# Saab Service Bulletin 2000-38-010: No revision named

- Rights: © Saab. Filed by the FAA in regulations.gov docket FAA-2014-0056; AD 2014-15-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Saab Service Bulletin 2000-38-010](https://openairdocs.org/service-documents/saab/sb-2000-38-010.md)
- Title as filed: U.S. DOT/FAA - SB2000 38-010-00
- Pages: 5
- PDF: https://openairdocs.org/files/sha256/a9/dd/a9dd49867d774e33579b5daad5209f17c968b9bf42afb6abd8e74dd25b55a14b
- Page: https://openairdocs.org/service-documents/saab/sb-2000-38-010/file/a9dd49867d77

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Service Bulletin
LETTER OF TRANSMITTAL
SERVICE BULLETIN SAAB 2000–38–010
TO: All holders of SAAB 2000 SERVICE BULLETIN.
This letter covers transmittal of the following Service Bulletin which should be included in the appropriate
section of your folder.
Initial issue of Service Bulletin SAAB 2000–38–010, 12 July 2013,”WATER/WASTE – POTABLE WATER
SYSTEM – DEACTIVATING OF THE POTABLE WATER SYSTEM”, cover sheet and 3 pages.
Saab AB (Publ) Date:  12 July 2013
Support and Services
Aircraft Services Division
Technical Communication
Mats Wagner

### Page 2

SERVICE BULLETIN
Number: SAAB 2000–38–010
Date: 12 July 2013
Subject: WATER/WASTE – POTABLE WATER SYSTEM – DEACTIVATING
OF THE POTABLE WATER SYSTEM
3 pages
The content of this document is proprietary and confidential to Saab AB and 
may not:
a) be used for any purpose other than those for which it was supplied;
b) be copied or reproduced in whole or in part without the prior written consent of 
Saab AB; nor
c) be disclosed to any third party without the prior written consent of Saab AB
Support and Services
Aircraft Services Division
SE–581 88 Linköping
Sweden Telephone: int+46 13 18 26 16 Telefax: int+46 13 18 41 83
Saab AB (Publ)

### Page 3

Service Bulletin
12 July 2013
 
2000–38–010
Page 1 of 3
ATA CHAPTER: 38
WATER/WASTE – POTABLE WATER SYSTEM – DEACTIVATING OF THE POTABLE
WATER SYSTEM
Mod No. –
1. PLANNING INFORMATION
A. EFFECTIVITY
(1) Aircraft:
Aircraft Mfg. Serial No’s SAAB 2000 – 004–016, 018, 022–024, 026, 029, 031–033, 035–039,
041–044, 046–048, 051, 053–063.
(2) Spares: Not affected.
B. REASON
One occurrence of water leakage at the inlet tubing for the in–line heater (25HY) has been reported
in the lower part of the forward fuselage (Zone 116). The in–line heater attachment was found
ruptured resulting in water spraying in the area.
This lead to a rudder pedal restriction caused by the frozen water on the rudder control mechanism
in zone 116.
Analysis after the reported event indicates that also the pitch control mechanism (including pitch
disconnect/spring unit) may in remote situation be frozen due to possible water spray also
preventing disconnection and normal pitch control leading to an unsafe condition.
As a temporary action the water system should be deactivated to avoid the unsafe condition. Saab
is working on a terminating action in order to eliminate the consequences of water spraying in the
area.
C. DESCRIPTION
This Service Bulletin gives instructions to deactivate the potable water system.
D. COMPLIANCE
Mandatory.
Saab recommends this Service Bulletin to be performed within 1 months from release of this Service
Bulletin
This Service Bulletin is under EASA consideration for an Airworthiness Directive.
The final compliance terms will be set by the EASA Airworthiness Directive (AD) when issued.
E. APPROVAL
The technical content of this Service Bulletin is approved under the authority of DOA nr.
EASA.21J.066.

### Page 4

Service Bulletin
12 July 2013
 
2000–38–010
Page 2 of 3
F. MANPOWER
Estimated time to complete this Service Bulletin is:
1 persons required.
Total manhours: 1
Elapsed time (hours): 1
Labour cost at operators expense.
G. MATERIAL – COST AND AVAILABILITY
(1) Sign, ”POTABLE SYSTEM INOPERATIVE” – Qty 4 (locally manufactured).
H. TOOLING
No special tooling required.
I. WEIGHT AND BALANCE
None.
J. ELECTRICAL LOAD DATA
Not affected.
K. REFERENCES
Aircraft Maintenance Manual (AMM) TASK 12–10–38–610–801
L. OTHER PUBLICATIONS AFFECTED
Not affected.
2. ACCOMPLISHMENT INSTRUCTIONS
A. JOB SET–UP
(1) Before you start the SB, make sure:
– The signs ”POTABLE SYSTEM INOPERATIVE” (locally manufactured) are available
– The documentation is available.
B. PROCEDURE
(1) Deactivate the potable water system
(a) Drain the potable water system (Ref AMM TASK 12–10–38–680–801).
(b) Open the circuit breakers
1 On the RH circuit breaker panel 12VU, open tag and safety the circuit breaker:
LABEL POS C/B
LAVATORY WATER HEATER S–32 1HVC
2 On the LH circuit breaker panel 11VU, open tag and safety the circuit breakers:
LABEL POS C/B
WATER HEAT PIPE J–33 3HY
WATER HEAT TANK J–34 1HY

### Page 5

Service Bulletin
12 July 2013
 
2000–38–010
Page 3 of 3
LABEL C/B POS
LAVATORY POTABLE WATER CTL 2 J–36 23MJ
LAVATORY POTABLE WATER CTL 1 J–35 25MJ
(c) At the galley panel, set the WATER/OFF switch to OFF. When you set the switch to OFF,
the bleed air shut–off valve closes and stop the bleed air supply from the air pressure
supply system.
(d) Put a sign ”POTABLE SYSTEM INOPERATIVE”:
– in the flight compartment
– in the lavatory
– on the galley panel
– Inside the water service door, 118BR (secure the sign with tape or equivalent).
3. MATERIAL INFORMATION
Not Applicable

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.