# Rolls-Royce Non-Modification Service Bulletin RB.211-72-G448: Revision 4

- Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2007-28059; AD 2015-02-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Rolls-Royce Non-Modification Service Bulletin RB.211-72-G448](https://openairdocs.org/service-documents/rolls-royce/rb211-72-g448.md)
- Title as filed: RB 211-72-G448 R4
- Pages: 63
- PDF: https://openairdocs.org/files/sha256/bf/09/bf092dc4fb5c9838f0ebfb0bc4a19260d63f63cc5707b82f9ebeaabd6ec836f4
- Page: https://openairdocs.org/service-documents/rolls-royce/rb211-72-g448/file/bf092dc4fb5c

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

This document transmits Revision 4 to Service Bulletin RB211-72-G448
Document History
Service Bulletin Revision Status Supplement Revision Status
Initial Issue Jul.26/10
Revision 1 Oct.29/10
Revision 2 Dec.23/10
Revision 3 Jul.7/11
Bulletin Revision 4
Remove Incorporate Reason for change
Pages 1 to 51 of the
Service Bulletin
Pages 1 to 53 of the
Service Bulletin
Revised 3.Accomplishment
Instructions to clarify
acceptance criteria for the
balance washer keys (tabs).
Added/Revised Figs.7 thru
Fig.9. Updated sections
1.B. Reason, 1.D.
Compliance, 1.E. Approval
and 1.I. References. Minor
text changes have also been
made.
Printed in Great Britain
Aug.21/14
RB211 TRENT 500 AND TRENT 900 SERIES PROPULSION SYSTEMS NON-MODIFICATION
SERVICE BULLETIN
RB.211−72−G448
Transmittal - Page 1 of 4
Date

### Page 2

All pages of
Appendix 1
Page 1 and 2 of
Appendix 1
Revised 3.Accomplishment
Instructions to clarify
acceptance criteria for the
balance washer keys (tabs).
Added/Revised Figs.7 thru
Fig.9. Updated sections
1.B. Reason, 1.D.
Compliance, 1.E. Approval
and 1.I. References. Minor
text changes have also been
made.
All pages of
Appendix 2
Page 1 and 2 of
Appendix 2
Revised 3.Accomplishment
Instructions to clarify
acceptance criteria for the
balance washer keys (tabs).
Added/Revised Figs.7 thru
Fig.9. Updated sections
1.B. Reason, 1.D.
Compliance, 1.E. Approval
and 1.I. References. Minor
text changes have also been
made.
All pages of
Appendix 3
Page 1 and 2 of
Appendix 3
Revised 3.Accomplishment
Instructions to clarify
acceptance criteria for the
balance washer keys (tabs).
Added/Revised Figs.7 thru
Fig.9. Updated sections
1.B. Reason, 1.D.
Compliance, 1.E. Approval
and 1.I. References. Minor
text changes have also been
made.
Printed in Great Britain
RB.211−72−G448
Transmittal - Page 2

### Page 3

LIST OF EFFECTIVE PAGES
The effective pages to this Service Bulletin following incorporation of Revision
4 are as follows:
Page Revision Number Revision Date
Bulletin
R     1 4 Aug.21/14
R     2 4 Aug.21/14
R     3 4 Aug.21/14
R     4 4 Aug.21/14
R     5 4 Aug.21/14
R     6 4 Aug.21/14
R     7 4 Aug.21/14
R     8 4 Aug.21/14
R     9 4 Aug.21/14
R    10 4 Aug.21/14
R    11 4 Aug.21/14
R    12 4 Aug.21/14
R    13 4 Aug.21/14
R    14 4 Aug.21/14
R    15 4 Aug.21/14
R    16 4 Aug.21/14
R    17 4 Aug.21/14
R    18 4 Aug.21/14
R    19 4 Aug.21/14
R    20 4 Aug.21/14
R    21 4 Aug.21/14
R    22 4 Aug.21/14
R    23 4 Aug.21/14
R    24 4 Aug.21/14
R    25 4 Aug.21/14
R    26 4 Aug.21/14
R    27 4 Aug.21/14
R    28 4 Aug.21/14
R    29 4 Aug.21/14
R    30 4 Aug.21/14
R    31 4 Aug.21/14
R    32 4 Aug.21/14
R    33 4 Aug.21/14
R    34 4 Aug.21/14
R    35 4 Aug.21/14
R    36 4 Aug.21/14
R    37 4 Aug.21/14
R    38 4 Aug.21/14
R    39 4 Aug.21/14
R    40 4 Aug.21/14
R    41 4 Aug.21/14
R    42 4 Aug.21/14
R    43 4 Aug.21/14
R    44 4 Aug.21/14
Printed in Great Britain
RB.211−72−G448
Transmittal - Page 3

### Page 4

R    45 4 Aug.21/14
R    46 4 Aug.21/14
R    47 4 Aug.21/14
R    48 4 Aug.21/14
R    49 4 Aug.21/14
R    50 4 Aug.21/14
R    51 4 Aug.21/14
R    52 4 Aug.21/14
R    53 4 Aug.21/14
Appendix 1
R     1 4 Aug.21/14
R     2 4 Aug.21/14
Appendix 2
R     1 4 Aug.21/14
R     2 4 Aug.21/14
Appendix 3
R     1 4 Aug.21/14
R     2 4 Aug.21/14
Printed in Great Britain
RB.211−72−G448
Transmittal - Page 4

### Page 5

1. Planning Information
A. Effectivity
(1) Airbus A340
RB211 TRENT553-61 Engines
RB211 TRENT553A2-61 Engines
RB211 TRENT556-61 Engines
RB211 TRENT556A2-61 Engines
RB211 TRENT556B-61 Engines
RB211 TRENT556B2-61 Engines
RB211 TRENT560-61 Engines
RB211 TRENT560A2-61 Engines
(2) Airbus A380
RB211 TRENT970-84 Engines
RB211 TRENT970B-84 Engines
RB211 TRENT972-84 Engines
RB211 TRENT972B-84 Engines
RB211 TRENT977-84 Engines
RB211 TRENT977B-84 Engines
RB211 TRENT980-84 Engines
B. Reason
(1) Problem
Cracking of the rear balance land has been found on two Trent 800 IP
compressor shafts and on one Trent 700 IP compressor shaft. The balancing
feature and method is similar on Trent 500 and Trent 900 engines although
the disc geometry is different from Trent 700 and Trent 800 engines.
ENGINE - IP COMPRESSOR SHAFT - IN SHOP EDDY CURRENT OR BORESCOPE INSPECTION OF
BALANCE LAND - NON-MODIFICATION SERVICE BULLETIN - NON - MOD.72-G448
Printed in Great Britain
RB.211−72−G448
Page 1 of 53
Jul.26/10
Aug.21/14R

### Page 6

Non-Modification Service Bulletin (NMSB) 72-AF260 was issued to specify an
in-shop visual inspection of the rear balance land and applied to Trent
500, Trent 700 and Trent 800 engines.
NMSB72-G269 was later issued to specify an in-shop visual inspection of
the rear balance land and applied to Trent 900 engines only.
NMSB72-G448 specifies an enhanced crack detection technique, eddy current
inspection for the rear balance land when the rear of the IPC module is
exposed and a borescope inspection of the balance land when it is not
exposed. This inspection is to be done in-shop on Trent 500 and Trent 900
engines.
(2) This NMSB supersedes NMSB 72-AF260 (for Trent 500 engines) and NMSB
72-G269 (for
R
R Trent 900 engines).
NMSB 72-AF260 and NMSB 72-G269 will be cancelled.R
(3) Substantiation
This NMSB instructs in-shop inspection of the IP compressor shaft rear
balance land. If the rear of the IP compressor module is exposed this is
an eddy current inspection. If it is not exposed this is a borescope
inspection gaining access through the intermediate case.
Revision 1 of this NMSB was issued to add a procedure for determining if
an Eddy Current Inspection crack indication is spurious or genuine.
Revision 2 of this NMSB was issued to extend the date from which the NMSB
became effective, that followed a delay in the availabilty of the Eddy
Current Inspection tooling.
Revision 3 of this NMSB wasR to change the order of visual and eddy current
inspection procedures and to make minor changes to eddy current inspection
procedures in section 3.D. Accomplishment Instructions.
Revision 4 of this NMSB is issued to revise sections 1.D. Compliance and
to clarify acceptance criteria for the balance washer keys (tabs) in 3.
Accomplishment Instructions, including a new Figure (Fig.9 sheet 2 of 2).
Minor text changes have been made and additional references added to 1.I.
References.
R
R
R
R
R
(4) Effect of Bulletin on:
(a) Operation
Not affected.
(b) Maintenance
Not affected.
Printed in Great Britain
RB.211−72−G448
Page 2
Jul.26/10
Aug.21/14R

