# Rolls-Royce Service Bulletin RB 72-AG971: Revision 2

- Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2013-1015, the docket of AD 2014-05-25, 2017-01-01, 2017-08-10. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Rolls-Royce Service Bulletin RB 72-AG971](https://openairdocs.org/service-documents/rolls-royce/rb72-ag971.md)
- Title as filed: RB_72-AG971 R2
- Pages: 34
- PDF: https://openairdocs.org/files/sha256/ab/fe/abfef1385d7c8901a3ed13859abb6f2301982a2cc256c0e7ece50478e349c7ba
- Page: https://openairdocs.org/service-documents/rolls-royce/rb72-ag971/file/abfef1385d7c

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

P.O. Box 31, DERBY
DE24 8BJ, UK  Telephone: 44 (0) 1332 242424  Rolls-Royce
Fax: 44(0) 1332 249936
PUBLICATION  TRANSMITTAL
The technical information contained in this document has been approved under the authority
of - See Planning Information, Approval.
Date May. 5/16
RB211 TRENT 900 SERIES PROPULSION SYSTEMS NON-MODIFICATION SERVICE BULLETIN
ALERT
Printed in Great Britain  This document transmits Revision 2 to Service Bulletin RB211-72-AG971
Document History
Service Bulletin Revision  Status  Supplement Revision Status
Initial Issue  Sep. 20/12
Revision 1  Sep. 27/13
Bulletin Revision 2
Remove  Incorporate  Reason for change
Pages 1 to 5 and 7  Pages 1 to 5 and 7  To introduce an alternative
method of inspection.
to 19 of the Service  to 31 of the Service
Bulletin  Bulletin
All pages of  Page 1 of Appendix 1  To introduce an alternative
Appendix 1  method of inspection.
ALERT  RB.211-72-AG971
Transmittal - Page 1 of 2
CHECK THAT ALL PREVIOUS TRANSMITTALS HAVE BEEN INCORPORATED
If any have not been received please advise Customer Data Services, Rolls-Royce pic, Derby, England
© Rolls-Royce plc (date as above) Printed in Great Britain

### Page 2

LIST OF EFFECTIVE PAGES
The effective pages to this Service Bulletin following incorporation of Revision
2 are as follows:
Page Revision Number Revision Date
Bulletin
R     1 2 May 5/16
R     2 2 May 5/16
R     3 2 May 5/16
R     4 2 May 5/16
R     5 2 May 5/16
6 1 Sep.27/13
R     7 2 May 5/16
R     8 2 May 5/16
R     9 2 May 5/16
R    10 2 May 5/16
R    11 2 May 5/16
R    12 2 May 5/16
R    13 2 May 5/16
R    14 2 May 5/16
R    15 2 May 5/16
R    16 2 May 5/16
R    17 2 May 5/16
R    18 2 May 5/16
R    19 2 May 5/16
R    20 2 May 5/16
R    21 2 May 5/16
R    22 2 May 5/16
R    23 2 May 5/16
R    24 2 May 5/16
R    25 2 May 5/16
R    26 2 May 5/16
R    27 2 May 5/16
R    28 2 May 5/16
R    29 2 May 5/16
R    30 2 May 5/16
R    31 2 May 5/16
Appendix 1
R     1 2 May 5/16
Printed in Great Britain
RB.211−72−AG971
Transmittal - Page 2

### Page 3

1. Planning Information
A. Effectivity
Airbus A380
All RB211 TRENT 900 Engines with part numbers FW27718, FW35923, FW51434,
KH46678, KH45090 or KH46677 only.
R
R
B. Reason
Problem
Re-analysis of Tail Bearing Housing (TBH) structural features identified a
potential limitation to
R
R the TBH capability in the fail safe condition. To
confirm intact capability, an on-wing and in-shop inspection regime wasR defined
for the Trent 900 TBH. The structural features to be inspected are the TBH
mount lug run-outs and Top Core Vanes (TCV). In addition, the life of the TBH
wasR limited to 17200 cycles to make sure it did not enter in fail safe mode.
Additionally, historical inspections of the TBH to initial issue of
Non-Modification Service Bulletin (NMSB) 72-AG971 identified issues which
required additional inspection criteria as part of a revised containment
strategy. This has been addressed independently through NMSB 72-AH154.
Revision 1 of this NMSB wasR issued to provide additional clarity for some of
the materials, tooling and cleaning tasks associated with inspections. It also
revisedR the acceptance criteria for the on-wing inspections (section 3.A.(2))
and introducedR the inspection of the fail safe catcher in-shop to inform root
cause understanding for the issues addressed in NMSB 72-AH154.
Revision 2 of this NMSB is issued to introduce eddy current inspection method
as an alternative to the existing FP inspection of the mount lug run out
region. It also removes the life limitation for the component following a
re-assessment of the TBH that has demonstrated full limit load capability of
the structure. The on-wing inspections of the mount lug run-outs are to be
maintained until a pin check is introduced into the Maintenance Planning
Document (MPD) every 3800 flight cycles. Finally, it also clarifies that the
Central Male Catcher Run-Out is also addressed as part of the full FP
inspection of the TBH in the shop.
R
R
R
R
R
R
R
R
R
C. Description
This Non-Modification Service Bulletin (NMSB) instructs the following:
TRENT 900 LP TURBINE EXHAUST CASE AND SUPPORT ASSEMBLY (TAIL BEARING HOUSING) MOUNT
LUG RUN-OUT AND TOP CORE VANE INSPECTIONS - NON-MODIFICATION SERVICE BULLETIN - NON -
MOD.72-AG971
Printed in Great Britain
RB.211−72−AG971
Page 1 of 31
Sep 20/12
May. 5/16R

