# STC ST00193IB

- Type: Supplemental type certificate
- Status: Current, Amended
- Holder: Avmax Aviation Services Inc., Canada
- Description: Installation of the Universal Avionics Kapture CVR
- Applied: January 30, 2024
- Status date: February 18, 2025
- Product: Aircraft, Large Airplane
- Certification basis: Part 25
- Foreign approvals: TCCA SA22-29
- Data sheets: [TCDS A13NM](https://openairdocs.org/tcds/A13NM), [TCDS A16WE](https://openairdocs.org/tcds/A16WE)
- Certificate PDF: https://openairdocs.org/files/sha256/01/9d/019d6ecddbb8d50e3237d7ba290f93b4ef25b1561a9c69105071c483b6a8ab98
- Approved model list and other attachments: [ST00193IB_AML.pdf](https://openairdocs.org/files/sha256/64/c3/64c3b8b4944b76884dc066e337d1d5830019a9a202b22c47a757af6b1665a39a)
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/DRSDOCID153829229720250221151047.0001
- DRS record last changed: December 6, 2025
- Page: https://openairdocs.org/stc/ST00193IB

## ADs that name it (0)

None.

## Approved models (7)

- De Havilland Aircraft of Canada Limited DHC-8-100 Series ([TCDS A13NM](https://openairdocs.org/tcds/A13NM))
- De Havilland Aircraft of Canada Limited DHC-8-200 Series ([TCDS A13NM](https://openairdocs.org/tcds/A13NM))
- De Havilland Aircraft of Canada Limited DHC-8-300 Series ([TCDS A13NM](https://openairdocs.org/tcds/A13NM))
- The Boeing Company 737-300 Series ([TCDS A16WE](https://openairdocs.org/tcds/A16WE))
- The Boeing Company 737-400 Series ([TCDS A16WE](https://openairdocs.org/tcds/A16WE))
- The Boeing Company 737-500 Series ([TCDS A16WE](https://openairdocs.org/tcds/A16WE))
- The Boeing Company 737-800 Series ([TCDS A16WE](https://openairdocs.org/tcds/A16WE))

## What the certificate says

Read from the PDF's text layer, without the form's printed wording; the layout is lost and the order can differ. The PDF is the record.

IMPORT ST00193IB Avmax Aviation Services Inc.

4404-14th Street Northeast Calgary, Alberta Canada T2E 6T7 Part 25 Title 14 Code of Federal Regulations *See attached FAA Approved Model List (AML) No. ST00193IB for a list of approved models and applicable airworthiness regulations.

*See attached FAA AML No. ST00193IB *See attached FAA AML No. ST00193IB

1. The installer must determine whether this design change is compatible with previously approved modifications.

(See Limitations and Conditions Continued on Page 3 of 3) 01/30/2024 04/22/2024 02/18/2025 John Yoo Manager, International Validation Branch Compliance & Airworthiness Division Aircraft Certification Service 3

1. Installation of the Universal Avionics Kapture CVR must be in accordance with Avmax Aviation Services Inc. documents as shown on the attached FAA AML No. ST00193IB.

2. Operation of the Universal Avionics Kapture CVR must be in accordance with Avmax Aviation Services Inc. documents as shown on the attached FAA AML No. ST00193IB.

(See Description of Type Design Change Continued on Page 3 of 3)

Description of Type Design Change (continued):

3. Maintenance of the Universal Avionics Kapture CVR must be in accordance with Avmax Aviation Services Inc. documents as shown on the attached FAA AML No.

ST00193IB.

2. If the holder agrees to permit another person to use this certificate to alter a product, the holder must give the other person written evidence of that permission.

3. This STC is applicable to all serial numbers for these Makes, Models, and Series as shown on the attached FAA AML No. ST00193IB.

4. A copy of this certificate and the FAA AML No. ST00193IB, issued February 18, 2025, must be maintained as part of the permanent records for the modified aircraft.

Note: This STC does not require a revised Electrical Wiring Interconnection System (EWIS) Instructions for Continued Airworthiness (ICA).

----------END---------- 3 3 Add Page

### ST00193IB_AML.pdf

Page 1 of 1

FAA APPROVED MODEL LIST (AML) No. ST00193IB AVMAX AVIATION SERVICES INC.

For INSTALLATION of UNIVERSAL KAPTURE CVR with RIPS Issue Date: February 18, 2025 Date Amended:

**ITEM MAKE MODEL CERT BASIS**

**TCDS REQUIRED DOCUMENTATION INITIAL**

**APPROVAL DATE AMEND**

**DATE MASTER DATA LIST**

**INSTRUCTIONS**

**FOR CONTINUED**

**AIRWORTHINESS**

**FLIGHT MANUAL**

**SUPPLEMENT**

1.

The Boeing Company 737-300 Series 737-400 Series 737-500 Series 737-800 Series * A16WE Avmax Aviation Services Inc. Master Data List CE504-000 Issue B, dated July 14, 2024, Transport Canada Civil Aviation (TCCA) approved July 14, 2024, or later TCCA approved revision.

Avmax Aviation Services Inc.

Instructions for Continued Airworthiness CE504-700-01 Issue A, dated July 4, 2024, or later TCCA accepted revision.

Avmax Aviation Services Inc.

Flight Manual Supplement CE504-800- 01 Issue B, dated June 17, 2024, or later TCCA approved revision.

February 18, 2025

2.

De Havilland Aircraft of Canada Limited DHC-8-100 Series DHC-8-200 Series DHC-8-300 Series * A13NM Avmax Aviation Services Inc.

Instructions for Continued Airworthiness CE504-701 Issue E, dated March 3, 2023, or later TCCA accepted revision.

Avmax Aviation Services Inc.

Flight Manual Supplement CE504-801 Issue A, dated June 15, 2022, or later TCCA approved revision.

April 22, 2024

* Certification Basis:

Based on 14 CFR §§ 21.115 and 21.101, and the FAA policy for design changes that are identified as not significant in FAA Order 8110.48, the certification basis for this Modification are as follows:

a. The type certification basis for all makes and models as shown on the applicable TCDS for parts not changed or not affected by the change.

b. The type certification basis for all makes and models as shown on the applicable TCDS for parts changed or affected by the change with the following exceptions as amended through Amendment 25-113 plus:

14 CFR § 25.1317 at amendment 25-122 14 CFR § 25.1423 at amendment 25-115 14 CFR § 25.1457 at amendment 25-124 14 CFR § H25.5 at amendment 25-146 14 CFR § 26.11 at amendment 26-7

FAA Approved:

John Yoo Manager, International Validation Branch (AIR-730) Compliance & Airworthiness Division Aircraft Certification Service (AIR)

## Every issue (2)

- February 18, 2025: Amended, Current. [certificate](https://openairdocs.org/files/sha256/01/9d/019d6ecddbb8d50e3237d7ba290f93b4ef25b1561a9c69105071c483b6a8ab98), [ST00193IB_AML.pdf](https://openairdocs.org/files/sha256/64/c3/64c3b8b4944b76884dc066e337d1d5830019a9a202b22c47a757af6b1665a39a)
- April 22, 2024: Issued, Historical. [certificate](https://openairdocs.org/files/sha256/de/3b/de3b131eed0aad90ec1a292fbf87c7bf988d47a75588e51cd0927f6ad4b6f038)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
