FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON Page of Page
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE - GENERAL
PREFACE PAGE FOR AIRCRAFT ON PRORATED TIME The aircraft listed hereon, including powerplants, propellers, and appliances which have prorated times, shall be overhauled in accordance with the respective limits as set forth in:
Proration Document No. __________ Dated ________ This document is applicable to: Aircraft N ____ - Serial No.
_____, its powerplants, propellers, and appliances until they are first overhauled. Thereafter, this document is cancelled and the aircraft will be inspected and overhauled in accordance with the _____ airlines maintenance program and the approved time limits.
Records maintained on the above aircraft shall show the actual and adjusted time since overhaul and, thereafter, such time in service shall be added thereto.
Effective date _____________________ ---------------------------------------------------------------- ---------------------------------------------------------------- * FIGURE 12. OPERATIONS SPECIFICATIONS - PREFACE PAGE FOR
AIRCRAFT USING PREVIOUS OPERATORS REMAINING PRORATED TIMES.
Form Approved.
UNITED STATES OF AMERICA OMB No. 04-R0075
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
WASHINGTON
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE - GENERAL
PREFACE PAGE FOR AIRCRAFT ON PRORATED TIME The aircraft listed hereon had the airframe overhaul times prorated when it was transferred from _____ Airlines with an FAA approved overhaul time of 16,000 for the airframe to _____ Airlines with an approved time of 12,000 hours. The aircraft is now operated by _____ Aviation who also has 12,000 hours airframe overhaul time. Therefore this aircraft is approved to use the remaining prorated time of _____ Airlines and shall be overhauled in accordance with the respective limits set forth in:
Proration Document No. _______________________________ Dated _____________________________ This document is applicable to: Aircraft N __________ - Serial No. _____, until its first overhaul. Thereafter, this document is cancelled and the aircraft will be inspected and overhauled in accordance with the __________ airlines maintenance program and the approved time limits.
Records maintained on the above aircraft shall show the actual and adjusted time since overhaul and, thereafter, such time in service shall be added thereto.
Effective date _________________________ ---------------------------------------------------------------- Appendix 2 ---------------------------------------------------------------- FIGURE 1. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- AVIONICS Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON PART D PAGE 1 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE
AVIONICS
Overhaul Inspection & Period ** Check Period ** Communications*. Chapter 23 Fixed Equipment - Wiring, plugs, filters, junction boxes, relays, resistors, capacitors, fuses, circuit breakers, transformers, antennas, transmission lines, switches, controls, mounts, etc.
H. F. Communication System V. H. F. Communication System Sel-Cal Decoder P. A. System Amplifier Interphone System Amplifier May be determined by assigned inspector ** Navigation*. Chapter 34 (Radio-Radar) Fixed Equipment - Wiring, plugs, filters, junction boxes, relays, resistors, capacitors, fuses, circuit breakers, transformers, antennas, transmission lines, switches, controls, mounts, etc.
L. F. Navigation System Receiver Loop Antenna V. H. F. Navigation System Receiver (VOR/LOC) Instrumentation Unit I. L. S. System G. S. Receiver Localizer Receiver Marker Receiver Loran System Weather Radar System Radar Altimeter System ATC Transponder Flight Director Computer/Amplifier Gyro May be determined by assigned inspector ** Effective date _____________________
PAGE 2 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE
AVIONICS NOTE * The term "System" means all those interdependent subassemblies, components, parts, etc., necessary for the proper functioning of the system as a whole. All the individual components of the system should be listed.
Effective date _____________________ ---------------------------------------------------------------- ---------------------------------------------------------------- FIGURE 2. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- DART 510/525 Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON PART D PAGE 1 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE
ENGINE MAKE - ROLLS ROYCE PROPELLER MAKE - DOWTY ROTOL ENGINE MODEL - DART 510 PROPELLER MODEL - R130/4-20-3/12E ENGINE MODEL - DART 525 PROPELLER MODEL - R170/4-20-4/33 Overhaul Inspection & Period Check Period Propellers, Chapter 61 Alternator - Sync. Propeller 2000 Controller Propeller 3500 Motor - Propeller Feathering 3500 Propeller Assembly 3500 Pump - Propeller Feathering 3500 Powerplant General, Chapter 71 Cowling OC Mount - Engine EO Engine, Chapter 72 Accessory Gearbox 3400 ACC Gearbox drive 1400 Engine - Basic 3000 *
Engine Fuel & Control, Chapter 73 Control Unit, Fuel Flow 4200 Indicator - Fuel Flow 7000 Pump - Engine Drive 3000 Transmitter - Fuel Flow 2800 Ignition System - Chapter 74 Box, Ignition EO Engine Indicating, Chapter 77 Generator DC 1400 Indicator - Tachometer 2400 Indicator - Torque Pressure 6000 Transmitter - Torque Pressure EO Exhaust System - Chapter 78 Exhaust Unit EO Oil System, Chapter 79 Transmitter - Oil Pressure 4000 Indicator - Oil Pressure 4000 * Sample one hot section inspection at 2000 hours, one engine overhaul at 2400 hours, and one engine overhaul at 2700 hours.
