SECTION 12. PLATED PARTS6-45
6-193. CHROMIUM AND NICKEL-PLATED PARTS6-45
6-194. CADMIUM AND ZINC-PLATED PARTS6-45
6-195.–6-205. [RESERVED.]6-45
SECTION 13. CORROSION PROOFING OF LAND PLANES CONVERTED TO
SEAPLANES6-46
6-206. GENERAL6-46
6-207. NECESSARY MINIMUM PRECAUTIONS6-46
6-208. RECOMMENDED PRECAUTIONS6-46
6-209.–6-219. [RESERVED.]6-47
SECTION 14. HANDLING AND CARE OF AIRCRAFT RECOVERED FROM WATER
IMMERSION6-48
6-220. GENERAL6-48
6-221. INITIAL FRESHWATER OR DETERGENT WASH6-48
6-222. RECIPROCATING ENGINES AND PROPELLERS6-48
6-223. AIRFRAME6-49
6-224.–6-234. [RESERVED.]6-49
CHAPTER 7. AIRCRAFT HARDWARE, CONTROL CABLES, AND TURNBUCKLES7-1
SECTION 1. RIVETS7-1
7-1. GENERAL7-1
7-2. MATERIAL APPLICATIONS7-1
7-3.–7-13. [RESERVED.]7-2
SECTION 2. SCREWS7-3
7-14. GENERAL7-3
7-15. STRUCTURAL SCREWS7-3
7-16. MACHINE SCREWS7-3
7-17. PAN HEAD SCREWS (NAS600 THROUGH NAS606, NAS610 THROUGH
NAS616, NAS623, AND NAS1402 THROUGH NAS1406)7-3
7-18. SELF-TAPPING SCREWS7-4
7-19. WOOD SCREWS7-4
7-20.–7-33. [RESERVED.]7-4
SECTION 3. BOLTS7-5
7-34. GENERAL7-5
7-35. BOLTS7-5
7-36. IDENTIFICATION7-5
7-37. GRIP LENGTH7-6
7-38. LOCKING OR SAFETYING OF BOLTS7-6
7-39. BOLT FIT7-6
7-40. TORQUES7-7
7-41. STANDARD AIRCRAFT HEX HEAD BOLTS (AN3 THROUGH AN20)7-10
7-42. DRILLED HEAD BOLTS (AN73 THROUGH AN81)7-10
7-43. ENGINE BOLTS7-10
7-44. CLOSE-TOLERANCE BOLTS7-10
7-45. INTERNAL WRENCHING BOLTS
(NAS144 THROUGH NAS158 AND NAS172 THROUGH NAS176)7-10
7-46. INTERNAL WRENCHING BOLTS (MS20004 THROUGH MS20024) AND SIX HOLE, DRILLED SOCKET HEAD BOLTS (AN148551 THROUGH
AN149350)7-11
7-47. TWELVE-POINT, EXTERNAL WRENCHING BOLTS
(NAS624 THROUGH NAS644)7-11
7-48. CLOSE-TOLERANCE SHEAR BOLTS (NAS464)7-11
7-49. NAS6200 SERIES BOLTS7-11
7-50. CLEVIS BOLTS (AN21 THROUGH AN36)7-11
7-51. EYEBOLTS (AN42 THROUGH AN49)7-11
7-52.–7-62. [RESERVED.]7-11
SECTION 4. NUTS7-12
7-63. GENERAL7-12
7-64. SELF-LOCKING NUTS7-12
7-65. NUT IDENTIFICATION FINISHES7-13
7-66. CASTLE NUT (AN310)7-14
7-67. CASTELLATED SHEAR NUT (AN320)7-14
7-68. PLAIN NUT (AN315 AND AN335)7-14
7-69. LIGHT HEX NUTS (AN340 AND AN345)7-14
7-70. CHECKNUT (AN316)7-15
7-71. WINGNUTS (AN350)7-15
7-72. SHEET SPRING NUTS (AN365)7-15
7-73.–7-84. RESERVED7-15
SECTION 5. WASHERS7-16
7-85. GENERAL7-16
7-86. PLAIN WASHERS (AN960 AND AN970)7-16
