# Rolls-Royce Service Bulletin RB 72-AJ101: No revision named

- Rights: © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2013-1015, the docket of AD 2014-05-25, 2017-01-01, 2017-08-10. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Rolls-Royce Service Bulletin RB 72-AJ101](https://openairdocs.org/service-documents/rolls-royce/rb72-aj101.md)
- Title as filed: RB_72-AJ101_0
- Pages: 23
- PDF: https://openairdocs.org/files/sha256/e6/c4/e6c410ecef604c1575cf2c5d9e60520136a3e8780d386c79f66b619b0306e703
- Page: https://openairdocs.org/service-documents/rolls-royce/rb72-aj101/file/e6c410ecef60

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

P.O. Box 31, DERBY
DE24 8BJ, UK  Telephone: 44 (0) 1332 242424  Rolls-Royce
Fax: 44(0) 1332 249936
PUBLICATION  TRANSMITTAL
The technical information contained in this document has been approved under the authority
of - See Planning Information, Approval.
Date May. 5/16
RB211 TRENT 900 SERIES PROPULSION SYSTEMS NON-MODIFICATION SERVICE BULLETIN
Printed in Great Britain  This document transmits the Initial Issue of Service Bulletin RB211-72-AJ101  ALERT
Bulletin Initial Issue
Remove  Incorporate  Reason for change
Pages 1 to 19 of the  Initial issue
Service Bulletin
Page 1 and 2 of  Initial issue
Appendix 1
ALERT  RB.211-72-AJ101
Transmittal - Page 1 of 2
CHECK THAT ALL PREVIOUS TRANSMITTALS HAVE BEEN INCORPORATED
If any have not been received please advise Customer Data Services, Rolls-Royce pic, Derby, England
© Rolls-Royce plc (date as above) Printed in Great Britain

### Page 2

LIST OF EFFECTIVE PAGES
The effective pages to this Service Bulletin are as follows:
Page Revision Number Revision Date
Bulletin
1 May 5/16
2 May 5/16
3 May 5/16
4 May 5/16
5 May 5/16
6 May 5/16
7 May 5/16
8 May 5/16
9 May 5/16
10 May 5/16
11 May 5/16
12 May 5/16
13 May 5/16
14 May 5/16
15 May 5/16
16 May 5/16
17 May 5/16
18 May 5/16
19 May 5/16
Appendix 1
1 May 5/16
2 May 5/16
Printed in Great Britain
RB.211−72−AJ101
Transmittal - Page 2

### Page 3

1. Planning Information
A. Effectivity
Airbus A380
RB211 TRENT970-84 engines incorporating Service Bulletin 72-J024.
RB211 TRENT970B-84 engines incorporating Service Bulletin 72-J024.
RB211 TRENT972-84 engines incorporating Service Bulletin 72-J024.
RB211 TRENT972B-84 engines incorporating Service Bulletin 72-J024.
B. Reason
Problem
Inspections of the Tail Bearing Housing (TBH) to Non-Modification Service
Bulletin (NMSB) 72-AG971 have identified crack indications in the mount lug
forging Leading Edge (LE). This area is currently being inspected through NMSB
72-AH154.
A modification of the Tail Bearing Housing has been released in Service
Bulletin 72-J024. This modification introduces a local change of the leading
edge profile, generating a cutback feature to reduce the stress on this
location and minimise the risk of cracking. However, cracking may still occur
in the future. As a consequence, this Non-Modification Service Bulletin is
released to instruct the inspection of Tail Bearing Housings incorporating SB
72-J024. This NMSB no longer includes the requirement to inspect the fail safe
male catcher for damage. This was originally included in NMSB 72-AH154 to
support the root cause understanding of the leading edge cracking. This root
cause investigation has concluded that cracking is not related to a potential
contact of the catcher with the engine mounts.
C. Description
This NMSB instructs the following:
On-wing or in-shop Non-Destructive Test (NDT) inspections of the mount lug
forging LE and cutback areas which are required on Trent 900 engines
incorporating Service Bulletin 72-J024 fleet every 1000 flight cycles.
This NMSB details the on-wing and in-shop inspection techniques for the TBH.
ENGINE - LP TURBINE EXHAUST CASE AND SUPPORT ASSEMBLY (TAIL BEARING HOUSING) MOUNT
LUG FORGING LEADING EDGE AND CUTBACK INSPECTIONS - NON-MODIFICATION SERVICE BULLETIN
- NON - MOD.72-AJ101
Printed in Great Britain
RB.211−72−AJ101
Page 1 of 19
May. 5/16
May. 5/16

