AC 90-113C

Advisory circular · Instrument Flight Procedure Validation (IFPV) of Performance Based Navigation (PBN) Instrument Flight Procedures (IFP)

Approved
July 6, 2023
Last reviewed
September 29, 2023
Cancels
AC90-113B
Family
AC 90-113 · 4 versions
Revision
C
14 CFR parts
97

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 22, 2025.

Show pages 13–24

APPENDIX B. EXAMPLE OF A BRIEFING FOR NON-IFPV AUTHORIZED PILOTS B.1 Introduction.

B.1.1 Operator’s PIC is responsible for all aspects of the flight.

B.1.2 IFPV personnel will not ask or require them to do anything outside the regulations or their operations specifications.

B.1.3 Comply with operator policies and procedures.

B.2 Mission.

B.2.1 IFP locations. Cover all scheduled validation locations and intentions.

B.2.2 Discuss procedure legs, altitudes, and airspeeds to be flown (i.e., initial, intermediate, final, missed approach, and holding).

B.2.3 Discuss, if the OEAs are to be flown, how they will be flown, who will define the track to be flown, etc.

B.2.4 If an AOA is to be flown, discuss how it will be flown.

B.2.5 Discuss a proposed route for efficiency, air traffic control, weather, fuel locations, and other operational needs.

B.3 Operating Rules.

B.3.1 Title 14 CFR part 91.

B.3.2 Flight plan type. Visual flight rules (VFR) and/or IFR operations are authorized during IFPV activities. However, the weather at the location of the IFPV activity must meet the requirements of this AC. Visual meteorological conditions are mandatory during obstacle evaluation, night evaluation, VFR area evaluation, visual segment evaluation, and departure procedure (DP) evaluations.

B.3.3 Weather – VFR / IFR, departure, en route, destination, alternate.

B.3.4 NOTAMs – departure, en route, destination, alternate.

B.3.5 Temporary Flight Restrictions.

B.3.6 Emergencies. During an emergency, the FV will terminate immediately.

B.4 Company/Operator Requirements.

B.4.1 PIC will follow all company/operator requirements.

B-1

B.4.2 There will be no pressure to operate outside the company/operator’s rules.

B.4.3 PIC follows company/operators flight following rules.

B.5 IFPV Requirements.

B.5.1 Will comply with FAA IFPV requirements.

B.5.2 Brief the crew to ensure understanding and comfort with the mission requirements.

B.6 Post Mission.

Obtain/verify contact information for the Chief Pilot, Director of Operations, and Principal Operations Inspector (POI).

B-2

Advisory Circular Feedback If you find an error in this AC, have recommendations for improving it, or have suggestions for new items/subjects to be added, you may let us know by emailing this form to [9-AWA-AFS400- COORD@faa.gov].

Subject: Date:

Please check all appropriate line items:

☐ An error (procedural or typographical) has been noted in paragraph on page.

☐ Recommend paragraph on page be changed as follows:

☐ In a future change to this AC, please cover the following subject:

(Briefly describe what you want added.)

☐ Other comments:

☐ I would like to discuss the above. Please contact me.

Submitted by: Date: