AC 43-206

Change 1

Advisory circular · Inspection, Prevention, Control, and Repair of Corrosion on Avionics Equipment

Approved
August 7, 2024
Last reviewed
August 12, 2024
This change
CHG 1 of AC 43-206.
Cancels
AC43-206
Family
AC 43-206 · 2 versions
Revision
change 1
14 CFR parts
43
Cited by
2 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 209–220
Page 221 · 6Open in PDF

Appendix 3 Minimum Failure Free Lifetime (MFL) The minimum period of time that an avionics system, subsystem, module, or component performs satisfactorily without failure.

Nitrates Compounds including certain combinations of nitrogen and oxygen. Present in many industrial pollutants.

Noble Metal A metal usually found as uncombined metal in nature. Platinum, gold, and silver are noble metals.

Noncritical Avionics Components Components such as tube sockets, mechanical devices, knobs, and hardware.

Non-Destructive Inspection A method used to check the soundness of a material or a part without diminishing the strength, value, quality, or serviceability of the part.

Organic Coating A coating composed of matter derived from living organisms or carbon-based compounds

(i.e., paint, plastic, grease, preservative).

Outgassing Emission of a gas during the cure or decomposition of organic material. Usually increases with a rise in temperature.

Passivation The process or processes that cause a metal to become inert in a given corrosive environment.

pH A measure of hydrogen ions in concentration of a solution (pH 7 is neutral; below 7 is acidic;

above 7 is basic or alkaline).

Phantom Gripe An intermittent malfunction or failure which cannot be verified, identified, or duplicated for corrective action.

Pitting A form of corrosion that develops in highly localized areas of a metal surface that is not attacked elsewhere to any great extent. This corrosion attack results in the development of cavities or pits.

Pits may vary from deep cavities of small diameter to relatively shallow depressions.

Plasticizer A chemical added to rubber or resins to impart flexibility.

Page 222 · 7Open in PDF

Appendix 3 Polyethylene A thermal plastic (softens when heated) characterized by its high impact strength, high electrical resistively, nontoxicity, and combustibility. One of several plastics used in wire coating.

Potting Compound A rubber-like material, usually poured, which cures to a hard consistency and provides moisture and vibration resistance to the item.

Primer Coat The first coat of a protective paint system. Improves adhesion of the succeeding topcoat and usually contains a corrosion inhibitor.

Reduction Reaction Gain of electrons by a constituent of a chemical reaction.

Relative Humidity The ratio of the amount of water vapor in the air at a specific temperature to the maximum amount that the air could hold at that temperature, expressed as a percentage.

Reversion The situation wherein a cured material reverts toward its original pre-cured condition, (e.g., a cured potting compound that reverts to a sticky, liquid-like consistency).

Stress Force divided by cross-sectional area.

Symbols The following definitions apply to warnings, cautions, and notes found throughout this advisory circular (AC):

WARNING: An operation or maintenance procedure, practice, condition, statement, etc., which if not strictly observed, could result in injury to or death of personnel or long term (chronic) health hazards to personnel.

CAUTION: An operation or maintenance procedure, practice, condition, statement, etc., which if not strictly observed, could result in damage or destruction of equipment or loss of mission effectiveness.

NOTE: An operating procedure, practice, or condition, etc., which is essential to emphasize.

Tensile Strength Stress at which a material fails.

Total Environment The circumstances and conditions which surround and influence the equipment. The total environment includes manufacturing, handling, storage, shipping, mission, maintenance, and repair.

Page 223 · 8Open in PDF

Appendix 3 Ultraviolet Light Light in a wavelength band ranging from the invisible wavelengths of about 4 nanometers (nm) to the border of the x-ray region at about 380 nm, just beyond the violet end of the visible spectrum.

Unacceptable Response A detrimental abnormality in system performance.

Undesirable Response A tolerated interruption of normal performance.

Wicking See Capillary Action.

