britain
TRENT XWB 72−AK188
Page 13
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 16

(iii) If OMat 632 Penetrant was applied, look for four indications in
view, refer to TSD 594J OP210 (TASK 70-00-00-200-210) -
Fluorescent Penetrant Inspection.
(iv) If the number of crack indications found is less than that
specified above, do the following steps:
(1) Remove the penetrant processing materials from the inspection
surface by wiping with a clean OMat 2-101 Absorbent cloth,
lint free moistened with OMat 150 Acetone based solvent
degreaser.
(2) Clean the Penetrant test panel (TAM Panel) with clean water
to remove the OMat 617 Non-Aqueous Wet Developer.
(3) Dry the Penetrant test panel (TAM Panel) with a clean OMat
2-101 Absorbent cloth, lint free or a paper-tissue.
(4) Soak the Penetrant test panel (TAM Panel) in one of the
approved non-aqueous liquid degreasers for a minimum time of
15 minutes, refer to Overhaul Process Manual (TSD594J) TASK
70-00-00-100-101.
(5) Then on the Penetrant test panel (TAM Panel) only, do the
full penetrant inspection again.
NOTE: A second unsatisfactory result on the Penetrant test
panel (TAM Panel), materials and/or procedure is
unsatisfactory. You must find the cause of the
unsatisfactory result, and then do the full penetrant
inspection of the part and Penetrant test panel (TAM
Panel) again.
(h) Inspect the Ring, Assy OGV Outer Mount Outer Rail Lug Fillets for
crack indications. Use of inspection mirror is required where direct
line of sight is not available to inspector.
CAUTION: THE USE OF HAND HELD AIR AND ELECTRICAL POWER TOOLS IS NOT
PERMITTED.
(i) Where an indication is highlighted, similar to the example shown in
Figure 6, due to a surface feature (known as redeposited material or
blackspots) it shall be removed by surface cleaning or non-smearing
hand polishing removal using the following steps (capture all details
of the surface features including whether it was bonded to the parent
material in Appendix 2):
(i) Lightly hand polish using OMat 582 Scotch-brite.
(ii) Where hand polishing using OMat 582 does not remove the surface
features, lightly hand polish using OMat 583 Scotch-brite.
Printed in Great Britain
TRENT XWB 72−AK188
Page 14
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 17

(iii) Where hand polishing using OMat 583 does not remove the surface
features, lightly hand polish using OMat 5/36 Waterproof
Silicon Carbide or Omat 5/60 Emery, polishing paper for no more
than 5 minutes, ensuring that the emery paper is clean and free
from debris at all times. Ensure that the polished surface does
not become hot to the touch.
R
R
R Follow this by lightly hand
polishing with OMat 5/32 Waterproof Silicon Carbide or OMat
5/54 Emery, polishing paper for no more than 5 minutes,
ensuring that the emery paper is clean and free from debris at
all times. Ensure that the polished surface does not become hot
to the touch.
R
R
R
R
(j) If surface cleaning or non-smearing hand polishing removal technique
was carried out in Step (i), then repeat the complete procedure from
step 3. B. (2). If no surface cleaning or non-smearing hand polishing
removal was required, skip step (k) and continue the inspection by
doing step (l).
(k) If any surface features (redeposited material/ blackspots) are
identified during the second FPI procedure, evaluate the blackspot
with following criteria:
DamageR
R
LimitR
R
ActionR
R
Blackspot/redeposited
material
R
R
R
One
blackspot/redeposited
material or cluster of
blackspot/redeposited
material not more than
4.0 mm (0.158 in.) in
diameter
R
R
R
R
R
R
R
R
AcceptR
R
One or more
blackspot/redeposited
material or cluster of
blackspot/redeposited
material not more than
4.0 mm (0.158 in.) in
diameter and minimum
distance between
blackspot/redeposited
material is more than
10.0 mm (0.394 in.)
R
R
R
R
R
R
R
R
R
R
R
R
AcceptR
R
More than above
permitted limits
R
R
R
Reject the OGV outer
mount ring assembly
R
R
R
Table.2 Redeposited material/blackspots acceptance limitsR
Printed in Great Britain
TRENT XWB 72−AK188
Page 15
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 18