Effective date _____________________
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE
ENGINE MAKE - ROLLS ROYCE PROPELLER MAKE - DOWTY ROTOL ENGINE MODEL - DART 510 PROPELLER MODEL - R179/4-20-4/33 Overhaul Inspection & Period Check Period Water Injection - Chapter 82 Actuator ADI 2500 Pump ADI 1400 Switch, Pressure Warning EO Valve, Pressure Relief 3000 Effective date _____________________ ---------------------------------------------------------------- ----------------------------------------------------------------
FIGURE 3. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- DART 525 Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE
ENGINE MAKE - ROLLS ROYCE PROPELLER MAKE - DOWTY ROTOL ENGINE MODEL - DART 525 PROPELLER MODEL - R130/4-20-4/12E Overhaul Inspection & Period Check Period Propellers, Chapter 61 Alternator - Sync. Propeller 2000 Controller Propeller 3500 Motor, Propeller Feathering 3500 Propeller Assembly 3500 Pump - Propeller Feathering 3500 Power Plant General, Chapter 71 Cowling OC Mount, Engine EO Engine, Chapter 72 Engine, Basic 3000 * Engine Fuel & Control, Chapter 73 Control Unit, Fuel Flow 4200 Indicator, Fuel Flow 7000 Pump, Engine Driven 3000 Transmitter, Fuel Flow 2800 Ignition System, Chapter 74 Box, Ignition EO Engine Indicating, Chapter 77 Generator DC 1400 Indicator, Tachometer 2400 Indicator, Torque Pressure 6000 Transmitter, Torque Pressure EO Exhaust System, Chapter 78 Exhaust Unit EO Oil System, Chapter 79 Transmitter, Oil Pressure 4000 Indicator, Oil Pressure 4000
Starting, Chapter 80 Starter EO Water Injection, Chapter 82 Actuator ADI 2500 Pump ADI 1400 Valve, Pressure Relief EO * Sample one hot section inspection at 2000 hours, one engine overhaul at 2400 hours, and one engine overhaul at 2700 hours.
Effective date _____________________ ---------------------------------------------------------------- ---------------------------------------------------------------- FIGURE 4. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- PRATT & WHITNEY - R2000 SERIES Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON PART D PAGE 1 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE R2000 SERIES Overhaul Inspection & Period Check Period Propellers, Chapter 61 Motor, Propeller Feathering 3000 Propeller Assembly 3000 Propeller Governors 1500 Pump, Propeller Feathering 3000 Power Plant - General, Chapter 71 Actuator, Cowl Flap 3000 Cowling 1500 Mount, Engine 1500 Engine, Chapter 72 Engine, Basic 1500 Engine Fuel & Control, Chapter 73 Carburetor Assembly 3000 Indicator, Fuel Flow 4500 Indicator, Fuel Pressure 4500 Pump, Engine Driven 1500
Transmitter, Fuel Flow 4500 Transmitter, Fuel Pressure 4500 Warning Unit, Fuel Pressure 4500 Ignition, Chapter 74 Ignition Harness 1500 Spark Plugs OC Engine Indicating, Chapter 77 Indicator, BMEP 4500 Indicator, Carburetor Air Temperature 4500 Indicator, Cylinder Head Temperature 4500 Indication, Manifold Pressure 4500 Indicator, Tachometer 4500 Tachometer, Generator 3000 Exhaust, Chapter 78 Exhaust Manifold Assembly 1500 Effective date _____________________ PAGE 2 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE R2000 SERIES Overhaul Inspection & Period Check Period Oil, Chapter 79 Indicator, Oil Pressure 3900 Indicator, Oil Quantity 3900 Indicator, Oil Temperature 3900 Oil Tank (3 E/C) Regulator, Oil Cooler 1300 Transmitter, Oil Pressure 3900 Transmitter, Oil Quantity 3900 Transmitter, Torque Pressure 3900 Valve, Emergency Shutoff 3900 Warning Unit, Oil Pressure 3900 Starters, Chapter 80 Relay, Starter 3900 Starter 2600 NOTE: Components or subcomponents of power plants that have overhaul time limitations in multiples of the basic engine overhaul time limitation shall receive an appropriate
inspection, check or test at the basic engine overhaul period.