7-87. LOCK WASHERS (AN935 AND AN936)7-16
7-88. BALL SOCKET AND SEAT WASHERS (AN950 AND AN955)7-16
7-89. TAPER PIN WASHERS (AN975)7-16
7-90.–7-100. [RESERVED.]7-16
SECTION 6. PINS7-17
7-101. TAPER PINS7-17
7-102. FLATHEAD PINS (AN392 THROUGH AN406)7-17
7-103. COTTER PINS (AN380)7-17
7-104. SPRING PINS7-17
7-105. QUICK-RELEASE PINS7-17
7-106.–7-121. [RESERVED.]7-17
SECTION 7. SAFETYING7-18
7-122. GENERAL7-18
7-123. SAFETY WIRE7-18
7-124. SAFETY-WIRING PROCEDURES7-20
7-125. TWISTING WITH SPECIAL TOOLS7-21
7-126. SECURING OIL CAPS, DRAIN COCKS, AND VALVES7-21
7-127. SECURING WITH COTTER PINS7-25
7-128.–7-139. [RESERVED.]7-26
SECTION 8. INSPECTION AND REPAIR OF CONTROL CABLES AND
TURNBUCKLES7-27
7-140. GENERAL7-27
7-141. CABLE DEFINITIONS7-27
7-142. FLEXIBLE CABLES7-27
7-143. NYLON-COATED CABLES7-29
7-144. NONFLEXIBLE CABLES7-30
7-145. CABLE SPECIFICATIONS7-31
7-146. CABLE PROOF LOADS7-31
7-147. REPLACEMENT OF CABLES7-31
7-148. MECHANICALLY-FABRICATED CABLE ASSEMBLIES7-32
7-149. CABLE SYSTEM INSPECTION7-39
7-150. CORROSION AND RUST PREVENTION7-44
7-151. WIRE SPLICES7-45
7-152. CABLE MAINTENANCE7-45
7-153. CABLE TENSION ADJUSTMENT7-45
7-154.–7-164. [RESERVED.]7-46
SECTION 9. TURNBUCKLES7-47
7-165. GENERAL7-47
7-166. TURNBUCKLE INSTALLATION7-47
7-167. WITNESS HOLE7-48
7-168.–7-178. [RESERVED.]7-48
SECTION 10. SAFETY METHODS FOR TURNBUCKLES7-49
7-179. GENERAL7-49
7-180. DOUBLE-WRAP METHOD7-49
7-181. SINGLE-WRAP METHOD7-50
7-182. SAFETY WIRE SECURED TURNBUCKLES7-50
7-183. SPECIAL LOCKING DEVICES7-52
7-184. ASSEMBLING AND SECURING CLIP-LOCKING TURNBUCKLES7-52
7-185.–7-195. [RESERVED.]7-53
SECTION 11. HARDWARE IDENTIFICATION TABLES7-54
7-196.–7-206. [RESERVED.]7-83
CHAPTER 8. ENGINES, FUEL, EXHAUST, AND PROPELLERS8-1
SECTION 1. ENGINES8-1
8-1. GENERAL8-1
8-2. SPECIAL INSPECTION8-1
8-3. CRANKSHAFT INSPECTION AND REPAIR REQUIREMENTS8-3
8-4. REPLACEMENT PARTS IN CERTIFICATED ENGINES8-4
8-5. OIL SYSTEM LINES INSPECTION8-4
8-6. OIL FILTER INSPECTION8-4
8-7. CYLINDER HOLD-DOWN NUTS AND CAP SCREWS8-4
8-8. REUSE OF SAFETYING DEVICES8-5
8-9. SELF-LOCKING NUTS FOR AIRCRAFT ENGINES AND ACCESSORIES8-5
8-10. METALLIZING8-5
8-11. PLATING8-5
8-12. CORROSION8-7
8-13. ENGINE RUN-IN8-7
8-14. COMPRESSION TESTING OF AIRCRAFT ENGINE CYLINDERS8-7
