# STC SR02740NY

- Type: Supplemental type certificate
- Status: Current, Reissued
- Holder: Dart Aerospace Limited, Canada
- Description: The installation of Roof Hardpoint Installation, Step and Cargo Deployment Arm
- Applied: June 22, 2009
- Status date: October 18, 2019
- Product: Aircraft, Rotorcraft
- Certification basis: Part 21
- Data sheets: [TCDS H1SW](https://openairdocs.org/tcds/H1SW), [TCDS H4SW](https://openairdocs.org/tcds/H4SW)
- Certificate PDF: https://openairdocs.org/files/sha256/02/65/026535511767915ef250390c62ee54f7709598fb11c7aa12307257dc1bc20f8c
- Approved model list and other attachments: [SR02740NY_AML.pdf](https://openairdocs.org/files/sha256/aa/de/aade17a9440611bd4a38a895d17a0e83f583ef03672dd5faeead0c1d42dde2db)
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/7BF1E849228ACA15862585BC0063D83C.0001
- DRS record last changed: December 6, 2025
- Page: https://openairdocs.org/stc/SR02740NY

## ADs that name it (0)

None.

## Approved models (4)

- Bell Textron Inc. 205A-1 ([TCDS H1SW](https://openairdocs.org/tcds/H1SW))
- Bell Textron Inc. 205B ([TCDS H1SW](https://openairdocs.org/tcds/H1SW))
- Bell Textron Inc. 212 ([TCDS H4SW](https://openairdocs.org/tcds/H4SW))
- Bell Textron Inc. 412 ([TCDS H4SW](https://openairdocs.org/tcds/H4SW))

## What the certificate says

Read from the PDF's text layer, without the form's printed wording; the layout is lost and the order can differ. The PDF is the record.

FAA Form 8110-2 (5/14) Page 1 of

Part of the

Signature

Title SR02740NY Dart Aerospace Ltd.

1270 Aberdeen Street Hawkesbury, Ontario Canada K6A 1K7 Civil Air / Federal Aviation Regulations.

1. The installation of Roof Hardpoint Installation, Step and Cargo Deployment Arm to be done in accordance with AERO Design Ltd. Document Control Lists as listed on AML SR02740NY.

1. Operation must be in accordance with Aircraft Flight Manual Supplement, as listed on AML SR02740NY.

2. Instructions for Continued Airworthiness described in AERO Design Ltd. Instructions for Continued Airworthiness ICA

808.90-FAA, Rev. 0, dated November 25, 2009, Transport Canada accepted on June 9, 2008, or later Transport Canada accepted revisions are required for this installation.

3. The installer must determine whether this design change is compatible with previously approved modifications.

4. If the holder agrees to permit another person to use this certificate to alter a product, the holder must give the other person written evidence of that permission.

Anthony E. Gallo Acting Manager New York ACO Branch * * October 18, 2019 June 22, 2009 January 6, 2010 IMPORT *See attached FAA Approved Model List (AML) No. SR02740NY for the list of approved aircraft models and applicable airworthiness regulations.

FAA Form 8110-2 (5/14) Page 2 of

To (Name and address of transferee)

From (Name and address of grantor)

2 SR02740NY

### SR02740NY_AML.pdf

**FAA APPROVED MODEL LIST (AML) NO. SR02740NY**

**INSTALLATION OF ROOF HARDPOINT INSTALLATION, STEP AND CARGO DEPLOYMENT ARM**

Original Issue Date: January 6, 2010 Date Reissued: October 18, 2019

**MAKE MODEL CERTIFICATION BASIS REQUIRED DOCUMENTATION**

AML

**AMENDMENT DATE**

**PART REGULATION TCDS DOCUMENT CONTROL LIST FLIGHT MANUAL**

**SUPPLEMENT**

Bell 205A-1, 205B CAR 7

Civil Aviation H1SW For Configuration A-Roof Hardpoint Installation Only: Aero Design Ltd.

Document Control List DCL808A-1-FAA Revision 0, dated 25 November 2009, Transport Canada Approved 15 December 2009, or later Transport Canada approved revisions.

For Configuration B- Roof Hardpoint Installation with Cargo Deployment Arm: Aero Design Ltd. Document Control List DCL808B-1-FAA, Revision 0, dated 25 November 2009, Transport Canada Approved 15 December 2009, or later Transport Canada approved revisions.

Optional Equipment Installation to Configuration A and B: Installation of Step is to be completed in accordance with Document Control List DCL808C-1- FAA, Revision 0, dated 25 November 2009, Transport Canada Approved 15 December 2009, or later Transport Canada approved revisions.

For Configuration A-Roof Hardpoint Installation Only: AERO Design Ltd.

Flight Manual Supplement FMS808A.90-FAA Revision 0, dated 2 December 2009, Transport Canada Approved 4 December 2009 or later Transport Canada approved revisions.

For Configuration B-Roof Hardpoint Installation with Cargo Deployment Arm:

AERO Design Ltd. Flight Manual Supplement FMS808A.90-FAA Revision 2 dated 30 December 2008, Transport Canada Approved 22 January 2009 and AERO Design Ltd. Flight Manual Supplement FMS792.90 Revision 2 dated 30 December 2008, Transport Canada Approved 22 January 2009 or later Transport Canada approved revisions.

212, 412 FAR 29 Federal Aviation H4SW

FAA Approved: ___________________________________ Anthony E. Gallo Acting Manager, New York ACO Branch (AIR-7H0) Compliance & Airworthiness Division Aircraft Certification Service (AIR), AVS/FAA

## Every issue (1)

- October 18, 2019: Reissued, Current. [certificate](https://openairdocs.org/files/sha256/02/65/026535511767915ef250390c62ee54f7709598fb11c7aa12307257dc1bc20f8c), [SR02740NY_AML.pdf](https://openairdocs.org/files/sha256/aa/de/aade17a9440611bd4a38a895d17a0e83f583ef03672dd5faeead0c1d42dde2db)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