### Page 7

(c) Overhaul
Not affected.
(d) Repair Schemes
Not affected.
(e) Interchangeability
Not affected.
C. Description
This NMSB instructs an in-shop inspection of the IP compressor shaft rear
balance land in order to maintain serviceability and obtain data to support
engineering analysis.
Send copies of the NMSB inspection results to your Rolls-Royce service
representative by completion of Appendix 1 (borescope inspection) or Appendix 2
(eddy current inspection) or send an equivalent form containing the same
information.
NOTE: If the rear face of the IPC module is not exposed, visual borescope
inspection of the IPC rear balance land, refer to 3.B. or 3.C., is
acceptable in lieu of a repeat on-wing inspection required under NMSB
72-AH058 or NMSB 72-AH059 and will reset the cyclic interval count to
zero.
R
R
R
R
R
D. Compliance
RECOMMENDED
This NMSB must be accomplished on engines at Module M32-IPC Module, rework
level of Module Check and Repair, Module Overhaul, Engine Refurbishment or
where the engine is disassembled sufficiently to expose the rear face of the IP
compressor module.
R
R
R
R
If the rear face of the IPC module is exposed: Conduct an Eddy current
inspection, refer to 3.D.
R
R
This NMSB does not need be accomplished on IP compressor shafts that have a
life of zero cycles since new.
R
R
This Non-Modification Service Bulletin is the subject of an European Aviation
Safety Agency (EASA) approved Airworthiness Directive (AD) No.: AD2014-0152.
R
R
Printed in Great Britain
RB.211−72−G448
Page 3
Jul.26/10
Aug.21/14R

### Page 8

E. Approval
The technical content of this Non-Modification Service Bulletin was approved
under the authority of Design Organisation Approval EASA.21J.035 on Jul.21/10,
Oct.28/10, Dec.23/10, Jul.5/11R and was re-approved on Aug.21/14.
F. Manpower
(1) Borescope Inspection:
(a) Time to gain access
30 minutes (1 person).
(b) Time to inspect
1 hour 30 minutes (2 persons).
(c) Time to restore to serviceable condition
1 hour (1 person).
(2) Eddy Current Inspection:
(a) Time to remove balance weights
15 minutes (1 person).
(b) Time to clean balance land
Up to 2 hours, depending on level of debris in balance land recess (1
person).
(c) Time to inspect
2 hours (1 person).
NOTE: The ECI technique described in section 3. Accomplishment
Instructions must only be carried out by personnel approved to
the applicable national standard (EN4179, NAS 410 or
equivalent) at level 2 or higher.
(d) Time to install balance weights
15 minutes (1 person).
NOTE: Parts affected by this NMSB are accessible at overhaul
G. Material Price and Availability
Modification kit not required; parts supplied as single line items.
Printed in Great Britain
RB.211−72−G448
Page 4
Jul.26/10
Aug.21/14R

### Page 9

H. Tooling Price and Availability
The following equipment is required to accomplish this NMSB:
Part No. Description
Borescope 4 mm or 6 mm flexible borescope with
forward viewing and side view tips
HU40324 IP Rotor turning tool (Trent 500)
HU43985 IP Rotor turning tool (Trent 900)
HU82346 Borescope guide tube
Rohmann Elotest B1 or
equivalent instrument
Phase Display Eddy Current Instrument
HU44791 Trent 500 IPC stage 8 balance land Eddy
Current Inspection Kit comprising of
the following parts:
HU44793 (Wheeled carriage)
MDK1 H-1803.03.1 (Eddy Current Probe)
HU44792 (Calibration Block)
HU44795 Trent 900 IPC stage 8 balance land Eddy
Current Inspection Kit comprising of
the following parts:
HU44797 (Wheeled carriage)
MDK1 H-1803.03.1 (Eddy Current Probe)
HU44796 (Calibration Block)
Elotest instruments - EK/2HF/1
Connecting leads for other instruments
are available from Rohmann
Probe to instrument connecting cable
I. References
(1) Trent 500 Engine Manual, 72-32-31, Cleaning, Inspection
(2) Trent 900 Engine Manual, 72-00-13, Clip Position Data
(3) Trent 900 CIR Manual, 72-32-31, Cleaning, Inspection
(4) Overhaul Processes Manual TSD594J, 70-00-00, OP101, OP117, OP363
(5) Standard Practices Manual, 70-51-00, Torque Tighten Components, 70-12-04,
Procedures used to Lock Threaded Parts
(6) Rolls-Royce RB211 Non-Modification Service Bulletins:
(a) 72-AF260
Engine - IP compressor shaft - Visual inspection of balance land
Printed in Great Britain
RB.211−72−G448
Page 5
Jul.26/10
Aug.21/14R

### Page 10

(b) 72-G269
Engine - IP compressor shaft - Visual inspection of balance land
(c) 72-AH058R
Engine - IP Compressor Shaft - Visual Borescope Inspection of Balance
Land
R
R
(d) 72-AH059R
Engine - IP Compressor Shaft - Visual Borescope Inspection of Balance
Land
R
R
(7) Rolls-Royce RB211 Service Bulletins:R
(a) 72-AH555R
Engine - IP compressor Shaft - Introduction of revised Method of
Balancing the Rear of the IP Compressor Rotor
R
R
(b) 72-AH561R
Engine - IP Compressor Shaft - Introduction of revised Balancing
Method at the Rear of the IP Compressor using New Balance Weights
under Blade
R
R
R
Printed in Great Britain
RB.211−72−G448
Page 6
Jul.26/10
Aug.21/14R

### Page 11

2. Material Information
A. Parts required to accomplish this Non-Modification Service Bulletin:
All Engines
72-32-31
FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE MAT OLD
PART
NO.
INSTR
DISP
01450 AS44702 AR Bolt, 0.190 in. dia
x 0.335 in.
VU1653
- AS44702 -
01452 AS44691 AR Washer, VU1653 - AS44691 -
01445 AS44696 AR Clamp - AS454696 -
01415 AS44695
-150
AR Balance weight - AS44695-150-
01417 AS44695
-175
AR Balance weight - AS44695-175-
01419 AS44695
-200
AR Balance weight - AS44695-200-
01421 AS44695
-225
AR Balance weight - AS44695-225-
01423 AS44695
-250
AR Balance weight - AS44695-250-
01425 AS44695
-275
AR Balance weight - AS44695-275-
01427 AS44695
-300
AR Balance weight - AS44695-300-
Trent 500 Engines
75-22-49
FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE MAT OLD
PART
NO.
INSTR
DISP
21100 FW17133 AR Air Tube - FW17133 -
Printed in Great Britain
RB.211−72−G448
Page 7
Jul.26/10
Aug.21/14R

### Page 12

FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE MAT OLD
PART
NO.
INSTR
DISP
21106 AS48510 AR Bolt - AS48510 -
21114 AS48513 AR Bolt - AS48513 -
21112 AS12944 AR Washer - AS12944 -
21113 CU37148 AR Washer - CU37148 -
21125 AS48408 AR Bolt (CP101919) - AS48408 -
21126 K8831 AR Washer (CP101919) - K8831 -
21128 UP11470 AR Clip (CP101919) - UP11470 -
21132 AS20624 AR Nut (CP101919) - AS20624 -
Trent 900 Engines
75-22-49
FIG
ITEM
NO.
NEW
PART
NO.
QTY PART TITLE MAT OLD
PART
NO.
INSTR
DISP
13100 FW24803 AR Air Tube - FW24803 -
13106 AS48528 AR Bolt - AS48528 -
13107 AS48512 AR Bolt - AS48512 -
NOTE: Quantity As Required (AR) up to a maximum of 4.
Printed in Great Britain
RB.211−72−G448
Page 8
Jul.26/10
Aug.21/14R

### Page 13

3. Accomplishment Instructions
A. Consumable Materials
OMat 4/46, jointing compound
OMat 261, temporary marker
OMat 2/142, safety cable
OMat 256 or OMat 2/30, PTFE adhesive tape. Note that the same type of tape
must be used throughout all stages of calibration and inspection.
B. Borescope Inspection of Trent 500 Engines
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN
CAUSE AN INJURY. IF YOU GET AN INJURY PUT IT IN COLD WATER FOR 10
MINUTES AND GET MEDICAL AID.
CAUTION: DO NOT START THE BORESCOPE INSPECTION UNTIL THE ENGINE HAS COOLED TO
WITHIN THE BORESCOPE MANUFACTURERS RECOMMENDATIONS. THE ENGINE IS HOT
IMMEDIATELY AFTER THE ENGINE IS STOPPED AND CAN CAUSE BURNS AND DAMAGE
TO BORESCOPE INSPECTION EQUIPMENT.
NOTE: If parts have already been disassembled or the applicable system is not
available, some steps will not be required.
(1) Get access to compressor intermediate case, vane 8 by removing the IP8
buffer air tube (EIPC 75-22-49, Fig/Item 21-100).
(a) Disconnect air tube (EIPC 75-22-49, Fig/Item 21-500) from the IP8
buffer air tube (EIPC 75-22-49, Fig/Item 21-100) at the compressor
intermediate case firewall. Refer to Fig.1.
(b) Remove and retain bolts (EIPC 75-22-49, Fig/Item 21-114) and washers
(EIPC 75-22-49, Fig/Item 21-112 and 21-113) that connect the IP8
buffer air tube (EIPC 75-22-49, Fig/Item 21-100) to the compressor
intermediate case firewall. Refer to Fig.1.
(c) Remove and retain clipstack CP101919. Refer to Fig.3.
(d) Remove and retain bolts (EIPC 75-22-49, Fig/Item 21-106) 3 off
connecting the tube to the compressor intermediate case. Refer to
Fig.1.
(e) Remove IP8 buffer air tube (EIPC 75-22-49, Fig/Item 21-100).
Printed in Great Britain
RB.211−72−G448
Page 9
Jul.26/10
Aug.21/14R