8-15. SPARK PLUGS8-10
8-16. OPERATIONAL PROBLEMS8-14
8-17. SPARK PLUG PRE-RECONDITIONING INSPECTION8-19
8-18. IGNITION HARNESSES INSPECTION8-19
8-19. MAGNETO INSPECTION8-20
8-20. MAGNETO-TO-ENGINE TIMING8-22
8-21.–8-29. [RESERVED.]8-22
SECTION 2. FUEL SYSTEMS8-23
8-30. GENERAL8-23
8-31. FUEL LINES AND FITTINGS8-23
8-32. FUEL TANKS AND CELLS8-24
8-33. FUEL TANK CAPS, VENTS, AND OVERFLOW LINES8-25
8-34. FUEL CROSS-FEED, FIREWALL SHUTOFF, AND TANK SELECTOR
VALVES8-25
8-35. FUEL PUMPS8-26
8-36. FUEL FILTERS, STRAINERS, AND DRAINS8-26
8-37. INDICATOR SYSTEMS8-26
8-38. FUEL SYSTEM PRECAUTIONS8-26
8-39.–8-44. [RESERVED.]8-27
SECTION 3. EXHAUST SYSTEMS8-28
8-45. GENERAL8-28
8-46. MUFFLER/HEAT EXCHANGER FAILURES8-28
8-47. MANIFOLD/STACK FAILURES8-30
8-48. INTERNAL MUFFLER FAILURES8-31
8-49. INSPECTION8-33
8-50. REPAIRS8-35
8-51. TURBOSUPERCHARGER8-36
8-52. AUGMENTER SYSTEMS8-36
8-53.–8-70. [RESERVED.]8-36
SECTION 4. REPAIR OF METAL PROPELLERS8-37
8-71. GENERAL8-37
8-72. STEEL BLADES8-37
8-73. ALUMINUM PROPELLER REPAIRS8-37
8-74. REPAIR LIMITS8-40
8-75. STEEL HUBS AND HUB PARTS8-42
8-76. PROPELLER HUB AND FLANGE REPAIR8-42
8-77. CONTROL SYSTEMS8-43
8-78. DEICING SYSTEMS8-44
8-79.–8-90. [RESERVED.]8-44
SECTION 5. INSPECTION OF PROPELLERS8-45
8-91. GENERAL8-45
8-92. WOOD OR COMPOSITION PROPELLERS AND BLADES8-45
8-93. METAL PROPELLERS AND BLADES8-47
8-94. PROPELLER HUB8-48
8-95. TACHOMETER INSPECTION8-49
8-96.–8-106. [RESERVED.]8-49
SECTION 6. PROPELLER TRACKING AND VIBRATION8-50
8-107. GENERAL8-50
8-108. PROPELLER TRACKING CHECK8-50
8-109. VIBRATION8-51
8-110.–8-129. [RESERVED.]8-51
CHAPTER 9. AIRCRAFT SYSTEMS AND COMPONENTS9-1
SECTION 1. INSPECTION AND MAINTENANCE OF LANDING GEAR9-1
9-1. GENERAL9-1
9-2. GENERAL INSPECTION9-1
9-3. CLEANING AND LUBRICATING9-1
9-4. FIXED-GEAR INSPECTION9-2
9-5. INSPECTION OF RETRACTABLE LANDING GEAR9-3
9-6. EMERGENCY SYSTEMS9-4
9-7. LANDING-GEAR COMPONENTS9-4
9-8. FLOATS AND SKIS9-6
9-9. INSPECTION AND REPAIR OF FLOATS AND SKIS9-8
9-10. TYPES OF LANDING-GEAR PROBLEMS9-9
9-11. SPECIAL INSPECTIONS9-11
9-12. RETRACTION TESTS9-11
9-13. TIRE AND TUBE MAINTENANCE9-11
9-14. TIRE INSPECTION AND REPAIR9-12
9-15. INFLATION OF TIRES9-13
9-16. PERSONAL SAFETY9-14
9-17. DISASSEMBLE THE WHEEL9-14
9-18. REASSEMBLING THE WHEEL9-15
