# Viking Air Alert Service Bulletin V3/0011: Revision NC

- Rights: © Viking Air. Filed by the FAA in regulations.gov docket FAA-2020-1005; AD 2022-05-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Viking Air Alert Service Bulletin V3/0011](https://openairdocs.org/service-documents/viking/v3-0011.md)
- Title as filed: Viking DHC-3 Otter Alert SB V3-0011 Rev NC
- Pages: 36
- PDF: https://openairdocs.org/files/sha256/48/9b/489b20b7b24ff85c242d545d2d397f319e1e631e9b9ab97578746314b3721d22
- Page: https://openairdocs.org/service-documents/viking/v3-0011/file/489b20b7b24f

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Page 1 of 2 ATA Ref. 57-40 
26-November-2019 Alert Service Bulletin V3/0011 
  
 
REVISION TRANSMITTAL SHEET 
Inspection and Replacement of DHC-3 Wing Strut Assembly C3W100 
Alert Service Bulletin No.: V3/0011 Date of Original Issue: 26 November 2019 
Revision No: NC  Date of Issue: 26 November 2019 
 
This Alert Service Bulletin is issued for a one-time inspection of all DHC-3 wing strut assemblies 
C3W100.  
This page transmits Revision ‘NC’ of Alert Service Bulletin V3/0011, pages 1 through 14, dated 
November 26, 2019.

### Page 2

Page 2 of 2 ATA Ref. 57-40 
26-November-2019 Alert Service Bulletin V3/0011 
  
THIS PAGE INTENTIONALLY LEFT BLANK

### Page 3

1959 de Havilland Way 
Sidney, B.C. 
Canada V8L 5V5 
Tel: (250) 656 - 7227 
 
  
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 1 of 14 
DHC-3 
OTTER 
 
ALERT SERVICE BULLETIN  
 ATA SYSTEM: 57-40 NUMBER: V3/0011 
  
I. PLANNING INFORMATION 
A. Effectivity 
This Alert Service Bulletin (ASB) is applicable to all DHC-3 aircraft equipped with wing 
strut assembly C3W100. This ASB applies to all dash numbers of the Strut C3W100 and 
all sub-assemblies. 
B. Reason 
Viking Air Limited (Viking) has become aware of the failure of a C3W100 Wing Strut 
during operation. The failure mode is under investigation and appears to be in the area 
of the C3W104 lug plate. The investigation continues in order to assess the situation, but 
Viking recommends taking immediate safety action. 
NOTE: Flights conducted above the original Type Certificate maximum gross weight of 
8,000 lbs, will have an impact on DHC-3 strut life. Operators must follow 
Supplemental Type Certificate (STC) holder instructions for continuing 
airworthiness (ICA). 
C. Description 
A Bolt Hole Eddy Current (BHEC) inspection of the lug hole on the lug plate C3W104,  
a visual and Fluorescent Dye Penetrant (FDP) inspection of the lug fitting C3W102 and 
C3W103, and a visual and Eddy Current Surface Scan (ECSS) inspection of the wing 
strut assembly C3W101 are specified in this ASB.  
D. Compliance 
1. For wing strut assembly C3W100 with 5,000 to 20,000 flight hours, perform a one-time 
inspection per Section II within 48 hours from the issue date of this ASB or, before 
next flight, whichever occurs later.  
NOTE 1: No Wing Strut Assy C3W100, with more 20,000 flights hours shall be in 
service. 
NOTE 2: In the case where, beyond the 48 hours, a ferry flight is required to go to the 
maintenance facility, contact Viking. 
SUBJECT:  Inspection and Replacement of DHC-3 Wing Strut Assembly C3W100

### Page 4

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 2 of 14 
NOTE 3: Whenever installing new or existing wing strut assembly C3W100, refer to 
Section II.E of this ASB for the required torqueing procedure to tighten the 
lug bolt nut and for application of Corrosion Preventive Compound, Type II 
(CPC) to all lug joints and all hardware. 
a. If any crack is found or if the part is unserviceable due to corrosion or other 
damage, replace the existing wing strut assembly C3W100 per SB 3/10 and  
PSM 1-3-2, Appendix IV Part 6 before further flight, or contact Viking Technical 
Support for further instructions. 
b. If no crack, corrosion or other damage is found, reinstall serviceable C3W100 
strut. 
2. For the wing strut assembly C3W100 with less than 5,000 flight hours, perform a  
one-time inspection per Section II, within seven (7) days from the issuing date of this 
ASB or, before next flight, whichever occurs later. 
NOTE 1: Operators may contact Viking to inquire about alternative inspection 
requirements with proof of purchase and usage history records. 
NOTE 2: In the case where, beyond the 48 hours, a ferry flight is required to go to the 
maintenance facility, contact Viking. 
NOTE 3: Whenever installing new or existing wing strut assembly C3W100, refer to 
Section II.E of this ASB for the required torqueing procedure to tighten the 
lug bolt nut and for application of CPC to all lug joints and all hardware. 
a. If any crack is found or if the part is unserviceable due to corrosion or other 
damage, replace the existing wing strut assembly C3W100 per SB 3/10 and  
PSM 1-3-2, Appendix IV Part 6 before further flight, or contact Viking Technical 
Support for further instructions.  
b. If no crack, corrosion or other damage is found, reinstall serviceable C3W100 
strut. 
3. After completion of this ASB, return the Inspection Reply Form attached at end of this 
ASB to Viking Technical Support. 
E. Approval 
The technical content of this ASB has been approved under the authority of Transport 
Canada Civil Aviation (TCCA) Design Approval Organization (DAO) 04-V-02. 
F. Labour Requirements 
Estimated time to accomplish this ASB is 12 to 16 hours per strut. 
G. Weight and Balance 
Not affected. 
H. Electrical Load Data 
Not affected. 
I. Publications Affected 
None

### Page 5

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 3 of 14 
J. References 
1. SB 3/10, Fatigue of the DHC-3 Otter Flight Structures – Component Replacement 
Times;  
2. PSM 1-3-2, DHC-3 Maintenance Manual; 
3. PSM 1-3-5, DHC-3 Otter Supplemental Inspection and Corrosion Control Manual 
4. SB 3/32, Main Pick-up Bolt Torque Loading – Special Inspection 
For more information please contact: 
Viking Air Limited FAX: 403-295-8888 
Technical Support Telephone Numbers: 
7757 8th Street NE   Regional: 587-430-0572 
Calgary, Alberta   North America: 1-800-663-8444 
Canada, T2E 8A2 dh_technical.support@vikingair.com  
II. ACCOMPLISHMENT INSTRUCTIONS 
A. NDT (Non-Destructive Testing) Inspection of the Wing Strut Lug Plate 
C3W104  
1. Inspection Procedure (Refer to Figure 1 and Figure 2) 
(a) Refer to PSM 1-3-2, Part 2 Section 2.14. Securely support the LHS (Left Hand 
Side) and RHS (Right Hand Side) wings with suitable cradles inside a hanger. 
Removal of the wing is unnecessary unless otherwise required. 
NOTE: If available, dummy struts may be installed to secure the wings. This can 
eliminate wing removals if no hanger is available.  
(b) Remove wing strut upper and lower fairings. 
(c) Remove LHS and RHS wing strut assembly C3W100 (remove the wings as 
required).  
NOTE: Refer to NOTE above for dummy struts.  
(d) Remove the two (2) lug fittings C3W102 and C3W103, from each wing strut 
assembly C3W100. 
(e) Remove the bushing C3W105 from each wing strut lug plate C3W104 (2 on each 
end of each strut, total 4). Mark or number the bushings and the corresponding lug 
holes to match their installation locations. 
NOTE 1: To prevent damage to the lug plate and strut spar/skin, ensure that each 
lug plate is properly and securely supported and protected while pressing 
out or installing the bushing.  
NOTE 2: CRC CANADA Freeze Spray or LOCTITE Freeze & Release, or 
equivalent may be used to ease the bushing removal and to prevent 
damage to hole bore: quickly spray to bushing ID for several seconds then 
immediately press out the bushing.  
CAUTION: DO NOT HEAT UP THE LUG PLATE AND SKIN.