(l) Examine the inspection area under UV light source for crack
indications:
(i) If crack indications are found, use a MAGNIFYING GLASS POWER
10X to make sure that there is a defect.
NOTE: When a mirror is being used where direct line of sight is
not available to the inspector, the use of a magnifying
glass power 10X may not be possible and the defect may need
to be assessed using a lower magnification.
(ii) If crack indications can be seen, visually examine the area
below a white light. Use a MAGNIFYING GLASS POWER 15X and
MAGNIFYING GLASS POWER 30X to make sure that there is a defect.
NOTE: When a mirror is being used where direct line of sight is
not available to the inspector, the use of a magnifying
glass power 15X and 30X may not be possible and the defect
may need to be assessed using a lower magnification.
(iii) To aid the evaluation of the indication, the wipe-off technique
can be used as specified in TSD594J OP 210 SUBTASK
70-00-00-230-210-078.
(14) If there are any cracks or crack indications on the inspection surface:
(a) Reject the OGV outer mount ring.
(b) Record the damage in Appendix 1.
(15) If there is damage observed during the Fluorescent Penetrant Inspection
which was not observed during the visual inspection in Step 3.B.(3),
assess the damage against the limits defined in Step 3.B.(3).
(16) If fretting and galling was observed and accepted in Step 3.B.(3)(e) but
the background fluorescence is too high to assess the region for cracks
repeat Steps 3.B. (2) to (16) only using OMat 650 penetrant where
Penetrant is referred to. Where OMat 677 Penetrant test panel (TAM panel)
is referred to, ensure that a Penetrant 1D2 test panel (TAM panel) which
has only been used with OMat 650 is used.
(17) If after Step (16) the background fluorescence is still too high to assess
the region for cracks repeat Steps 3.B. (2) to (16) only using OMat 632
penetrant where Penetrant is referred to. Where OMat 677 Penetrant test
panel (TAM panel) is referred to, ensure that a Penetrant 1A3 test panel
(TAM panel) which has only been used with OMat 632 is used.
(18) Once all indications have been evaluated and recorded, remove the
penetrant processing materials from the inspection surface by wiping with
a clean OMat 2-101 Absorbent cloth, lint free moistened with OMat 150
Acetone based solvent degreaser.
Printed in Great Britain
TRENT XWB 72−AK188
Page 16
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 19

(19) Clean the Penetrant test panel (TAM Panel) used in accordance with the
following steps, refer to TSD 594J OP210 (TASK 70-00-00-200-210) -
Fluorescent Penetrant Inspection.
(a) Clean the Penetrant test panel (TAM Panel) with clean water to remove
the OMat 617 Non-Aqueous Wet Developer.
(b) Dry the Penetrant test panel (TAM Panel) with a clean OMat 2-101
Absorbent cloth, lint free or a paper-tissue.
(c) Soak the Penetrant test panel (TAM Panel) in one of the approved
non-aqueous liquid degreasers for a minimum time of 15 minute.
(d) Visually examine the Penetrant test panel (TAM Panel) below the
portable UV light source for penetrant indications.
(e) If penetrant indications are found, repeat step (19).
(20) Make sure that the work area is clean and clear of tools and other items.
(21) Complete and return Appendix 1, or similar form, to your Rolls-Royce
Overhaul Support Team representative.
Printed in Great Britain
TRENT XWB 72−AK188
Page 17
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 20

dex0002097
FORWARD ENGINE
MOUNT RAILS
A
B
B
A
B
TYPICAL 2 LOCATIONS
OUTER RAIL
LUG FILLET
OUTER RAIL LUG
A
TYPICAL 2 LOCATIONS
OUTER RAIL
LUG FILLET
OUTER RAIL LUG
Figure 1 - OGV Outer Mount Ring - Inspection Locations
Printed in Great Britain
TRENT XWB 72−AK188
Page 18
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 21