### Page 4

(1) On-wing or in-shop TBH mount lug run-out inspections which are required onR
Trent 900 Tail Bearing Housings with part numbers FW27718, FW35923,
FW51434, KH46678, KH45090 or KH46677
R
R every 2200 cycles.
(2) The in-shop inspection of TBH top core vanes and central male catcher
runout
R
R which are required on Trent 900 Tail Bearing Housings with part
numbers FW27718, FW35923, FW51434, KH46678, KH45090 or KH46677
R
R every 3800
cycles.
On-wing a specified area on the mount lug run-outs is to be crack tested using
a Fluorescent Penetrant Inspection (FPI) method or an alternative Eddy Current
Method,
R
R see Fig.1. In shop, the mount lug run-outs can either be inspected
using a local FPI,R local eddy current or through a full FPI of the TBH.
In shop the top core vanes and central male catcher runoutR are to be inspected
by a full FPI of the TBH.
Results of the Inspections are to be returned to Rolls-Royce. Return Appendix 1
(or similar form) to your Rolls-Royce Service representative.
D. Compliance
ALERT
This Non-Modification Service Bulletin isR the subject of an EASA Airworthiness
Directive AD 2013-0240.R
Rolls-Royce recommends that the following action is undertaken to maintain
continued airworthiness.
This NMSB applies to both on-wing and in-shop activities.
(1) On-wing - Localised Mount Lug Run-Outs Inspection:
Accomplish the first inspection in accordance with section 3.A. Accomplish
the first inspection within 2200 cycles for the TBH mount lug run-outs if
it is not to be done in-shop. Subsequent inspections whether in-shop or
on-wing should be within 2200 cycles of previous inspection. Any TBH mount
lug run-outs that were inspected to TV124801 or TV124851 prior to initial
issue of this NMSB are deemed as compliant with the NMSB.
(2) In-shop - Localised Mount Lug Run-outs Inspection:
Accomplish the first inspection in accordance with section 3.B. Accomplish
the first inspection within 2200 cycles for the TBH mount lug run-outs if
it is not to be done on-wing or in-shop through full FPI of the TBH.
Subsequent inspections whether in-shop or on-wing should be within 2200
cycles of previous inspection. Any TBH mount lug run-outs that were
inspected to TV124801 or TV124851 prior to initial issue of this NMSB are
deemed as compliant with the NMSB.
Printed in Great Britain
RB.211−72−AG971
Page 2
Sep 20/12
May. 5/16R

### Page 5

(3) In-shop - Top Core Vanes and Mount Lug Run-outs Inspection through full
FPI of the TBH:
Accomplish the first inspection of the Top Core Vanes and central male
catcher runout
R
R in accordance with section 3.C. Accomplish the first
inspection within 3800 cycles for the TBH top core vanes and central male
catcher runout.
R
R Subsequent inspections should be within 3800 cycles of
previous inspection.
Inspection of the mount lug run-outs can also be accomplished in
accordance with section 3.C. Accomplish the first inspection within 2200
cycles for the TBH mount lug run-outs if it is not to be done on-wing or
through a localised in-shop inspection. Subsequent inspections whether
in-shop or on-wing should be within 2200 cycles of previous inspection.
E. Approval
The technical content of this Non-Modification Service Bulletin was approved
under the authority of Design Organisation Approval EASA.21J.035 on Sep.4/12,
Sep.13/13
R
R and was re-approved on Apr.29/16.
The inspection procedures described in this SB are reviewed and technically
accepted by Airbus Design Office to apply to the Airbus fleet affected.
This SB does not contain any change information that revises the equipment
definition covered by Airbus approved modifications.
F. Manpower
(1) On-wing:
(a) Time to gain access
1 hour (1 person)
(b) Time to inspect TBH Mount Lug Run-outs (FPI Method)R
3 hours (2 persons)
(c) Time to inspect TBH Mount Lug Run-outs (Eddy Current Method)R
1 hour (1 person)R
(d) Time to restore to serviceable condition
1 hour (1 person)
Printed in Great Britain
RB.211−72−AG971
Page 3
Sep 20/12
May. 5/16R

### Page 6

(2) In-shop:
(a) Time to locally inspect TBH Mount Lug Run-outs (FPI Method)R
2 hours (2 persons)
(b) Time to locally inspect TBH Mount Lug Run-outs (Eddy Currrent Method)R
1 hour (1 person)R
(c) Inspection of TBH through full FPI
Level 2 workscope
The FPI defined in this NMSBR shall only be performed by personnel qualified to
FPI level 2 or higher and in possession of an up to date eyesight record in
accordance with EN4179/NAS410 or alternative standards/guidelines accepted by
the applicable National Aviation Authority.
The eddy current defined in this NMSB shall only be performed by personnel
qualified to eddy current level 2 or higher and in possession of an up to date
eyesight record in accordance with EN4179/NAS410 or alternative
standards/guidelines accepted by the applicable National Aviation Authority.
R
R
R
R
G. Material Price and Availability
(1) For Local FPIR
Material/
Compounds
R
R
DescriptionR
OMat 651
(Aerosol)
R
R
Aerosol penetrant - Commercially availableR
OMat 617
(Aerosol)
R
R
Aerosol Developer - Commercially availableR
OMat 150R AcetoneR
OMat 2/101R Lint-Free ClothR
OMat 677R Penetrant Test PanelR
(2) For Eddy CurrentR
Material/
Compounds
R
R
DescriptionR
OMat 2/30R PTFE Tape - Minimum width of 10 mmR
H. Tooling Price and Availability
(1) For Local FPIR
Material/
Compounds
R
R
DescriptionR
Printed in Great Britain
RB.211−72−AG971
Page 4
Sep 20/12
May. 5/16R

### Page 7

Dark
Non-reflective
cover
R
R
R
To darken the area for inspection - Commercially
available
R
R
Ultra Violet (UV)
light source
R
R
2 alternativesR
Capable of providing a minimum UV radiation intensity
of 1200 micro W/sq.cm at the inspection surface.
R
R
Alternatively, Spectroline Tritan 365 UV/White LED
Inspection Lamp, Portable, Battery Operated Version,
Part Number - TRI-365MH series Kit
R
R
R
Unit Price - Approximately £1200, Supplier - RSL NDT
Ltd.
R
R
(2) For Eddy CurrentR
Material/
Compounds
R
R
DescriptionR
HU82371R Eddy Current Inspection KitR
Rohmann Eddy current instrument capable of showing an
X-Y display
R
R
NOTE: The eddy current instrument must be subject to annual calibration
in accordance with the manufacturer instructions.
R
R
I. References
(1) Aircraft Maintenance Manual (AMM)
(a) 71-13-00, Maintenance Practices, Opening of Fan Cowl Doors
(b) 78-26-00, Maintenance Practices, Opening/Closing of the Fan Exhaust
Cowl or Thrust Reverser
(c) 78-30-00, Deactivation/Reactivation, Make the Thrust Reverser
Unserviceable for Maintenance
(d) 70-20-02, Maintenance Processes - Inspection - Maintenance Practices,
Fluorescent Penetrant Inspection
(2) Engine Manual (EM)
(a) 70-00-00, Overhaul Process 102, Primary Cleaning Aqueous, Overhaul
Process 121, Alkaline Derusting and Descaling, Overhaul Process 134,
Acidic Descalers, Overhaul Process 210, Fluorescent Penetrant
Inspection.
(b) 72-52-00-030-802, Engine Data Task, Disassemble the LP Turbine
(c) 72-52-51-200-801, Cleaning/Inspection and Repair Data Task, Examine
the LP Turbine Exhaust Case
Printed in Great Britain
RB.211−72−AG971
Page 5
Sep 20/12
May. 5/16R

### Page 8

2. Material Information
A. None
Printed in Great Britain
RB.211−72−AG971
Page 6
Sep 20/12
Sep.27/13R

### Page 9

3. Accomplishment Instructions
A. On-wing - Localised Mount Lug Run-outs InspectionR
WARNING: YOU MUST BE CAREFUL WHEN YOU WORK ON THE ENGINE AFTER THE ENGINE IS
SHUTDOWN.  THE ENGINE CAN STAY HOT FOR ALMOST ONE HOUR.
R
R
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN
CAUSE INJURY.  IF YOU GET AN INJURY, PUT IT IN COLD WATER FOR 10
MINUTES.  THEN GET MEDICAL AID.
R
R
R
CAUTION: IN ORDER TO REDUCE THE POTENTIAL FOR MULTIPLE ENGINE IN FLIGHT SHUTDOWN,
POWER LOSS OR OTHER ANOMALIES  DUE TO MAINTENANCE ERROR, ROLLS-ROYCE
RECOMMENDS THAT OPERATORS AVOID PERFORMING MAINTENANCE ON MULTIPLE
ENGINES INSTALLED ON THE SAME AIRCRAFT AT THE SAME TIME. IF IT IS NOT
POSSIBLE TO AVOID MAINTENANCE ON MORE THAN ONE ENGINE AT THE SAME TIME,
ROLLS-ROYCE RECOMMENDS THAT ADDITIONAL CONTROLS ARE APPLIED IN ORDER TO
ENSURE THAT MAINTENANCE TASKS HAVE BEEN COMPLETED AS DEFINED.
MAINTENANCE GUIDELINES SHOULD BE REVISED, WHERE POSSIBLE, TO PROMOTE
THIS RECOMMENDATION.
R
R
R
R
R
R
R
R
R
(1) Flourescent Penetrant InspectionR
NOTE: Eddy current inspections in accordance with step 3.A.(2) is a valid
alternative inspection method to the local FPI of the mount lug
run-outs.
R
R
R
(a) To get access to the Tail Bearing Housing (TBH) mount lug run-outs:R
(i) Open the fan cowl doors in accordance with AMM Task 71-13-00,
Maintenance Practices to get access
R
R
(ii) Make the thrust reverser unserviceable for maintenance in
accordance with AMM 78-30-00, Deactivation/Activation.
R
R
WARNING: YOU MUST MAKE THE THRUST REVERSER UNSERVICEABLE (INSTALL
AND SAFETY THE INHIBITION DEVICE) BEFORE YOU DO WORK ON
OR AROUND THE THRUST REVERSER.  IF YOU DO NOT INSTALL
AND SAFETY THE INHIBITION DEVICE, THERE IS A RISK THAT
THE THRUST REVERSER CAN OPERATE ACCIDENTALLY. THIS CAN
CAUSE  INJURY TO PERSON AND/OR DAMAGE TO THE EQUIPMENT.
R
R
R
R
R
R
(iii) Open the fan exhaust cowls in accordance with the AMM,
78-26-00.
R
R
(iv) Use appropriate staging to gain access to the TBH.R
(b) Carry out the inspection on the mount lug run-outs:R
Printed in Great Britain
RB.211−72−AG971
Page 7
Sep 20/12
May. 5/16R

### Page 10

WARNING: PROTECTIVE GLOVES AND SAFETY GLASSES MUST BE WORN AT ALL TIMES
DURING THE INSPECTION. IF YOU GET AN INJURY, SEEK MEDICAL AID
IMMEDIATELY
R
R
R
(i) This inspection must be performed in accordance with the
requirements of AMM 70-20-02, Maintenance Processes -
Inspection - Maintenance Practices, Fluorescent Penetrant
Inspection.
R
R
R
R
(ii) Clean the inspection areas (see Fig.1) with a clean OMat 2/101
lint-free cloth moistened with OMat 150 acetone.
R
R
(iii) Discard the soiled cloth after use.R
(iv) Repeat the swabbing using fresh OMat 150 acetone and a fresh
OMat 2/101 lint-free cloth until all deposits have been
removed.
R
R
R
NOTE: The inspection surface, must be clean, dry and free from
soils, oil, grease, paint, coatings, corrosion products,
scale, smeared metal, welding flux, chemical residues or
any other material that could prevent penetrant from
entering a discontinuity, affect process performance or
produce an unacceptable background.
R
R
R
R
R
R
(v) Allow five minutes for the area to completely dry prior to
penetrant application.
R
R
(vi) Penetrant application - Apply OMat 651 penetrant to the
inspection areas (Fig.1) by brush or sponge applicator. The
penetrant must be dispensed from a sealed aerosol can and any
unused penetrant must go to waste.
R
R
R
R
(vii) Make sure that the inspection area is fully covered with
penetrant with the aid of a UV lamp.
R
R
(viii) Apply OMat 651 penetrant to the OMat 677 penetrant test panel.R
(ix) Leave the penetrant in contact with the components for 30
minutes.
R
R
NOTE: The penetrant contact time must not exceed one hour. If it
does, the penetrant must be re-applied and 5 minutes
contact time allowed.
R
R
R
(x) Penetrant Removal - After the 30 minutes contact time, remove
the excess penetrant from the inspection surface and the OMat
677 penetrant test panel by wiping thoroughly with a clean OMat
2/101 lint-free cloth.
R
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 8
Sep 20/12
May. 5/16R

