# Saab Service Bulletin 2000-54-036: sb2000_54_036_02

- Rights: © Saab. Filed by the FAA in regulations.gov docket FAA-2019-0520; AD 2019-21-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Saab Service Bulletin 2000-54-036](https://openairdocs.org/service-documents/saab/sb-2000-54-036.md)
- Title as filed: sb2000_54_036_02
- Pages: 18
- PDF: https://openairdocs.org/files/sha256/be/5b/be5bfcb72ac9b1b7aa2e4af385181e79d2497916cceb8ba35cb9a0d9b3759465
- Page: https://openairdocs.org/service-documents/saab/sb-2000-54-036/file/be5bfcb72ac9

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 1 of 18
ATA CHAPTER: 54
NACELLE/PYLONS − EMS STRUCTURE − REPAIR / REAM OF HOLE TOLERANCE AND
INSTALL NEW FASTENERS
Mod No.
1. PLANNING INFORMATION
A. EFFECTIVITY
(1) Aircraft:
Aircraft Mfg. Serial No’s SAAB 2000 −  004 thru − 063.
NOTE: Aircraft as stated in Table 1 below, could consider the performed repair via Saab Repair
Statement as a terminating action for this Service Bulletin. Make a note in the logbook
that SB 2000−54−036 has been implemented.
A/C Serial Number Related Repair Statement
(Latest Revision)
006 2000SDS045679
043 2000SDS045888
056 2000SDS045859
061 2000SDS045159
Table 1 − Aircraft Affected by Repair Statement
(2) Spares: Not affected.
B. REASON
Loose and irregular fasteners have been found at the forward extent of the nacelle upper longeron
where the bulkhead frame and struts of the EMS structure attach.
Investigation results indicate potential risk for significant reduction of the safety margins.
Inspection and corrective actions will make sure the aircraft is repaired to the intended type design.
C. DESCRIPTION
This Service Bulletin gives instructions for:
− Removal of the power plant
− Removal of the upper struts
− Removal of the horizontal struts
− Removal of fasteners in the EMS fittings
− Inspection of fasteners hole tolerance.
− If necessary ream the fastener holes to correct tolerance.
− If you can not get correct tolerance, Saab must be contacted for further repair instructions.
− Installation of fasteners
− Installation of the horizontal struts
− Installation of the upper struts
− installation of the power plant
NOTE: Applicable for L/H and R/H nacelle, inboard and outboard fittings.
D. COMPLIANCE
Mandatory.

### Page 2

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 2 of 18
Saab recommends this Service Bulletin to be performed within 24 month or 3000 flight hours, whichever
occurs first, from release of this Service Bulletin.
This Service Bulletin is under EASA consideration for an Airworthiness Directive.
The final compliance terms will be set by the EASA Airworthiness Directive (AD) when issued.
E. APPROVAL
The technical content of this Service Bulletin is approved under the authority of DOA nr.
EASA.21J.066.
F. MANPOWER
Estimated time to complete this Service Bulletin is:
2 persons required.
Total manhours removal: 12 x 2 = 24
Total manhours modification: 100 x 2 = 200
Total manhours installation: 16 x 2 = 32
Total manhours:  256
Elapsed time (hours): 130
Labour cost at operators expense.
G. MATERIAL − COST AND AVAILABILITY
Local supply.
H. TOOLING
(1) Access platform, 1.75 m (5.75 in.) height.
(2) Reamer for Hi −lok and Visu−lok nominal size and first and second step oversize (SRM
51−40−22, 51−40−25, 51−40−30).
(3) Visu −lok tool.
I. WEIGHT AND BALANCE
None.
J. ELECTRICAL LOAD DATA
Not affected.