Page 224 · 1Open in PDF

Index

COMPREHENSIVE INDEX

SUBJECT PAGE A Abrasive Tools ......................................................................................................... 51, 53, 74, 95, 96

Aircraft Cleaning Compound Method184

Air Drying62

Alternate Cleaning Methods183

Aluminum ............................................................................. 8, 18, 32, 33, 34, 75, 121, 151, 163, 173

Aluminum Electrolytic Capacitors138

Aluminum Surface Treatment75

Anode ................................................................................................................................... 5, 17, 148

Definition5

Antenna Connectors ............................................................................................................... 120, 121

Antenna Mounting Area Preparation Procedures111

Antenna Systems ...................................................................................................................... 24, 111

Application of Coatings80

Application of Primer80

Application of Topcoat83

Aqueous Ultrasonic Cleaner52

ATE Cabinets, Doors, and Panels125

Atom5

Avionics Cleaning Equipment50

Avionics Cleaning Materials47

Avionics Cleaning Procedures54

Cleaning and Drying Restrictions ........................................................................................ 55, 56

Cleaning and Removal of Bacteria and Fungi58

Cleaning and Removal of Dust, Dirt, Grease, and Oil58

Cleaning and Removal of Silicone Lubricant .................................................................... 58, 130 Cleaning and Removal of Solder Flux Residue ....................................................... 37, 48, 57, 98

Fingerprint Removal57

Hand Cleaning Methods56

Hazardous Chemical or Material Identification Label ................................................... 49, 50, 73

Avionics Cleaning Equipment50

Cleaning Procedures54

Corrosion Cleaning Facility45

Hazards of Cleaning54

Materials Used for Cleaning46

Post-cleaning Procedures61

Pre-cleaning Criteria55

Solvent Ultrasonic Cleaner .......................................................................................... 53, 63, 127 Special Considerations ......................................................................................................... 26, 61 Surface Preparation ...................................................................................................... 59, 78, 149

Water Base Solvent Spray Booth51

When To Clean54

Avionics Test Equipment124

Page 225 · 2Open in PDF

Index B

Basic ESD Precautions176

Battery Compartment ....................................................................................................... 21, 100, 126

Battery Compartments, Boxes, and Adjacent Areas100

Beryllium Copper163-168

Bilge Areas ........................................................................................................................... 21, 39, 99

Bimetallic Junctions148

Black Plague35

Bonding/Ground Connection Electrical Resistance Test124

Electronic Equipment Shock Mount158

Preservation ................................................................................. 45, 64, 123, 125, 139, 158, 184

Boric Acid Neutralizing Solution101

Bromothymol Blue Indicating Solution ................................................................................. 100, 103 Litmus Indicating Solution .............................................................................................. 100, 103

Preparation of Solution for Cleaning and Neutralizing Battery Electrolytes100

C Cadmium ................................................................................................ 8, 18, 32, 100, 121, 148, 149

Catastrophic Failures175

Cathode ......................................................................................................................................... 6, 15 Chemical Conversion Material Procedures .......................................................................................... 74, 75

Magnesium Surface Treatment76

Post-Treatment of Conversion Coated Surfaces77

Surface Treatment .................................................................................................................. 9, 74

Treatment of Other Metals77

Cleaning Neutralizing Procedure .................................................................................................... 102, 103 Priority ............................................................................................................................. 181, 182 Surface Preparation ........................................................................................ 59, 78, 96, 149, 171

Versus Calibration124

Coaxial Connectors ........................................................................................ 6, 53, 65, 119, 120, 145 Cockpit Cockpit and Control Boxes ...................................................................................... 105, 106, 136

Cockpit Area Components188

Compounds Electrolyte ................................................................................. 5, 6, 13, 15-17, 44, 100, 125, 169 Electron .............................................................................................................. 5, 6, 87, 169, 172

Electron Conductor6

Galvanic Couple .................................................................................................................... 6, 17 Ion .......................................................................................................................................... 6, 15

Condensed Moisture11

Copper ......................................................................... 7-10, 33-35, 148, 151-158, 163-166, 169, 171 Corrosion Aluminum Surface Treatment .............................................................................................. 32, 75

Effects of Solder Flux37

Effects on Metals32

Effects on Nonmetals36

Factors Influencing6

Page 226 · 3Open in PDF

Index

Fatigue19

Prevention Philosophy21

Preventive Maintenance and Control20

Prone Areas21-26

Electromechanical25

Electronics ........................................................................................... 25, 31, 83, 90, 91, 162 Moisture and Other Fluid Intrusion Sources ...................................................... 21, 24-26, 32 Special Considerations .................................................................................................. 26, 61 Structural ......................................................................................... 24, 74, 77, 108, 111, 146 Resistant Steel ............................................................................................................. 32, 151-156