### Page 4

On-wing, the mount lug forging LE and cutback areas are to be Fluorescent
Penetrant Inspection (FPI) crack tested. In-shop, the mount lug forging LE and
cutback areas can either be inspected using a local FPI method or through a
full FPI of the entire TBH.
This NMSB applies to all the below TBH part numbers:
KH46677, KH46678, KH45090.
Results of the inspections are to be returned to Rolls-Royce. Return Appendix 1
(or similar form) to your Rolls-Royce Service representative.
D. Compliance
ALERT
This NMSB is expected to be the subject of an EASA Airworthiness Directive.
Rolls-Royce recommends that the following action is undertaken to maintain
continued airworthiness.
This NMSB applies to both on-wing and in-shop activities.
(1) On-wing:
Accomplish the first inspection in accordance with section 3.A.
Accomplishment Instructions, accomplish the first inspection within 1000
flight cycles of the embodiment of SB 72-J024 for the TBH mount lug
forging LE and cutback areas if it is not to be done in-shop.
Any TBH that received a full FPI in accordance with NMSB 72-AG971, 3.C.
Accomplishment Instructions are deemed as compliant with this NMSB
(72-AJ101).
Subsequent inspections whether in-shop or on-wing should be within 1000
cycles of previous inspection.
(2) In-shop:
Mount Lug Forging LE area (Local Inspection)
This inspection must be applied on all Engines where the Module 52 is
level 1 (Serviceability). The inspection must be carried out whilst the
part is at module level and strip of the module to piece part is not
required.
For Engines where the Module 52 is Level 2 (Check and Repair) or above,
this local inspection is not required if the TBH receives a full
Fluorescent Penetrant Inspection in accordance with NMSB 72-AG971, 3.C.
Accomplishment Instructions. Otherwise the local inspection is required.
Printed in Great Britain
RB.211−72−AJ101
Page 2
May. 5/16
May. 5/16

### Page 5

For Engines that are hospital shop visit, this inspection can be applied
but is not compulsory.
All Engine Rework definitions can be found in the applicable paragraphs of
the Trent 900 Generic Engine Management Programme (EMP).
For all Engines not currently installed on an Aircraft and not planned for
induction into overhaul shop, this inspection can be applied but it is not
compulsory.
Accomplish the first inspection in accordance with section 3.B.
Accomplishment Instructions, accomplish the first inspection within 1000
flight cycles of the embodiment of SB 72-J024 for the TBH mount lug
forging LE and cutback areas if it is not to be done on-wing.
(3) Any TBH that have received a full FPI in accordance with NMSB 72-AG971,
3.C. Accomplishment Instructions, are deemed as compliant with this NMSB
(72-AJ101).
Subsequent inspections whether in-shop or on-wing should be within 1000
cycles of the previous inspection.
E. Approval
The technical content of this Non-Modification Service Bulletin was approved
under the authority of Design Organisation Approval EASA.21J.035 on Apr.29/16.
F. Manpower
(1) On-wing
(a) Time to gain access
2.5 hours (2 person)
(b) Time to inspect Mount Lug Forging LE Areas
2 hours (2 person)
(c) Time to restore to serviceable condition
2.5 hours (2 person)
(2) In-shop
(a) Time to inspect Mount Lug Forging LE Areas
2 hours (2 persons)
Printed in Great Britain
RB.211−72−AJ101
Page 3
May. 5/16
May. 5/16

### Page 6

The FPI defined in this Technical Instruction shall only be performed by
personnel qualified to Fluorescent Penetrant Inspection FPI Level 2 or higher
and in possession of an up to date eyesight record in accordance with
EN4179/NAS410 or alternative standards/guidelines accepted by the applicable
National Aviation Authority.
G. Material Price and Availability
OMat 632 - Aerosol penetrant - Commercially Available.
OMat 617 - Aerosol developer - Commercially Available.
OMat 150 - Acetone - Commercially Available.
OMat 2/101 - Lint-Free Cloths - Commercially Available.
OMat 677 - Penetrant Test Panel - Commercially Available.
H. Tooling Price and Availability
Material/Compounds Description
Dark Non-reflective
cover
To darken the area for inspection - Commercially available
Ultra Violet (UV)
light source
2 alternatives
Capable of providing a minimum UV radiation intensity of
1200 micro W/sq.cm at the inspection surface.
Alternatively, Spectroline Tritan 365 UV/White LED
Inspection Lamp, Portable, Battery Operated Version, Part
Number - TRI-365MH series Kit
Unit Price - Approximately £1200, Supplier - RSL NDT Ltd.
Mirror Commercially Available.
I. References
(1) Rolls-Royce RB211 Service Bulletin:
72-J024
Engine - Exhaust Case - Introduction of LP Turbine Exhaust Case and
Support Assemblies Accomplished by Rework of Existing Assemblies
(2) Rolls-Royce RB211 Non-Modification Service Bulletins:
(a) 72-AG971
Trent 900 LP Turbine Exhaust Case and Support Assembly (Tail Bearing
Housing) Mount Lug Run-Out and Top Core Vane Inspections -
Non-Modification Service Bulletin
Printed in Great Britain
RB.211−72−AJ101
Page 4
May. 5/16
May. 5/16