### Page 3

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 3 of 18
K. REFERENCES
Aircraft Maintenance Manual (AMM) 26 −11−10−000−801
26−11−10−400−801
71−00−00−400−801
71−21−10−000−801
71−21−10−000−804
71−21−10−000−805
71−21−10−000−813
71−21−10−400−801
71−21−10−400−804
71−21−10−400−805
71−21−10−400−813
Structural Repair Manual (SRM) 51 −20−40
51−20−41
51−20−42
51−20−43
51−20−50
51−20−56
51−40−21
51−40−22
51−40−24
51−40−25
51−40−30
51−40−40
51−40−60
L. OTHER PUBLICATIONS AFFECTED
Not affected.
2. ACCOMPLISHMENT INSTRUCTIONS
CAUTION: BE CAREFUL WHEN YOU DO STRUCTURAL MODIFICATIONS NEAR ELECTRICAL
HARNESSES AND/OR MECHANICAL COMPONENTS. MAKE SURE THAT YOU
COVER ELECTRICAL HARNESSES AND/OR MECHANICAL COMPONENTS
ADJACENT TO THE WORK AREA. CLEAN AND INSPECT THE HARNESSES AND/OR
THE MECHANICAL COMPONENTS WHEN THE MODIFICATION IS COMPLETED.
DAMAGES TO THE WIRES OR THE MECHANICAL COMPONENTS CAN CAUSE
SYSTEM MALFUNCTION.
NOTE: This Service Bulletin gives instructions to ream fasteners hole to nominal size, or to first step
oversize hole (at one location, second step oversize is approved without contact Saab). If the
fastener holes are not within tolerance, after reaming to first or second step oversize hole,
Saab must be contacted for further instructions.
NOTE: It is approved to perform actions in accordance with this SB on one nacelle at one occasion
and on the other nacelle at another occasion. However, the SB must not be reported as fully
implemented until actions are performed on both LH and RH side nacelle.

### Page 4

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 4 of 18
A. JOB SET −UP
(1) Before you start the SB, make sure:
− The local supply items listed in the Service Bulletin are available
− The documentation is available
− The special tools are available
− The fasteners are available.
CAUTION: IF FASTENERS HAS BEEN INSTALLED WITH STATEMENTS IN THIS AREA, THE
FASTENERS SHALL NOT BE REMOVED AND THE HOLE NOT BE INSPECTED.
THESE HOLES SUPPOSED TO BE WITHIN LIMIT OF THE HOLE TOLERANCE.
(2) Put the access platforms in position.
B. REMOVAL
(1) Remove the power plant (Ref. AMM TASK 71−00−00−000−801).
(2) Remove the Engine Mounting Structure (EMS) LH Upper Strut (Ref. AMM TASK
71−21−10−000−801).
(3) Remove the Engine Mounting Structure (EMS) RH Upper Strut (Ref. AMM TASK
71−21−10−000−804).
(4) Remove the Engine Mounting Structure (EMS) LH/RH Horizontal Strut (Ref. AMM TASK
71−21−10−000−805).
(5) Remove the Aft Beam (Ref. AMM TASK 71−21−10−000−813).
(6) Remove / loose the sensor wire in the repair area of the inner skin (Ref. AMM TASK
26−11−10−000−801).
REF. FIG. 2 View A
(a) Loosen the screw (14).
(b) Lift the clamp cover (11).
(c) Carefully lift the bushing (13) and the sensor wire (12).
(d) Remove the screw (15) and keep.
(e) Remove the clamp (16) and keep.
C. MODIFICATION
WARNING: BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIAL(S). YOU MUST OBEY
THE OPERATOR,S AND MANUFACTURER,S HEALTH AND SAFETY INSTRUCTIONS.
THE CONSUMABLE MATERIAL (S) CAN CAUSE INJURY OR DEATH TO PERSONS.
CAUTION: MAKE SURE YOU DO NOT DAMAGE THE FIRE SENSOR WIRE WHEN YOU DO THIS
REPAIR.
CAUTION: IF FASTENERS HAS BEEN INSTALLED WITH STATEMENTS IN THIS AREA, THE
FASTENERS SHALL NOT BE REMOVED AND THE HOLE NOT BE INSPECTED.
THESE HOLES SUPPOSED TO BE WITHIN LIMIT OF THE HOLE TOLERANCE.
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO THE
ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
(1) Make a cut out in the inboard skin and make a doubler.
REF. FIG. 2 View A and B
(a) Remove the five screws (1), and keep them.
(b) Remove the door (2), and keep it.