### Page 6

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 4 of 14 
(f) On each wing strut assembly C3W101, perform Bolt Hole Eddy Current (BHEC) 
inspection of the four (4) lug plate holes through all layers for crack or corrosion in 
accordance with Appendix A Section I. 
2. If any crack or corrosion is found, replace the existing wing strut assembly C3W100 
(next higher assembly of C3W101) per SB 3/10 and PSM 1-3-2, Appendix IV Part 6 
before further flight, or contact Viking Technical Support for disposition. Refer to 
Section II.E of this ASB for the required torque to tighten the lug bolt nut and for 
application of CPC to all lug joints and all hardware. 
NOTE: If the existing LHS or RHS or both wing strut assemblies C3W100 (next higher 
assembly of C3W101) are to be replaced per SB 3/10 and PSM 1-3-2, 
Appendix IV Part 6, the remaining inspections specified in Section II.B to II.D 
can be ignored for LHS or RHS or both sides as applicable. 
3. If no crack is found: 
(a) On each wing strut assembly C3W101: check the lug plate hole bore condition 
(surface roughness shall be RA 125 or better, free of gouges, scratches, scores or 
similar imperfections). Measure and record the Inner Diameter (ID) using a suitable 
hole bore gauge or internal micrometer, which shall be between 0.8745” and 
0.8755”. 
(b) On each wing strut assembly C3W101: check inner and outer surface plating 
condition of the four (4) bushings C3W105 removed in Step II.A.1.(e). Measure 
and record the Outer Diameter (OD) and ID (using a suitable hole bore gauge or 
internal micrometer). The OD shall be 0.8755”-0.8760”. The ID shall be  
0.7495”-0.7505”. 
NOTE: New bushings C3W105-3 are highly recommended because the surface 
finish on existing bushing may likely be damaged. Step II.A.3.(b) is not 
required when existing bushings are replaced. 
(c) If the lug hole bore and bushing surface conditions (including cadmium plating) are 
serviceable with proper diameters as measured in previous Step, wet-reinstall the 
existing bushings back to their original locations (as marked in Step II.A.1.(e) with 
structural sealant PS 870 Class A conforming to MIL-PRF-81733 or AMS 3265 
(refer to PSM 1-3-5 Part 1, Paragraph 6.D), using shrink fit technique. Or,  
wet-install new C3W105-3 bushings as required (refer to the Note (1) in Table 1 
below for pre-reaming of the bushing ID prior to installation). 
NOTE 1: Diestone DS 108, Diestone DLS, Diestone HFP or equivalent is used for 
general solvent cleaning process. Solvent clean the lug hole bore. Solvent 
cleaning the bushings may use dampened wiping cloths (or a quick-short 
emersion method: remove the bushing out from solvent as soon as 
grease/oil/dirt is dissolved). Wipe away any remaining solvent with a clean 
dry cloth. 
NOTE 2: Solvent clean the hole bore and wipe away any remaining solvent with a 
clean dry cloth. Apply Alodine Class 1A solution MIL-DTL-81706 to bare 
metal as required (where original anodized subface finish is damaged). 
NOTE 3: Solvent clean the hole bore and wipe away any remaining solvent with a 
clean dry cloth. Apply a thin layer of sealant into hole bore prior to 
installing the bushing. After installation, seal the bushing edges as shown 
in Figure 3 and remove excessive sealant as required.

### Page 7

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 5 of 14 
NOTE 4: After solvent cleaning, cool bushings with liquid nitrogen to contract the 
diameter. The handling tongs or installation tools are to be chilled along 
with the bushing. 
CAUTION: DO NOT HEAT UP THE LUG PLATE AND SKIN. 
(d) If the lug hole bore is out of tolerance, oversized bushings as listed in Table 1 
below shall be wet-installed with structural sealant PS 870 Class A conforming to 
MIL-PRF-81733 or AMS 3265 (refer to PSM 1-3-5, Part 1 Paragraph 6.D), using 
shrink fit technique. Ream the lug holes accordingly per Table 1. The 0.010” 
oversized bushings shall be used first unless other oversized bushing is required 
due to the hole quality. 
Refer to NOTE 1 to NOTE 4 in previous Step for bushing installation.  
The oversized bushing may be slightly longer than the total thickness of the lug 
plate and the two layers of the strut skins. It shall be installed with one end surface 
flush with the inner-free surface of the lug plate C3W104, and machine the outer 
end surface flush the skin as required (do not damage the skin surface). Solvent 
clean the machined surface and wipe away with a clean dry cloth. Apply Epoxy 
Primer. Contact Viking Technical Support for detailed disposition. 
NOTE 1: The oversized bushings and lug hole sizes are listed in Table 1 below. 
Table 1. Oversized Bushings and Lug Hole Sizes 
Bushing 
Part No. 
Bushing 
ID(1) Bushing OD Lug Hole ID Note 
C3W107-5 23/32” 0.8855”-0.8860” 0.8845”-0.8855” 0.010” Oversize 
C3W107-7 23/32” 0.8955”-0.8960” 0.8945”-0.8955” 0.020” Oversize 
C3W107-9 23/32” 0.9055”-0.9060” 0.9045”-0.9055” 0.030” Oversize 
(1)  Prior to bushing installation, ream bushing ID to 0.7400” (or 0.7395”-0.7405”) 
and protect the ID immediately to prevent rusting. This is to prevent bushing 
from spinning during the final reaming. After the installation of the bushings, 
line-ream the bushing ID to 0.7495”-0.7505” at each end of the strut (protect 
the reamed ID immediately to prevent rusting).  
NOTE 2: An adjustable reamer may be required to line-ream the lug holes (and 
the bushing ID) to the required sizes. Prior to the reaming process, verify 
the reamed hole size on a piece of dummy material (same/similar 
material as the part) before reaming the actual part. 
NOTE 3: Prior to the final reaming process, ensure that the hole bore of the 
bushing ID at each end of the strut is properly aligned and squared to 
lug plate surface. 
B. Visual and NDT Inspection of the Wing Strut Lug Fittings C3W102 and C3W103 
1. On each wing strut assembly C3W100: thoroughly clean the two (2) lug fittings 
C3W102 and C3W103 (total 4 on 2 wing strut assemblies C3W100). 
2. Perform a general visual inspection of each lug fitting for corrosion, dent, wear or other 
damage, using a strong light and minimum 10X magnifying glass, as required.

### Page 8

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 6 of 14 
3. Perform Fluorescent Dye Penetrant (FDP) inspection of each lug fitting C3W102 and 
C3W103 for cracking at the lug holes (near/around the bushing OD) and the transition 
radii, in accordance with Appendix B. 
4. If any damage is found, repair or replace as required, or contact Viking Technical 
Support for detailed disposition. 
5. If no damage is found, reapply surface finishes on each lug fitting for reinstallation: 
apply Alodine Class 1A solution MIL-DTL-81706 to bare metal as required (where 
original anodized surface finish is damaged), plus one coat of Epoxy Primer (masking 
the bushing ID). Two coats of Epoxy Primer are preferred if there is no interference in 
following the fitments: 
• between the lug fitting (C3W102, C3W103) and strut lug plates C3W104;  
• between the lug fittings (C3W102) and the lug on the wing; 
• between the lug fittings (C3W103) and the lug on the fuselage Tie Bar.  
C. Detailed Visual Inspection and NDT Inspection of the Wing Strut C3W101 
1. On each wing strut assembly C3W101: thoroughly clean the external and internal 
surfaces along the entire length of the strut. 
2. Perform a detailed visual inspection of the external surface of each strut for cracks or 
corrosion or other damage, using a strong light and minimum 10X magnifying glass. 
Pay particular attention to following areas for cracking:  
(a) The joint area between the lug plate (C3W104) and the strut skin for cracks on the 
skin around fastener heads (refer to Figure 2). 
(b) Around fastener head on the skin at/near the lightening hole centres (on the strut 
spar web). 
3. Perform ECSS inspection of the external surface of each strut around fastener heads 
(common to the two flanges of the strut spar) for cracking on the strut skin in 
accordance with Appendix A Section II. 
4. Perform detailed visual inspection of the internal surfaces of each strut along the entire 
length for cracking or corrosion or other damage, using a borescope with strong light 
source. Pay particular attention to following areas for cracking: 
NOTE: A borescope with 5.5 feet long flexible tube between the eyepiece and the 
display is recommended to cover the entire length of the strut internal 
surfaces. The eyepiece side may be fixed to a stiff and light rod to ease the 
access. 
(a) Strut spar web at lightening holes (refer to Figure 2);  
(b) Strut spar web at the end row of fastener hole (inner end of spar web reinforcement 
plates C3W101-5, refer to Figure 2); 
(c) Strut spar flange around fastener heads near/at the lightening hole centres (lateral 
cracks); strut spar flange along the bending radii (longitudinal cracks). 
(d) The lug plate edge at the end row of fastener holes (outer end of the strut spar, refer 
to Figure 2). 
5. If any damage is found, repair or replace as required, or contact Viking Technical 
Support for detailed disposition.

### Page 9

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 7 of 14 
6. If no damage is found, touch up the surface finishes on the strut external and internal 
surface as required. Touch up corrosion protection of the internal surface per PSM  
1-3-5.  
D. General Visual Inspection of the Wing Strut Attachment Hardware 
1. Thoroughly clean all wing strut attachment hardware (bolts, washers and nuts). 
2. Perform detailed visual inspection of each hardware for condition, using a strong light 
and minimum 10X magnifying glass. Pay particular attention to each bolt for cracking 
or corrosion or other damage.  
3. Replace damaged hardware as required (refer to NOTE 1 below). 
E. Close Out 
NOTE 1: Prior to assembly, clean all bushing IDs (including the lug holes on the wing and 
on the fuselage Tie Bar) (such as Diestone DS 108, Diestone DLS, Diestone 
HFP, or equivalent). Wipe away any remaining solvent with a clean dry cloth. 
Also clean the lug surfaces on the wing and on the fuselage Tie Bar and 
perform visual inspection for condition (rectify discrepancy, as required) prior to 
strut installation.  
NOTE 2: Apply a thin layer of non-drying jointing compound (CorBan 27L, CA 1000, or 
similar) to all bushing IDs and bolt shanks. 
1. Reinstall serviceable lug fittings C3W102 and C3W103 to each wing strut assembly 
C3W100. 
2. Reinstall LHS and RHS wing strut assembly C3W100 (refer to SB 3/32 for the required 
torqueing procedure to tighten the lug bolt nut). Apply CPC to all lug joints including all 
hardware and ensure all lug gaps are filled. Refer to PSM 1-3-5, Part 1, Paragraph 7 
for more information. 
NOTE 1: Whenever new wing struts C3W100 are installed, new attachment bolts 
shall be used: 
• C3W128-3 (Pre-Mod 3/1010) or C3W128-5/-9 (Post Mod 3/1010) Bolt, 
Special upper attachment, QTY (Quantity) 1 per strut.  
• C3W129-3 (Pre-Mod 3/1010) or C3W129-5/-9 (Post Mod 3/1010) Bolt, 
Special lower attachment, QTY 1 per strut. 
NOTE 2: Follow PSM 1-3-2, Part 2 Section 2.14 to reinstall wings, if removed and 
rigging control surfaces per applicable Sections in PSM 1-3-2, as required. 
3. Reinstall wing strut upper and lower fairings, LHS and RHS. 
4. Remove wing supports as applicable. 
F. Recording 
After completion of this Service Bulletin, make the following entry in the aircraft log book: 
“Alert Service Bulletin No. V3/0011 Revision ‘NC’ – Inspection of DHC-3 Wing Strut 
Assembly C3W100 has been incorporated”.

