AC 65-15A

Historical

Advisory circular · Airframe & Powerplant Mechanics Airframe Handbook

Approved
January 1, 1976
Last reviewed
March 24, 2025
This change
Canceled by Memo signed by Robert Ruiz and Derek Honda; dated 3/21/2025.
Family
AC 65-15 · 1 version
Revision
A
14 CFR parts
1, 145

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 22, 2025.

Show pages 597–608
Page 609OCROpen in PDF

ment to prevent heating of the oxygen system.

8. Maintain at least 2 inches clearance between oxygen lines and all oil, fuel, hydraulic, or other fluid lines to prevent contamination.

* U.S. G.P.O.: 1996-873-S/20104 601

9. Do not use lubricants unless specifically approved for oxygen system use.

10. A pressure and leak check must be performed each time the system is opened for maintenance.