### Page 5

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 5 of 18
(c) Remove the four rivets (4), for the plate (3), with the anchor nuts.
(d) Carefully press the plate (3) inboard, and keep away from the inner skin.
(e) Make a cut −out in the inner skin.
1 Mark a cut−out line.
NOTE: Make sure you have a minimum radii of 13.0 mm (0.500 in) in the cut −out.
2 Make sure you have a distance of minimum 1 mm to the inner structure.
3 Make the cut−out.
4 Burr the edges.
(f) Remove the plate (3), with the anchor nuts.
1 Remove the anchor nuts, and keep them.
2 Keep the plate (3) as a template.
3 Use masking tape and cover the lightening holes in the nacelle.
(g) Make a doubler.
1 Make a doubler (5) from material Titan AMS 4911, T = 1.27 mm.
2 Measure the size of the doubler (5) is going to cover.
NOTE: Make sure you make the doubler (5) bigger than the final size, to get good
edge distance.
3 Put the plate (3) on the doubler (5).
4 Mark the center hole, the five bolt holes.
5 Drill and ream the center hole, the five bolt holes.
6 Use the anchor nut as a template and drill for rivets.
7 Countersink for the anchor nuts rivets, ZCU3.
8 Deburr and chamfer the holes.
9 Clean the doubler (5) and the anchor nuts with MEK.
10 Use fay sealant and install the anchor nuts with rivets, ZCU3.
11 Do not remove fasteners for the doubler (5) at this moment.
(2) Repair of the inner skin area.
REF. FIG. 1 Sh 1
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener (10 plcs).
(b) Inspect the holes.
1 If the hole is within Hi−lok 6 limit, go to step (2)(f).
2 If the hole not is within Hi−lok 6 limit, go to step (2)(c).
(c) Ream to first step oversize for Hi −lok.
(d) Inspect the hole.
1 If the hole not is within limit, contact Saab.

### Page 6

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 6 of 18
2 If the hole is within limit, go to step (2)(e).
(e) Chamfer the hole.
(f) Apply a thin layer of Bonderite 1200 in the hole.
(g) Apply a thin layer of FR −primer in the hole.
(h) Let the primer cure.
(i) Wet install Hi −lok (22 or 23) and washers with fay sealant.
(j) Install the nut on the Hi −lok.
(k) Torque the nut on the Hi −lok.
(l) Remove every other fastener, which not has bee removed in step (2)(a).
(m) Do step (2)(a) to (2)(k).
(n) Retorque all nuts.
(3) Repair of the outer skin area.
REF. FIG. 1 Sh 2
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener (10 plcs).
(b) Inspect the holes.
1 If the hole is within Hi−lok 6 limit, go to step (3)(f).
2 If the hole not is within Hi−lok 6 limit, go to step (3)(c).
(c) Ream to first step oversize for Hi −lok.
(d) Inspect the hole.
1 If the hole not is within limit, contact Saab.
2 If the hole is within limit, go to step (3)(e).
(e) Chamfer the hole.
(f) Apply a thin layer of Bonderite 1200 in the hole.
(g) Apply a thin layer of FR −primer in the hole.
(h) Let the primer cure.
(i) Wet install Hi −lok (24 or 25) and washers with fay sealant.
(j) Install the nut on the Hi −lok.
(k) Torque the nut on the Hi −lok.
(l) Remove every other fastener, which not has bee removed in step (3)(a).
(m) Do step (3)(a) to (3)(k).
(n) Retorque all nuts.
(4) Repair of the upper area.
REF. FIG. 1 Sh 2 View A−A
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener (18 plcs).