### Page 10

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 8 of 14 
III. MATERIAL INFORMATION AND TOOLING 
A. Material Information  
C3W105-3 Bushing, Wing Strut, QTY 4 per Strut 
Strut Attachment Bushings - oversized: 
• C3W107-5, Bushing, 0.010” Oversize, AR (as required). 
• C3W107-7, Bushing, 0.020” Oversize, AR.  
• C3W107-9, Bushing, 0.030” Oversize, AR. 
NOTE: Oversize bushings can be purchased individually or in custom quantities. Multiple 
sizes and quantities are recommended for unexpected errors that may occur 
during the bushing installation process.  
B. Special Tools and Equipment Required 
Eddy Current and Fluorescent Penetrant non-destructive testing equipment is 
commercially available. 
1. The fastener hole inspection requires the following equipment: 
• Hocking Phasec 2200, Eddy Current Instrument, Impedance−Plane Type, or 
equivalent 
• Hocking 33A100, Mini Drive Unit, or equivalent 
• Hocking 33A103, Cable−Mini Drive Unit, or equivalent 
• Calibration Reference Standard, Techna NDT RH12-T40-7075T6 or  
RH20-T40-7075T6, or equivalent 
• Techna NDT HRY 0.750-0.875, rotating bolt hole probe, 100 kHz − 2.0 MHz 
frequency, 0.125 to 0.156−inch adjustable diameter, 2.0−inch length, or 
equivalent. 
Alternative: Techna NDT HRY 0.875-1.0, rotating bolt hole probe, 100 kHz − 2.0 
MHz frequency, 0.875 to 1.0-inch adjustable diameter, 2.0−inch length, or 
equivalent. 
2. The Eddy Current surface scan inspection requires the following equipment: 
• Hocking Phasec 2200, Eddy Current Instrument, Impedance−Plane Type, or 
equivalent. 
• Coaxial cable, BNC to Microdot. 
• Calibration Reference Standard AL29−32, or equivalent. 
• Techna NDT PEN45−6, 45° Surface probe, 50 kHz to 500 kHz frequency, 
Fe/NFe, absolute, shielded, 0.125−in. (3.175−mm) diameter, 6.0−in. (152.4−mm) 
length, 0.500−in (12.7 mm) drop, or equivalent. 
3. Fluorescent Dye Penetrant inspection requires the following equipment: 
• MAGNAFLUX MODEL ZB-24A, PN 513721 Black Light Inspection Lamp, or 
equivalent with minimum power rating 100 watts, intensity of 1200 microwatts per 
cm2 at 15 inches (38.1 cm). 
• Ultra Violet Products Inc. Model J-221 Black Light Intensity Meter, or equivalent.

### Page 11

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 9 of 14 
• Light meter, suitable for testing ambient white light intensity. 
• Cellulose sponge or nylon brush. 
• Cloths, clean, lint-free. 
• AMS 2644, MIL-I-25135, Fluorescent dye penetrant, Method C, Type I. 
sensitivity level 3 or greater. 
• QPL AMS 2644, Developer, Form d, nonaqueous. 
• QPL AMS 2644, Solvent remover, non-halogenated, Class 2. 
• TURCO 5351, (BONDERITE S-ST 5351 AERO), or equivalent, Paint remover, 
stripper. 
• Diestone DS 108, Diestone DLS, Diestone HFP, ASTM-D740 (MEK), or 
equivalent, Solvent, general cleaning. 
• Tape, masking, lead or plastic 
4. Detailed visual inspection tools:  
• A borescope with strong light source 
• A strong light. 
• minimum 10X magnifying glass. 
• Mirror.

### Page 12 (OCR)

ALERT SERVICE BULLETIN V3/0011
Faring Assembly C3W141
Lug Fitting C3W102
Bolt C3W114-3/-5/-9
Lug Plate
Bolt C3W 128-3/-5/-9
C3W104
Bushing C3W105-3, QTY 2
(or Bushing C3W107-5)
Strut Spar C3W101-4  (or Bushing C3W107-7)
(or Bushing C3W107-9)
Strut Assembly C3W100, including:
• Strut Assembly C3W101
• Lug Fittings C3W102 and C3W103
Bolt C3W114-3/-5/-9  • Bolt C3W114-3/-5/-9
Strut Assembly C3W101, excluding:
• Lug Fittings C3W102 and C3W103
• Bolt C3W114-3/-5/-9
Bolt C3W 129-3/-5/-9
Bushing C3W105-3, QTY 2
(or Bushing C3W107-5)
(or Bushing C3W107-7)
(or Bushing C3W107-9)
Lug Fitting C3W103
Faring Assembly C3W140
Figure 1. DHC-3 Wing Strut Assembly C3W100
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page 10 of 14

### Page 13

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 11 of 14 
 
 
Figure 2. DHC-3 Potential Cracks on Wing Strut Assembly C3W101-9  
Potential 
cracks on 
the skin 
Potential cracks on 
the lug plate (look 
at plate edge) 
Potential cracks in 
fastener holes on 
spar web at end 
of C3W101-5 
Potential cracks on 
skin and lug plate 
Potential cracks on 
the lug plate (look 
at plate edge) 
Potential cracks 
on the skin and 
spar flanges 
Potential cracks on 
spar flange in the 
bending radii along 
the entire strut length 
Potential cracks on 
spar flange in the 
bending radii along 
the entire strut length 
 
Spar web reinforcement 
plate C3W101-5 
Potential cracks in 
all lightening holes 
on spar web

### Page 14

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 12 of 14 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 3. Sealing Bushing Edges 
 
  
Sealing bushing edges with PS 870 Class A 
or equivalent (flush with lug surface) 
Sealing bushing edges with PS 870 Class A 
or equivalent (flush with lug surface)

### Page 15

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 13 of 14 
Alert Service Bulletin V3/0011 Revision NC – Inspection Reply Form 
Operator:    Date of Inspection:   
Contact Person:     
Contact Phone/Email:     
A/C Registration #     A/C Serial #    
A/C TTSN     A/C TCSN    
L/H Strut Part #     L/H Strut Serial #    
L/H Strut Hours TTSN    L/H Strut TCSN   
R/H Strut Part #     R/H Strut Serial #    
R/H Strut Hours TTSN    R/H Strut TCSN   
 
Inspection Findings: 
  
  
  
  
  
  
  
Corrective Actions: 
  
  
  
  
  
  
  
  
Please return form via email to dh_technical.support@vikingair.com or via fax to 403-295-8888

### Page 16

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page 14 of 14 
 
THIS PAGE INTENTIONALLY LEFT BLANK

### Page 17

26-November-2019  S.B. V3/0011 
Revision ‘NC’  Page A1 of A14 
Appendix A.  
 
Bolt Hole Eddy Current (BHEC) Inspection Technique and 
Eddy Current Surface Scan (ECSS) Inspection Technique

### Page 18

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A2 of A14 
I. Bolt Hole Eddy Current (BHEC) Inspection Technique 
1. Equipment and Materials: 
Table A1. Equipment and Materials - Bolt Hole Eddy Current (BHEC) Inspection 
DESCRIPTION PART NO./  SPECIFICATION UNITS PER ASSEMBLY ITEM NO. 
Eddy Current Instrument, 
Impedance-Plane Type 
Hocking Phasec 2200  
or equivalent* 
1 − 
Mini Drive Unit Hocking 33A100  
or equivalent* 
1 − 
Cable for Mini Drive Unit, Hocking 33A103 
or equivalent* 
1 − 
Calibration−Reference Standard, 
with various hole sizes with 0.040 – 
inch (1.02 − mm) deep electrical 
discharge machined (EDM) notches. 
Techna NDT  
RH12-T40-7075T6 or 
RH20-T40-7075T6 
 or equivalent* 
1 − 
Rotating Bolt Hole Probe, 100 kHz − 
2.0 MHz frequency, 0.75 to 
0.875−inch adjustable diameter, 
2.0−inch length 
Techna NDT  
HRY 0.750-0.875  
or equivalent** 
1 − 
    