### Page 11

(xi) Whilst illuminating with UV light, wipe off the penetrant with
a clean OMat 2/101 lint-free cloth moistened with OMat 150
acetone. Use the minimum application necessary to achieve
acceptable background fluorescence and make sure that acetone
is not allowed to flow on the inspection surface.
R
R
R
R
R
(xii) Make sure that all traces of the OMat 150 acetone have been
completely removed.
R
R
(xiii) Develop - Apply a light, even coating of OMat 617 non-aqueous
wet developer from a sealed aerosol can to the inspection area
and the OMat 677 penetrant test panel.
R
R
R
(xiv) Allow 10 minutes contact time for the developer prior to
inspection.
R
R
(xv) Cover the region of the engine with a dark non-reflective cover
in order to reduce the white light levels.
R
R
(xvi) Make sure there are no white light sources or fluorescent items
(including clothing) within the inspection area or the
inspector's field of vision.
R
R
R
(xvii) Do not wear darkened or light sensitive glasses.R
(xviii)Allow one minute for eye adaptation to the darkened area.R
(xix) Illuminate the OMat 677 penetrant test panel in the darkened
area with one of the allowed UV light sources listed in 1.H.
Tooling Price and Availability.
R
R
R
(xx) Inspect the OMat 677 penetrant test panel and check that the
four largest indications are visible and match the control
photograph for that individual panel.
R
R
R
(xxi) Illuminate the inspection surface with the same UV light in the
darkened area.
R
R
(xxii) Inspect the mount lug run-outs for crack indications.R
(xxiii)The Wipe Off technique can be used to aid the evaluation of any
indications:
R
R
(1) Dampen a cotton swab with acetone.R
(2) Wipe once across the indication.R
(3) Allow the acetone to evaporate and inspect immediately.R
Printed in Great Britain
RB.211−72−AG971
Page 9
Sep 20/12
May. 5/16R

### Page 12

(4) If the indication reappears then record it is a crack. If the
indications does not reappear then apply a light, even
coating of OMat 617 non-aqueous wet developer from a sealed
aerosol can to the area.
R
R
R
R
(5) Allow the solvent in the developer to evaporate and inspect
immediately.
R
R
(6) If the indication reappears then record it as a crack. If the
indication does not reappear then allow 10 minutes contact
time for the developer.
R
R
R
(7) If the indication reappears after the 10 minutes contact time
then record it as a crack. If the indication does not
reappear then that area is acceptable.
R
R
R
(xxiv) The cause of all indications must be evaluated under white
light using visual aids, such as magnification, as appropriate.
R
R
(xxv) Photograph any suspected crack indications and record them in
Appendix 1.
R
R
(1) No cracks detected - AcceptR
(2) Any cracks less than or equal to 2mm length - Remove engine
within 10 flight cycles
R
R
(3) Any cracks greater than 2mm length - Remove engine or refer
to Rolls-Royce
R
R
NOTE: Any findings outside the above limits can be referred
to Rolls-Royce to determine if up to 10 flight cycles
additional fly on can be granted in order to
facilitate engine removal.
R
R
R
R
(xxvi) Post Clean - Once all indications have been evaluated and
recorded, remove the penetrant processing materials from the
inspection surface by wiping with a clean OMat 2/101, lint-free
cloth moistened with OMat 150 acetone.
R
R
R
R
(xxvii)Restore the OMat 677 penetrant test panel to a completely clean
condition and make sure there is no residual fluorescence.
R
R
(c) Close access to the tail bearing housing:R
(i) Make sure the work area is clean and clear of tools and other
items.
R
R
Printed in Great Britain
RB.211−72−AG971
Page 10
Sep 20/12
May. 5/16R

### Page 13

(ii) Close the fan exhaust cowls in accordance with AMM 78-26-00,
Maintenance Practices.
R
R
(iii) Make the thrust reverser serviceable after maintenance in
accordance with AMM 78-30-00, Deactivation/Activation as
necessary.
R
R
R
(iv) Close the fan exhaust cowls in accordance with AMM 71-13-00,
Maintenance Practices.
R
R
(d) Accomplishment of this Non-Modification Service Bulletin should be
recorded in accordance with local SB tracking system procedures.
R
R
(2) Eddy Current InspectionR
NOTE: FPI inspection in accordance with step 3.A.(1) is a valid
alternative inspection to this eddy current procedure for the mount
lug run-outs.
R
R
R
(a) Pre Inspection CalibrationR
(i) Check the equipment before use for any signs of wear or damage
and, if necessary, rectify before use.
R
R
(ii) Use the following nominal instrument settings for the initial
setup:
R
R
- Frequency - 2 MHzR
- Gain - 40 dBR
- Angle - 250 deg.R
- Low Pass Filter - 65 HzR
- High Pass Filter - StaticR
- Spot Position - CentreR
(iii) Apply a strip of PTFE (OMat 2/30) tape along the length of the
working standard, HU82372, on the edge containing the EDM notch
(Fig.3) and apply a disc of PTFE tape on the face of the eddy
current probe (Fig.4).
R
R
R
R
Make sure that there are no creases in the tape as this will cause
the probe to move away from the surface and produce lift-off
signals.
R
R
R
The disc of PTFE tape on the eddy current probe must not extend
over the edge of the probe face as this will affect the ability of
the spring loaded mechanism to compress.
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 11
Sep 20/12
May. 5/16R