### Page 14

(2) Do the borescope inspection of the IP compressor stage 8 disc balance land
from Direction 1.
(a) Put the borescope with a forward viewing tip fitted into the
intermediate case, vane 8. The vane will guide the borescope towards
the rear of the IP compressor stage 8 disc.
(b) Slowly move the borescope to view the balance land from Direction 1 as
shown in Fig.5.
CAUTION: MAKE SURE THAT THE BORESCOPE IS NOT IN THE PATH OF ANY ROTATING
COMPONENT WHEN YOU TURN THE ENGINE. IF THE BORESCOPE AND ROTATING
COMPONENT TOUCH, DAMAGE TO EITHER THE ROTATING COMPONENT OR
BORESCOPE WILL OCCUR.
(c) Use HU40324, turning tool to slowly turn the IP compressor.
(d) Do an inspection of the balance land from Direction 1 over all the
circumference of the balance land. Refer to Fig.5.
NOTE: Together with inspection from Direction 2 (refer to section
3.B.(3)), you must do an inspection of Zone A of the balance
land along the circumference. Refer to Fig.6.
(e) Look for cracks,R dents or nicks, loose balance weights and washer key
(tab) locations.
R
R For acceptance criteria refer to step 3.B.(4).
NOTE: Carefully examine the area around the balance weights.
Carefully examine all around the edge of the clamp plate to
make sure there is no cracking that has started underneath the
clamp plate. Fig.7, Fig.8 and Fig.9 are provided as examples.R
(f) Record the results in Appendix 1.
(g) Remove borescope from the compressor intermediate case, vane 8.
(3) Do the borescope inspection of the IP compressor stage 8 disc balance land
from Direction 2.
(a) Put the borescope with a side viewing tip fitted into HU82346, guide
tube, so that the tip of the borescope is just short of the guide tube
end.
(b) Make sure the curved end of the guide tube is towards the front of the
engine and put the guide tube into the intermediate case, vane 8.
NOTE: The guide tube will need to be straightened by hand to go into
the vane.
Printed in Great Britain
RB.211−72−G448
Page 10
Jul.26/10
Aug.21/14R

### Page 15

(c) Push the guide tube into the engine until the end of the guide tube is
in the cavity behind the stage 8 disc. The guide tube will then spring
back to its original shape.
(d) Push the borescope through the guide tube until the viewing tip
emerges from the guide tube.
(e) Slowly move the borescope until you can see the balance land from
Direction 2 as shown in Fig.5.
CAUTION: MAKE SURE THAT THE BORESCOPE IS NOT IN THE PATH OF ANY ROTATING
COMPONENT WHEN YOU TURN THE ENGINE. IF THE BORESCOPE AND ROTATING
COMPONENT TOUCH, DAMAGE TO EITHER THE ROTATING COMPONENT OR
BORESCOPE WILL OCCUR.
(f) Use HU40324, turning tool to Slowly turn the IP compressor.
(g) Do an inspection of the balance land from Direction 2 over all the
circumference of the balance land.
NOTE: Together with the inspection from Direction 1 (refer to section
3.B.(2)), you must do an inspection of Zone A of the balance
land along the circumference. Refer to Fig.6.
(h) Look for cracks,R dents or nicks, loose balance weights and washer key
(tab) locations.
R
R For acceptance criteria refer to step 3.B.(4).
NOTE: Carefully examine the area around the balance weights.
Carefully examine all around the edge of the clamp plate to
make sure there is no cracking that has startedR underneath the
clamp plate. Fig.7, Fig.8 and Fig.9 are provided as examples.R
(i) Record the results in Appendix 1.
(j) Remove borescope until the viewing tip is inside the guide tube and
then remove the borescope and guide tube from the intermediate case
vane 8.
(4) Acceptance Criteria
(a) Cracked - Reject, inform Rolls-Royce as soon as practically possible.R
(b) Dented or nicked:R
(i) Reject. Supply pictures of dent or nick to Rolls-Royce
Technical Help Desk.
R
R
(c) Loose balance weights (refer to Fig.9):R
(i) Reject. Supply pictures of balance weights to Rolls-Royce
Technical Help Desk.
R
R
Printed in Great Britain
RB.211−72−G448
Page 11
Jul.26/10
Aug.21/14R

### Page 16

(d) Washer key (tab) locations (refer to Fig.9):R
(i) One or more locking keys (tabs) limiting bolt rotation in the
anti-clockwise direction - Accept
R
R
(ii) No locking keys (tabs) limiting bolt rotation in the
anti-clockwise direction - Reject. Supply pictures of balance
weights to Rolls-Royce Technical Help Desk.
R
R
R
(5) Install the IP8 buffer air tube (EIPC 75-22-49, Fig/Item 21-100).
(a) Clean mating faces of the tube flange and the intermediate case
diaphragm. Refer to OP TASK 70-00-00, OP101.
(b) Apply a thin layer of OMat 4/46, jointing compound to the mating faces
of the flange and the compressor intermediate case diaphragm. Refer to
Fig.2.
(c) Let OMat 4/46, jointing compound dry for a minimum of 10 minutes.
(d) Make sure all of OMat 4/46, jointing compound is removed from the bolt
holes.
(e) Connect the tube to the compressor intermediate case diaphragm with
bolts (EIPC 75-22-49, Fig/Item 21-114) 2 off and washers (EIPC
75-22-49, Fig/Item 21-112 and 21-113). Refer to Fig.1.
(f) Torque bolts (EIPC 75-22-49, Fig/Item 21-114) to 11,5 Nm (100 lbfin.).
(g) After 10 minutes, torque the bolts (EIPC 75-22-49, Fig/Item 21-114)
again to 11,5 Nm (100 lbfin.).
(h) Install tube (EIPC 75-22-49, Fig/Item 21-100) to the compressor
intermediate case (EIPC 72-33-10, Fig/Item 02-500) with bolts (EIPC
75-22-49, Fig/Item 21-106) 3 off. Refer to Fig.1.
(i) Torque bolts to (EIPC 75-22-49, Fig/Item 21-106) to 11,5 Nm (100
lbfin).
(j) Connect tube (EIPC 75-22-49, Fig/Item 21-100) to the bracket (EIPC
75-33-16, Fig/Item 01-010) at clip position CP101919. Refer to Fig.3.
(k) Torque nut (EIPC 72-22-49, Fig/Item 21-132) to 6,2 Nm (55 lbfin.).
(l) Connect tube (EIPC 75-22-49, Fig/Item 21-500) to tube (EIPC 75-22-49,
Fig/Item 21-100). Refer to Fig.1.
(m) Torque union nut on tube (EIPC 75-22-49, Fig/Item 21-500) to 67 Nm
(590 lbfin.).
Printed in Great Britain
RB.211−72−G448
Page 12
Jul.26/10
Aug.21/14R

### Page 17

(n) Where applicable, attach safetyR union nut on tube (EIPC 75-22-49,
Fig/Item 21-500) with OMat 2/142, safety cable.
(6) Accomplishment of this Non-Modification Service Bulletin should be
recorded in the engine logbook.
(7) Record the results of the inspection in Appendix 1.
C. Borescope Inspection of Trent 900 Engines.
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN
CAUSE AN INJURY. IF YOU GET AN INJURY PUT IT IN COLD WATER FOR 10
MINUTES AND GET MEDICAL AID.
CAUTION: DO NOT START THE BORESCOPE INSPECTION UNTIL THE ENGINE HAS COOLED TO
WITHIN THE BORESCOPE MANUFACTURERS RECOMMENDATIONS. THE ENGINE IS HOT
IMMEDIATELY AFTER THE ENGINE IS STOPPED AND CAN CAUSE BURNS AND DAMAGE
TO BORESCOPE INSPECTION EQUIPMENT.
NOTE: If parts have already been disassembled or the applicable system is not
available, some steps will not be required.
(1) Get access to the compressor intermediate case.
(a) Disassemble and retain 6 clip positions CP210106, CP210107, CP210101,
CP210100, CP210104 and CP210105. Refer to Engine Manual, 72-00-13,
Clip Position Data and Fig.4.
(b) Disconnect air tube (EIPC 75-22-49, Fig/Item 13-100) from the two IP8
air tubes (EIPC 75-22-49, Fig/Item 13-500 and 13-700). Refer to Fig.4.
(c) Remove and retain bolts (EIPC 75-22-49, Fig/Item 13-106) 2 off and the
bolt (EIPC 75-22-49, Fig/Item 13-107) that connects tube (EIPC
75-22-49, Fig/Item 13-100) to the compressor intermediate case. Refer
to Fig.4.
(d) Remove IP8 air tube (EIPC 75-22-49, Fig/Item 13-100).
(2) Do the borescope inspection of the IP compressor stage 8 disc balance land
from Direction 1.
(a) Put the borescope with a forward viewing tip fitted into the
intermediate case IP8 offtake hole. The vane will guide the borescope
towards the rear of the IP compressor stage 8 disc.
(b) Slowly move the borescope to view the balance land from Direction 1 as
shown in Fig.5.
Printed in Great Britain
RB.211−72−G448
Page 13
Jul.26/10
Aug.21/14R