Figure 2 - Front Mount Ring with Mount Assembly showing 4-off OGV Outer Mount Ring
Outer Rail Lug Fillets Inspection Areas
Printed in Great Britain
TRENT XWB 72−AK188
Page 19
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 22

Figure 3 - Definition of Extent of Inspection Areas
Printed in Great Britain
TRENT XWB 72−AK188
Page 20
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 23

dex0002297
E
D
20.00 mm
(0.787 in)
20.00 mm
(0.787 in)
10.00 mm
(0.394 in)
Figure 4 - Definition of Extent of Inspection Areas
Printed in Great Britain
TRENT XWB 72−AK188
Page 21
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 24 (OCR)

IR Rolls-Royce  TRENT XWB SERIES  SERVICE BULLETIN
Printed in Great Britain
Inspection Areas:
Fillet radius
including
circumferential
and axial extents
and pockets
(green).
Inspect starboard
and port lugs on
forward and aft
rails- 4-off lug
inspections.
Figure 5 - Areas required to undergo FPI processing and inspection
Aug 13/19  TRENT XWB 72-AK188
R May. 9/22  Page 22
© Rolls-Royce pic

### Page 25

Figure 6 - Surface feature (known as redeposited material or blackspot) shown in the
pre and post wipe-off condition.
Printed in Great Britain
TRENT XWB 72−AK188
Page 23
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 26

This form (or similar) to be completed for every OGV Outer Mount Ring inspected.
Results to be sent to Rolls-Royce via your Rolls-Royce Representative.
Feedback Sheet NMSB 72-AK188
Overhaul Base / Operator
Date of Inspection
Engine Serial Number
Engine Hours Since New
Engine Cycles Since New
OGV Outer Mount Ring Part Number
(Identification: Outer circumference of
the mount ring, right angle to center
catcher lug position)
Inspection result (accept/reject) and if applicable
details on the reason for rejection
Inspection of Lug 1
(Forward port)
(refer to Figure 2)
Inspection of Lug 2
(Rearward port)
(refer to Figure 2)
Inspection of Lug 3
(Forward starboard)
(refer to Figure 2)
Inspection of Lug 4
(Rearward starboard)
(refer to Figure 2)
APPENDIX 1
Printed in Great Britain
TRENT XWB 72−AK188
Appendix 1 - Page 1 of 2
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 27

Attach photographic
evidence of damages
if any.
Printed in Great Britain
TRENT XWB 72−AK188
Appendix 1 - Page 2
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

### Page 28

This form (or similar) to be completed for every surface feature (redeposited
material/blackspot) identified during the OGV Outer Mount Ring inspection.
Results to be sent to Rolls-Royce via your Rolls-Royce Representative
Details of surface feature (redeposited material/blackspot) identified during
NMSB 72-AK188
Overhaul Base / Operator
Date of Inspection
Engine Serial Number
Engine Hours Since New
Engine Cycles Since New
OGV Outer Mount Ring Part Number
(Identification: Outer circumference of
the mount ring, right angle to center
catcher lug position)
Remarks
Has a surface feature (redeposited
material/blackspot appeared during
inspection.
Y e s/N o
If Yes, was the feature removable? Y e s/N o
If Yes, were the features removed and
what removal method was carried out?
Details of surface feature (redeposited
material/blackspot) identified during
second FPI procedure.
Number of occurrences:
Locations:
Diameter of feature:
Add the photographic evidence of
redeposited material/blackspots which
remained during second FPI procedure,
if any.
APPENDIX 2
Printed in Great Britain
TRENT XWB 72−AK188
Appendix 2 - Page 1 of 1
Aug 13/19
May. 9/22R
TRENT XWB SERIES
SERVICE BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