### Page 14

(iv) Place the probe on the edge of the working standard containing
the EDM notch. Make sure the probe is away from the EDM notch
(see Fig.5) and then balance the instrument. Make sure the
probe is at 45 degrees to the corner and the spring is fully
compressed (see Fig.6).
R
R
R
R
R
(v) Slide the probe over the 1 mm x 1 mm corner EDM notch and
identify the signal on the eddy current instrument display. The
scanning speed must be between 15 mm per second and 30 mm per
second.
R
R
R
R
(vi) Make sure that the probe is kept at 45 degrees to the corner
with the spring fully compressed (see Fig.6). If the probe is
off-axis then the phase angle and signal amplitude will be
affected.
R
R
R
R
(vii) Adjust the phase angle so that the signal rises and falls
vertically from the centre of the screen.
R
R
(viii) Adjust the gain so that the signal amplitude covers 80 per cent
of the full screen height, see Fig.7.
R
R
(b) InspectionR
(i) Using suitable staging, access the Tail Bearing Housing Mount
Lug Run-Out inspection areas (see Fig.1 for the inspection
areas). Both edges of all 4 Mount Lug Run-Outs are to be
inspected.
R
R
R
R
(ii) Remove any loose dirt and debris from the inspection areas with
an OMat 2/101 - Lint-free cloth in order to allow PTFE tape to
adhere well to the inspection surface.
R
R
R
(iii) Make sure the inspection area is clean, dry and free from
contaminants that could affect process performance.
R
R
(iv) Place PTFE tape along each of the eight edges of the Mount Lug
Run-Outs requiring eddy current inspection (see Fig.8). Make
sure that the full 120 mm of the inspection area is covered by
the tape by applying it 20 mm beyond each end of the inspection
area and make sure that there are no creases in the tape that
would provide lift-off signals.
R
R
R
R
R
R
(v) Check the condition of the tape on the eddy current probe face.
If it is torn or damaged then replace it before continuing with
the inspection.
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 12
Sep 20/12
May. 5/16R

### Page 15

(vi) Place the probe on the edge of the first Mount Lug Run-Out (see
Fig.8) and balance the instrument. Make sure that the probe is
kept at 45 degrees to the edge with the spring fully compressed
(see Fig.6). If the probe is off-axis then the phase angle and
signal amplitude will be affected.
R
R
R
R
R
(vii) Slide the probe along the edge of the Mount Lug Run-Out,
covering the full extent of the inspection area. The scanning
speed must be between 15 mm per second and 30 mm per second.
R
R
R
(viii) Monitor the instrument display for any indications.R
NOTE: Crack signals will appear as a figure-of-eight rising and
falling vertically from the centre of the screen, as seen
on the working standard during calibration, see Fig.7.
R
R
R
NOTE: Indications of mechanical damage, for example burrs or
grooves, may also produce indications. These indications
will have a different phase angle that is aligned further
from the vertical axis and will often be a wider
figure-of-eight or a single loop, some examples are shown
in Fig.9.
R
R
R
R
R
R
(ix) If there are tears or damage to the tape on the Mount Lug
Run-Outs or on the probe face then the tape must be replaced
before continuing the inspection in order to avoid damage to
the probe.
R
R
R
R
(x) Repeat the inspection for the remaining seven Mount Lug Run-Out
corners.
R
R
(xi) Mark the location of any crack indications.R
(c) Post Inspection CalibrationR
(i) Make sure the PTFE tape is still in place and in good condition
on the corner of the working standard, HU82372, and on the
probe face. If not, replace the tape prior to the post
inspection calibration and make sure there are no creases.
R
R
R
R
(ii) Place the probe on the edge of the working standard containing
the EDM notch. Make sure the probe is away from the EDM notch
(Fig.5) and then balance the instrument. Make sure the probe is
at 45 degrees to the corner and the spring is fully compressed
(see Fig.6).
R
R
R
R
R
(iii) Slide the probe over the 1 mm x 1 mm corner EDM notch and
identify the signal on the eddy current instrument display. The
scanning speed must be between 15 mm per second and 30 mm per
second.
R
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 13
Sep 20/12
May. 5/16R

### Page 16

(iv) Make sure that the probe is kept at 45 degrees to the corner
with the spring fully compressed (see Fig.6). If the probe is
off-axis then the phase angle and signal amplitude will be
affected.
R
R
R
R
(v) Check that the signal from the EDM notch is still 80 per cent
full screen height, as seen in Fig.7. If the signal is less
than 80 per cent full screen height, then the equipment must be
recalibrated and the inspection repeated.
R
R
R
R
(d) Accept/RejectR
(i) Any indications leading to a signal with an amplitude less than
50 per cent full screen height - Accept
R
R
(ii) Any crack indications leading to a signal with an amplitude of
50 per cent full screen height or more (see Fig.10) - Remove
engine or refer to Rolls-Royce.
R
R
R
NOTE: Crack indications will rise and fall vertically from the
centre of the screen with a similar form to the signal from
the EDM notch in the working standard and will be
repeatable.
R
R
R
R
NOTE: Any findings outside the above limits can be referred to
Rolls-Royce to determine if up to 10 flight cycles
additional fly on can be granted in order to facilitate
engine removal.
R
R
R
R
(e) Photograph any suspected crack indications and record them in Appendix
1.
R
R
B. In-shop - Localised Mount Lug Run-outs InspectionR
(1) Flourescent Penetrant InspectionR
(a) Carry out the inspection on the mount lug run-outs (local inspection
only)
R
R
NOTE: Eddy current inspections in accordance with step 3.B.(2) is a
valid alternative inspection method to the local FPI of the
mount lug run-outs.
R
R
R
WARNING: PROTECTIVE GLOVES AND SAFETY GLASSES MUST BE WORN AT ALL
TIMES DURING THE INSPECTION. IF YOU GET AN INJURY, SEEK
MEDICAL AID IMMEDIATELY
R
R
R
(i) This inspection must be performed in accordance with the
requirements of 70-00-00 Overhaul Process 210, Fluorescent
Penetrant Inspection.
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 14
Sep 20/12
May. 5/16R