### Page 18

CAUTION: MAKE SURE THAT THE BORESCOPE IS NOT IN THE PATH OF ANY ROTATING
COMPONENT WHEN YOU TURN THE ENGINE. IF THE BORESCOPE AND ROTATING
COMPONENT TOUCH, DAMAGE TO EITHER THE ROTATING COMPONENT OR
BORESCOPE WILL OCCUR.
(c) Use HU43985 turning tool to slowly turn the IP compressor and inspect
the balance land from Direction 1 over all the circumference of the
balance land.
NOTE: Together with the inspection from Direction 2 (refer to section
3.C.(3)), you must do an inspection of Zone A of the balance
land along the circumference. Refer to Fig.6.
(d) Look for cracks, dents or nicks, loose balance weights and washer key
(tab) locations. For acceptance criteria refer to step 3.C.(4).
R
R
NOTE: Carefully examine the area around the balance weights.
Carefully examine all around the edge of the clamp plate to
make sure there is no cracking that has startedR underneath the
clamp plate. Fig.7, Fig.8 and Fig.9 are provided as examples.R
(e) Record the results in Appendix 1.
(f) Remove the borescope from the intermediate case.
(3) Do the borescope inspection of the IP Compressor stage 8 disc balance land
from Direction 2.
(a) Put borescope with a side viewing tip fitted into HU82346, guide tube
so that the tip of the borescope is just short of the guide tube end.
(b) Make sure the curved end of the guide tube is towards the front of the
engine and put the guide tube into the intermediate case IP8 offtake
hole.
NOTE: The guide tube will need to be straightened by hand to go into
the vane.
(c) Push guide tube into the engine until the end of the guide tube is in
the cavity behind the stage 8 disc. The guide tube will then spring
back to its original shape.
(d) Push borescope through the guide tube until the viewing tip emerges
from the guide tube.
(e) Slowly move the borescope until it views the balance land from
Direction 2 as shown in Fig.5.
Printed in Great Britain
RB.211−72−G448
Page 14
Jul.26/10
Aug.21/14R

### Page 19

CAUTION: MAKE SURE THAT THE BORESCOPE IS NOT IN THE PATH OF ANY ROTATING
COMPONENT WHEN YOU TURN THE ENGINE. IF THE BORESCOPE AND ROTATING
COMPONENT TOUCH, DAMAGE TO EITHER THE ROTATING COMPONENT OR
BORESCOPE WILL OCCUR.
(f) Use HU43985 turning tool to slowly turn the IP Compressor.
(g) Do an inspection of the balance land from Direction 2 along the
circumference of the balance land.
NOTE: Together with inspection from Direction 1 (refer to section
3.C.(2)), do an inspection of Zone A of the balance land along
the circumference. Refer to Fig.6.
(h) Look for cracks, dents or nicks, loose balance weights and washer key
(tab) locations. For acceptance criteria refer to step 3.C.(4).
R
R
NOTE: Carefully examine the area around the balance weights.
Carefully examine all around the edge of the clamp plate to
make sure there is no cracking that has startedR underneath the
clamp plate. Fig.7, Fig.8 and Fig.9 are provided as examples.R
(i) Record the results in Appendix 1.
(j) Remove borescope until the viewing tip is inside the guide tube and
then remove the borescope and guide tube through the intermediate
case.
(4) Acceptance criteria
(a) Cracked - Reject, inform Rolls-Royce as soon as practically possible.R
(b) Dented or nicked:R
(i) Reject. Supply pictures of dent or nick to Rolls-Royce
Technical Help Desk.
R
R
(c) Loose balance weights (refer to Fig.9):R
(i) Reject. Supply pictures of balance weights to Rolls-Royce
Technical Help Desk.
R
R
(d) Washer key (tab) locations (refer to Fig.9):R
(i) One or more locking keys (tabs) limiting bolt rotation in the
anti-clockwise direction - Accept
R
R
(ii) No locking keys (tabs) limiting bolt rotation in the
anti-clockwise direction - Reject. Supply pictures of balance
weights to Rolls-Royce Technical Help Desk.
R
R
R
Printed in Great Britain
RB.211−72−G448
Page 15
Jul.26/10
Aug.21/14R

### Page 20

(5) Install the IP8 air tube (EIPC 75-22-49, Fig/Item 13-100).
(a) Connect tube (EIPC 75-22-49, Fig/Item 13-100) to tube (EIPC 75-22-49,
Fig/Item 13-700) and tube (EIPC 75-22-49, Fig/Item 13-500). Refer to
Fig.4.
(b) Connect tube (EIPC 75-22-49, Fig/Item 13-100) to the compressor
intermediate case with the bolts (EIPC 75-22-49, Fig/Item 13-106) 2
off and bolt (EIPC 75-22-49, Fig/Item 13-107). Refer to Fig.4.
(c) Torque the bolts (EIPC 75-22-49, Fig/Item 13-106) 2 off and bolt (EIPC
75-22-49, Fig/Item 13-107) to 11,5 Nm (100 lbfin.).
(d) Assemble the clip positions CP210106, CP210107, CP210101, CP210100,
CP210104 and CP210105. Refer to Engine Manual, 72-00-13, Clip Position
Data and Fig.4.
(e) Torque tube nut on tube (EIPC 75-22-49, Fig/Item 13-700) that connects
to tube (EIPC 75-22-49, Fig/Item 13-100) to 84,0 Nm (61.9 lbfft.).
(f) Torque tube nut on tube (EIPC 75-22-49, Fig/Item 13-500) that connects
to tube (EIPC 75-22-49, Fig/Item 13-100) to 61,0 Nm (540 lbfin.).
(g) Where applicable, attach safetyR tubes (EIPC 75-22-49, Fig/Item 13-500)
and (EIPC 75-22-49, Fig/Item 13-700) with OMat 2/142, safety cable.
(6) Accomplishment of this Non-Modification Service Bulletin should be
recorded in the engine logbook.
(7) Record the results of the inspection in Appendix 1.
D. Eddy Current Inspection of Trent 500 and Trent 900 Engines.
CAUTION: YOU MUST USE CLEAN COTTON GLOVES WHEN YOU TOUCH THE IP COMPRESSOR SHAFT.
NOTE: Step 3.D.(1) applies to Pre SB 72-AH555 or Pre SB 72-AH561 only. All
other steps apply to both Pre and Post SB 72-AH555 or SB 72-AH561.
R
R
(1) Remove and inspect fitted balance weight assemblies.
(a) Make a careful record of which balance weight and clamp are fitted at
each position. Use an OMat 261, temporary marker to show the position
of each balance weight on the shaft. Refer to TSD 594J, 70-00-00,
OP363.
(b) Record the position and weight of each of the balance weights in
Appendix 2 for reference during the assembly procedure.
Printed in Great Britain
RB.211−72−G448
Page 16
Jul.26/10
Aug.21/14R

### Page 21

(c) Remove balance weight assemblies (balance weight (EIPC 72-32-31,
Fig/Item 01-415, 01-417, 01-419, 01-421, 01-423, 01-425 and 01-427),
clamp (EIPC 72-32-31, Fig/Item 01-455), washer (EIPC 72-32-31,
Fig/Item 01-452) and bolt (EIPC 72-32-31, Fig/Item 01-450)) from the
balance land.
(d) Clean the balance weights and clamps in accordance with:
TRENT 500 EM, 72-32-31, Cleaning
TRENT 900 CIR Manual, 72-32-31, Cleaning
(e) Do an inspection of the balance weights for frettage.
No frettage (galling) Accept, retain weights and
discard bolts and washers
Frettage (galling) Reject
Balance weight rejected Find and record the weight of the
rejected balance weight assembly
(balance weight (EIPC 72-32-31,
Fig/Item 01-415, 01-417, 01-419,
01-421, 01-423, 01-425 and
01-427), clamp (EIPC 72-32-31,
Fig/Item 01-455), washer (EIPC
72-32-31, Fig/Item 01-452) and
bolt (EIPC 72-32-31, Fig/Item
01-450)). This is to help the
Assembly process
(f) Do an inspection of the clamps for bending and damage.
No damage and not bent Accept
Damaged or Bent Reject
(2) Clean the balance land
(a) Do an inspection of the balance land recess (refer to Fig.16). If the
IP compressor shaft has not been cleaned, deposits in this recess will
prevent the movement of the eddy current tool carriage.
(b) Clean the balance land recess with OMat 154, cold paint stripper, in
accordance with Overhaul Processes Manual TSD594J 70-00-00, OP117, if
required, until all deposits are removed.
(c) Remove all of OMat 154, cold paint stripper, as damage to the rubber
tyres of the eddy current tool carriage can occur.
Printed in Great Britain
RB.211−72−G448
Page 17
Jul.26/10
Aug.21/14R