*  If equivalent equipment is used, it must satisfy the requirement of the task and resolve 
the reference notches in the calibration reference standard at the required level of 
resolution and sensitivity. 
** Acceptable alternative: Techna NDT HRY 0.875-1.0, or equivalent is (Rotating Bolt Hole 
Probe, 100 kHz − 2.0 MHz frequency, 0.875 to 1.0−inch adjustable diameter, 2.0−inch 
length.) 
2. Preparation and Cleaning 
Visually inspect the hole to be inspected for conditions that may interfere with the inspection 
such as burrs, sealant, galling, out of round conditions or offset at component interfaces. Using 
a suitable bristle hole brush to clean fastener hole bore, as required. 
If a reaming operation is required to correct the above conditions, permission must be obtained 
from Viking Technical Support before enlarging any hole. 
3. Calibrate the BHEC inspection equipment (Refer to Figure A1 to Figure A3) 
(1) Connect the cable and the drive unit to the eddy current instrument. Attach the rotating 
probe that represents the diameter of the fastener hole to be inspected. Refer to Figure A2. 
(2) Adjust the probe to fit the same diameter hole, on the calibration reference standard, as the 
fastener hole to be inspected. Refer to Figure A2. 
NOTE: There should be light friction while inserting and removing the probe into and from 
the fastener hole. Excessive friction will cause wear on the coil. 
(3) Turn the instrument ON and set the instrument to the XY display mode and adjust the 
instrument settings for phase angle calibration as shown in Figure A1.

### Page 19

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A3 of A14 
NOTE: The screen displays show the results of the instruments used in Table A1. Other 
frequencies and settings may be used if the requirements of this calibration are 
met. 
(4) Align and insert the rotating probe into the equivalent diameter hole in the calibration 
reference standard containing a 0.040−inch (1.02−mm) EDM notch. 
Start the rotating drive unit and adjust the instrument phase (rotation) control to position the 
EDM notch signal in the vertical direction. 
(5) Perform the sensitivity calibration. Change the instrument setting to the YT display mode, as 
shown in Figure A1. 
(6) Align and insert the rotating probe into the equivalent diameter hole, in the calibration 
reference standard containing a 0.040−inch (1.02−mm) EDM notch. 
Maximize the signal from the EDM notch and adjust the Gain control to give a 100% 
amplitude signal above the zero datum. Refer to Figure A1. 
(7) Ensure the signal to noise ratio does not exceed 10% from the screen display center line. 
(8) Note the relative position of the drive unit with the notch at 180°, or at the center of the 
screen display as shown in Figure A3. 
4. BHEC Inspection Using Rotating Probe (Refer to Figure A1 to Figure A3) 
(1) Insert the rotating probe perpendicular to the fastener hole to be inspected and adjust the 
probe diameter if required. Turn the drive unit ON and inspect the entire bore of the fastener 
hole. Turn the drive unit OFF before withdrawing the probe. 
(2) Rotate the drive unit 90° and repeat previous Step 4.(1). 
(3) Using the Inspection Reply Form provided, record the results, taking note of the type and 
location of any damage indication. Submit all your findings to Viking Technical Support. 
NOTE: A photographic record of the damage attached to the Inspection Reply Form is 
highly recommended.

### Page 20 (OCR)

ALERT SERVICE BULLETIN V3/0011
INSTRUMENT SETTINGS  SCREEN DISPLAY (XY)
EDM NOTCH SIGNAL
Rotary  RPM  33A100  1500  100%  80%
Freq.  Display  500 kHz  60%  40%
Phase  270.0°  20%
Gain  33.0 dB  (ZERO  0%
X:Y  0.0 dB  DATUM)
Hi-Pass  100 Hz
Lo-Pass  1500 Hz
X-Pos
Y-Pos  90°  180°  270°  360°
CALIBRATION SHOWN FOR XY MODE
INSTRUMENT SETTINGS  I SCREEN DISPLAY (YT)
EDM NOTCH SIGNAL
Rotary  33A100
RPM  Display  1500  YT  100%  80%
Freq.  500 kHz  60%  40%
Phase  270.0°  20%
Gain  33.0 dB  0%
X:Y  0.0 dB  (ZERO
Hi-Pass  100 Hz  DATUM)
Lo-Pass  1500 Hz
X-Pos
Y-Pos  90°  180°  270°  360°
CALIBRATION SHOWN FOR YT MODE
FIGURE A1
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page A4 of A14

### Page 21 (OCR)

ALERT SERVICE BULLETIN V3/0011
START
BUTTON
MINI DRIVE UNIT
CABLE 33A103  33A100
FIXED DIAMETER TYPE
BOLT-HOLE PROBE
D -0.006 IN. MAX.  POSSIBLE CRACK
LOCATION
TO PHASEC 2200
ET INSTRUMENT
HOLE SIZE TO BE
INSPECTED (D)
ADJUSTABLE
COLLAR
ADJUSTABLE DIAMETER TYPE
ROTATING BOLT-HOLE PROBE
EXAMPLES OF BOLT HOLE PROBE SET-UP
FIGURE A2
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page A5 of A14

### Page 22 (OCR)

ALERT SERVICE BULLETIN V3/0011
100%
80%
60%
40%
20%
90°  180°  270°  360°
CRT DISPLAY OF HOLE E (NO CRACK)
O E
100%  B
80%
60%
40%
20%  o  D
Ö°  90°  180°  270°  360°
CRACKS ALONG ZERO DATUM (TIME BASE)
FOR HOLES A THRU D
CABLE 33A103  A
TO PHASEC 2200
ET INSTRUMENT
ORIENTATION OF DRIVE UNIT TO CRACKS RELATIVE TO HOLE
CIRCUMFERENCE AND CRT DISPLAYS
FIGURE A3
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page A6 of A14

