# STC ST11853IB

- Type: Supplemental type certificate
- Status: Current, Issued
- Holder: Boeing Ireland Limited
- Description: Antenna Removal must be in accordance with Boeing Ireland Limited Change / Repair Approval Number
BIL-00243-APP, Revision 00, dated September 16, 2024, or later EASA approved revisions. This change
deactivates and removes a Global Communications Suite (GCS) system installed by FAA Supplemental
Type Certificate (STC) ST02908NY (EASA STC 10059775).
- Status date: December 2, 2024
- Data sheets: A16WE
- Certificate PDF: https://openairdocs.org/files/sha256/60/0e/600ecd8ed3a9990dd9b6b39a8e47d600e6ce3f14db60bb174add0a9b65eb385d
- FAA DRS: https://drs.faa.gov/browse/excelExternalWindow/DRSDOCID135726787620241204165314.0001
- Page: https://openairdocs.org/stc/ST11853IB

## ADs that name it

None.

## Approved models (1)

- The Boeing Company 737-800 Series (TCDS A16WE)

## What the certificate says

Read from the PDF's text layer, without the form's printed wording; the layout is lost and the order can differ. The PDF is the record.

**IMPORT ST11853IB**

**BOEING IRELAND LIMITED LEVEL 3 EAST, CLOGHRAN HOUSE**

**DUBLIN AIRPORT**

DUBLIN AIRPORT K67 F3X2 IRELAND Part 25 Title 14 Code of Federal Regulations A16WE 737-800 Series The Boeing Company

1. Antenna Removal must be in accordance with Boeing Ireland Limited Change / Repair Approval Number BIL-00243-APP, Revision 00, dated September 16, 2024, or later EASA approved revisions. This change deactivates and removes a Global Communications Suite (GCS) system installed by FAA Supplemental Type Certificate (STC) ST02908NY (EASA STC 10059775).

(See Description of Type Design Change Continued on Page 3 of 3)

1. The installer must determine whether this design change is compatible with previously approved modifications.

(See Limitations and Conditions Continued on Page 3 of 3) October 25, 2024 December 2, 2024 John Yoo Manager, International Validation Branch Compliance & Airworthiness Division Aircraft Certification Service 3

**IMPORT ST11853IB 3**

IMPORT ST11853IB Date of Issuance: December 2, 2024

Description of Type Design Change (continued):

2. Maintenance must be in accordance with Boeing Ireland Limited Instructions for Continued Airworthiness (ICA) Number BIL-00243-ICA01, Revision 02, dated September 11, 2024, or later EASA accepted revisions.

2. Maintenance must be in accordance with Boeing Ireland Limited Airworthiness Limitations (AWL) Supplement Number BIL-00243-AWL01, Revision 01, dated May 23, 2024, and Maintenance Planning Document (MPD) Supplement Number BIL-00243-MPD01, Revision 01, dated May 23, 2024, or later EASA approved revisions.

3. Supplemental structural inspections are established for this change, refer to MPD and AWL referenced under the Limitations and Conditions section of this STC for further information.

4. This STC is applicable to serial numbers as listed in Boeing Ireland Limited Change / Repair Approval referenced in the Description of Type Design Change of this STC.

5. If the holder agrees to permit another person to use the certificate to alter the product, the holder shall give the other person written evidence of that permission.

----------END----------

## Every issue (1)

- December 2, 2024: Issued, Current. [certificate](https://openairdocs.org/files/sha256/60/0e/600ecd8ed3a9990dd9b6b39a8e47d600e6ce3f14db60bb174add0a9b65eb385d)

---
From OpenAirDocs.org, an independent open copy of FAA data. Only the Federal Register edition on govinfo.gov is the official legal text of an AD.