9-19. SLIPPAGE9-15
9-20. WHEEL INSPECTION9-15
9-21. WHEEL INSTALLATION9-15
9-22.–9-24. [RESERVED.]9-16
SECTION 2. HYDRAULIC SYSTEMS9-17
9-25. GENERAL9-17
9-26. PURPOSES OF HYDRAULIC SYSTEMS9-17
9-27. TYPES OF HYDRAULIC FLUID9-17
9-28. HANDLING HYDRAULIC FLUID9-18
9-29. HYDRAULIC SYSTEM MAINTENANCE PRACTICES9-19
9-30. HYDRAULIC LINES AND FITTINGS9-22
9-31.–9-36. [RESERVED.]9-34
SECTION 3. EMERGENCY EQUIPMENT9-35
9-37. LIFE RAFTS9-35
9-38. LIFE RAFT INSPECTIONS9-35
9-39. SURVIVAL KIT INSPECTION9-37
9-40. SPECIAL INSPECTIONS9-41
9-41. INSPECTION RECORD9-41
9-42. RAFT REPAIRS9-41
9-43. LIFE PRESERVERS9-44
9-44. LIFE PRESERVER INSPECTION9-45
9-45. REPAIR OF LIFE PRESERVERS9-46
9-46. MISCELLANEOUS EQUIPMENT9-46
9-47. OXYGEN SYSTEMS9-47
9-48. INSPECTION9-48
9-49. MAINTENANCE9-49
9-50. FUNCTIONAL TESTING AFTER REPAIR9-51
9-51. REQUIREMENTS FOR REQUALIFICATION OF OXYGEN CYLINDERS9-52
9-52.–9-59. [RESERVED.]9-55
SECTION 4. CABIN INTERIOR9-56
9-60. GENERAL9-56
9-61. CAR 3 AIRCRAFT INTERIOR9-56
9-62. PART 23 AIRCRAFT INTERIOR9-56
9-63. SOURCE OF INFORMATION9-57
9-64. UPHOLSTERY AND/OR BELTS9-57
9-65.–9-70. [RESERVED.]9-57
CHAPTER 10. WEIGHT AND BALANCE10-1
SECTION 1. TERMINOLOGY10-1
10-1. GENERAL10-1
10-2. TERMINOLOGY10-1
10-3.–10-13. [RESERVED.]10-9
SECTION 2. WEIGHING PROCEDURES10-10
10-14. GENERAL10-10
10-15. PROCEDURES10-10
10-16. REPAIRS AND ALTERATIONS10-11
10-17. ANNUAL OR 100-HOUR INSPECTION10-11
10-18. W&B COMPUTATIONS10-12
10-19. W&B EXTREME CONDITIONS10-13
10-20. LOADING CONDITIONS AND/OR PLACARDS10-16
10-21. EQUIPMENT LIST10-19
10-22. EQUIPMENT CHANGE10-20
10-23. SAMPLE W&B REPORT10-21
10-24. INSTALLATION OF BALLAST10-24
10-25. LOADING SCHEDULE10-25
10-26.–10-34. [RESERVED.]10-25
CHAPTER 11. AIRCRAFT ELECTRICAL SYSTEMS11-1
SECTION 1. INSPECTION AND CARE OF ELECTRICAL SYSTEMS11-1
11-1. GENERAL11-1
11-2. INSPECTION AND OPERATION CHECKS11-1
11-3. FUNCTIONAL CHECK OF STAND-BY OR EMERGENCY EQUIPMENT11-2
11-4. CLEANING AND PRESERVATION11-2
11-5. BATTERY ELECTROLYTE CORROSION11-2
11-6. ADJUSTMENT AND REPAIR11-2
11-7. INSULATION OF ELECTRICAL EQUIPMENT11-3
11-8. BUS BARS11-3
11-9. ASTM INTERNATIONAL11-3
11-10.–11-14. [RESERVED.]11-4
SECTION 2. STORAGE BATTERIES11-5
11-15. GENERAL11-5
11-16. BATTERY CHARGING11-5
11-17. BATTERY FREEZING11-5