### Page 23

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A7 of A14 
5. Evaluation of Indications (determine the depth of indicated bore cracks parallel to the hole axis) 
(1) Align and insert the rotating probe slowly and carefully into the fastener hole containing the 
crack indication, until a maximized vertical signal from the crack is displayed on the screen 
display. Adjust the GAIN control to obtain a 100% FSH vertical signal above the zero datum 
from the crack. 
(2) Feed the probe through the fastener hole until a 25% FSH vertical signal is displayed. Mark 
on the shaft of the probe to identify the end point of the crack.  
(3) Slowly remove the probe away from the fastener hole until a 25% FSH vertical signal is 
displayed. Mark on the shaft of the probe to identify the start point of the crack. 
(4) Measure the distance between the start and finish points on the shaft of the probe; this is 
the total depth (parallel to the hole axis) of the crack. 
(5) Measure the distance between the start point and the center of the coil; this is the depth 
(parallel to the hole axis) of the crack start point. 
6. Evaluation of Indications (determine the direction of indicated cracks (bore) relative to the 
fastener hole circumference) 
(1) With the probe inserted and rotating in the fastener hole, turn the drive unit until the crack 
signal is displayed at 180° on the screen display. 
The crack location is relative to the position of the drive unit (refer to the sensitivity 
calibration step) as shown in Figure A3. 
7. Acceptance and Rejection Criteria 
(1) Refer to NOTE below. Any distinct vertical signal (or corrosion related “noise” signal) that is 
not attributed to edges, ferrous contamination or poor fastener hole condition which is near 
(or equal to or greater than) 50% of the response from the 0.040−inch (1.02−mm) deep EDM 
notch is classified as a crack (or corrosion) indication and is cause for rejection. 
NOTE: It is highly recommended to establish the CLEAN (i.e., new hole without defect) 
hole signal under the existing setup of the calibrated Eddy Current inspection 
equipment, and any hole with distinct vertical signal or corrosion related “noise” 
signal (that is not attributed to edges, ferrous contamination or poor fastener hole 
condition) above the CLEAN hole signal level should be rejected. This will 
capture/rectify cracks or corrosion less than 0.020” long/deep. The CLEAN hole 
signal level can be established from a newly drilled/ream hole with the equivalent 
hole diameter on a multiple-layer-sheet block simulating the actual structural 
material and hole size being inspected, taking into account the edge surface effect. 
(2) If a crack is detected, determine its length and location with Eddy Current surface scan in 
accordance with Appendix A Section II, and/or estimate the crack length using the vertical 
signal level of the BHEC rotating probe (smaller cracks in fastener holes) compared against 
the response from the 0.040−inch (1.02−mm) deep EDM notch.  
(3) Using the Inspection Reply Form provided, record the results, taking note of the type and 
location of any damage indication. Submit all your findings to Viking Technical Support. 
NOTE: A photographic record of the damage attached to the Inspection Reply Form is 
highly recommended.

### Page 24

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A8 of A14 
II. Eddy Current Surface Scan (ECSS) Inspection Technique 
NOTE: The ECSS is for general inspection of surface cracks and estimation of surface crack 
length. 
1. Equipment and Materials: 
Table A2. Equipment and Materials - Eddy Current Surface Scan (ECSS) Inspection 
DESCRIPTION PART NO./  SPECIFICATION UNITS PER ASSEMBLY ITEM  NO. 
Eddy Current Instrument, 
Impedance-Plane Type 
Hocking Phasec 2200 
or equivalent 
1 − 
Coaxial cable, BNC to 
Microdot 
Commercial 1 − 
Calibration Reference 
Standard made from 
aluminum alloy (29−32% 
IACS) containing 0.008 in. 
(0.20 mm), 0.020 in. 
(0.51 mm), and a 0.040 
in. (1.02 mm) deep 
electrical discharge 
machined (EDM) notches. 
AL29−32 (refer to Figure A5) 
or equivalent 
 
1 − 
45° Surface probe, 50 kHz to 
500 kHz frequency, Fe/NFe, 
absolute, shielded, 0.125−in. 
(3.175−mm) diameter, 6.0−in. 
(152.4−mm) length, 0.500−in. 
(12.7 mm) drop. 
Techna NDT 
PEN45−6  
or equivalent 
1 − 
Non−Conductive Tape Commercial AR − 
Ruler or straight edge 
(non−conductive) 
Commercial 1 − 
Circle Template 
(non−conductive) 
Commercial 1 − 
NOTE: If equivalent equipment is used, it must satisfy the requirement of the task and 
resolve the reference notches in the calibration reference standard at the required 
level of resolution and sensitivity.

### Page 25 (OCR)

ALERT SERVICE BULLETIN V3/0011
Calibration Data
Instrument Settings  Screen Display
Mode  ABS, Ch 1  SIGNAL FROM 0.040 in (1,02 mm)
EDGE SIGNAL
EDM NOTCH
Display
View  Ch 1
100%
Ch 1 Frequency  500 kHz
Ch 1 Phase  301.0°
Ch 1 Gain  46 dB  80%
Ch 1 X:Y  X - 8 dB  FSH
Hi - Pass  DC
Lo - Pass  200 Hz
Balance Load  47 gH  0%
X - Pos  40
Y - Pos  -40  LIFT-OFF SIGNAL  BALANCE POINT
CALIBRATION DATA
FIGURE A4
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page A9 of A14

### Page 26 (OCR)

ALERT SERVICE BULLETIN V3/0011
0.005 in. + 0.000/-0.002 in.
(0,127 mm + 0,000/-0,051 mm)
WIDE × 1.50 in. (38,10 mm)
LONG EDM NOTCH
(TYPICAL)
1.00 in.  (2,54 cm)
3758 cm  0.75 in.  (19,05 mm)
0.75 in.  (19,05 mm)
.008
28-68 7V  .O2U
04Ừ  0.02 in.  DEPTH  (0,51 mm)  DEPTH  0.008 in.  (0,20 mm)
1,02 mm)  DEPTH  0.04 in.
16:25 mm)
CALIBRATION REFERENCE STANDARD AL29-32
FIGURE A5
26-November-2019  A.S.B. V3/0011
Revision 'NC'  Page A10 of A14

### Page 27

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A11 of A14 
 
 
 
 
 
NOTE: Circular scan with draftsman’s circle template is not required to determine surface crack size. 
 
 
 
 
TYPICAL CIRCULAR SCAN PATH AND PROBE POSITION  
FIGURE A6

### Page 28

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A12 of A14 
2. Preparation and Cleaning 
The surface to be inspected with ECSS shall be cleaned to remove dirt, sealant, flaking paint or 
other conditions that may interfere with the inspection. 
3. Calibrate the Equipment (Refer to Figure A4, Figure A5, and Figure A6) 
(1) Connect the probe with the coaxial cable to the eddy current instrument. 
(2) Turn the instrument [ON]. Adjust and set the instrument controls, as shown in Figure A4 
Calibration Data, Instrument Settings. 
(3) Put the probe (coil) tip perpendicular to the surface of AL29−32 Calibration Reference 
Standard (CRS) away from the edges and the EDM notches. Refer to Figure A5. 
(4) Balance the eddy current instrument. Adjust the instrument [PHASE] control to obtain a 
horizontal lift−off signal moving from RHS−to−LHS (with increasing lift−off) across the 
screen display. RHS stands for Right Hand Side, and LHS stands for Left Hand Side. 
(5) Move the probe (coil) tip across the 0.040−inch (1.02−mm) deep EDM notch and adjust the 
instrument sensitivity [GAIN] to obtain an amplitude signal, as shown in Figure A4. 
(6) Differentiate between the EDM notch and the edge signals by moving the probe over the 
edge of the reference standard. The signal obtained from the edge shall slant−off towards 
the upper LHS quadrant, as shown in Figure A4. 
(7) If the inspection area is painted, carry out the lift−off compensation prior to inspection, as 
follows: 
(a) Put the probe (coil) tip perpendicular to the inspection surface. Do not balance the 
instrument. 
(b) Compare the screen displays between the operating point on the inspection surface and 
the balance point on the CRS. 
(c) If the operating point on the inspection surface matches the balance point on the CRS, 
no compensation for paint thickness is required. 
(d) If the operating point on the inspection area does not match the balance point on the 
CRS, but has moved to the LHS, compensation for the paint thickness is required. Do as 
follows: 
• Slide the probe (coil) tip across the 0.040−inch (1.02−mm) deep EDM notch covered 
with tape on the CRS. 
• Adjust the [GAIN] to obtain an eddy current amplitude signal from the 0.040−inch 
(1.02−mm) deep EDM notch, as shown in Figure A4. 
4. Perform the ECSS Inspection 
(1) Place the probe (coil) tip on the inspection surface, adjacent to the fastener hole/head to be 
inspected. Refer to Figure A6. 
(2) Rebalance the instrument. If necessary, adjust instrument [PHASE] control to obtain a 
horizontal lift−off signal moving from RHS−to−LHS across the screen display. Make a 
circular scan around a fastener head (or around an open hole within a suitable draftsman’s 
circle template). 
(3) To determine a surface crack length, make a scan perpendicular (90°) to crack orientation in 
a zig-zag pattern moving away from crack initiating point (e.g., hole bore edge) to the crack 
termination point, to determine the crack tips. Mark the crack tips with a thin Sharpie pen, 
then, measure and record the crack location, orientation and length.