Theory5

Anode .................................................................................................................. 5, 6, 15, 148 Atom .................................................................................................................................. 5, 6 Cathode ................................................................................................................ 6, 15, 18, 33 Visual Inspection . 28-31, 58, 60, 98, 111, 126, 133, 139, 141, 142, 144-146, 169-171, 187-189, 193, 194 Corrosive Conditions and Elements ................................................................................. 8, 10, 13, 44

Condensed Moisture11

Man-made Environments13

Micro-organism, Insect, and Animal Attack .................................................................. 13, 31, 38 Moisture ............................................................................................................................ 7-11, 13 Other Fluids ......................................................................................................................... 11, 21 Pressure ................................................................................................................................ 11, 13 Temperature ................................................................................................................. 8, 9, 11, 13 Crevice Corrosion ....................................................................................................................... 15, 16 D

Damaged Items194

Discharge Sensitive Equipment172

Desiccants70-72

Direct Failures175

Disassembly Inspection Procedures193

Dissipation of Static Charges176-178

ESD Protection Guidelines176-180

Drying and Preservation of Non-removable Avionics equipment ................................... 190, 191 Drying ..................................................................................................................................... 184, 185

Air Drying62

Coated Equipment88

Preparation62

Preservation Procedures184-186

Solvent Vapor Drying63

with Circulating Air Oven ............................................................................................. 62, 63 with Forced Air Oven ............................................................................................ 63, 98, 184 with Hot Air Blower .................................................................................................... 62, 185 with Vacuum Oven ................................................................................................ 63, 89, 185

Page 227 · 4Open in PDF

Index E Edge Connectors and Mating Plugs ............................................................................... 130, 137, 145 Effects of Corrosion ............................................................................................................ 24, 25-28, 31-44

Dust/Lint Accumulation44

Insect and Animal Attack38

Microbial Attack37

Electrical Bonding and Grounding Straps ........................................................................................ 109, 130

Bonding/Grounding Connections148-158

Bimetallic Junctions148

Hardware ................................................................................................... 148, 151, 153, 156

Connector and Wave guide Caps69

Connectors and Receptacles191

Equipment Shock Mount Bonding Preservation158

Motors and Generators188

Electrolyte ....................................................................................... 5, 6, 13-17, 19, 44, 100, 125, 126

Electron Conductor6

Electrostatic Voltages174

Emergency Cleaning Procedures ......................................................................................... 182-184, 192-195

Aircraft Cleaning Compound184

Alternate Methods ..................................................................................................... 183, 184

Primary Method183

Solvent Method183

Water-Displacing Method .................................................................................. 184, 186-191 Drying and Preservation .................................................................................................. 184, 185

Drying and Preservation Procedures185

Heated Compartment185

Hot Air Blower185

Vacuum Oven Drying185

Vented Drying Oven185

Vented Drying Oven (Bulb Type)185

Preparations181

Emergency Reclamation Team.................................................................................. 181, 192

Production Planning182

Required Tools, Materials, and Equipment182

Reclamation Team Organization181

EMI

Definition159

Precipitation Static162

Protection Maintenance168-171

Shielding Structures162-165

Shielding Design Goals162

Types of Protection162-168

Encapsulates83-98

Drying of Coated Equipment88

Fungus-Proof Coating86-89

Fungus-Proof Varnish86

Methods of Application88

Page 228 · 5Open in PDF

Index

Potting Compounds83-86

Sealant ....................................................................................................................... 84, 85, 90-92

Special Precautions89

Environmental Conditions .......................................................................................................... 10, 21

Environmental Factors10

Equipment Bays ..................................................................................................... 29, 30, 47, 99, 100 Equipment Hinges and Latches .............................................................................................. 108, 109 ESD

Corrosion Inspection and Repair180

Definition172

Direct Failures175

Packaging Practices ......................................................................................................... 177, 180

Protection Guidelines178

Susceptible Equipment175

Workstation Shop Practices ............................................................................................. 177, 180

Evaluation of Corrosion Damage31-44

Exfoliation Corrosion19

External Corrosion Removal and Cleaning ...................................................................... 77, 140, 141