11-18. TEMPERATURE CORRECTION11-6
11-19. BATTERY MAINTENANCE11-7
11-20. ELECTROLYTE SPILLAGE11-10
11-21. NOXIOUS FUMES11-10
11-22. INSTALLATION PRACTICES11-10
11-23.–11-29. [RESERVED.]11-12
SECTION 3. INSPECTION OF EQUIPMENT INSTALLATION11-13
11-30. GENERAL11-13
11-31. INSTALLATION CLEARANCE PROVISIONS11-13
11-32. WIRES, WIRE BUNDLES, AND CIRCUIT PROTECTIVE DEVICES11-13
11-33. ALTERNATOR DIODES11-13
11-34. STATIC ELECTRICAL POWER CONVERTERS11-13
11-35. ACCEPTABLE MEANS OF CONTROLLING OR MONITORING THE
ELECTRICAL LOAD11-14
11-36. ELECTRICAL LOAD DETERMINATION11-14
11-37. JUNCTION BOX CONSTRUCTION11-15
11-38.–11-46. [RESERVED.]11-15
SECTION 4. INSPECTION OF CIRCUIT-PROTECTION DEVICES11-16
11-47. GENERAL11-16
11-48. DETERMINATION OF CIRCUIT BREAKER RATINGS11-16
11-49. DC CIRCUIT PROTECTOR CHART11-16
11-50. RESETTABLE CIRCUIT PROTECTION DEVICES11-17
11-51. CIRCUIT BREAKER USAGE11-17
11-52. CIRCUIT BREAKER MAINTENANCE11-18
11-53. SWITCHES11-18
11-54. RELAYS11-22
11-55. LOAD CONSIDERATIONS11-23
11-56. OPERATING CONDITIONS FOR SWITCHES AND RELAYS11-23
11-57.–11-65. [RESERVED.]11-23
SECTION 5. ELECTRICAL WIRE RATING11-24
11-66. GENERAL11-24
11-67. METHODS FOR DETERMINING CURRENT CARRYING CAPACITY OF
WIRES11-28
11-68. INSTRUCTIONS FOR USE OF ELECTRICAL WIRE CHART11-29
11-69. COMPUTING CURRENT CARRYING CAPACITY11-33
11-70.–11-75. [RESERVED.]11-40
SECTION 6. AIRCRAFT ELECTRICAL WIRE SELECTION11-41
11-76. GENERAL11-41
11-77. AIRCRAFT WIRE MATERIALS11-41
11-78. SUBSTITUTIONS11-43
11-79.–11-84. [RESERVED.]11-43
SECTION 7. TABLE OF ACCEPTABLE WIRES11-44
11-85. AIRCRAFT WIRE TABLE11-44
11-86. OPEN AIRFRAME INTERCONNECTING WIRE11-47
11-87. PROTECTED WIRE11-47
11-88. SEVERE WIND AND MOISTURE PROBLEMS (SWAMP)11-47
11-89. SHIELDED WIRE11-47
11-90.–11-95. [RESERVED.]11-48
SECTION 8. WIRING INSTALLATION INSPECTION REQUIREMENTS11-49
11-96. GENERAL11-49
11-97. WIRING REPLACEMENT11-52
11-98. TERMINALS AND TERMINAL BLOCKS11-53
11-99. FUSES AND FUSE HOLDERS11-53
11-100. CONNECTORS11-54
11-101. JUNCTION BOXES, PANELS, SHIELDS, AND
MICRO-SWITCH HOUSINGS11-55
11-102. RIGID METALLIC, FLEXIBLE METALLIC AND RIGID NONMETALLIC
CONDUIT11-55
11-103. JUNCTIONS11-55
11-104. CIRCUIT BREAKERS11-56
11-105. SYSTEM SEPARATION11-56
11-106. ELECTROMAGNETIC INTERFERENCE (EMI)11-56