### Page 22

(3) Prepare for eddy Current Inspection.
(a) Make sure the balance land is sufficiently clean to let the eddy
current tool carriage move and make sure the balance weights are
removed.
(b) Find the centre of the IPC stage 8 blade loading slot. This is the
datum position of the IPC8 disc when performing the inspection.
(c) Set the Eddy Current instrument switch to on and leave it to warm up
for 10 minutes or in accordance with the manufacturers instructions.
Set the display to X-Y.
(d) Put the PTFE adhesive tape on the face of the probe MDK1 H-1803.03.1
as shown in Fig.10.
(e) Fit probe MDK-1 H-1803.03.1 into probe holder make sure the probes
positioning pin safely locks into one of the probe holders positioning
pin slots. Refer to Fig.11.
(4) Initial probe / instrument set-up required for new probe / instrument
combination.
(a) Connect the probe to instrument cable.
NOTE: When the Eddy Current instrument has been on for 10 minutes or
in accordance with the manufacturers instructions.
(b) Set the instruments FREQUENCY to 3.0Mhz
(c) Set the instrument up for the correct probe type and set the optimum
instrument conditions.
(d) Set the display spot position to the centre of the screen and the spot
persistence to 1.0 seconds.
(e) Push the FILTER button and set the HIGHPASS FILTER to Off, set the
LOWPASS FILTER to 80Hz.
(f) Adjust the Phase Angle and Sensitivity controls for the inspection
requirements of the individual probe.
(g) Set the Preamp to 0dB, Main amp to 21dB, Axis Spread to 0dB giving
Total Gain 21dB. These gain values are estimates and will possibly
need adjusting for the individual instruments to make sure a signal
from the notch, not exceeding full screen height (FSH), can be seen.
Printed in Great Britain
RB.211−72−G448
Page 18
Jul.26/10
Aug.21/14R

### Page 23

(5) Calibration before inspection (Red Dot / White Dot set-up).
(a) Set up the instrument according to the data card, Appendix 3 (or
similar form) for the probe to be used. Make sure that all items have
been set up correctly. Set display to X-Y.
(b) Check the condition of the probe coil spring and all the support wheel
tyres on the carriage. Refer to Fig.12.
(c) Pull out and slowly turn the probe in the probe holder until the red
dot on the probe aligns with the red dot on the probe holder.
(d) Push the probe into the probe holder until the positioning pin
securely locks into the positioning slot.
(e) Connect the probe to instrument cable.
(f) Loosen the knurled screw and slide the probe and block assembly around
the slot in the positioning plate to the white dot position.
(g) Slowly turn the probe and block assembly until the locking pin in
block B engages into the positioning plate. Check that the white dot
on block B aligns with the white dot on the positioning plate.
(h) Tighten the knurled screw.
(i) Turn thumbscrew A and thumbscrew B to align their datum lines to the
correct position as shown in Fig.13.
(j) Put the probe onto the surface of the calibration block (HU44792 for
Trent 500 and HU44796 for Trent 900) with the probe coil set
approximately central to the width of the face, away from the EDM
Notch. Refer to Fig.14.
(k) Move the probe over the notch in the face of the calibration block,
and adjust the signal phase angle such that it is 10 degrees from the
Vertical. Refer to Fig.15.
(l) Push the probe down lightly and NULL the probe. Lift the probe a small
distance from the surface and observe the lift off signal. Movement
should be from left to right at an angle between the 3 o'clock and 6
o'clock position.
(m) With the notch detected, adjust the Gain control to change the
amplitude from the notch to approximately 100 per cent full screen
height (FSH). Refer to Fig.15.
(n) The sensitivity is correctly set when the maximised signal from the
target rises to 100 per cent FSH as the probe is passed over the
notch.
Printed in Great Britain
RB.211−72−G448
Page 19
Jul.26/10
Aug.21/14R

### Page 24

(o) Do not use the probe if correct sensitivity cannot be set, until the
reason for the change has been determined.
(p) Record instrument settings data on the Data Card, Appendix 3 (or
similar form).
(6) Balance land rear face inspection (Red Dot set-up).
(a) Set up the instrument according to the data card (Appendix 3) for the
probe and instrument combination to be used.
(b) Confirm that all items have been set up correctly.
(c) Set the display to X-Y.
(d) Make sure the PTFE adhesive tape is fitted to the face of the probe
and in good condition, replace if necessary.
(e) Make sure the condition of the probe coil spring and all the support
wheel tyres are satisfactory.
(f) Pull out and slowly turn the probe in the probe holder until the red
dot on the probe aligns with the red dot on the probe holder. Do not
disconnect the cable.
NOTE: If the cable is disconnected the signal can be affected and the
probe should be recalibrated.
(g) Push the probe into the probe holder until the positioning pin safely
locks into the positioning slot.
(h) Loosen the knurled screw and slide the probe and block assembly around
the slot in the positioning plate to the red dot position.
(i) Slowly turn the probe and block assembly until the locking pin in
block B engages into the positioning plate.
(j) Make sure that the red dot on block B aligns with the red dot on the
positioning plate.
(k) Tighten the knurled screw.
(l) Turn thumbscrew A and thumbscrew B to align their datum lines to the
correct position as shown in Fig.18.
(m) Find the stage 8 discs datum position. Refer to section 3.D.(3).(b).
(n) Carefully place the probe carriage over the balance land and locate
the large horizontal wheel in the balance land recess. Refer to Fig.17
and Fig.18.
Printed in Great Britain
RB.211−72−G448
Page 20
Jul.26/10
Aug.21/14R

### Page 25

(o) Push down on the carriage until the probe tip is seated flush with the
surface.
(p) Null the probe. See if the probe is touching by lifting the probe
holder a small distance from the surface. This must lead to a large
movement of the spot on the display screen at an angle between the 3
o'clock and 6 o'clock position.
(q) Push the probe trolley around the balance land to perform the scan.
Start from the datum position.
(r) Make sure you do a full 360 degree inspection of the balance land.
NOTE: The probe must always be moving at approximately 5 cm to 15 cm
per second to detect cracking. Special attention must be paid
to the areas where the balance weight(s) were removed.
(s) If you turn the trolley around the balance land in one direction only,
make sure the cable does not become wound up.
(t) Set the probe to the next increment by turning Thumbscrew A half a
turn counter clockwise. This increments the probe radially inwards.
(u) Make sure the datum line on the probe holder has moved with respect to
the vernier marks on Block A. Refer to Fig.18 (view B).
(v) The scan starts from the radially outward edge of the face and
increments radially inwards. Repeat sections 3.D.(6)(q) to 3.D.(6)(u)
until the complete face is inspected. The complete face must be
inspected. This will typically require 12 scan increments.
(w) Record any crack indications seen in Appendix 2. If an indication is
seen, refer to Accomplishment Instructions, 3.D.(9) and 3.D.(10).
(7) Land Recess Outside Diameter Inspection (White Dot set-up).
(a) Set up the instrument according to the data card (Appendix 3) for the
probe and instrument combination to be used.
(b) Confirm that all items are set up correctly.
(c) Set the display to X-Y.
(d) Make sure the PTFE adhesive tape is fitted to the face of the probe
and in good condition, replace if necessary.
(e) Check the condition of the probe coil spring and all the support wheel
tyres.
Printed in Great Britain
RB.211−72−G448
Page 21
Jul.26/10
Aug.21/14R

### Page 26

(f) Without disconnecting the cable, pull out and slowly turn the probe in
the probe holder until the white dot on the probe aligns with the
white dot on the probe holder.
NOTE: If the cable is disconnected the signal can be affected and the
probe must be recalibrated.
(g) Push the probe into the probe holder until the positioning pin
securely locks into the positioning slot.
(h) Loosen the knurled screw and slide the probe and block assembly around
the slot in the positioning plate to the white dot position.
(i) Slowly turn the probe and block assembly until the locking pin in
block B engages into the positioning plate.
(j) Make sure the white dot on block B aligns with the white dot on the
positioning plate.
(k) Tighten the knurled screw.
(l) Turn thumbscrew A and thumbscrew B to align their datum lines to the
correct position as shown in Fig.20.
(m) Identify the stage 8 discs datum position. Refer to section
3.D.(3).(b).
(n) Carefully place the probe carriage on the balance land and engage the
large horizontal wheel in the balance land recess. Refer to Fig.19 and
Fig.20.
(o) Push down on the probe until it is seated on the outside diameter
face.
(p) Null the probe. See if the probe is touching by lifting the probe
holder a small distance from the surface, which must lead to a large
movement of the spot on the display screen at an angle between the 3
o'clock and 6 o'clock position.
(q) Starting from the datum position, push the probe trolley around the
balance land to perform the scan.
(r) Make sure you do a full 360 degree inspection of the balance land.
NOTE: The probe must always be moving at approximately 5 cm to 15 cm
per second to detect cracking. Special attention must be paid
to the areas where the balance weight(s) were removed.
(s) If you turn the trolley around the balance land in one direction only,
make sure the cable does not become wound up.
Printed in Great Britain
RB.211−72−G448
Page 22
Jul.26/10
Aug.21/14R