### Page 7

(b) 72-AH154
Engine - LP Turbine Exhaust Case and Support Assembly (Tail Bearing
Housing) Mount Lug Forging Leading Edge Inspections - Non-Modification
Service Bulletin
(3) Engine Manual
(a) Task 72-52-51-200-801, Cleaning/Inspection and Repair Data Task,
Examine the LP Turbine Exhaust Case.
(b) Task 72-52-51-300-023, Low Pressure (LP) Turbine Bearing and Support
Exhaust Case - Dress to Remove Micro cracking on the Vane Leading Edge
at Vanes 1 and 14 (FRSH741).
(4) Aircraft Maintenance Manual (AMM)
(a) 71-13-00, Maintenance Practices, Opening of Fan Cowl Doors.
(b) 78-26-00, Maintenance Practices, Opening/Closing of the Fan Exhaust
Cowl or Thrust Reverser.
(c) 78-30-00, Deactivation/Reactivation, Make the Thrust Reverser
Unserviceable for Maintenance.
(d) 78-11-41-000-801-A, Removal of the Exhaust Nozzle.
(e) 78-11-42-000-804-A, Removal of the Aft Exhaust Plug.
(f) 78-11-42-000-803-A, Removal of the Forward Exhaust Plug.
(g) 78-11-41-400-801-A, Installation of the Exhaust Nozzle.
(h) 78-11-42-400-804-A, Installation of the Aft Exhaust Plug.
(i) 78-11-42-400-803-A, Installation of the Forward Exhaust Plug.
(j) 72-21-00-300-825-A, Low Pressure (LP) Turbine Bearing and Support
Exhaust Case - Dress to Remove Micro cracking on the Vane Leading Edge
at Vanes 1 and 14 (FRSH741).
Printed in Great Britain
RB.211−72−AJ101
Page 5
May. 5/16
May. 5/16

### Page 8

2. Material Information
None.
Printed in Great Britain
RB.211−72−AJ101
Page 6
May. 5/16
May. 5/16

### Page 9

3. Accomplishment Instructions
A. On-wing (Mount Lug Forging LE and Cutback Areas Inspection)
WARNING: YOU MUST BE CAREFUL WHEN YOU WORK ON THE ENGINE AFTER THE ENGINE IS
SHUTDOWN. THE ENGINE CAN STAY HOT FOR UP TO ONE HOUR.
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN
CAUSE INJURY. IF YOU GET AN INJURY, PUT IT IN COLD WATER FOR 10 MINUTES.
THEN GET MEDICAL AID.
CAUTION: IN ORDER TO REDUCE THE POTENTIAL FOR MULTIPLE ENGINES IN-FLIGHT
SHUTDOWN, POWER LOSS, OR OTHER ANOMALY DUE TO MAINTENANCE ERROR,
ROLLS-ROYCE RECOMMENDS THAT ADDITIONAL CONTROLS ARE APPLIED IN ORDER TO
ENSURE THAT MAINTENANCE TASKS HAVE BEEN COMPLETED AS DEFINED.
MAINTENANCE GUIDELINES SHOULD BE REVISED, WHERE POSSIBLE, TO PROMOTE
THIS RECOMMENDATION.
(1) To get access to the Mount Lug Forging LE and cutback areas.
(a) Open the Fan Cowl Doors in accordance with AMM Task 71-13-00,
Maintenance Practices to get access.
(b) Make the Thrust Reverser unserviceable for maintenance in accordance
with AMM Task 78-30-00, Deactivation/Activation.
WARNING: YOU MUST MAKE THE THRUST REVERSER UNSERVICEABLE (INSTALL AND
SAFETY THE INHIBITION DEVICE) BEFORE YOU DO WORK ON OR AROUND THE
THRUST REVERSER.  IF YOU DO NOT INSTALL AND SAFETY THE INHIBITION
DEVICE, THERE IS A RISK THAT THE THRUST REVERSER CAN OPERATE
ACCIDENTALLY. THIS CAN CAUSE  INJURY TO PERSON AND/OR DAMAGE TO
THE EQUIPMENT.
(c) Open the Exhaust Cowl Doors in accordance with the AMM, Task 78-26-00,
Maintenance Practices, Opening/Closing of the Fan Exhaust Cowl or
Thrust Reverser.
(d) Remove the Exhaust Nozzle to allow access to the rear of the TBH in
accordance with AMM, Task 78-11-41-000-801-A, Removal of the Exhaust
Nozzle.
(e) Remove the Aft Exhaust Plug in accordance with AMM, Task
78-11-42-000-804-A, Removal of the Aft Exhaust Plug.
Printed in Great Britain
RB.211−72−AJ101
Page 7
May. 5/16
May. 5/16

