# Sikorsky Service Instruction 92-070A: No revision named

- Rights: © Sikorsky. Filed by the FAA in regulations.gov docket FAA-2015-3942, the docket of AD 2016-07-01. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Sikorsky Service Instruction 92-070A](https://openairdocs.org/service-documents/sikorsky/92-070a.md)
- Title as filed: Sikorksy SSI 92-070A
- Pages: 11
- PDF: https://openairdocs.org/files/sha256/23/1d/231d35da323d7185769bccdb0ae28756275c69bc12d85416c370cc8ea7604434
- Page: https://openairdocs.org/service-documents/sikorsky/92-070a/file/231d35da323d

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

SSI 92-070
Revision A - April 25, 2014
TRANSMITTAL
Special Service Instruction 92-070 dated February 19, 2014 has been revised. This page accompanies Revision A,
dated April 25, 2014.
92-070A dated April 25, 2014 supersedes the basic issue of 92-070, dated February 19, 2014. Text changes are
indicated by a vertical line in the outer margin of the page. Illustration changes are indicated by a vertical line next
to the figure title.
INSTRUCTIONS TO OPERATORS:
Operators that have complied with 92-070 dated February 19, 2014, no further action is required.
Operators that have not complied with the basic issue dated February 19, 2014, comply with revision A in its
entirety.
HIGHLIGHTS OF THIS REVISION:
Drawings Required for Modification
Added 92070-55094.
Effectivity
Revised serial numbers to 920006 through 920084.
Instructions
Added note prior to step A. (1) indicating alternate clamp and hardware sizes can be used to achieve proper
fit.
Added note prior to step B. (8) indicating No. 1 AC generator feeder must not be in contact with hydraulic
lines.
Added Figure 1 showing acceptable and unacceptable clearance between No. 1 AC generator feeder and
hydraulic lines.
Material Information
Updated Modification Kit Required and Source Information.

### Page 2

Sikorsky Aircraft Corporation
6900 Main Street
P .O. Box 9729
Stratford, Connecticut 06497-9129
(203) 386-4000
NOTICE TO ALL PERSONS RECEIVING THIS DOCUMENT:
WARNING:T HIS DOCUMENT, OR AN EMBODIMENT OF IT IN ANY MEDIA, DISCLOSES INFORMATION WHICH IS PROPRIETARY, IS THE PROPERTY OF SIKORSKY AIRCRAFT CORPORATION AND/OR ITS 
SUBSIDIARIES, IS AN UNPUBLISHED WORK PROTECTED UNDER APPLICABLE COPYRIGHT LAWS, AND IS DELIVERED ON THE EXPRESS CONDITION THAT IT IS NOT TO BE USED, DISCLOSED, REPRODUCED, IN 
WHOLE OR IN PART (INCLUDING REPRODUCTION AS A DERIVATIVE WORK), OR USED FOR MANUFACTURE FOR ANYONE OTHER THAN SIKORSKY AIRCRAFT CORPORATION AND/OR ITS SUBSIDIARIES WITHOUT 
ITS WRITTEN CONSENT, AND THAT NO RIGHT IS GRANTED TO DISCLOSE OR SO USE ANY INFORMATION CONTAINED HEREIN.A LL RIGHTS RESERVED.A NY ACT IN VIOLATION OF APPLICABLE LAW MAY RESULT 
IN CIVIL AND CRIMINAL PENALTIES.
EXPORT WARNING:T HESE COMMODITIES, TECHNICAL DATA OR SOFTWARE ARE SUBJECT TO THE EXPORT CONTROL OF EITHER THE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) OR THE 
EXPORT ADMINISTRATION REGULATIONS (EAR) AND CANNOT BE EXPORTED WITHOUT THE PRIOR AUTHORIZATION OF EITHER THE DEPARTMENT OF STATE OR THE DEPARTMENT OF COMMERCE.T HE TERM 
“EXPORT” INCLUDES ANY DISCLOSURE AND/OR PROVISION OF ACCESS TO COMMODITIES, TECHNICAL DATA OR SOFTWARE TO OR BY FOREIGN NATIONALS (WHETHER LOCATED IN THE UNITED STATES OR 
ABROAD).  THIS REQUIREMENT ALSO APPLIES TO FOREIGN NATIONAL EMPLOYEES OFU.S. COMPANIES AND THEIR FOREIGN SUBSIDIARIES.
S-92® IS A REGISTERED TRADEMARK OF SIKORSKY AIRCRAFT CORPORATION.
SPECIAL
SERVICE INSTRUCTIONS
SSI No. 92-070A
Subject: STANDARD PRACTICES – AIRFRAME – Clamping Electrical Wires and Bundles -
Upper Deck Wiring Harness Installation, Field Modification
Purpose: To remove and reroute Upper Deck Wiring Harnesses to prevent chafe condition.
Model:S - 9 2 ®
Effectivity: S-92A model helicopters with serial numbers 920006 through 920084.
Component: LH and RH upper deck wiring harnesses, mounting hardware, and associated attaching 
hardware.
Description: Helicopter is prepared for maintenance. Access is gained to the LH and RH Upper Deck 
Wiring Harnesses and electrical harnesses. Clamps are removed from the No. 1 and No. 
2 AC Generator/Engine Inlet Anti-ice Feeders and LH and RH electrical main harnesses. 
The No. 1 and No. 2 AC Generator Feeders are removed. Electrical lines mounting 
provisions are reworked. The LH and RH top deck harnesses are rerouted. The LH Top 
Deck Rotor Ice Protection System (RIPS), No. 1 AC Generator Feeder, No. 1 Engine 
Inlet Feeder, No. 2 AC Generator Feeder, and No. 2 Engine Inlet Feeder are installed. 
Clamps and hardware are installed on applicable harnesses. Helicopter is returned to 
service.
Drawings Required for Modification:
92070-20059, 92070-55034, 92070-55094, and 92551-00446.
References:
(a) Maintenance Manual SA S92A-AMM-000, Task, 30-61-00-710-001.
(b) Maintenance Manual SA S92A-AMM-000, Task, 53-70-00-900-001.
(c) Maintenance Manual SA S92A-AMM-000, Task, 71-62-04-900-001.
(d) Maintenance Manual SA S92A-AMM-000, Task, 71-62-04-900-002.
(e) Maintenance Manual SA S92A-AMM-000, Task, 20-20-02-910-001.
February 19, 2014
Revision A – April 25, 2014 Page 1 of 8
Sikorsky
A United Technologies Company