### Page 27

(t) Set the probe to the next increment by turning Thumbscrew A half a
turn anticlockwise. This increments the probe axially forwards.
(u) Make sure the datum line on the probe holder has moved with respect to
the vernier marks on Block A. Refer to Fig.20 (view B).
(v) The scan starts from the rearwards edge of the outer diameter face and
increments forwards towards the disc diaphragm. Repeat sections
3.D.(7)(q) to 3.D.(7)(u) until the complete face is inspected. The
complete face must be inspected. This will typically require 6 scan
increments.
(w) Record any crack indications seen in Appendix 2. If an indication is
seen, refer to Accomplishment Instructions, 3.D.(9) and 3.D.(10).
(8) Balance Land Chamfer Face Inspection (Blue Dot set-up).
(a) Set up the instrument according to the data card (Appendix 3) for the
probe and instrument combination to be used.
(b) Make sure that all items are set up correctly.
(c) Set the display to X-Y.
(d) Make sure the PTFE adhesive tape is fitted to the face of the probe
and in good condition, replace if necessary.
(e) Check the condition of the probe coil spring and all the support wheel
tyres.
(f) Pull out and slowly turn the probe in the probe holder until the blue
dot on the probe aligns with the blue dot on the probe holder. Do not
disconnect the cable.
NOTE: If the cable is disconnected the signal can be affected and the
probe must be recalibrated.
(g) Push the probe into the probe holder until the positioning pin safely
locks into the positioning slot.
(h) Loosen the knurled screw and slide the probe and block assembly around
the slot in the positioning plate to the blue dot position.
(i) Slowly turn the probe and block assembly until the locking pin in
block B engages into the positioning plate.
(j) Make sure the blue dot on block B aligns with the blue dot on the
positioning plate.
(k) Tighten the knurled screw.
Printed in Great Britain
RB.211−72−G448
Page 23
Jul.26/10
Aug.21/14R

### Page 28

(l) Turn thumbscrew A and thumbscrew B to align their datum lines to the
correct position as shown in Fig.22.
(m) Find the stage 8 discs datum position. Refer to section 3.D.(3).(b).
(n) Carefully place the probe carriage on the balance land and engage the
large horizontal wheel in the balance land recess. Refer to Fig.21 and
Fig.22.
(o) Push down on the probe until it is seated on the chamfer face.
(p) Null the probe. See if the probe is touching by lifting the probe
holder a small distance from the surface, which must lead to a large
movement of the spot on the display screen at an angle between the 3
o'clock and 6 o'clock position.
(q) Push the probe trolley around the balance land to perform the scan.
Start from the datum position.
(r) Make sure you do a full 360 degrees inspection of the balance land.
NOTE: The probe must always be moving at approximately 5 cm to 15 cm
per second to detect any cracking. Special attention must be
paid to the areas where the balance weight(s) were removed.
(s) If you turn the trolley around the balance land in one direction only,
make sure the cable does not become wound up.
(t) Set the probe to the next increment by turning Thumbscrew B half a
turn clockwise. This increments the probe towards the disc.
(u) Make sure the datum line on block A has moved with respect to the
vernier marks on block B. Refer to Fig.22 (view B).
(v) The scan starts from the rearward edge of the chamfer face and
increments forwards towards the disc. Repeat sections 3.D.(8)(q) to
3.D.(8)(u) until the complete face is inspected. The complete face
must be inspected. This will typically require 4 scan increments.
(w) Record any crack indications seen in Appendix 2. If an indication is
seen, refer to Accomplishment Instructions, 3.D.(9) and 3.D.(10).
(x) Do a post inspection calibration check by performing section 3.D.(5).
If the signal result is not the same as the calibration result before
inspection, then calibrate again in accordance with section 3.D.(5)
and a full inspection of the balance land is required.
Printed in Great Britain
RB.211−72−G448
Page 24
Jul.26/10
Aug.21/14R

### Page 29

(9) Interpretation of the Eddy Current Instrument CRT Screen Display.
(a) Defects will be seen again and again and show on the X-Y display as a
signal rising between vertical and 10 degrees from the vertical from
the centre spot, as the probe passes over the defect (refer to
Fig.23). To confirm an indication as genuine, make sure the area is
clean and the signal is seen again and again.
(b) Transient signals can be seen which can look similar to defects. You
can ignore these signals as they will not be seen again and again.
(c) As the probe passes over the scallop areas of the balance land face
(refer to Fig.21 view A), a signal moving in a downward and opposite
direction to a defect indication will be seen. Refer to Fig.24.
(d) Carefully monitor as defects can occur within the scalloped area.
Refer to Fig.25 for example of defects within a scallop area.
(10) Determining if an indication is spurious or genuine
If an indication is found in section 3.D.(6), (7) or (8), and
passes the inspections in section 3.D.(9), then use the following
procedure to determine if the indication is spurious or a genuine
crack signal.
(a) Set the HIGHPASS FILTER to ON and set the frequency to 5 Hz.
(b) Set the LOWPASS FILTER frequency to 50 Hz.
(c) Set up the inspection tool ready for use on the calibration block in
accordance with 3.D.(5)(c) to 3.D.(5)(i).
(d) Put the probe onto the surface of the calibration block (HU44792 for
Trent 500 and HU44796 for Trent 900) with the probe coil set
approximately central to the width of the face, away from the EDM
notch. refer to Fig.14.
(e) Push the probe down lightly and NULL the probe.
(f) Move the probe over the notch in the face of the calibration block and
adjust the phase angle so that the notch signal is vertical.
(g) Adjust the gain so that the notch signal is at full screen height.
(h) Inspect the area on the balance land again only where the indication
was found:
(i) If a vertical signal is seen in this area, the indication must
be a genuine crack signal.
Printed in Great Britain
RB.211−72−G448
Page 25
Jul.26/10
Aug.21/14R

### Page 30

(ii) If no vertical signal can be seen in this area, then the
indication found in section 3.D.(6), (7) or (8) must be a
spurious signal and must be ignored.
NOTE: With the HIGHPASS filter set to ON, the probe lift-off will
show as a vertical spot movement, therefore take care not
to interpret the lift-off of the probe as a crack signal.
(11) Acceptance criteria.
If an indication is identified as a crack signal following steps 3.D.(9)
and 3.D.(10), the Shaft must be rejected. Do not complete section 3.D.(12)
and perform any dressing repair of damage or fretting masks. The IP
compressor shaft, balance weights, clamp plates, washers and bolts must be
quarantined. The location shall be visually inspected and the results
reported to Rolls-Royce via your local representative.
(12) Do an inspection of the balance land.
(a) Do a visual inspection of the balance land rear face, chamfer face and
recess outside diameter (refer to Fig.16) look for damage, indentation
marks and galling. Use a 10x magnifying glass and a torch (if
required).
(b) For acceptance criteria refer to:
TRENT 500 Engine Manual, 72-32-31, Inspection
TRENT 900 CIR Manual, 72-32-31, Inspection
(c) If the IP compressor shaft is rejected, quarantine the IP compressor
shaft, balance weights, clamp plates, washers and bolts. Photograph
the mark and send the image to Rolls-Royce via your local
representative.
(13) Install the balance weight and the clamp on IP Compressor Shaft (EIPC
72-32-31, Fig/Item 01-180), in the same position as removed.
(a) If one or all of the balance weights have been rejected following
inspection (refer to section 3.D.(1).(e)), a new balance weight must
be used. The weight of the new balance weight assembly (balance
weight, clamp, washer and bolt) must be within 0,1 g (0.003 oz) of the
original balance weight assembly.
(b) Install the balance weights (EIPC 72-32-31, Fig/Item 01-415, 01-417,
01-419, 01-421, 01-423, 01-425 and 01-427), clamp (EIPC 72-32-31,
Fig/Item 01-455) with new bolts (EIPC 72-32-31, Fig/Item 01-450) and
new locking washers (EIPC 72-32-31, Fig/Item 01-452) in the same
position as where they were removed from on the inspected and
serviceable IP compressor drum.
Printed in Great Britain
RB.211−72−G448
Page 26
Jul.26/10
Aug.21/14R