### Page 10

(f) Remove the Forward Exhaust Plug in accordance with AMM, Task
78-11-42-000-803-A, Removal of the Forward Exhaust Plug.
NOTE: Steps (d) to (f) are optional tasks intended to improve access
to the TBH. If suitable access to complete the FPI inspection
can be gained without performing some or all of Tasks (d) to
(f) then they are not required. In any case, Tasks (d) to (f)
will need to be accomplished if the FRSH741 repair is to be
performed, as per instructions in section 3.A.(3).
(g) Use appropriate staging and platforms to gain access to the Tail
Bearing Housing.
(2) Processing the Penetrant Test Panel
WARNING: PROTECTIVE GLOVES AND SAFETY GLASSES MUST BE WORN AT ALL TIMES
DURING THE INSPECTION. IF YOU GET AN INJURY, SEEK MEDICAL AID
IMMEDIATELY.
(a) The OMat 677 - penetrant test panel must be processed at the beginning
of each shift and viewed in each Engine that is to be inspected during
the shift in order to ensure that the test environment and materials
are acceptable.
(b) Ensure the OMat 677 - penetrant test panel is clean and there is no
residual fluorescence.
(c) Cover the region of the Engine to be inspected with a dark
non-reflective cover in order to reduce the white light levels in the
leading edge inspection area.
(d) Apply OMat 632 penetrant to the OMat 677 - penetrant test panel by
sponge applicator or brush. The penetrant must be dispensed from a
sealed aerosol can and any unused penetrant must go to waste following
the inspection.
(e) Leave the penetrant in contact with the panel for 20 minutes.
(f) After the 20 minutes contact time, take the OMat 677 penetrant test
panel inside the darkened area to process. Allow 3 minutes for eye
adaptation to the low light levels.
(g) Remove the excess penetrant from the panel surface by wiping
thoroughly with a clean, dry OMat 2/101 - lint free cloth whilst
illuminating the panel with UV light.
(h) Soak a clean OMat 2/101 - lint free cloth in water and then gently
squeeze the excess water out to reduce the flow of water on the panel
surface.
Printed in Great Britain
RB.211−72−AJ101
Page 8
May. 5/16
May. 5/16

### Page 11

(i) Whilst illuminating the OMat 677 - penetrant test panel with UV light,
wipe off the penetrant with the wet cloth before immediately wiping
over with a clean, dry OMat 2/101 lint free cloth. Repeat this process
using the minimum application necessary to achieve acceptable
background fluorescence.
(j) Ensure that the panel is dry by wiping with a clean, dry OMat 2/101
lint free cloth.
(k) Apply a light, even coating of OMat 617 - non-aqueous wet developer
from a sealed aerosol can to the OMat 677 - penetrant test panel.
(l) Allow 10 minutes contact time for the developer prior to inspecting
the panel.
(m) Ensure there are no white light sources or fluorescent items
(including clothing) within the darkened area.
(n) Hold the OMat 677 - penetrant test panel alongside the leading edge of
the Top Core Vanes and illuminate it with UV light.
(o) Inspect the OMat 677 - penetrant test panel and check the visible
indications match the control photograph for that panel.
(p) If the panel matches the photograph then the inspection materials and
environment are acceptable and the inspection can be performed.
(q) Repeat steps (m) to (p) for each engine to be inspected during the
shift. Ensure that the inspection area is darkened for each engine.
(r) Restore the OMat 677 - penetrant test panel to a completely clean
condition and ensure there is no residual fluorescence and store in
acetone.
(3) Carry out the Inspection of the Mount Lug Forging LE and Cutback Areas.
WARNING: PROTECTIVE GLOVES AND SAFETY GLASSES MUST BE WORN AT ALL TIMES
DURING THE INSPECTION. IF YOU GET AN INJURY, SEEK MEDICAL AID
IMMEDIATELY.
(a) Clean the inspection areas (See Fig.1) with a clean OMat 2/101 - lint
free cloth moistened with OMat 150 - acetone.
(b) Discard the soiled cloth after use
Printed in Great Britain
RB.211−72−AJ101
Page 9
May. 5/16
May. 5/16