Effective date December 15, 1962 ---------------------------------------------------------------- ---------------------------------------------------------------- FIGURE 5. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- PRATT & WHITNEY - R2800 SERIES Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON PART D PAGE 1 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE R2800 SERIES Overhaul Inspection & Period Check Period Propellers, Chapter 61 Motor, Propeller Feathering 3000 Propeller Assembly 2500 Propeller Governors 1500 Pump, Propeller Feathering 3000 Power Plant - General, Chapter 71 Actuator, Cowl Flap 3000 Cowling 1500 Mount, Engine 1500 Engine, Chapter 72 Engine, Basic 1500 Engine Fuel & Control, Chapter 73 Carburetor Assembly 3000 Indicator, Fuel Pressure 4500 Pump, Engine Driven 1500 Transmitter, Fuel Pressure 4500 Warning Unit, Fuel Pressure 4500 Ignition, Chapter 74 Ignition Harness 1500 Spark Plugs 330 Engine Indicating, Chapter 77
Indicators, BMEP 4500 Indicators, Carburetor Air Temperature 4500 Indicators, Cylinder Head Temperature 4500 Indicators, Manifold Pressure 4500 Tachometer, Generator 3000 Exhaust, Chapter 78 Exhaust Manifold Assembly 1500 Effective date December 15, 1962 Page 2 of 2 Pages
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE R-2800 and R-2800 C-CA-CB SERIES Overhaul Inspection & Period Check Period Oil, Chapter 79 Indicator, Oil Pressure 4500 Indicator, Oil Quantity 4500 Indicator, Oil Temperature 4500 Oil Tank (3 E/C) Regulator, Oil Cooler 1700 Transmitter, Oil Pressure 4500 Transmitter, Oil Quantity 4500 Transmitter, Torque Pressure 4500 Valve, Emergency Shutoff 4500 Warning Unit, Oil Pressure 4500 Starters, Chapter 80 Relay, Starter 4500 Starter 1700 Water Injection, Chapter 82 Indicator, Water Pressure 4200 Indicator, Water Quantity 4200 Pump, Water Injection (ADI) 4200 Solenoid (4 E/C) Transmitter, Water Quantity 4200 Valve, Oil Pressure 4200 NOTE: Components or subcomponents of power plants that have overhaul time limitations in multiples of the basic engine overhaul time limitation shall receive an appropriate
inspection, check or test at the basic engine overhaul period.
Effective date _____________________ ---------------------------------------------------------------- ---------------------------------------------------------------- FIGURE 7. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- WRIGHT AERO - R1820 SERIES PRATT & WHITNEY R-1830 SERIES Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.
WASHINGTON PART D PAGE 1 of 2 PAGES
OPERATIONS SPECIFICATIONS
AIRCRAFT MAINTENANCE R-1820 and R-1830 SERIES Overhaul Inspection & Period Check Period Propellers, Chapter 61 Motor, Propeller Feathering 2600 Propeller Assembly 2600 Propeller Governors EO Pump Propeller Feathering 2600 Power Plant - General, Chapter 71 Actuator, Cowl Flap EO Cowling EO Mount, Engine EO Engine, Chapter 72 Engine, Basic 1300 Engine Fuel & Control, Chapter 73 Carburetor Assembly (2 EO) Indicators, Fuel Pressure 3600 Pump, Engine Driven EO Transmitter, Fuel Pressure 3600 Warning Unit, Fuel Pressure 3600 Ignition, Chapter 74 Ignition Harness EO Spark Plugs OC Vibrator EO
Engine Indicating, Chapter 77 Indicators, Carburetor Air Temperature 4800 Indicators, Cylinder Head Temperature 4800 Indicators, Manifold Pressure 4800 Tachometer, Generator 2600 Indicator, Tachometer Generator 4800 Exhaust, Chapter 78 Exhaust Manifold Assembly EO Oil, Chapter 79 Indicator, Oil Pressure 4800 Indicator, Oil Quantity 4800 Indicator, Oil Temperature 4800 Regulator, Oil Cooler EO Valve, Emergency Shutoff 3600 Effective date _____________________ PAGE 2 of 2 PAGES
OPERATIONS SPECIFICATIONS R-1820 and R-1830 SERIES ENGINE Overhaul Inspection & Period Check Period Starters, Chapter 80 Relay, Starter 3600 Starter EO NOTE: Components or subcomponents of power plants that have overhaul time limitations in multiples of the basic engine overhaul time limitations shall receive an appropriate inspection, check or test at the basic engine overhaul period.
Effective date _____________________ ---------------------------------------------------------------- ---------------------------------------------------------------- FIGURE 9. OPERATIONS SPECIFICATIONS AIRCRAFT MAINTENANCE
- WRIGHT AERO - C18 SERIES Form Approved.
UNITED STATES OF AMERICA Budget Bureau FEDERAL AVIATION AGENCY No. 04-R075.