### Page 31

(c) Torque tighten the bolts to 4 Nm (35 lbfin.). Refer to Standard
Practices Manual, 70-51-00, Torque Tighten Components.
(d) Use the locking washers (EIPC 72-32-31, Fig/Item 01-452), to lock the
bolts (EIPC 72-32-31, Fig/Item 01-450), in position. Refer to Standard
Practices Manual, 70-12-04, Procedures used to Lock Threaded Parts.
(e) Make sure all temporary markings produced in section 3.D.(1) are
removed.
(14) If one or all of the acceptance criteria in sections 3.D.(11) and 3.D.(12)
are not met; retain and quarantine the balance weights (EIPC 72-32-31,
Fig/Item 01-415, 01-417, 01-419, 01-421, 01-423, 01-425 and 01-427), clamp
(EIPC 72-32-31, Fig/Item 01-455),  bolts (EIPC 72-32-31, Fig/Item 01-450),
locking washers (EIPC 72-32-31, Fig/Item 01-452) and IP compressor shaft
(EIPC 72-32-31, Fig/Item 01-180). Refer to Rolls-Royce via your local
representative within 2 weeks of the inspection.
(15) Record the condition of the balance land on the attached inspection sheet
provided in Appendix 2 or similar form.
E. Accomplishment of this Non-Modification Service Bulletin is to be recorded in
the engine logbook.
Printed in Great Britain
RB.211−72−G448
Page 27
Jul.26/10
Aug.21/14R

### Page 32 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
TUBE
21-500
FW17134  TOBE  (101919  Printed in Great Britain
21-500
PRE SB 72-G120
FW69876  IP8 AIR TUBE  21-100
SB 72-G120
WASHER
AS12944
21-112
IP COMPRESSOR  CASE  FWD
72-33-10
02-500
BOLT
AS48513
21-114
WASHER
(2 off)  CU37148
21-113  BOLT
IP COMPRESSOR  AS48510
CASE  21-106
72-33-10  (3 off)
02-500
IP8 AIR TUBE
FW17133
21-100
A
NOTE:
All chapter-section-subject and Fig/Item references
are quoted for the Engine IPC
NOTE:
All PC Fig/Item numbers are 75-22-49 unless identified differently
deg0004217
Trent 500 - Location of IP8 Buffer Air Tube
Fig.1
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 28
© Rolls-Royce p/c

### Page 33 (OCR)

RB211  PROPULSION  SYSTEM
SERVICE
ROYCE  BULLETIN
IP COMPRESSOR
CASE
- 72-33-10
02-500
Printed in Great Britain  IP8 AIR TUBE
FW17133
21-100
JOINING COMPOUND APPLIED
TO MATING FACE OF
TWO BOLT FLANGE
IP COMPRESSOR
CASE
- 72-33-10
02-500
IP8 AIR TUBE
FW17133
- 21-100
5 - 15mm FILLET
OF JOINING COMPOUND
L  deg0004218
Jointing Compound Application
Fig.2
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 29
© Rolls-Royce p/c

### Page 34 (OCR)

ROLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
BOLT  Printed in Great Britain
AS48408
21-125
CLIP
UP11470
21-126  21-128
IP8 AIR TUBE -
FW17133
21-100
BRACKET
FK32426
75-33-16
01-010
NUT -
AS20624
28118
CLIP POSITION 101919
NOTE:
All chapter-section-subject and Fig/Item references
are quoted for the Engine IPC
NOTE:
All PC Fig/Item numbers are 75-22-49 unless identified differently
deg0004219
Clip Position CP101919
Fig.3
Jul. 26/10  RB.211-72-G448
R Aug.21/14  Page 30
© Rolls-Royce plc

### Page 35

deh0009427
210106
210107
210101 210100 210104
210103
210105
A
B
B
A
COMPRESSOR
INTERMEDIATE
CASE
72−33−10
TUBE
FW48296
13−500
TUBE
FW24803
13−100
TUBE
FW30489
13−700
BOLT
AS48512
13−107
BOLT
AS48528
13−106
(2 off)
TUBE
FW24803
13−100
NOTE:
All IPC Fig/Item numbers are 75−22−49 unless identified differently
NOTE:  
All Chapter−Section−Subject and Fig−Item references  
are quoted for the Engine IPC  
  
02−500
SB 72−C994
FW18047
SB 72−D131
FW15202
SB 72−F434 PTI
FW62836
SB 72−F434 PT2
FW63495
Trent 900 - Location of IP8 Buffer Air Tube
Fig.4
Printed in Great Britain
RB.211−72−G448
Page 31
Jul.26/10
Aug.21/14R

### Page 36 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
BORESCOPE
HU82346  Printed in Great Britain
• GUIDE TUBE
DIRECTION 2
SIDE VIEWING TIP
DIRECTION 1
FORWARD VIEWING TIP
deg0005463
Trent 500 and Trent 900 - Borescope View Directions
Fig.5
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 32
© Rolls-Royce p/c

### Page 37 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
ZONE A
L
L  deg0005464
Trent 500 and Trent 900 - Inspection of Zone A
Fig-6
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 33
© Rolls-Royce plc

### Page 38 (OCR)

OLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
R
OF THE CLAMP PLATE  CRACK
(Example)
TO ENSURE THAT
THERE IS NO CRACK
THAT HAS STARTED
UNDERNEATH THE
CLAMP PLATE
deg0006296
R  Previously Seen Crack Position on Trent 700 Engine
R  (Rear Face Location)
R  Fig.7
Jul. 26/10  RB.211-72-G448
R Aug.21/14  Page 34
© Rolls-Royce p/c

### Page 39 (OCR)

ROLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
CAREFULLY INSPECT
AROUND THE EDGE
Printed in Great Britain  OF THE CLAMP PLATE  TO ENSURE THAT
THERE IS NO CRACK
THAT HAS STARTED
UNDERNEATH THE
CLAMP PLATE
CRACK
(Example)
R
L  deg0006300
R  Previously Seen Crack Position on Trent 800 Engine
R  (Recess Outside Diameter Location)
R  Fig.8
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 35
© Rolls-Royce p/c

### Page 40 (OCR)

COLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
NO VISIBLE GAPS BETWEEN
BOLT HEAD AND WASHER OR
WASHER AND CLAMP PLATE
NO VISIBLE GAPS
BETWEEN CLAMP PLATE
AND WEIGHT
BALANCE
LAND
L  deg0006297
R  Example of a Properly Fitted Balance Weight Assembly
R  Fig.9 (sheet 1 of 2)
Jul.26/10  RB.211-72-G448
R Aug.21/14  Page 36
© Rolls-Royce p/c

### Page 41 (OCR)

RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain  WASHER KEY
(4 off)
ANTI-CLOCKWISE
ROTATION
R
TO LIMIT ANTI-CLOCKWISE ROTATION TO PREVENT THE BOLT FROM BECOMING LOOSE
AT LEAST SOME PART OF ONE OF THE FOUR WASHER KEYS (Tabs) MUST BE LOCATED
WITHIN A CIRCLE AROUND THE BOLT HEAD DIAMETER
Washer key prevents rotation
Washer key does not prevents rotation
deg0006298
R  Example of Acceptable Locking Washer Key (Tab) Locations
R  Fig.9 (sheet 2 of 2)
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 37
© Rolls-Royce p/c

### Page 42 (OCR)

ROLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
POSITION OF  Printed in Great Britain
TEFLON TAPE
ON PROBE
deg0005465
Teflon Tape Attached to Probe
Fig.10
Jul.26/10  RB.211-72-G448
R Aug. 21/14  Page 38
© Rolls-Royce pic

### Page 43 (OCR)

RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
POSITIONING PIN  PROBE
Printed in Great Britain  POSITIONING PIN
SLOT
(3 positions)
PROBE
HOLDER
deg0004223
Probe Positioning Pin and Probe Holder Positioning Pin Slot
Fig. 11
Jul. 26/10  RB.211-72-G448
R Aug.21/14  Page 39
© Rolls-Royce p/c

### Page 44 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
SUPPORT WHEEL  TYRES  Printed in Great Britain
KNURLED
SCREW
POSITIONING
PLATE
THUMBSCREW B
• BLOCK B
• BLOCK A
CARRAGE
THUMBSCREW A
PROBE
SPRUNGLOADED LEVER  HORIZONTAL SUPPORT  HOLDER
TO LOCATE  WHEEL AND TYRE
HORIZONTAL WHEEL
UNDER BALANCE
LAND FLANGE  PROBE
deg0005466
Eddy Current Inspection Tool
Fig.12
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 40
© Rolls-Royce pic

### Page 45 (OCR)

RB211  PROPULSION
SYSTEM
SERVICE
BULLETIN
Printed in Great Britain
O
CALIBRATION
BLOCK  THUMBSCREW B
TURN TO ALIGN
THUMBSCREW B  DATUM LINE WITH
BLUE
THUMBSCREW A  DOT LINE
TURN TO ALIGN
DATUM LINE WITH
WHITE/RED
DOT LINE  • BLUE  THUMBSCREW A
BLUE
- WHITE
RED
WHITE
RED
B
deg0005467
Eddy Current Tool Positioned for Calibration
Fig. 13
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 41
© Rolls-Royce p/c