### Page 12

(c) Repeat the swabbing using fresh OMat 150 - acetone and a fresh OMat
2/101 - lint free cloth until all deposits have been removed.
NOTE: THE INSPECTION SURFACE, MUST BE CLEAN, DRY AND FREE FROM SOILS,
OIL, GREASE, PAINT, COATINGS, CORROSION PRODUCTS, SCALE,
SMEARED METAL, WELDING FLUX, CHEMICAL RESIDUES OR ANY OTHER
MATERIALS THAT COULD PREVENT PENETRANT FROM ENTERING A
DISCONTINUITY, AFFECT PROCESS PERFORMANCE OR PRODUCE AN
UNACCEPTABLE BACKGROUND.
(d) Allow 5 minutes for the area to completely dry prior to penetrant
application.
(e) Apply OMat 632 penetrant to the inspection areas in Fig.1 The
penetrants must be dispensed from a sealed aerosol can and any unused
penetrant must go to waste.
(f) Ensure that the inspection areas are fully covered with penetrant with
the aid of the UV lamp and mirror.
(g) Leave the penetrant in contact with the components for 20 minutes.
NOTE: THE PENETRANT CONTACT TIME MUST NOT EXCEED 1 HOUR. IF IT DOES
THE PENETRANT MUST BE REAPPLIED AND 5 MINUTES CONTACT TIME
ALLOWED.
(h) After the 20 minutes contact time, remove the excess penetrant from
the inspection surfaces by wiping thoroughly with a clean OMat 2/101 -
lint-free cloth.
(i) Soak a clean OMat 2/101 - lint-free cloth in water and then gently
squeeze the excess water out to reduce the flow on the component
surface.
(j) Whilst illuminating the inspection area with UV light, wipe off the
penetrant with the wet cloth before immediately wiping over with a
clean, dry OMat 2/101 lint-free cloth. Repeat this process using the
minimum application necessary to achieve acceptable background
fluorescence.
(k) Ensure that the inspection area is dry by wiping with a dry OMat 2/101
lint-free cloth.
(l) Apply a light, even coating of OMat 617 - non-aqueous wet developer
from a sealed aerosol can to the inspection areas.
(m) Allow a minimum of 10 minutes and a maximum of 15 minutes contact time
for the developer prior to inspection.
(n) Cover the region of the engine with a dark non-reflective cover in
order to reduce the white light levels.
Printed in Great Britain
RB.211−72−AJ101
Page 10
May. 5/16
May. 5/16

### Page 13

(o) Positioned inside a darkened area, allow 3 minutes for eye adaptation
to the low light levels.
(p) Illuminate the inspection surfaces with UV light in the darkened area
and view by line of sight or by using the mirror as necessary.
(q) Assess the Inspection areas for crack indications. White light may be
used to aid assessment.
(r) The wipe off technique shall be used to determine the nature of any
indications.
(i) Dampen a cotton swab with acetone.
(ii) Wipe once across the indication.
(iii) Allow the acetone to evaporate and inspect immediately.
(iv) If the indication reappears then record it is a crack. If the
indication does not reappear then apply a light, even coating
of OMat 617 - non-aqueous wet developer from a sealed aerosol
can to the area.
(v) Allow the solvent in the developer to evaporate and inspect
immediately.
(vi) If the indication reappears record it as a crack. If the
indication does not reappear then allow 10 minutes contact time
for the developer.
(vii) If the indication reappears after the 10 minutes contact time
then record it as a crack. If the indication does not reappear
then that area is acceptable.
(s) Record any suspected crack indication in Appendix 1.
(i) Determine whether the indication is continuous or discontinuous
where possible.
(ii) Measure the length of the indication using a fluorescent
comparator gauge.
(iii) Photograph any crack indications.
(t) No cracks detected - ACCEPT.
Printed in Great Britain
RB.211−72−AJ101
Page 11
May. 5/16
May. 5/16