### Page 7

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 7 of 18
(b) Inspect the holes.
1 Rivet hole.
a If the hole is within limit, install LM 5 rivet.
b If the hole not is within limit, drill for LM 6 rivet. Install LM 6 rivet.
2 Hi−lok hole.
a If the hole is within Hi−lok 6 limit, go to step (4)(f).
b If the hole not is within Hi−lok limit, go to step (4)(c).
(c) Ream to first step oversize for Hi −lok.
(d) Inspect the hole.
1 If the hole not is within limit, contact Saab.
2 If the hole is within limit, go to step (4)(e).
(e) Chamfer the hole.
(f) Apply a thin layer of Bonderite 1200 in the hole.
(g) Apply a thin layer of FR −primer in the hole.
(h) Let the primer cure.
(i) Wet install Hi −lok (22 or 23) and washers with fay sealant.
(j) Install the nut on the Hi −lok.
(k) Torque the nut on the Hi −lok.
(l) Remove every other fastener, which not has bee removed in step (4)(a).
(m) Do step (4)(a) to (4)(k).
(n) Retorque all nuts.
(5) Repair of the inner area.
REF. FIG. 1 Sh 2 View B−B
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener(7 plcs).
(b) Inspect the hole.
1 If the hole is within Hi−lok 6 limit, go to step (5)(f).
2 If the hole not is within Hi−lok 6 limit, go to step (5)(c).
(c) Ream to first step oversize for Hi −lok.
(d) Inspect the hole.
1 If the hole not is within limit, contact Saab.
2 If the hole is within limit, go to step (5)(e).
(e) Chamfer the hole.
(f) Apply a thin layer of Bonderite 1200 in the hole.
(g) Apply a thin layer of FR −primer in the hole.
(h) Let the primer cure.

### Page 8

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 8 of 18
(i) Wet install Hi −lok (22 or 23) and washers with fay sealant.
(j) Install the nut on the Hi −lok.
(k) Torque the nut on the Hi −lok.
(l) Remove every other fastener, which not has bee removed in step (5)(a).
(m) Do step (5)(a) to (5)(k).
(n) Retorque all nuts.
(6) Repair of the forward area.
REF. FIG. 1 Sh 2 View C−C
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener (7 plcs).
(b) Inspect the hole.
1 If the hole is within Hi−lok 6 limit, go to step (6)(g).
2 If the hole not is within Hi−lok 6 limit, go to step (6)(c).
(c) Ream to first step oversize for Hi −lok.
(d) Inspect the hole.
1 If the hole not is within limit, go to step (6)(e).
2 If the hole is within limit, go to step (6)(f).
(e) Ream to second step oversize for Hi −lok.
1 If the hole not is within limit, contact Saab.
2 If the hole is within limit, go to step (6)(f).
(f) Chamfer the hole.
(g) Apply a thin layer of Bonderite 1200 in the hole.
(h) Apply a thin layer of FR −primer in the hole.
(i) Let the primer cure.
(j) Wet install Hi −lok (22 or 23) and washers with fay sealant.
(k) Install the nut on the Hi −lok.
(l) Torque the nut on the Hi −lok.
(m) Remove every other fastener, which not has bee removed in step (6)(a).
(n) Do step (6)(a) to (6)(l).
(o) Retorque all nuts.
(7) Modification of the doubler and installation.
REF. FIG. 2 View C and D
CAUTION: WHEN YOU REMOVE FASTENERS, REMOVE EVERY OTHER FASTENERS, SO
THE ITEMS ARE CLOSE TOGETHER. IF NOT THE ITEMS CAN SEPARATE.
CAUTION: WHEN YOU INSPECT THE HOLES AFTER REAMING, AND A HOLE IS NOT
WITHIN LIMIT, CONTACT SAAB.
(a) Remove every other fastener (23 plcs).