### Page 46 (OCR)

ROLLS  RB211 PEsTULSion
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
CALIBRATION
BLOCK
EDM NOTCH
deg0004226
Eddy Current Calibration Block - HU44792 (Trent 500) and HU44796 (Trent 900)
Fig.14
Jul.26/10  RB.211-72-G448
R Aug. 21/14  Page 42
© Rolls-Royce p/c

### Page 47 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain  B300WinClient
Parameter Setup  Ch1
Frequency  3.0 MHz  Ch1
Amplitude  100 % A
Preamplifier  | 13.0 dB
Mainamplifier
Spread Y  12.0 dB
Total gain Y/X  41.0/29.0
Phase  129.5°
Lowpass  ZH 08
Highpass  static
DotPosition Y  - 12.0 %
DotPosition X  8.0 %
SW 0O0
File: FACE_CALIBRATION (modified)  |6.22/1:44 min
set DotPos  Quick Save  Save File  Load File  Record
L  deg0004227
Typical Calibration Display
Fig.15
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 43
© Rolls-Royce p/c

### Page 48 (OCR)

COLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
BALANCE LAND
RECESS OUTSIDE
DIAMETER (WHITE Dot)
BALANCE LAND
CHAMFER
(BLUE Dot)
BALANCE LAND
REAR FACE
(RED Dot)
BALANCE LAND
RECESS
L  deg0004228
Trent 500 and Trent 900 - Balance Land Inspection Zones
Fig. 16
Jul. 26/10  RB.211-72-G448
R Aug.21/14  Page 44
© Rolls-Royce p/c

### Page 49 (OCR)

RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain  WA
BLUE
- WHITE
• RED
(Cable omitted for clarity)
L  deg0005468
Probe Placed to Inspect Balance Land Rear Face
Fig. 17
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 45
© Rolls-Royce p/c

### Page 50 (OCR)

OLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
BLUE
WHITE
THUMBSCREW A  -RED  Printed in Great Britain
TURN UNTIL DATUM LINE
ALIGNS WITH SECOND MINOR
LINE FROM THUMBSCREW END
• DATUM LINE ALIGNS
WITH SECOND MINOR
LINE FROM
THUMBSCREW END
CABLE OMITTED
FOR CLARITY
THUMBSCREW B
TURN UNTIL DATUM
LINE ALIGNS WITH
WHITE/RED DOT LINE
BLUE
WHITE RED  THUMBSCREW A
L  deg0005742
Probe Placed to Inspect Balance Land Rear Face
Fig.18
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 46
© Rolls-Royce p/c

### Page 51 (OCR)

RB211  _ PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
(Cable omitted for clarity)
deg0005741
Probe Placed to Inspect Balance Land Recess Outside Diameter
Fig.19
Jul.26/10  RB.211-72-G448
R Aug. 21/14  Page 47
© Rolls-Royce p/c

### Page 52 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
THUMBSCREW A
TURN UNTIL DATUM LINE
ALIGNS WITH SECOND MINOR
LINE FROM THUMBSCREW END
CABLE OMITTED  FOR CLARITY  Printed in Great Britain
- BLUE
WHITE
RED
DATUM LINE ALIGNS
WITH SECOND MINOR
LINE FROM
THUMBSCREW END
THUMBSCREW B
TURN TO ALIGN DATUM LINE WITH
FIFTH MAIN LINE FROM THUMBSCREW  DATUM LINE
END/THE BLUE DOT LINE  ALIGNED WITH
BLUE DOT LINE
BLUE -  •Q
THUMBSCREW A
WHITE  RED
deg0005740
Probe Placed to Inspect Balance Land Recess Outside Diameter
Fig.20
Jul. 26/10  RB.211-72-G448
R Aug.21/14  Page 48
© Rolls-Royce p/c

### Page 53 (OCR)

RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
THUMBSCREW A
TURN TO ALIGN
DATUM LINE WITH
BLUE DOT LINE
BLUE
•WHITE
BLUE DOT
LINE
-RED
BALANCE LAND
SCALLOP
(Cable omitted for clarity)
L  deg0005472
Probe Placed to Inspect Balance Land Chamfer Face
Fig. 21
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 49
© Rolls-Royce p/c

### Page 54 (OCR)

ROLLS  RB211 PRSPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain
THUMBSCREW A  THUMBSCREW B
TURN TO ALIGN DATUM
LINE WITH FOURTH
MAIN LINE FROM
THUMBSCREW END
BLUE
RED  WHITE
DATUM LINE ALIGNED
WITH FOURTH MAIN
LINE FROM
THUMBSCREW END
deg0005473
Probe Placed to Inspect Balance Land Chamfer Face
Fig.22
Jul.26/10  RB.211-72-G448
R Aug.21/14  Page 50
C Rolls-Royce pic

### Page 55 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain  Parameter Setup  Ch1  1:A  2  4 M1 M2 M3
Available : 1:44 min  2.1 MB  "Ch1
Used : 5.5 s  110 kB
Chart Time :  9.0 s  180 kB
Left Cursor :  4.0 s
Right Cursor :  3.5 S
Selection :  460 ms  18 kB
Ch1
• Ch1
File: OUTER_DIA_DEFECT_SCAN1  5.5 s / 1;44 min
Lock Cursors  Quick Save  Save File  Load file  Record
L  deg0004235
Defect Indication in Outside Diameter as Seen on Screen Display
Fig. 23
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 51
© Rolls-Royce p/c

### Page 56 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Parameter Setup  Ch1  1:A  Printed in Great Britain
Available : 1:44 min  2.1 MB
Used : 9.0 s  180 KB
Chart Time :  9.0 s  180 kB
Left Cursor :  8.5 s
Right Cursor :  7.8 S
Selection :  650 ms  26 kB
- Ch1
Ch1
File: FACE_SCALLOP_SCAN1  9.0 s / 1;44 min
Lock Cursors  Quick Save  Save File  Load file  Record
L  deg0004236
Typical Screen Display as the Probe Passes Over a Scallop Area
Fig.24
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 52
© Rolls-Royce p/c

### Page 57 (OCR)

ROLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
Printed in Great Britain  Parameter Setup  Ch1  1:A
Available :  1:44 min  2.1 MB  Ch1
Used :  9.0 s  180 kB
Chart Time :  9.0 s  180 kB
Left Cursor :  8.4 s
Right Cursor :  8.1 S
Selection :  260 ms  10 kB
Ch1
- Ch1
File: FACE_SCALLOP_DEFECT_SCAN1  9.0 s / 1;44 min
Lock Cursors  Quick Save  Save File  Load file  Record
L  deg0004237
Defect Indication Within a Scallop Area
Fig. 25
Jul. 26/10  RB.211-72-G448
R Aug. 21/14  Page 53
© Rolls-Royce pic

### Page 58

Trent 500 or Trent 900 Visual Borescope Inspection Results
1. This Form is to be completed for every engine inspected in accordance with
Accomplishment Instructions (3.B. or 3.C.).
2. Results to be sent to Rolls-Royce via your local representative.
See over
APPENDIX 1
Printed in Great Britain
RB.211−72−G448
Appendix 1 - Page 1 of 2
Jul.26/10
Aug.21/14R

### Page 59 (OCR)

OLLS  RB211  PROPULSION
SYSTEM
SERVICE
ROYCE  BULLETIN
-ORM TO BE COMPLETED FOR EVERY ENGINE INSPECTED (Refer to 3.B or 3.C)
RESULTS TO BE SEND TO ROLLS ROYCE, VIA YOUR LOCAL REPRESENTATIVE
Feedback Sheet  NMSB 72-G448 Visual Borescope Inspection of IPC8 Balance Land
Overhaul Base  Printed in Great Britain
Date of Inspection
ESN
Engine Mark
Engine CSN
Engine TSN
IPC Shaft Part No
IPC Shaft Ser No
IPC Shaft CSN
IPC Shaft TSN
Borescope Inspection Result (If none record N/A, if finding
record dimensions and position)
R  Direction 1  Direction 2
Cracking
Dents or Nicks on the
Balance Land
Loose Balance
Weights
At least one washer locking
keys (Tabs) preventing rotation
Inspected by :  Stamp :
L  deg0006299
R  Borescope Inspection - Feedback Sheet
Jul.26/10  RB.211-72-G448
R Aug. 21/14  Appendix 1 - Page 2
© Rolls-Royce p/c

### Page 60

Trent 500 or Trent 900 Eddy Current Inspection Results
1. This Form is to be completed for every shaft inspected in accordance with
Accomplishment Instructions (3.D.).
2. Results to be sent to Rolls-Royce via your local representative.
See over
APPENDIX 2
Printed in Great Britain
RB.211−72−G448
Appendix 2 - Page 1 of 2
Jul.26/10
Aug.21/14R

The text continues at https://openairdocs.org/service-documents/rolls-royce/rb211-72-g448/file/bf092dc4fb5c.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