### Page 14

Any single continuous crack or
discontinuous cracks that total
less than 10 mm in length (see
Fig.2).
RE-INSPECT WITHIN 400 FC or
Repair in accordance with AMM
Task 72-21-00-300-825-A (FRSH741)
and repeat inspection from step
3.A.(3).
Any single continuous crack or
discontinuous cracks that total
greater than or equal to 10 mm
and less than 18 mm in length
(see Fig.2).
RE-INSPECT WITHIN 250 FC or
Repair in accordance with AMM
Task 72-21-00-300-825-A (FRSH741)
and repeat inspection from step
3.A.(3).
Any single continuous crack or
discontinuous cracks that total
greater than or equal to 18 mm
and less than 22 mm in length
(see Fig.2).
RE-INSPECT WITHIN 100 FC or
Repair in accordance with AMM
Task 72-21-00-300-825-A (FRSH741)
and repeat inspection from step
3.A.(3).
Any single continuous crack or
discontinuous cracks that total
greater than or equal to 22 mm
and less than 24 mm in length
(see Fig.2).
RE-INSPECT WITHIN 10 FC or Repair
in accordance with AMM Task
72-21-00-300-825-A (FRSH741) and
repeat inspection from step
3.A.(3).
Any single continuous crack or
discontinuous cracks that total
greater than or equal to 24 mm in
length (see Fig.2).
REMOVE ENGINE or Repair in
accordance with AMM Task
72-21-00-300-825-A (FRSH741) and
repeat inspection from step
3.A.(3).
NOTE: THE POLISHING AND ETCHING REPAIR OF THE TBH CARRIED OUT IN
ACCORDANCE WITH AMM TASK 72-21-00-300-825-A (FRSH741) CAN ONLY
BE ACCOMPLISHED ONE TIME FOR A GIVEN VANE. PLEASE REFER TO THE
LIMITATIONS IN THE REPAIR AMM TASK 72-21-00-300-825-A
(FRSH741).
(u) Once all indications have been evaluated and recorded, remove the
penetrant processing materials from the inspection surface by wiping
with a clean OMat 2/101 - lint-free cloth moistened with OMat 150 -
Acetone.
(4) Close access to the TBH.
(a) Make sure the work area is clean and clear of tools and other items.
Printed in Great Britain
RB.211−72−AJ101
Page 12
May. 5/16
May. 5/16

### Page 15

(b) If applicable, install the Forward Exhaust Plug in accordance with
AMM, Task 78-11-42-400-803-A, Installation of the Forward Exhaust
Plug.
(c) If applicable, install the Aft Exhaust Plug in accordance with AMM,
Task 78-11-42-400-804-A, Installation of the Aft Exhaust Plug.
(d) If applicable, install the Exhaust Nozzle in accordance with AMM, Task
78-11-41-400-801-A, Installation of the Exhaust Nozzle.
(e) Close the Fan Exhaust Cowls in accordance with AMM, Task 78-26-00,
Maintenance Practices.
(f) Make the Thrust Reverser serviceable after maintenance in accordance
with AMM 78-30-00, Deactivation/Activation as necessary.
(g) Close the Fan Cowl Doors in accordance with AMM Task 71-13-00,
Maintenance Practices.
(5) Accomplishment of this Non-Modification Service Bulletin should be
recorded in accordance with local SB tracking system procedures.
B. In-shop - Local Inspection Mount Lug Forging LE and Cutback areas.
(1) Processing the penetrant test panel.
(a) The OMat 677 - penetrant test panel must be processed at the beginning
of each shift and viewed in each engine that is to be inspected during
the shift in order to ensure that the test environment and materials
are acceptable.
(b) Ensure the OMat 677 - penetrant test panel is clean and there is no
residual fluorescence.
(c) Cover the region of the engine to be inspected with a dark
non-reflective cover in order to reduce the white light levels in the
leading edge inspection area.
(d) Apply OMat 632 penetrant to the OMat 677 - penetrant test panel by
sponge applicator or brush. The penetrant must be dispensed from a
sealed aerosol can and any unused penetrant must go to waste following
the inspection.
(e) Leave the penetrant in contact with the panel for 20 minutes.
(f) After the 20 minutes contact time, take the OMat 677 penetrant test
panel inside the darkened area to process. Allow 3 minutes for eye
adaptation to the low light levels.
Printed in Great Britain
RB.211−72−AJ101
Page 13
May. 5/16
May. 5/16