External Mounted Equipment105

F

Factors Influencing Corrosion6

Moisture Intrusion ......................................................................................................... 6, 9-12, 21 Failure Mechanisms ............................................................................................................... 174, 175 ESD-Related Failure of Components ............................................................................... 174, 175 Filters .............................................................................................................................. 145, 162, 168

Fingerprint Removal57

Flush or Dome Antenna Mountings ....................................................................................... 119, 120

Frames, Mounting Racks, and Shock Mounts103

Fretting Corrosion16

Fungus-Proof

Coatings86

Varnish86

Fuselage Shielding162

G Galvanic Corrosion ........................................................................................................... 17, 121, 169 Galvanic Couple ........................................................................................................................... 6, 17

Generation of Static Charges172-174

General Inspection Procedures30

Gold and Gold Plating ........................................................................................... 8, 10, 16, 18, 33-35 H

Hand Cleaning Methods56

Handling ............................................................. 10, 13, 24, 45, 46, 68, 69, 73, 77, 78, 121, 132, 176 Hardware Selection ................................................................................................................ 148, 149

Hazardous Chemicals and Waste Generation49

Hazards of Cleaning54

Page 229 · 6Open in PDF

Index Heated Compartment .............................................................................................................. 185, 186 Hermetically Sealed Avionics Equipment .................................................................................. 9, 187 High Temperature ....................................................................................................................... 13, 92 Hot Air Blower ................................................................................................................. 62, 182, 185

How to Preserve66

Human Body Generated ESD174

Humidity Indicators72

I

In-Place Cleaning190

Inspection Procedures169

General Inspection Procedure30

Inspection Factors28

Water Intrusion Inspection30

Intermittent Failures174

Intergranular Corrosion .............................................................................................................. 19, 34 Internal Cleaning of

Automatic Test Equipment125

General Purpose Test Equipment125-128

Microwave Test Equipment129

Support Equipment ..................................................................................... 45, 107, 124-128, 182 Intrasystem/Intersystem EMI ................................................................................................. 160, 167 Ion ................................................................................................................................................. 5, 15 Iron and Steel ................................................................................................................................ 7, 32 J K L

Latent Failures175

Lighting Systems and Assemblies133

Lightning ................................................................................................................................ 161, 162

Litmus Indicating Solution100

Long Wire and Direction Finder (DF) Sense Antenna Corrosion123

Prevention Procedures123

Lubricants68

M

Maintenance Functions77

Magnesium ........................................................................ 7, 9, 18, 33, 74-76, 83, 108, 151, 153, 155

Magnesium Surface Treatment76

Man-made Environments13

Manufacturing Processes9

Material

Compatibility8

Selection and Use7

Identification Label49

Page 230 · 7Open in PDF

Index Used for Cleaning ........................................................................................................... 46-49, 53

Metallic Equipment Covers and Housings107

Methods of Application88

Methods of Minimizing the Effects of ESD177-180

Meters ............................................................................................................................... 89, 124, 126

Micro-organism, Insect, and Animal Attack13

Military Specifications6

Moisture and Other Fluid Intrusion Sources .......................................................................... 9, 11, 21 Traps and Cavity Areas ........................................................................................................ 7, 109

Mounting Racks and Shock Mounts189

Multi-pin Electrical Connectors, Cleaning and Preservation .......................................... 130, 139-145 N Nonmetallic Deterioration .......................................................................................................... 19, 36 Non-removable Avionics Equipment ..................................................................................... 190, 191 O Operator and Instrument Panels ............................................................................................. 126, 127

Operator/Unit Level Emergency Cleaning Procedures186-192

Antennas189

Cockpit Area Components ............................................................................................... 188, 189

Electrical Connectors and Receptacles191

Electric Motors and Generators188

Hermetically-Sealed Avionics Equipment187

In-Place Cleaning190

Mounting Racks and Shock Mounts189

Non-removable Avionics Equipment190

Removable Avionics Equipment186

Switches and Circuit Breakers188

Terminal Boards, Junction Boxes, Relay Boxes, and Circuit Breaker Panels191

Wiring Harnesses and Cables192

P Packaging

and Storage68-72

Desiccants70-72

Electrical Connector and Wave Guide Caps69

Handling ............................................................................................................................... 68, 69

Humidity Indicators72

Paint Systems ........................................................................................................................... 78, 131 Painting Equipment and Materials ............................................................................................. 78, 79 Pitting ............................................................................................................................. 16, 32, 34, 36