### Page 9

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 9 of 18
(b) Pin the holes.
NOTE: This keep the structure together.
(c) Remove the rest of the fasteners.
(d) Remove the pins.
(e) Put the doubler (5) in position.
(f) Use a hole finder and drill holes in the doubler (5).
(g) Deburr the holes in nacelle structure and the doubler (5).
(h) Pin the doubler to the nacelle structure.
(i) Mark the new fastener holes (11 plcs).
(j) Drill and ream the new holes for Visu −lok (27) (11 plcs).
(k) Drill and ream the old holes for Visu −lok (28) (4 plcs).
(l) Ream the existing holes to first step oversize for Hi −lok (23).
(m) Inspect the hole.
1 If the hole not is within  limit for Hi−lok 6 oversize, or Visu−lok (08 and 3), contact
Saab.
2 If the hole is within limit for Hi−lok 6 oversize, or Visu−lok (08 and 3), go to step
(7)(n).
(n) Remove the doubler (5).
(o) Drill and ream the two holes for the sensor wire clamp in the doubler (5).
(p) Chamfer the holes in the doubler (5) and the nacelle structure.
(q) Use a vacuum cleaner and clean in the nacelle and the repair area.
(r) Remove the masking tape from the nacelle lightening holes.
(s) Clean the doubler (5) and the nacelle structure with MEK.
(t) Wet install Hi −loks (23), and if necessary washer under the head with fay sealant.
NOTE: The Hi −loks shall be installed from the inner area, so you easily install the nuts.
(u) Press the Hi −loks (23) into the holes, so it does not turn.
(v) Apply fay sealant on the doubler (5).
(w) Put the doubler (5) in position on to the Hi −loks threads (23).
(x) Push the doubler (5) carefully in position.
(y) Install washer and nut on the Hi −lok (23).
(z) Torque the nuts on the Hi −loks.
(aa) Pin every other Visu −lok hole.
(ab) Wet install the Visu −loks (27 and 28) and washers with fay sealant.
(ac) Remove the pins.
(ad) Wet install the rest of the Visu −loks (27 and 28) and washers with fay sealant.
(ae) Retorque all nuts on the HI −loks.
(af) Apply FR −primer on the Visu−luk pin.
(8) Install the door (2).
REF. FIG. 2 View D

### Page 10

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 10 of 18
(a) Clean the door (2) and doubler (5) with MEK.
(b) Apply firewall sealant, DC 730, on the doubler at the door (2) position.
(c) Apply promoter, DC 1200 on door (2).
(d) Let the promoter dry.
(e) Install the door (1) with the five bolt (1).
(f) Torque the bolts.
(9) Apply firewall sealant.
REF. FIG. 2 View D
(a) Remove redundant fay sealant around the doubler (5).
(b) Clean edge around the doubler (5) with MEK.
(c) Apply promoter, DC 1200, on the edge.
(d) Let the promoter dry.
(e) Apply firewall sealant, DC 730, on the edge.
D. JOB CLOSE −UP
(1) Close the access.
(a) Remove all the tools and equipment from the work area. Make sure the work area is
clean.
(b) Install the sensor wire in the repair area of the inner skin (Ref. AMM TASK
26−11−10−000−801).
NOTE: Make sure that the sensor wires for the Fire Detection System have distance to
fasteners in the repaired area.
REF. FIG. 2 View A
1 Put the clamp (16) in position.
2 Install the screw (15).
3 Put the bushing (13) and the sensor wire (12) in position.
4 Put the clamp cover (11) in position.
5 Install the screw (14).
6 Clean the head of the screw (15) with MEK.
7 Apply promoter, DC 1200, on the head of the screw (15).
8 Let the promoter dry.
9 Apply firewall sealant, DC 730, on the head of the screw (15).
(c) Install the Aft Beam (Ref. AMM TASK 71−21−10−400−813).
(d) Install the Engine Mounting Structure (EMS) LH/RH Horizontal Strut (Ref. AMM TASK
71−21−10−400−805).
(e) Install the Engine Mounting Structure (EMS) RH Upper Strut (Ref. AMM TASK
71−21−10−400−804).
(f) Install the Engine Mounting Structure (EMS) LH Upper Strut (Ref. AMM TASK
71−21−10−400−801).
(g) Install the power plant (Ref. AMM TASK 71−00−00−400−801).

### Page 11

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 11 of 18
(h) Remove the access platforms.
3. MATERIAL INFORMATION
A. Local supply
Item Part Number Qty Nomenclature Designation Remarks
5 4 Doubler − Make from Titan
AMS 4911,  alt.
AISI 301 ¼ Hard,
T = 1.27 mm
21 HL10VAP −5−xx
Alternative:
HL10VAZ−5−xx
AR Hi −Lok − Length as re-
quired
22 HL10VAP −6−xx
Alternative:
HL10VAZ−6−xx
AR Hi −Lok − Length as re-
quired, oversize
for size 5
23 HL110 −6−xx AR Hi −Lok − Length as re-
quired, oversize
for size 6, step 1
24 HL11VAP −6−xx
Alternative:
HL11VAZ−6−xx
AR Hi −Lok − Length as re-
quired, oversize
for size 5
25 HL111 −6−xx AR Hi −Lok − Length as re-
quired, oversize
for size 6, step 1
26 MS20613C AR Rivet LM 5 or 6
− AN960C8L AR Washer − Thin washer un-
der protrouding
head, if needed
− AN960C8 AR Washer −
− AN960C10L AR Washer − Thin washer un-
der protrouding
head, if needed
− AN960C10 AR Washer −
_ MS21042 −08 AR Nut −
_ MS21042 −3 AR Nut −
AF184C3 AR Rivet − ZCU3
27 NAS 1671 −08 AR Visu −lok −
− 0224994−045 AR Visu −lok Washer −
28 NAS 1671 −3 AR Visu −lok −

### Page 12

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 12 of 18
Item RemarksDesignationNomenclatureQtyPart Number
− 0224994−041 AR Visu −lok Washer −
29 HL410 −6−xx AR Hi −Lok − Length as re-
quired, oversize
for size 6, step 2
− Methyl Ethyl Ketone AR Cleaning agent − TT−M−261 or
equivalent
− Bonderite M−CR
1200S
AR Surface Treatment − MIL−DTL−81706
Class 1A
− PS 870 A AR Fay sealant − MIL-PRF-81733
Type I
− Aerudur S15/90 AR FR −Primer −−
DC 730 RTV AR Firewall sealant −
DC 1200 AR Promoter − MIL−A−46106 A
Type I
NOTE: Equivalent materials can be used for listed items, Ref. SRM 51 −33−00.

### Page 13

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 13/14 of 18
Repair / Modification of the EMS Upper Fitting
FIG. 1 (Sheet 1 of 2)
B23767
B23767
N STA
204.7
N STA
204.7
N STA
199.2
N STA
199.2
UPPER INTERCOSTAL
A
B
C
C
A
B
INNER SKIN
22 or 23

### Page 14

Service Bulletin
Date Month Year
Revison X, Date Month Year
2000−XX−XXX
Page 14

### Page 15

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 15/16 of 18
Repair / Modification of the EMS Upper Fitting
FIG. 1 (Sheet 2 of 2)
B23768
B23768
N STA
204.7
N STA
199.2
N STA
204.7
N STA
199.2
OUTER SKIN
A−A
B−B
C−C
22 OR 23
22, 23 OR 29
22 OR 23
22 OR 23
24 OR 25
26
24 OR 25
INBD
WL 98.3

### Page 16

Service Bulletin
Date Month Year
Revison X, Date Month Year
2000−XX−XXX
Page 16

### Page 17

Service Bulletin
06 November 2018
Revision 02, 18 January 2019
2000−54−036
Page 17/18 of 18
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Make Inspection / Access Hole in the Inner Nacelle Skin
FIG. 2
B23777
B23777
N STA
204.7
N STA
199.2
1
2
3
4
MAKE A CUT OUT
1 mm FROM
INNER STRUCTURE
REMOVE
FASTENERS
REMOVE
FASTENERS
RADII
MIN 5 mm
RADIUS
MIN 13.0 mm
WL
92.2
WL
98.3
N STA
204.7
N STA
199.2
N STA
204.7
N STA
199.2
N STA
204.7
N STA
199.2
AB C D
27
23
27
28
23
11
12
13
14
15
16
5
RADII
MIN 13.0 mm
28 28
1 2
E E
E−E
5FIRE WALL SEALANT
INNER NACELLE SKIN

### Page 18

Service Bulletin
Date Month Year
Revison X, Date Month Year
2000−XX−XXX
Page 18

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.