### Page 16

(g) Remove the excess penetrant from the panel surface by wiping
thoroughly with a clean, dry OMat 2/101 - lint-free cloth whilst
illuminating the panel with UV light.
(h) Soak a clean OMat 2/101 - lint-free cloth in water and then gently
squeeze the excess water out to reduce the flow of water on the panel
surface.
(i) Whilst illuminating the OMat 677 - penetrant test panel with UV light,
wipe off the penetrant with the wet cloth before immediately wiping
over with a clean, dry OMat 2/101 lint-free cloth. Repeat this process
using the minimum application necessary to achieve acceptable
background fluorescence.
(j) Ensure that the panel is dry by wiping with a clean, dry OMat 2/101
lint-free cloth.
(k) Apply a light, even coating of OMat 617 - non-aqueous wet developer
from a sealed aerosol can to the OMat 677 - penetrant test panel.
(l) Allow 10 minutes contact time for the developer prior to inspecting
the panel.
(m) Ensure there are no white light sources or fluorescent items
(including clothing) within the darkened area.
(n) Hold the OMat 677 - penetrant test panel alongside the leading edge of
the Top Core Vanes and illuminate it with UV light.
(o) Inspect the OMat 677 - penetrant test panel and check that the visible
indications match the control photograph for that panel.
(p) If the panel matches the photograph then the inspection materials and
environment are acceptable and the inspections can be performed.
(q) Repeat steps (m) to (p) for each engine to be inspected during the
shift. Ensure that the inspection area is darkened for each engine.
(r) Restore the OMat 677 - penetrant test panel to a completely clean
condition and ensure there is no residual fluorescence and store in
acetone.
(2) Carry out the inspection of the mount lug forging LE and cutback areas.
WARNING: PROTECTIVE GLOVES AND SAFETY GLASSES MUST BE WORN AT ALL TIMES
DURING THE INSPECTION. IF YOU GET AN INJURY, SEEK MEDICAL AID
IMMEDIATELY.
(a) Clean the inspection areas (see Fig.1) with a clean OMat 2/101 -
lint-free cloth moistened with OMat 150 - Acetone.
Printed in Great Britain
RB.211−72−AJ101
Page 14
May. 5/16
May. 5/16

### Page 17

(b) Discard the soiled cloth after use.
(c) Repeat the swabbing using fresh OMat 150 - acetone and a fresh OMat
2/101 - lint-free cloth until all deposits have been removed.
NOTE: THE INSPECTION SURFACE, MUST BE CLEAN, DRY AND FREE FROM SOILS,
OIL, GREASE, PAINT, COATINGS, CORROSION PRODUCTS, SCALE,
SMEARED METAL, WELDING FLUX, CHEMICAL RESIDUES OR ANY OTHER
MATERIAL THAT COULD PREVENT PENETRANT FROM ENTERING A
DISCONTINUITY, AFFECT PROCESS PERFORMANCE OR PRODUCE AN
UNACCEPTABLE BACKGROUND.
(d) Allow 5 minutes for the area to completely dry prior to penetrant
application.
(e) Apply OMat 632 penetrant to the inspection areas in Fig.1. The
penetrant must be dispensed from a sealed aerosol can and any unused
penetrant must go to waste.
(f) Ensure that the inspection areas are fully covered with penetrant with
the aid of the UV lamp and mirror.
(g) Leave the penetrant in contact with the components for 20 minutes.
NOTE: THE PENETRANT CONTACT TIME MUST NOT EXCEED 1 HOUR. IF IT DOES
THE PENETRANT MUST BE REAPPLIED AND 5 MINUTES CONTACT TIME
ALLOWED.
(h) After the 20 minutes contact time, remove the excess penetrant from
the inspection surfaces by wiping thoroughly with a clean OMat 2/101 -
lint free cloth.
(i) Soak a clean OMat 2/101 - lint-free cloth in water and then gently
squeeze the excess out to reduce the flow of water on the component
surface.
(j) Whilst illuminating the inspection area with UV light, wipe off the
penetrant with the wet cloth before immediately wiping over with a
clean, dry OMat 2/101 lint-free cloth. Repeat this process using the
minimum application necessary to achieve acceptable background
fluorescence.
(k) Ensure that the inspection area is dry by wiping with a dry OMat 2/101
lint free cloth.
(l) Apply a light, even coating of OMat 617 - non-aqueous wet developer
from a sealed aerosol can to the inspection areas.
(m) Allow a minimum of 10 minutes and a maximum of 15 minutes contact time
for the developer prior to inspection.
Printed in Great Britain
RB.211−72−AJ101
Page 15
May. 5/16
May. 5/16