### Page 3

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
(f) Maintenance Manual SA S92A-AMM-000, Chapter/Section, 25-29-01.
(g) Functional Check Flight Procedures Manual, SA S92A-FCP-000.
Compliance: Sikorsky Aircraft recommends compliance with this SSI.
Approval: The design change affected by this document is classified as Minor, and is FAA approved 
in accordance with the applicable requirements of United States Federal Aviation 
Regulations 14 CFR Part 29. FAA approval constitutes EASA and Transport Canada 
approval under the terms of current bilateral agreement procedures.
Instructions:
A. Preparation for modification:
NOTE
x A complete review of this SSI is recommended before starting the 
procedure.
x Before beginning this modification procedure, use the material 
information list to inventory the kit. Make sure all parts are present and in 
serviceable condition.
x The instructions in this SSI shall be done by personnel experienced in 
standard working/repair and safety practices.
x Slight variations to the instructions contained herein are allowed, as long 
as the intent of the modification is accomplished.
x Alternate clamp and hardware sizes can be used to achieve proper fit.
WARNING
TO PREVENT ELECTRICAL SHOCK OF PERSONNEL, MAKE SURE 
ELECTRICAL POWER IS DE-ENERGIZED. DO NOT APPLY POWER 
TO HELICOPTER UNTIL INSTRUCTED TO DO SO.
(1) Turn off electrical and hydraulic power and make helicopter safe for ground maintenance.
(2) Gain access to LH and RH upper deck wiring harnesses as follows:
(a) Open No. 1 and No. 2 engine cowling/work platform. (Refer to Maintenance Manual SA 
S92A-AMM-000, Task, 53-70-00-900-001).
(b) Open main rotor pylon sliding fairing. (Refer to Maintenance Manual SA S92A-AMM-000,
Task, 53-70-00-900-001).
(c) Remove No. 1 and No. 2 engine center cover assemblies. (Refer to Maintenance Manual 
SA S92A-AMM-000, Task, 71-62-04-900-001).
(d) Remove applicable ceiling panels. (Refer to Maintenance Manual SA S92A-AMM-000,
Chapter/Section, 25-29-01).
B. Completion of modification:
(1) Remove existing clamp setups and hardware securing No. 1 AC generator feeder (92552-
07103-041), and No. 2 AC generator feeder (92552-07104-041). (Dwg 92551-00446).
February 19, 2014
Revision A – April 25, 2014 2