### Page 17

(ii) Clean the inspection areas (see Fig.1) with a clean OMat 2/101
lint-free cloth moistened with OMat 150 acetone.
R
R
(iii) Discard the soiled cloth after use.R
(iv) Repeat the swabbing using fresh OMat 150 acetone and a fresh
OMat 2/101 lint-free cloth until all deposits have been
removed.
R
R
R
NOTE: The inspection surface, must be clean, dry and free from
soils, oil, grease, paint, coatings, corrosion products,
scale, smeared metal, welding flux, chemical residues or
any other material that could prevent penetrant from
entering a discontinuity, affect process performance or
produce an unacceptable background.
R
R
R
R
R
R
(v) Allow five minutes for the area to completely dry prior to
penetrant application.
R
R
(vi) Penetrant application - Apply OMat 651 penetrant to the
inspection areas (see Fig.1) by brush or sponge applicator. The
penetrant must be dispensed from a sealed aerosol can and any
unused penetrant must go to waste.
R
R
R
R
(vii) Make sure that the inspection area is fully covered with
penetrant with the aid of a UV lamp.
R
R
(viii) Apply OMat 651 penetrant to the OMat 677 penetrant test panel.R
(ix) Leave the penetrant in contact with the components for 30
minutes.
R
R
NOTE: The penetrant contact time must not exceed one hour. If it
does, the penetrant must be re-applied and 5 minutes
contact time allowed.
R
R
R
(x) Penetrant Removal - After the 30 minutes contact time, remove
the excess penetrant from the inspection surface and the OMat
677 penetrant test panel by wiping thoroughly with a clean OMat
2/101 lint-free cloth.
R
R
R
R
(xi) Whilst illuminating with UV light, wipe off the penetrant with
a clean OMat 2/101 lint-free cloth moistened with OMat 150
acetone. Use the minimum application necessary to achieve
acceptable background fluorescence and make sure that acetone
is not allowed to flow on the inspection surface.
R
R
R
R
R
(xii) Make sure that all traces of the OMat 150 acetone have been
completely removed.
R
R
Printed in Great Britain
RB.211−72−AG971
Page 15
Sep 20/12
May. 5/16R

### Page 18

(xiii) Develop - Apply a light, even coating of OMat 617 non-aqueous
wet developer from a sealed aerosol can to the inspection area
and the OMat 677 penetrant test panel.
R
R
R
(xiv) Allow 10 minutes contact time for the developer prior to
inspection.
R
R
(xv) Cover the region of the engine with a dark non-reflective cover
in order to reduce the white light levels.
R
R
(xvi) Make sure there are no white light sources or fluorescent items
(including clothing) within the inspection area or the
inspector's field of vision.
R
R
R
(xvii) Do not wear darkened or light sensitive glasses.R
(xviii)Allow one minute for eye adaptation to the darkened area.R
(xix) Illuminate the OMat 677 penetrant test panel in the darkened
area with one of the allowed UV light sources listed in 1.H.
Tooling Price and Availability.
R
R
R
(xx) Inspect the OMat 677 penetrant test panel and check that the
four largest indications are visible and match the control
photograph for that individual panel.
R
R
R
(xxi) Illuminate the inspection surface with the same UV light in the
darkened area.
R
R
(xxii) Inspect the mount lug run-outs for crack indications.R
(xxiii)The Wipe Off technique can be used to aid the evaluation of any
indications:
R
R
(1) Dampen a cotton swab with acetone.R
(2) Wipe once across the indication.R
(3) Allow the acetone to evaporate and inspect immediately.R
(4) If the indication reappears then record it is a crack. If the
indications does not reappear then apply a light, even
coating of OMat 617 non-aqueous wet developer from a sealed
aerosol can to the area.
R
R
R
R
(5) Allow the solvent in the developer to evaporate and inspect
immediately.
R
R
(6) If the indication reappears then record it as a crack. If the
indication does not reappear then allow 10 minutes contact
time for the developer.
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 16
Sep 20/12
May. 5/16R

### Page 19

(7) If the indication reappears after the 10 minutes contact time
then record it as a crack. If the indication does not
reappear then that area is acceptable.
R
R
R
(xxiv) The cause of all indications must be evaluated under white
light using visual aids, such as magnification, as appropriate.
R
R
(xxv) Photograph any suspected crack indications and record them in
Appendix 1.
R
R
(1) No cracks detected - AcceptR
(2) Any cracks detected - RejectR
(xxvi) Post Clean - Once all indications have been evaluated and
recorded, remove the penetrant processing materials from the
inspection surface by wiping with a clean OMat 2/101, lint-free
cloth moistened with OMat 150 acetone.
R
R
R
R
(xxvii)Restore the OMat 677 penetrant test panels to a completely
clean condition and make sure there is no residual
fluorescence.
R
R
R
(2) Eddy Current InspectionR
NOTE: FPI inspection in accordance with step 3.B.(1) is a valid
alternative inspection to this eddy current procedure for the mount
lug run-outs.
R
R
R
(a) Pre Inspection CalibrationR
(i) Check the equipment before use for any signs of wear or damage
and, if necessary, rectify before use.
R
R
(ii) Use the following nominal instrument settings for the initial
setup:
R
R
- Frequency - 2 MHzR
- Gain - 40 dBR
- Angle - 250 deg.R
- Low Pass Filter - 65 HzR
- High Pass Filter - StaticR
- Spot Position - CentreR
Printed in Great Britain
RB.211−72−AG971
Page 17
Sep 20/12
May. 5/16R

### Page 20

(iii) Apply a strip of PTFE tape along the length of the working
standard, HU82372, on the edge containing the EDM notch (Fig.3)
and apply a disc of PTFE tape on the face of the eddy current
probe (Fig.4).
R
R
R
R
Make sure that there are no creases in the tape as this will cause
the probe to move away from the surface and produce lift-off
signals.
R
R
R
The disc of PTFE tape on the eddy current probe must not extend
over the edge of the probe face as this will affect the ability of
the spring loaded mechanism to compress.
R
R
R
(iv) Place the probe on the edge of the working standard containing
the EDM notch. Make sure the probe is away from the EDM notch
(see Fig.5) and then balance the instrument. Make sure the
probe is at 45 degrees to the corner and the spring is fully
compressed (see Fig.6).
R
R
R
R
R
(v) Slide the probe over the 1 mm x 1 mm corner EDM notch and
identify the signal on the eddy current instrument display. The
scanning speed must be between 15 mm per second and 30 mm per
second.
R
R
R
R
(vi) Make sure that the probe is kept at 45 degrees to the corner
with the spring fully compressed (see Fig.6). If the probe is
off-axis then the phase angle and signal amplitude will be
affected.
R
R
R
R
(vii) Adjust the phase angle so that the signal rises and falls
vertically from the centre of the screen.
R
R
(viii) Adjust the gain so that the signal amplitude covers 80 per cent
of the full screen height, see Fig.7.
R
R
(b) InspectionR
(i) Using suitable staging, access the Tail Bearing Housing Mount
Lug Run-Out inspection areas (see Fig.1 for the inspection
areas). Both edges of all 4 Mount Lug Run-Outs are to be
inspected.
R
R
R
R
(ii) Remove any loose dirt and debris from the inspection areas with
an OMat 2/101 - Lint-free cloth in order to allow PTFE tape to
adhere well to the inspection surface.
R
R
R
(iii) Make sure the inspection area is clean, dry and free from
contaminants that could affect process performance.
R
R
Printed in Great Britain
RB.211−72−AG971
Page 18
Sep 20/12
May. 5/16R