### Page 18

(n) Cover the region of the engine with a dark non-reflective cover in
order to reduce the white light levels.
(o) Ensure there are no white light sources or fluorescent items
(including clothing) within the inspection area.
(p) Positioned inside the darkened area, allowing 3 minutes for eye
adaptation to the low light levels.
(q) Illuminate the inspection surface with UV light in the darkened area
and view by line of sight or by using the mirror as necessary.
(r) Assess the Inspection areas for crack indications. White light may be
used to aid assessment.
(s) The wipe off technique shall be used to determine the nature of any
indications.
(i) Dampen a cotton swab with acetone.
(ii) Wipe once across the indication.
(iii) Allow the acetone to evaporate and inspect immediately.
(iv) If the indication reappears then record it is a crack. If the
indication does not reappear then apply a light, even coating
of OMat 617 - non-aqueous wet developer from a sealed aerosol
can to the area.
(v) Allow the solvent in the developer to evaporate and inspect
immediately.
(vi) If the indication reappears, record it as a crack. If the
indication does not reappear then allow 10 minutes contact time
for the developer.
(vii) If the indication reappears after 10 minutes contact time then
record it as a crack. If the indication does not reappear then
that area is acceptable.
(t) Record any suspected crack indications in Appendix 1.
(u) Photograph any cracks indications.
(i) No cracks detected ACCEPT.
(ii) Any cracks. REJECT or repair in accordance with
CIR Task 72-52-51-300-023 and repeat
inspection from step 3.B.(2).
Printed in Great Britain
RB.211−72−AJ101
Page 16
May. 5/16
May. 5/16

### Page 19

(v) Once all indications have been evaluated and recorded, remove the
penetrant processing materials from the inspection surface by wiping
with a clean OMat 2/101 - Lint-Free Cloth moistened with OMat 150 -
acetone.
NOTE: THE POLISHING AND ETCHING REPAIR OF THE TBH CARRIED OUT IN
ACCORDANCE WITH CIR TASK 72-52-51-300-023 (FRSH741) CAN ONLY BE
ACCOMPLISHED ONE TIME FOR A GIVEN VANE. PLEASE REFER TO THE
LIMITATIONS IN THE REPAIR CIR TASK 72-52-51-300-023 (FRSH741).
(3) Accomplishment of this Non-Modification Service Bulletin should be
recorded in accordance with local SB tracking system procedures.
Printed in Great Britain
RB.211−72−AJ101
Page 17
May. 5/16
May. 5/16

### Page 20

deh0014728
B
BA
A−A
B−B
VIEW LOOKING REARWARD
LEADING
EDGE
OUTER ANNULUS
LEADING EDGE FILLET
LEADING
EDGE
B
VANE 1 VANE 14
INSPECTION AREA
VANES 1 AND 14 ONLY
OUTER ANNULUS
LEADING EDGE FILLET
INSPECTION AREA
VANES 1 AND 14 ONLY
A
A
15.00 mm (0.590 in)
35.00 mm (1.378 in)
10.00 mm (0.393 in)
VANE TRAILING EDGE
OVER−THICKNESS AREA
MOUNT LUG
LEADING EDGE FILLET
OUTER ANNULUS
VANES 1 AND 14 ONLY
INSPECTION AREA
LEADING EDGES
WELD LINE
A A
Mount Lug Forging LE Area
Fig.1
Printed in Great Britain
RB.211−72−AJ101
Page 18
May. 5/16
May. 5/16

### Page 21

deh0014729
A
A−A
VANE 1 VANE 14
A
DISCONTINUOUS CRACK
INDICATION
CONTINUOUS CRACK
INDICATION
LEADING EDGES
A
A
VIEW LOOKING REARWARD
A = CONTINUOUS LENGTH
C
AA
BDWELD LINE WELD LINE
A A
A + B + C + D =
DISCONTINUOUS
LENGTH
35.00 mm
(1.378 in)
35.00 mm
(1.378 in)
Discontinuous and Continuous Crack Indication
Fig.2
Printed in Great Britain
RB.211−72−AJ101
Page 19
May. 5/16
May. 5/16

### Page 22

This form (or similar) to be completed for every engine/component inspected.
Results to be sent to Rolls-Royce via your Service Representative.
Feedback Sheet NMSB 72-AJ101
Overhaul Base
Operator
Engine Mark
Date of Inspection
Engine Serial Number
Engine Hours Since New
Engine Cycles Since New
08 Module Serial Number
08 Module Hours Since New
08 Module Cycles Since New
Component Part Numbers
Component Serial Number
Component Hours Since New
Component Cycles Since New
APPENDIX 1
Printed in Great Britain
RB.211−72−AJ101
Appendix 1 - Page 1 of 2
May. 5/16
May. 5/16

### Page 23

Inspection results and comments
On-wing Inspection of Mount
Lug Forging Leading Edge and
Cutback Areas (if applicable)
Any crack indications?
Max length?
Photographs of crack
indications
In-shop Inspection of Mount
Lug Forging Leading Edge and
Cutback Areas (if applicable)
Any crack indications?
Max length?
Photographs of any crack
indications
NOTE: PLEASE INCLUDE INFORMATION ABOUT ANY REPAIR ACCOMPLISHED AS PART OF THIS
INSPECTION.
Printed in Great Britain
RB.211−72−AJ101
Appendix 1 - Page 2
May. 5/16
May. 5/16

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.