11-107. INTERFERENCE TESTS11-56
11-108. IDENTIFICATION STENCILS AND PLACARDS ON ELECTRICAL
EQUIPMENT11-57
11-109.–11-114. [RESERVED.]11-57
SECTION 9. ENVIRONMENTAL PROTECTION AND INSPECTION11-58
11-115. MAINTENANCE AND OPERATIONS11-58
11-116. GROUP AND BUNDLE TIES11-58
11-117. MINIMUM WIRE BEND RADII11-59
11-118. SLACK11-59
11-119. DRIP LOOP IN WIRE BUNDLE11-60
11-120. POWER FEEDERS11-61
11-121. RF CABLE11-61
11-122. PRECAUTIONS11-61
11-123. MOISTURE PROTECTION, WHEEL WELLS, AND
LANDING GEAR AREAS11-62
11-124. PROTECTION AGAINST PERSONNEL AND CARGO11-62
11-125. HEAT PRECAUTIONS11-62
11-126. MOVABLE CONTROLS WIRING PRECAUTIONS11-62
11-127. FLAMMABLE FLUIDS AND GASES11-62
11-128.–11-134. [RESERVED.]11-63
SECTION 10. SERVICE LOOP HARNESSES (PLASTIC TIE STRIPS)11-64
11-135. GENERAL11-64
11-136. SUPPORT11-64
11-137. ANTI-CHAFING MATERIAL11-64
11-138. STRAIN RELIEF11-64
11-139. “SERVICE LOOP”11-64
11-140.–11-145. [RESERVED.]11-65
SECTION 11. CLAMPING11-66
11-146. GENERAL11-66
11-147. WIRE AND CABLE CLAMPS INSPECTION11-66
11-148.–11-154. [RESERVED.]11-69
SECTION 12. WIRE INSULATION AND LACING STRING TIE11-70
11-155. GENERAL11-70
11-156. INSULATION MATERIALS11-70
11-157. STRIPPING INSULATION11-70
11-158. LACING AND TIES11-71
11-159. INSULATION TAPE11-74
11-160.–11-166. [RESERVED.]11-74
SECTION 13. SPLICING11-75
11-167. GENERAL11-75
11-168.–11-173. [RESERVED.]11-75
SECTION 14. TERMINAL REPAIRS11-76
11-174. GENERAL11-76
11-175. ATTACHMENT OF TERMINALS TO STUDS11-77
11-176. STUDS AND INSULATORS11-77
11-177. WIRE TERMINALS AND BINDING POSTS11-78
11-178. CRIMP ON TERMINAL LUGS AND SPLICES (pre-insulated crimp type)11-78
11-179. LOCK WASHERS FOR TERMINALS ON EQUIPMENT11-79
11-180.–11-184. [RESERVED.]11-79
SECTION 15. GROUNDING AND BONDING11-80
11-185. GENERAL11-80
11-186. GROUNDING11-80
11-187. BONDING11-82
11-188. BONDING INSPECTION11-82
11-189. BONDING JUMPER INSTALLATIONS11-84
11-190. CREEPAGE DISTANCE11-89
11-191. FUEL SYSTEMS11-89
11-192. ELECTRIC SHOCK PREVENTION BONDING11-89
11-193. LIGHTNING PROTECTION BONDING11-89
11-194. LIGHTNING PROTECTION FOR ANTENNAS AND AIR DATA PROBES . 11-90
11-195. STATIC-DISCHARGE DEVICE11-90
11-196. CLEANING11-90
11-197. HARDWARE ASSEMBLY11-90
11-198.–11-204. [RESERVED.]11-91