### Page 29

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A13 of A14 
NOTE: It is highly recommended to establish the CLEAN (i.e., away from the EDM notch 
area on the calibration standard) surface scan response under the existing setup of 
the calibrated equipment, and any distinct response (that is not attributed to edges 
effect, abrupt change in geometry, localized variation in conductivity, permeability 
or other non−relevant factors) above the CLEAN surface response should be 
considered as the continuation of the crack while identifying the crack tip.  
(4) Repeat this technique on each and every identified inspection location. 
5. Evaluation of Indications 
(1) Any distinct vertical deflection signal that occurs over a short scan distance (one probe tip 
diameter) is considered a suspect indication and is cause for further investigation. 
(2) Make sure the indication is not caused by edge effect, abrupt change in geometry, localized 
variation in conductivity, permeability or other non−relevant factors. 
(3) Evaluate all suspect crack indications by comparing their phase angle, amplitude and shape 
to the calibration standard EDM notch signal. 
6. Acceptance and Rejection Criteria 
(1) Refer to NOTE below. Any distinct vertical signal that is not attributed to edge effect which is 
near (or equal to or greater than) 50% of the response from the 0.040−inch (1.02−mm) deep 
EDM notch as shown in Figure A4 is classified as a crack indication and is cause for 
rejection. 
NOTE: It is highly recommended to establish the CLEAN surface scan response (i.e., away 
from the EDM notch area on the calibration standard) under the existing setup of 
the calibrated equipment, and any inspected surface with distinct response or 
corrosion related “noise” response (that is not attributed to edges effect, abrupt 
change in geometry, localized variation in conductivity, permeability or other 
non−relevant factors) above the CLEAN surface response should be rejected. This 
will capture and rectify cracks or corrosion less than 0.020” long/deep. 
(2) Using the Inspection Reply Form provided, record the results, taking note of the type and 
location of any damage indication. Submit all your findings to Viking Technical Support. 
NOTE: A photographic record of the damage attached to the Inspection Reply Form is 
highly recommended.

### Page 30

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page A14 of A14 
 
THIS PAGE INTENTIONALLY LEFT BLANK

### Page 31

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B1 of B6 
Appendix B.  
 
Florescent Dye Penetrant (FDP) Inspection Technique

### Page 32

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B2 of B6 
I. Florescent Dye Penetrant (FDP) Inspection Technique 
1. Equipment and Materials: 
Table B1. Equipment and Materials – Florescent Dye Penetrant (FDP) Inspection 
DESCRIPTION PART NO./  SPECIFICATION UNITS PER ASSEMBLY ITEM NO. 
Inspection lamp, black light, 
minimum power rating 100 watts, 
intensity of 1200 microwatts per cm2 
at 15 inches (38.1 cm) 
MAGNAFLUX 
MODEL ZB-24A,  
PN 513721, or 
equivalent 
− − 
Light meter, black light intensity Ultra Violet Products 
Inc. Model J-221, or 
equivalent 
− − 
Light meter, white light intensity Suitable for testing 
ambient white light 
intensity 
− − 
Cellulose sponge or nylon brush Commercial AR − 
Cloths, clean, lint-free Commercial AR − 
Fluorescent dye penetrant, Method 
C, Type I, sensitivity level 3 or 
greater. 
AMS 2644,  
MIL-I-25135 
AR − 
Developer, Form d, nonaqueous QPL AMS 2644 AR − 
Solvent remover, non-halogenated, 
Class 2 
QPL AMS 2644 AR − 
Paint remover, stripper TURCO 5351, 
(BONDERITE S-ST 
5351 AERO), or 
equivalent 
AR − 
Solvent, general cleaning Diestone DS 108, 
Diestone DLS, 
Diestone HFP, 
ASTM-D740 (MEK), 
or equivalent 
AR − 
Tape, masking, lead or plastic Commercial AR − 
NOTE 1: Make sure that any equivalent source of light gives a wavelength of 320 to 380 
nanometers (near ultraviolet) and that the largest part of the radiation is near 365 
nanometers. 
NOTE 2: All the material used to do a specified inspection such as developer, fluorescent 
dye and penetrant solvent must be compatible and come from the same 
manufacturer.