Post-Cleaning Procedure61

Post-Treatment of Conversion Coated Surfaces77

Potting Compounds ............................................................................................................. 83-86, 140

Precipitation Static162

Preservation

How to Preserve66

Page 231 · 8Open in PDF

Index Preservative Materials ................................................................................................................ 66, 67 What Not to Preserve ........................................................................................................... 65, 66

What to Preserve65

When to Preserve ................................................................................................................. 64, 65

Why Preserve64

Pressure Air .................................................................................................................................. 13, 51, 72

Contact12

Prime Sources of Static Charge172-174

Production Planning182

Program Requirements20

Proper Package Practices .......................................................................................................... 69, 180

Protective Coatings77-83

Application of Coatings80

Application of Primer80

Application of Topcoat83

Printed Circuit Boards (PCB) .................................... 7, 8, 16, 50, 51, 53, 62, 68, 84, 93-98, 130, 145

Purple Plague35

Q R

Radar Antenna Associated Hardware121

Radar Dish Antenna Corrosion Prevention Procedures121

Recognizing Avionics Corrosion31

Aluminum32

Black Plague35

Cadmium35

Corrosion Effects of Solder Flux37

Corrosion Effects on Nonmetals36

Corrosion Resistant Steel32

Copper33

Effects of Insect and Animal Attack38

Effects of Microbial Attack37

Gold and Gold Plating35

Iron and Steel32

Magnesium33

Nickel35

Purple Plague35

Red Plague35

Silver35

Tin35

Recommended Practices for ESD Sensitive Equipment180

Basic ESD Precautions178-180

Packaging Practices178-180

Sensitive Device Handling Practices178-180

Testing and/or Repair Practices178-180

Red Plague35

Relay and Circuit Breakers135

Removal and Cleaning of Identification and Modification Plates186

Page 232 · 9Open in PDF

Index Removal Priority .................................................................................................................... 181, 186 Repair of

Avionics Equipment Housings, Mounting Racks, and Storage Hardware99-111

Bilge Areas99

Cockpit and Control Boxes105

Electrical Bonding and Grounding Straps109

Engine Compartments100

Equipment Bays99

Equipment Covers, Hinges, and Latches ................................................................... 107, 108

External Mounted Equipment105

Frames, Mounting Racks, and Shock Mounts103

Internal Metal Surfaces146

Moisture Traps and Cavity Areas109

Terminal Boards, Junction Boxes, Relay Boxes, and Circuit Breaker Panels107

Avionics Systems, Equipment, and Components111

Aluminum Electrolytic Capacitors138

Antenna Bonding/Ground Connection124

Electrical Resistance Test124

Antenna Connectors121

Antenna Mounting Area Preparation Procedures .............................................. 111, 116, 119

Antenna Systems111

ATE Cabinets, Doors, and Panels125

Battery Compartments ............................................................................................... 100, 126

Cleaning Versus Calibration124

Coaxial Connectors145

Corrosion Visual Inspection .............................................................................. 111, 169, 170

Edge Connectors and Mating Plugs137

External Corrosion Removal and Cleaning ............................................................... 140, 141

Filters145

Flush or Dome Antenna Mounting119

Handling, Storage, and Packaging132

Internal Cleaning of General Purpose Test Equipment128

Internal Cleaning of Microwave Test Equipment129

Internal Corrosion Removal and Cleaning142

Lighting Systems and Assemblies133

Long Wire/Direction Finder Sense Antenna123

Meters126

Multi-pin Electrical Connectors, Cleaning, and Preservation ................................... 130, 139

Operator and Instrument Panels126

Painting Systems131

Printed Circuit Boards ............................................................................................... 130, 145

Battery Compartments, Boxes, and Adjacent Areas100

Radar Antenna Associated Hardware121

Relays and Circuit Breakers ............................................................................................. 130, 135 Sealing Connector Back shells ......................................................................................... 143, 144

Sensitive Internal Metal Surfaces146

Special Cleaning Procedures130

Support Equipment/General Purpose Test ....................................................................... 127, 128 Equipment Covers and Housings ..................................................................................... 107, 125 Switches ........................................................................................... 105, 126, 127, 130, 136, 188

Temporary Dish Protection121