### Page 4

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
(2) Remove No. 1 AC generator feeder (92552-07103-041) (Item 30). (Dwg 92551-00446, 
sheets 8, 12, 13, 14, 16, 16.3, 16.4, 16.5, and 16.6).
(3) Remove No. 2 AC generator feeder (92552-07104-041) (Item 31). (Dwg 92551-00446, 
sheets 30, 30.1, 31, 33, 33.1, 34, 34.1, 34.2, 35.2, and 36).
(4) Rework electrical lines mounting provision between stations 221.50 and 399.54, and LH and 
RH BL 16.50 and 26.62. (Dwg 92070-20059-011, Rev A, sheets 1-3).
(5) Reroute LH top deck harness (92552-04101-046) (Item 18). (Dwg 92070-55034, sheets 9, 
10, 12, 13, 15 - 20, and 22 - 27).
(6) Reroute RH top deck harness (92552-04102-046) (Item 19). (Dwg 92070-55034, sheets 14, 
28 - 35, 37 - 46, and 48).
NOTE
Observe standard practices for clamping electrical wires and bundles. 
(Refer to Maintenance Manual SA S92A-AMM-000, Task, 20-20-02-910-
001).
(7) Install LH top deck RIPS (92552-04118-047) (Item 237). (Dwg 92070-55034, sheets 21 -
27).
CAUTION
NO. 1 AC GENERATOR FEEDER (92552-07103-042) MUST NOT BE 
IN CONTACT WITH HYDRAULIC LINES.
(8) Install No. 1 AC generator feeder (92552-07103-042) (Item 130). (Dwg 92070-55034, sheets 
17 - 19, 52, and 54 - 56).
(9) If necessary, heat and reshape No. 1 AC generator feeder boot to prevent contact with 
hydraulic lines. (Refer to Figure 1).
(10) Install No. 1 engine inlet feeder (92552-07105-041) (Item 132). (Dwg 92070-55034, sheets 
23 - 27, 49 - 56).
(11) Install No. 2 AC generator feeder (92552-07104-042) (Item 131). (Dwg 92070-55034,
sheets, 37, 38, 40 - 42, 60, 61, and 64).
(12) Install No. 2 engine inlet feeder (92552-07106-041) (Item 133). (Dwg 92070-55034, sheets 
45, 46, 48, 57 - 63).
(13) Install clamp setups and hardware in accordance with Dwg 92070-55034.
(14) Install ceiling panels. (Refer to Maintenance Manual SA S92A-AMM-000, Chapter/Section,
25-29-01).
(15) Install No. 1 and No. 2 engine center cover assemblies. (Refer to Maintenance Manual SA 
S92A-AMM-000, Task, 71-62-04-900-002).
(16) Close main rotor pylon sliding fairing. (Refer to Maintenance Manual SA S92-AMM-000, 
Task, 53-70-00-900-001).
February 19, 2014
Revision A – April 25, 2014 3

### Page 5

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
(17) Close No. 1 and No. 2 engine cowling/work platform. (Refer to Maintenance Manual SA 
S92A-AMM-000, Task, 53-70-00-900-001).
C. Return helicopter to service.
D. Perform operational check as follows:
(1) Perform test procedures. (Refer to Functional Check Flight Procedures Manual, SA S92A-
FCP-000).
(2) Perform IBIT test. (Refer to Maintenance Manual SA S92A-AMM-000, Task, 30-61-00-710-
001).
February 19, 2014
Revision A – April 25, 2014 4

### Page 6 (OCR)

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
UNACCEPTABLE CLEARANCE BETWEEN HEAT SHRINK BOOT AND HYDRAULIC LINES
ACCEPTABLE CLEARANCE BETWEEN HEAT SHRINK BOOT AND HYDRAULIC LINES
TD3260
NO. 1 AC GENERATOR FEEDER AND HYDRAULIC LINES CLEARANCE
FIGURE 1
February 19, 2014
Revision A - April 25, 2014  5

### Page 7

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
E. Record of compliance:
(1) Make helicopter logbook entries to show compliance with this SSI as follows:
(a) Make helicopter level logbook entry on form SA7343-15 (Aircraft ASB and CSN 
Release Signoff).
(b) When SSI modifies a component that can be removed from this helicopter:
1. Make component log card entries on forms SA7343-22 (Aircraft Component 
Log Cards) & SA7343-21 (Component Log Cards) as applicable.
2. If a component modified by this SSI does not have a log card and the SSI
does not create one, then annotate compliance on the next higher assembly 
that the component belongs to which does have a log card.
(2) Upon compliance with this SSI, complete attached SPECIAL SERVICE INSTRUCTIONS 
COMPLIANCE RECORD CARD and return it to Sikorsky Aircraft Corporation.
 