SECTION 16. WIRE MARKING11-92
11-205. GENERAL11-92
11-206. WIRE IDENTIFICATION11-92
11-207. IDENTIFICATION AND INFORMATION RELATED TO THE WIRE AND
WIRING DIAGRAMS11-92
11-208. PLACEMENT OF IDENTIFICATION MARKINGS11-92
11-209. TYPES OF WIRE MARKINGS11-93
11-210. HOT STAMP MARKING11-94
11-211. DOT MATRIX MARKING11-94
11-212. INK JET MARKING11-94
11-213. LASER MARKING11-95
11-214. IDENTIFICATION SLEEVES11-95
11-215. IDENTIFICATION TAPE11-95
11-216. OPERATING CONDITIONS11-96
11-217. INSTALLATION OF PRINTED SLEEVES11-96
11-218. IDENTIFICATION OF WIRE BUNDLES AND HARNESSES11-96
11-219. TERMINAL MARKING SLEEVE AND TAGS11-97
11-220. SLEEVES AND CABLE MARKERS SELECTION11-98
11-221. TEMPORARY WIRE AND CABLE MARKING PROCEDURE11-103
11-222. MARKER SLEEVE INSTALLATION AFTER PRINTING11-103
11-223.–11-229. [RESERVED.]11-104
SECTION 17. CONNECTORS11-105
11-230. GENERAL11-105
11-231. SELECTION11-105
11-232. TYPES OF CONNECTORS11-105
11-233. VOLTAGE AND CURRENT RATING11-111
11-234. SPARE CONTACTS (FUTURE WIRING)11-111
11-235. INSTALLATION11-112
11-236. FEED-THROUGH BULKHEAD WIRE PROTECTION11-113
11-237. SPECIAL PURPOSE CONNECTOR11-113
11-238. POTTING COMPOUNDS11-113
11-239. POTTING CONNECTORS11-113
11-240. THROUGH BOLTS11-114
11-241.–11-247. [RESERVED.]11-114
SECTION 18. CONDUITS11-115
11-248. GENERAL11-115
11-249. SIZE OF CONDUIT11-115
11-250. CONDUIT FITTINGS11-115
11-251. CONDUIT INSTALLATION11-115
11-252. RIGID CONDUIT11-115
11-253. FLEXIBLE CONDUIT11-116
11-254.–11-259. [RESERVED.]11-117
SECTION 19. UNUSED CONNECTORS AND UNUSED WIRES11-118
11-260. GENERAL11-118
11-261. QUICK REFERENCE CHART11-118
11-262. UNPRESSURIZED AREA CONNECTORS11-118
11-263. PRESSURIZED AREAS11-120
11-264.–11-270. [RESERVED.]11-120
SECTION 20. ELECTRICAL AND ELECTRONIC SYMBOLS11-121
11-271. GENERAL11-121
11-272. SYMBOLS11-121
11-273.–11-283. [RESERVED.]11-134
CHAPTER 12. AIRCRAFT AVIONICS SYSTEMS12-1
SECTION 1. AVIONICS EQUIPMENT MAINTENANCE12-1
12-1. GENERAL12-1
12-2. HANDLING OF COMPONENTS12-1
12-3.–12-7. [RESERVED.]12-1
SECTION 2. GROUND OPERATIONAL CHECKS FOR AVIONICS EQUIPMENT
(ELECTRICAL)12-2
12-8. GENERAL12-2
12-9. INSPECTION OF AVIONICS SYSTEMS12-2
12-10. COMMUNICATION SYSTEMS12-4
12-11. VHF OMNI-DIRECTIONAL RANGE (VOR)12-4
12-12. DISTANCE MEASURING EQUIPMENT (DME)12-4