### Page 21

(iv) Place PTFE tape along each of the eight edges of the Mount Lug
Run-Outs requiring eddy current inspection (see Fig.8). Make
sure that the full 120 mm of the inspection area is covered by
the tape by applying it 20 mm beyond each end of the inspection
area and make sure that there are no creases in the tape that
would provide lift-off signals.
R
R
R
R
R
R
(v) Check the condition of the tape on the eddy current probe face.
If it is torn or damaged then replace it before continuing with
the inspection.
R
R
R
(vi) Place the probe on the edge of the first Mount Lug Run-Out (see
Fig.9) and balance the instrument. Make sure that the probe is
kept at 45 degrees to the edge with the spring fully compressed
(see Fig.6). If the probe is off-axis then the phase angle and
signal amplitude will be affected.
R
R
R
R
R
(vii) Slide the probe along the edge of the Mount Lug Run-Out,
covering the full extent of the inspection area. The scanning
speed must be between 15 mm per second and 30 mm per second.
R
R
R
(viii) Monitor the instrument display for any indications.R
NOTE: Crack signals will appear as a figure-of-eight rising and
falling vertically from the centre of the screen, as seen
on the working standard during calibration, see Fig.7.
R
R
R
NOTE: Indications of mechanical damage, for example burrs or
grooves, may also produce indications. These indications
will have a different phase angle that is aligned further
from the vertical axis and will often be a wider
figure-of-eight or a single loop, some examples are shown
in Fig.10.
R
R
R
R
R
R
(ix) If there are tears or damage to the tape on the Mount Lug
Run-Outs or on the probe face then the tape must be replaced
before continuing the inspection in order to avoid damage to
the probe.
R
R
R
R
(x) Repeat the inspection for the remaining seven Mount Lug Run-Out
corners.
R
R
(xi) Mark the location of any crack indications.R
(c) Post Inspection CalibrationR
(i) Make sure the PTFE tape is still in place and in good condition
on the corner of the working standard, HU82372, and on the
probe face. If not, replace the tape prior to the post
inspection calibration and make sure there are no creases.
R
R
R
R
Printed in Great Britain
RB.211−72−AG971
Page 19
Sep 20/12
May. 5/16R

### Page 22

(ii) Place the probe on the edge of the working standard containing
the EDM notch. Make sure the probe is away from the EDM notch
(Fig.5) and then balance the instrument. Make sure the probe is
at 45 degrees to the corner and the spring is fully compressed
(see Fig.6).
R
R
R
R
R
(iii) Slide the probe over the 1 mm x 1 mm corner EDM notch and
identify the signal on the eddy current instrument display. The
scanning speed must be between 15 mm per second and 30 mm per
second.
R
R
R
R
(iv) Make sure that the probe is kept at 45 degrees to the corner
with the spring fully compressed (see Fig.6). If the probe is
off-axis then the phase angle and signal amplitude will be
affected.
R
R
R
R
(v) Check that the signal from the EDM notch is still 80 per cent
full screen height, as seen in Fig.7. If the signal is less
than 80 per cent full screen height, then the equipment must be
recalibrated and the inspection repeated.
R
R
R
R
(d) Accept/RejectR
(i) Any indications leading to a signal with an amplitude less than
50 per cent full screen height - Accept
R
R
(ii) Any crack indications leading to a signal with an amplitude of
50 per cent full screen height or more (see Fig.10) - Reject.
R
R
NOTE: Crack indications will rise and fall vertically from the
centre of the screen with a similar form to the signal from
the EDM notch in the working standard and will be
repeatable.
R
R
R
R
(e) Photograph any suspected crack indications and record them in Appendix
1.
R
R
(3) Accomplishment of this Non-Modification Service Bulletin should be
recorded in the engine log book.
R
R
C. In-shop - Top Core Vanes, Mount Lug Run-outs and Central Male Catcher Run-out
Inspection through Full FPI of the TBH
R
R
(1) Carry out the inspection on the Top Core Vanes (TCV) and mount lug
run-outs and central male catcher run-out.
R
R
(a) Remove the tail bearing housing in accordance with Engine Data Task
72-52-00-030-802, Disassemble the LP Turbine.
R
R
Printed in Great Britain
RB.211−72−AG971
Page 20
Sep 20/12
May. 5/16R

### Page 23

(b) Disassemble the TBH in accordance with Engine Data Task
72-52-50-040-801, Disassemble the LP Turbine Bearing Housing (TBH)
Support and Exhaust Case.
R
R
R
(c) Clean the TBH in accordance with Overhaul Process 134, Acidic
Descalers, Subtask 70-00-00-110-134-002:
R
R
(i) In accordance with Subtask 70-00-00-110-134-002, Degrease the
part in accordance with Overhaul Process 102, Primary Cleaning
Aqueous.
R
R
R
(ii) In accordance with Subtask 70-00-00-110-134-002, perform the
optional Alkali Derust in accordance with Overhaul Process 121,
Alkaline Derusting and Descaling, Subtask 70-00-00-110-121-001.
R
R
R
(iii) In accordance with remainder of Subtask 70-00-00-110-134-002,
perform the Acidic Descale (step 1), Scale Condition Acidic
Descale (step 2).
R
R
R
(d) Carry out a full FPI crack test in line with Cleaning/Inspection and
Repair Data Task 72-52-51-200-801, Subtask 72-52-51-230-023. Use a
high sensitivity penetrant as the minimum sensitivity.
R
R
R
(e) Inspect the entire TBH for crack indications, including the areas for
the mount lug run-outs highlighted in Fig.1 and the areas of the TCV
and the areas of the central male catcher highlighted in Fig.2.
R
R
R
(f) Record inspection results and any crack indications in Appendix 1.R
(i) No CracksR ACCEPTR
(ii) Cracks on the Mount Lug
Leading Edge area of Vanes
1 or 14
R
R
R
REJECT or repair in accordance with
CIR Task 72-52-51-300-023 and repeat
a local flourescent penetrant crack
test of this area. Use OMat 632
flourescent penetrant, high
sensitivity water washable. Refer to
OP Task 70-00-00-200-210. Reject if
cracked.
R
R
R
R
R
R
R
R
(iii) Cracks on any other
location
R
R
REJECTR
(2) Accomplishment of this Non-Modification Service Bulletin should be
recorded in the engine log book.
R
R
Printed in Great Britain
RB.211−72−AG971
Page 21
Sep 20/12
May. 5/16R

### Page 24

deh0014561
A
A
B
C
5.0 mm
(0.20 in)B
60.0 mm
(2.36 in)
INSPECTION AREAS
IN ADDITION APPROXIMATELY
5.0 mm (0.20 in) COVERAGE
IS REQUIRED AROUND
THE CORNERS
120.0 mm
(4.72 in)
B
THE 4 EDGES OF THE
MOUNT LUGS ON BOTH
SIDES OF THE TBH MUST
BE INSPECTED
R
Mount Lug Run Outs - Inspection AreasR
Fig.1R
Printed in Great Britain
RB.211−72−AG971
Page 22
Sep 20/12
May. 5/16R

### Page 25

deh0013071
TOP CORE VANES
C
REQUIRING
INSPECTION
CENTRAL MALE
CATCHER RUN OUT AREA
R
Top Core Vanes Requiring InspectionR
Fig.2R
Printed in Great Britain
RB.211−72−AG971
Page 23
Sep 20/12
May. 5/16R

### Page 26

deh0014396
WORKING STANDARD
HU82372
EDM NOTCH
PTFE TAPE
ALONG THE EDGE
R
Apply a strip of PTFE Tape along the Edge of the Working Standard containing the EDM
NotchR
Fig.3R
Printed in Great Britain
RB.211−72−AG971
Page 24
Sep 20/12
May. 5/16R

### Page 27

deh0014397
PTFE TAPE
ACROSS THE PROBE FACE
AND NOT EXTENDING OVER
THE EDGES
ROHMANN EDDY
CURRENT PROBE
KD−1 H−373.01E
R
Apply a Disc of PTFE Tape across the Probe FaceR
Fig.4R
Printed in Great Britain
RB.211−72−AG971
Page 25
Sep 20/12
May. 5/16R

### Page 28

deh0014398
WORKING STANDARD
HU82372
EDM NOTCH
PROBE PLACED
ON THE EDGE
AWAY FROM THE
EDM NOTCH
R
Place the Probe on the Edge of the Working Standard and Balance the InstrumentR
Fig.5R
Printed in Great Britain
RB.211−72−AG971
Page 26
Sep 20/12
May. 5/16R

### Page 29

deh0014399
WORKING STANDARD/
COMPONENT
EDDY CURRENT
PROBE
R
The Probe must be fully Pressed on to the EdgeR
Fig.6R
Printed in Great Britain
RB.211−72−AG971
Page 27
Sep 20/12
May. 5/16R

### Page 30

deh0014400a
100%
0
100%
80%
80%
R
Gain adjusted so that the Signal Amplitude covers 80 per cent of the Full Screen
HeightR
Fig.7R
Printed in Great Britain
RB.211−72−AG971
Page 28
Sep 20/12
May. 5/16R

### Page 31

deh0014402
PTFE TAPE ON
BOTH EDGES OF THE
MOUNT LUG RUN OUTS
PROBE PLACED
ON THE EDGE
R
Place the Probe on the Edge of the Mount Lug Run-OutR
Fig.8R
Printed in Great Britain
RB.211−72−AG971
Page 29
Sep 20/12
May. 5/16R

### Page 32

deh0014403
INDICATIONS OF MECHANICAL DAMAGE
WILL HAVE A PHASE ANGLE
ALIGNED FURTHER FROM
VERTIVAL AXIS THAN A
CRACK INDICATION
INDICATIONS OF MECHANICAL DAMAGE
WILL HAVE A PHASE ANGLE
ALIGNED FURTHER FROM
VERTIVAL AXIS THAN A
CRACK INDICATION
R
Examples of Signals that may be caused by Mechanical DamageR
Fig.9R
Printed in Great Britain
RB.211−72−AG971
Page 30
Sep 20/12
May. 5/16R

### Page 33

deh0014404a
100%
0
100%
50%
50%
R
Reject Crack Indications of 50 Per cent Full Screen Height or GreaterR
Fig.10R
Printed in Great Britain
RB.211−72−AG971
Page 31
Sep 20/12
May. 5/16R

### Page 34

This form (or similar) is to be completed for every component. Results and
photographs to be sent to Rolls-Royce via your Service Representative.
Feedback Sheet NMSB 72-AG971
Overhaul Base
Operator
Engine Mark
Date of Inspection
Engine Serial Number
Engine Hours Since New
Engine Cycles Since New
08 Module Serial Number
08 Module Hours Since new
08 Module Cycles Since New
Component Part Number / Component Serial
Number
Component Hours Since New / Component
Cycles Since New
Inspection Result and Comments
On-wing Inspection of Mount Lug Run-outs
(if applicable)
In-shop Inspection of Mount Lug Run-outs
(if applicable)
In-shop Inspection of Top Core Vanes and
central male catcher run-out
R
R (if
applicable)
In-shop Inspection of Fail Safe Catcher
(if applicable)
Any other finding during In-shop
Inspection (Full FPI)
APPENDIX 1
Printed in Great Britain
RB.211−72−AG971
Appendix 1 - Page 1 of 1
Sep 20/12
May. 5/16R

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.