### Page 33

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B3 of B6 
2. Preparation and Cleaning 
(1) Apply masking materials circumferentially around the bushing holes. 
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR 
WHEN HANDLING SOLVENTS, SEALING COMPOUNDS, OR 
ADHESIVES. CONTACT WITH SOLVENTS, SEALING COMPOUNDS, OR 
ADHESIVES AND THEIR VAPOURS MAY CAUSE IRRITATION TO THE 
SKIN, THE EYES, AND THE LUNGS. FAILURE TO WEAR PROPER 
PROTECTION MAY CAUSE INJURIES, SERIOUS ILLNESS, OR DEATH 
TO PERSONNEL. OBEY ALL LOCAL HEALTH AND SAFETY 
PRECAUTIONS AND REGULATIONS CONCERNING STORAGE, USE, 
AND DISPOSAL. 
(2) Apply paint remover, by brush application, to the inspection areas. When the paint begins to 
show signs of wrinkling, scrub the surfaces vigorously with a nylon brush saturated with 
paint remover, until the surface finish is thoroughly loosened. 
(3) Remove the loose paint with water dampened cloths. If necessary, repeat Step (2) until the 
existing finish is completely removed. Ensure that all traces of the slurry are removed from 
any crevices. 
(4) Thoroughly wash the part with 160°F (70°C) hot water, then allow it to dry completely. 
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR 
WHEN HANDLING METHYL ETHYL KETONE. CONTACT WITH SOLVENT 
(SUCH AS DIESTONE DS 108, DIESTONE DLS, DIESTONE HFP OR 
METHYL ETHYL KETONE) MAY CAUSE IRRITATION TO THE SKIN, THE 
EYES, AND THE LUNGS. FAILURE TO WEAR PROPER PROTECTION 
MAY CAUSE INJURIES, SERIOUS ILLNESS, OR DEATH TO 
PERSONNEL. OBEY ALL LOCAL HEALTH AND SAFETY PRECAUTIONS 
AND REGULATIONS CONCERNING STORAGE, USE, AND DISPOSAL. 
(5) Remove the masking tape and clean the inspection areas with clean, lint-free cloths 
dampened with general cleaning solvent (Diestone DS 108, Diestone DLS, Diestone HFP, 
methyl ethyl ketone or equivalent). Wipe away any remaining solvent with a clean dry cloth. 
(6) Perform a final cleaning of the inspection areas with solvent remover (AMS 2644 Class 2) 
per manufacturer instructions for use. Allow the surfaces to completely dry for a minimum of 
5 minutes prior to applying liquid penetrant. 
3. Penetrant Application 
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR WHEN 
HANDLING FLUORESCENT DYE, DEVELOPER, OR SOLVENT REMOVING 
FLUIDS. CONTACT WITH FLUORESCENT DYE, DEVELOPER, OR SOLVENT 
REMOVING FLUIDS MAY CAUSE IRRITATION TO THE SKIN, THE EYES, 
AND THE LUNGS. FAILURE TO WEAR PROPER PROTECTION MAY CAUSE 
INJURIES, SERIOUS ILLNESS, OR DEATH TO PERSONNEL. OBEY ALL 
LOCAL HEALTH AND SAFETY PRECAUTIONS AND REGULATIONS 
CONCERNING STORAGE, USE, AND DISPOSAL. 
(1) Spray or brush the fluorescent dye penetrant solution evenly over the inspection area. Allow 
the penetrant solution to dwell on the inspection area for 30 to 35 minutes.

### Page 34

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B4 of B6 
(2) After the fluorescent penetrant application, confirm full coverage by viewing the surface with 
a black light under the proper lighting conditions. 
(3) During the dwell time, do not allow the penetrant solution to dry on the inspection surface. 
Reapply fresh solution as required to keep the surface wet. 
4. Removal of Excess Penetrant 
(1) Using a clean, dry, lint-free cloth, remove excess penetrant from the inspection surface.  
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR 
WHEN HANDLING FLUORESCENT DYE, DEVELOPER, OR SOLVENT 
REMOVING FLUIDS. CONTACT WITH FLUORESCENT DYE, 
DEVELOPER, OR SOLVENT REMOVING FLUIDS MAY CAUSE 
IRRITATION TO THE SKIN, THE EYES, AND THE LUNGS. FAILURE TO 
WEAR PROPER PROTECTION MAY CAUSE INJURIES, SERIOUS 
ILLNESS, OR DEATH TO PERSONNEL. OBEY ALL LOCAL HEALTH AND 
SAFETY PRECAUTIONS AND REGULATIONS CONCERNING STORAGE, 
USE, AND DISPOSAL. 
CAUTION: OVER−REMOVAL OF THE SURFACE PENETRANT SHALL REQUIRE 
THAT THE COMPONENT BE CLEANED AND REPROCESSED. A GOOD 
INDICATOR OF OVER−WASH OR OVER−REMOVAL OF THE SURFACE 
PENETRANT IS EVIDENCED BY A TOTAL LACK OF RESIDUE THAT 
MAY OCCUR ON ALL OR SPECIFIC AREAS OF THE PART WHEN 
INSPECTED UNDER BLACK LIGHT. 
(2) Using a clean cloth dampened with solvent penetrant remover, remove the excess penetrant 
from the inspection surface. 
NOTE: Do not saturate the cloths with solvent as this may overwash potential indications 
by removing all of the penetrant. 
(3) Using a black light inspection lamp, verify that the excess fluorescent dye penetrant is 
removed from the inspection surface. Repeat Step 4.(2) if necessary. 
5. Developer Application 
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR WHEN 
HANDLING FLUORESCENT DYE, DEVELOPER, OR SOLVENT REMOVING 
FLUIDS. CONTACT WITH FLUORESCENT DYE, DEVELOPER, OR SOLVENT 
REMOVING FLUIDS MAY CAUSE IRRITATION TO THE SKIN, THE EYES, 
AND THE LUNGS. FAILURE TO WEAR PROPER PROTECTION MAY CAUSE 
INJURIES, SERIOUS ILLNESS, OR DEATH TO PERSONNEL. OBEY ALL 
LOCAL HEALTH AND SAFETY PRECAUTIONS AND REGULATIONS 
CONCERNING STORAGE, USE, AND DISPOSAL. 
(1) Spray a thin uniform coat of well agitated developer on to the inspection surface. Allow the 
developer to dwell on the inspection surface for a minimum of 10 minutes and a maximum of 
60 minutes. 
6. Inspection 
(1) The black light inspection lamp shall provide a minimum of 1200 microwatts/cm2 at no 
closer that 15 inches (38.1 centimetres) from inspection surface and positioned to provide a 
clear field of view for the inspection of the fittings.

### Page 35

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B5 of B6 
(2) The maximum ambient white light must not exceed 2 foot candles (20 lux) at the inspection 
surface including those emitted by the black light lamp. 
(3) If during the inspection the developer exhibits excessive background fluorescence due to 
poor removal of the penetrant solution, the part must be reprocessed. 
NOTE: Cracks may appear as lines or a linear set of small points. 
7. Acceptance/Rejection Criteria 
(1) Any crack indication on the part is cause for rejection. 
8. Post Inspection Cleaning and Refinishing 
WARNING: WEAR RUBBER GLOVES, EYE PROTECTION, AND A RESPIRATOR WHEN 
HANDLING SOLVENT (SUCH AS DIESTONE DS 108, DIESTONE DLS, 
DIESTONE HFP, OR METHYL ETHYL KETONE). CONTACT WITH SOLVENT 
MAY CAUSE IRRITATION TO THE SKIN, THE EYES, AND THE LUNGS. 
FAILURE TO WEAR PROPER PROTECTION MAY CAUSE INJURIES, 
SERIOUS ILLNESS, OR DEATH TO PERSONNEL. OBEY ALL LOCAL 
HEALTH AND SAFETY PRECAUTIONS AND REGULATIONS CONCERNING 
STORAGE, USE, AND DISPOSAL. 
(1) Within four hours of applying the developer, clean the inspection area using a clean cloth 
dampened with cleaning solvent (Diestone DS 108, Diestone DLS, Diestone HFP, methyl 
ethyl ketone or equivalent). Wipe away any remaining solvent with a clean dry cloth. 
(2) Inspect the area using a black light lamp and verify the complete removal of penetrant 
residue. Repeat Step 8.(1) as required.

### Page 36

ALERT SERVICE BULLETIN V3/0011 
 
26-November-2019  A.S.B. V3/0011 
Revision ‘NC’  Page B6 of B6 
 
THIS PAGE INTENTIONALLY LEFT BLANK

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