February 19, 2014
Revision A – April 25, 2014 6

### Page 8

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
Electrical Load Data:
None.
Software Load Data:
None.
Weight and Balance: Change resulting from these instructions is as follows:
W/I Upper Deck Reroute F/M: Change in weight: +23.0 lb @ station 302.5, +7.0 in. lbs/1000, BL 
2.9 (LH), +0.1 in. lbs/1000
W/I Miscellaneous Hardware Kit: Change in weight: +25.0 lb @ station 300.0, +7.5 in. lbs/1000, BL 
0.0, 0.0 in. lbs/1000
Mod Kit Mounting Provisions Electrical Lines: Change in weight: +0.7lb @ station 310.0, +0.2 in. 
lbs/1000, BL 0.0, 0.0 in. lbs/1000
Manpower (Estimated):
Task No. of Men No. of Hours Man-Hours*
Gain Access (Covers and Interior) 2 2.75 5.5 
Airframe (Modifications, Brackets, 
Penetrations) 
2 15.5 31.0 
Electrical (Removal and Installation 
of Harnesses) 
2 9.5 19.0 
Perform Operations checks 
(Electrical and Rips) 
2 1.15 2.3 
Total   57.80 
*Estimate does not include time required to prepare helicopter or return it to flight status. 
Material Information:
F. Modification Kit Required:
Qty Nomenclature Part Number Source
1 Mod Kit Collector, Top Deck W/I 92070-55094-011 (1) 
 Consisting of:   
1 W/I Upper Deck Reroute F/M 92070-55034-011 (1) 
1 Mod Kit Mounting Provisions Electrical 
Lines 
92070-20059-011 (1) 
G. Consumable Materials:
None.
February 19, 2014
Revision A – April 25, 2014 7

### Page 9

SPECIAL SERVICE INSTRUCTIONS NO. 92-070A
H. Support Equipment:
None.
I. Tooling Required:
Qty Nomenclature Part Number Source
1 Torque Wrench (50 - 250 in. lbs) Comm ercially Available or equivalent (2) 
    
J. Source:
(1) For parts availability and lead time requirements contact your Customer Service 
Representative at Helicopter Support Inc. (HSI). Submit a (cost/no-cost) purchase order 
referencing this SSI number and the helicopter serial number(s) on which these parts will be 
used. This will allow HSI and operator to track shipment and receipt of parts. Orders will be 
accepted by letter, telephone, facsimile (FAX), or through the HSI website: 
www.HSIUS.com. For prompt shipment, reference address of each shipping destination. 
Direct your order to:
HELICOPTER SUPPORT INC.
124 Quarry Road
P.O. Box 111068
Trumbull, Connecticut 06611 U.S.A.
Attn: Customer Service
FAX: (203) 416-4291, Telephone: (203) 416-4000
HSI website: www.HSIUS.com
(2) Available through normal supply channels.
February 19, 2014
Revision A – April 25, 2014 8

### Page 10 (OCR)

(Fold over and tape closed)
SIKORSKY AIRCRAFT CORPORATION
FACSIMILE NUMBER (860) 998-7565
EMAIL ADDRESS: GPSIKSASProductSafet@utc.com
ATTENTION: SAS PRODUCT SAFETY MANAGER
SIKORSKY AEROSPACE SERVICES
IMPORTANT NOTICE
Upon COMPLIANCE with the attached SSI, Sikorsky requests your cooperation in
completing and returning this ENTIRE PAGE by MAIL, FAX, or scan & EMAIL.
Please fill in the requested information at the bottom of the page, so we may maintain
proper records documenting the configuration of your aircraft. This information is useful
when determining configuration and effectivity of issues affecting fielded aircraft.
This request is in keeping with our policy to assure that our customers receive the latest
information applicable for the maintenance of your aircraft. Thank you.
SPECIAL SERVICE INSTRUCTION: SSI No. 92-070A  Compliance Record Card
TITLE:  STANDARD PRACTICES - AIRFRAME - Clamping Electrical Wires and Bundles -
Upper Deck Wiring Harness Installation, Field Modification
OWNER/OPERATOR:
SUBMITTED BY:  DATE:
FOLLOWING SERIAL NUMBERS ARE NOT AFFECTED BY THIS SSI
SSI HAS BEEN COMPLIED WITH ON THE FOLLOWING SERIAL NUMBERS
(Fold Up to Arrows)

### Page 11

No Postage 
Necessary
BUSINESS REPLY MAIL
FIRST-CLASS MAIL PERMIT NO. 432 BRIDGEPORT CT
POSTAGE WILL BE PAID BY ADDRESSEE
SIKORSKY AIRCRAFT CORPORATION
P.O. BOX 9729
6900 MAIN STREET
STRATFORD, CONNECTICUT 06615-9129 U.S.A.
MAILSTOP: S328A
ATTENTION: SAS PRODUCT SAFETY MANAGER
SIKORSKY AEROSPACE SERVICES
Please complete the form on the reverse side and FAX to
FACSIMILE NUMBER (860) 998-7565
Or scan and email to:
EMAIL ADDRESS: GPSIKSASProductSafet@utc.com
or fold and return ENTIRE form to Sikorsky Aircraft Corporation

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.